CN108425436A - A kind of built-up thermal insulation board and preparation method thereof and installation method - Google Patents

A kind of built-up thermal insulation board and preparation method thereof and installation method Download PDF

Info

Publication number
CN108425436A
CN108425436A CN201810459741.4A CN201810459741A CN108425436A CN 108425436 A CN108425436 A CN 108425436A CN 201810459741 A CN201810459741 A CN 201810459741A CN 108425436 A CN108425436 A CN 108425436A
Authority
CN
China
Prior art keywords
thermal insulation
screed
connector
insulation board
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810459741.4A
Other languages
Chinese (zh)
Inventor
宋宝玉
胡彩云
宋嘉成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoding Micro Exhibition Polytron Technologies Inc
Original Assignee
Baoding Micro Exhibition Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoding Micro Exhibition Polytron Technologies Inc filed Critical Baoding Micro Exhibition Polytron Technologies Inc
Priority to CN201810459741.4A priority Critical patent/CN108425436A/en
Publication of CN108425436A publication Critical patent/CN108425436A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/78Heat insulating elements
    • E04B1/80Heat insulating elements slab-shaped
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/762Exterior insulation of exterior walls
    • E04B1/7629Details of the mechanical connection of the insulation to the wall

Abstract

The invention discloses a kind of built-up thermal insulation board and preparation method thereof and installation methods, built-up thermal insulation board includes fireproof heat insulating techonosphere, first thermal insulation structure layer, second thermal insulation structure layer and third thermal insulation structure layer, and first connector and the second connector, first connector includes the first connector ontology and the first lead screw, first connector ontology runs through fireproof heat insulating techonosphere, first thermal insulation structure layer, second thermal insulation structure layer and third thermal insulation structure layer, first lead screw one end is connect with the first connector ontology, the other end stretches out outside built-up thermal insulation board, second connector runs through fireproof heat insulating techonosphere, first thermal insulation structure layer, second thermal insulation structure layer and third thermal insulation structure layer only run through the second thermal insulation structure layer and third thermal insulation structure layer, the right end of second connector is equipped with several screws.The configuration of the present invention is simple, easy to connect, stability is preferable, and easy for installation, and cost is relatively low.

Description

A kind of built-up thermal insulation board and preparation method thereof and installation method
Technical field
The invention belongs to heat-preserving wall technical fields more particularly to a kind of built-up thermal insulation board and preparation method thereof and installation Method.
Background technology
In traditional architecture, air-tightness bad by heat preservation and insulations such as wall, door and windows be bad and the shadows such as cold-heat bridge effect It rings, room temperature is influenced very greatly by temperature, and especially in two season of summer in winter, people have to adjust room temperature by external force.Thus, not only Increase energy consumption, it is also possible to health can be influenced.Conventional vacuum plate physical stability is poor, is easy damaged, cracking, is easy to take off It falls and keeps the temperature and flameproof effect is all bad.
Invention content
It is an object of the invention in view of the above shortcomings of the prior art, provide a kind of built-up thermal insulation board and its making side Method and installation method.
To solve the above problems, the technical solution used in the present invention is:
In a first aspect, a kind of built-up thermal insulation board is provided, including sequentially connected fireproof heat insulating techonosphere, first protect from left to right Warm techonosphere, the second thermal insulation structure layer and third thermal insulation structure layer, and the connection fireproof heat insulating techonosphere, the first heat preservation structure Make the first connector and the second connector of layer, the second thermal insulation structure layer and third thermal insulation structure layer, the first connector packet The first connector ontology and the first lead screw are included, the first connector ontology is protected through the fireproof heat insulating techonosphere, first Warm techonosphere, the second thermal insulation structure layer and third thermal insulation structure layer, first lead screw one end connect with the first connector ontology It connects, the first lead screw other end stretches out outside built-up thermal insulation board, and second connector is constructed through the fireproof heat insulating Layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer only run through the second thermal insulation structure layer and third The right end of thermal insulation structure layer, second connector is equipped with protrusion and several screws.If the second connector right end protrusion and Dry screw makes the second connector be connected firmly with concrete, prevents from falling off, and in the present invention, second connector is to pass through Anti-corrosion, fire prevention treated round log, the installation ferrule of round log both ends prevent round log from cracking.Protrusion forms mortise and tenon knot with concrete Structure.Uniformly 2~4 screws of installation make round log holder be connected firmly with concrete to raised surrounding, prevent round log from falling off.
Preferably, the fireproof heat insulating techonosphere includes the first screed, the first metal mesh sheet, the second screed and fire prevention Heat preservation core layer, the first thermal insulation structure layer include third screed, the second metal mesh sheet, the 4th screed and the first heat preservation core Layer, the second thermal insulation structure layer include the 5th screed, third metal mesh sheet, the 6th screed and the second heat preservation core layer, institute It includes the 7th screed, the 4th metal mesh sheet, the 8th screed, third heat preservation core layer, the 9th mortar to state third thermal insulation structure layer Layer, fifth metal mesh sheet and the tenth screed.The right side of the third heat preservation core layer is equipped with several metal bowls, when casting concrete Concreting makes concrete form tenon structure with built-up thermal insulation board to metal bowl after solidification, enable built-up thermal insulation board with Concrete structure connection is more secured.
Preferably, it is equipped with hanging ring in the 4th screed and the 8th screed, in order to keep hanging ring connection more secured, Small metal mesh sheet is equipped on the right side of the hanging ring.
Preferably, between the fireproof heat insulating sandwich layer and the first heat preservation core layer, first heat preservation core layer and the second heat preservation Hollow belt burr fiber-glass pole, the hollow belt are equipped between sandwich layer and between second heat preservation core layer and third heat preservation core layer The side wall of burr fiber-glass pole is equipped with through-hole, has filling thermal insulation material inside the hollow belt burr fiber-glass pole.In the present invention The filling thermal insulation material uses foamed glue, easy to operation.
Preferably, the fireproof heat insulating sandwich layer is fireproof heated board, first heat preservation core layer, the second heat preservation core layer and the Three heat preservation core layers are made of several thermal insulation boards, and fireproof heat insulating item is filled between adjacent thermal insulation board.This fireproof heat insulating item plays Fire-blocking belt acts on, and prevents flame from being spread in same layer heat preservation core layer.
Preferably, the first connector ontology is hollow coniform, has several phases on the first connector ontology The through-hole of mutual stagger setting, the larger diameter end of the first connector ontology towards left side, the first connector ontology it is small Diameter end is equipped with nut, first lead screw one end and first towards right side, the smaller diameter end of the first connector ontology The nut thread connection of connector ontology smaller diameter end setting, further includes several steel bars, and several steel bars pass through the first connection It is respectively placed in after through-hole on part ontology in second screed, third screed, the 5th screed and the 7th screed. Several steel bars are parallel or arranged in a crossed manner, and the connection of steel bar and the first connector greatly strengthens the first connector and fireproof heat insulating structure Make the bonding strength of layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer.
Preferably, the larger diameter end of the first connector ontology, which is equipped with, returns edge, and the edge of returning is set to first sand In pulp layer.It can be blocked with the first metal mesh sheet, prevent from falling off.
Preferably, further include the second lead screw, second lead screw one end is set with the first connector ontology smaller diameter end The nut thread connection set, the other end are connect with outer wall bracket.
Preferably, the first connector ontology is plate, there is several through-holes on the first connector ontology, described the The left end of a connection piece ontology, which is equipped with, returns edge, and the edge of returning is set in first screed.It can be with the first metal mesh sheet It blocks, prevents from falling off.The right end of the first connector ontology is equipped with nut, first lead screw one end and the first connector The nut thread connection of ontology right end setting, further includes several steel bars, several steel bars pass through on the first connector ontology It is respectively placed in after through-hole in second screed, third screed, the 5th screed and the 7th screed.Several steel bars are flat The connection of row setting, steel bar and the first connector greatly strengthens the first connector and fireproof heat insulating techonosphere, the first heat preservation structure Make the bonding strength of layer, the second thermal insulation structure layer and third thermal insulation structure layer.
Preferably, it is additionally provided with isolation grid cloth on the left of first screed, makes secondary plastering and finishing after installation is complete It is connect with built-up thermal insulation board more secured.
Second aspect provides a kind of production method of built-up thermal insulation board, includes the following steps:
S1 places bed die;
Grid cloth is isolated on bed die upper berth in S2, and such way makes secondary plastering and finishing after installation is complete be connect more with thermal insulation board Securely;
S3 puts the first connector and the second connector;
S4, spreads the first screed, and mortar requires uniformly to be laid with;
S5 spreads the first metal mesh sheet, fixes the position of preformed hole, the first metal mesh sheet cut is taped against the first screed On;
S6 penetrates first layer steel bar by the through-hole of the first connector, pay attention to wanting when wearing steel bar indwelling go out centre position with For connecting the second lead screw of outer wall bracket;
S7, install fireproof heat insulating sandwich layer, the uniform brushing interfacial agents in fireproof heated board two sides, it is cool set a hour after wait for that interfacial agents are dried in the air The second screed is uniformly smeared in fireproof heated board side after dry, will be applied and be wiped the fireproof heated board of the second screed and be installed to the On one metal mesh sheet;(At this time it should be noted that fireproof heated board is in the advance indwelling in the position of the first connector and the second connector Hole)
S8 is put into hollow belt burr fiber-glass pole, and hollow belt burr fiber-glass pole one end is made to be inserted at fireproof heated board 2/3;
S9 penetrates second layer steel bar by the through-hole of the first connector, pay attention to wanting when wearing steel bar indwelling go out centre position with For connecting the second lead screw of outer wall bracket;
S10, spreads third screed, and mortar requires uniformly to be laid with;
S11 spreads the second metal mesh sheet, fixes the position of preformed hole, the second metal mesh sheet cut is taped against third mortar On layer;
S12 installs hanging ring, and the hanging ring is U-shaped, and U-shaped end is extend out to outside built-up thermal insulation board, facilitates lifting;
S13 spreads small metal mesh sheet in installation hanging ring position;
S14, install the first heat preservation core layer, several uniform brushing interfacial agents in thermal insulation board two sides, it is cool set a hour after wait for interfacial agents The 4th screed is uniformly smeared in thermal insulation board side after drying, several thermal insulation boards for wiping the 4th screed will be applied and be installed to second On metal mesh sheet, the hollow belt burr fiber-glass pole other end is made to be inserted at thermal insulation board 2/3, fire prevention is filled between adjacent thermal insulation board Heat preservation strip, to hollow belt burr fiber-glass pole inside filling filling thermal insulation material;(At this time it should be noted that thermal insulation board is in the first connection The advance indwelling hole in the position of part and the second connector)
S15 is put into hollow belt burr fiber-glass pole, and hollow belt burr fiber-glass pole one end is made to be inserted into the thermal insulation board of the first heat preservation core layer At 2/3;
S16 penetrates third layer steel bar by the through-hole of the first connector, pay attention to wanting when wearing steel bar indwelling go out centre position with For connecting the second lead screw of outer wall bracket;
S17, spreads the 5th screed, and mortar requires uniformly to be laid with;
S18 spreads third metal mesh sheet, fixes the position of preformed hole, the third metal mesh sheet cut is taped against the 5th mortar On layer;
S19, install the second heat preservation core layer, several uniform brushing interfacial agents in thermal insulation board two sides, it is cool set a hour after wait for interfacial agents The 6th screed is uniformly smeared in thermal insulation board side after drying, several thermal insulation boards for wiping the 6th screed will be applied and be installed to third On metal mesh sheet, the hollow belt burr fiber-glass pole other end is made to be inserted at thermal insulation board 2/3, fire prevention is filled between adjacent thermal insulation board Heat preservation strip, to hollow belt burr fiber-glass pole inside filling filling thermal insulation material;(At this time it should be noted that thermal insulation board is in the first connection There are holes in advance for the position of part and the second connector)
S20 is put into hollow belt burr fiber-glass pole, and hollow belt burr fiber-glass pole one end is made to be inserted into the thermal insulation board of the second heat preservation core layer At 2/3;
S21 penetrates the 4th layer of steel bar by the through-hole of the first connector, pay attention to wanting when wearing steel bar indwelling go out centre position with For connecting the second lead screw of outer wall bracket;
S22, spreads the 7th screed, and mortar requires uniformly to be laid with;
S23 spreads the 4th metal mesh sheet, fixes the position of preformed hole, the 4th metal mesh sheet cut is taped against the 7th mortar On layer;
S24 installs hanging ring, and the hanging ring is U-shaped, and U-shaped end is extend out to outside built-up thermal insulation board, facilitates lifting;
S25 spreads small metal mesh sheet in installation hanging ring position;
S26, install third heat preservation core layer, several uniform brushing interfacial agents in thermal insulation board two sides, it is cool set a hour after wait for interfacial agents The 8th screed other side uniformly being smeared in thermal insulation board side after drying and metal bowl being installed, painting is wiped into the several of the 8th screed Thermal insulation board is installed on the 4th metal mesh sheet, so that the hollow belt burr fiber-glass pole other end is inserted at thermal insulation board 2/3, in adjacent guarantor Between warm plate fill fireproof heat insulating item, to hollow belt burr fiber-glass pole inside filling filling thermal insulation material;(At this time it should be noted that There are holes in advance in the position of the first connector and the second connector for thermal insulation board)
S27, spreads the 9th screed, and mortar requires uniformly to be laid with;
S28 spreads fifth metal mesh sheet, fixes the position of preformed hole, the fifth metal mesh sheet cut is taped against the 9th mortar On layer;
S29, spreads the tenth screed, and mortar requires uniformly to be laid with;
S30, natural curing 2~5 days.
The third aspect provides a kind of installation method of built-up thermal insulation board, includes the following steps:
S1, lifting are in place;
S2, supporting are connect by the first lead screw of the first connector with inner template using built-up thermal insulation board as exterior sheathing, will Second lead screw is connect with outer wall bracket;
S3 after supporting is good, cuts hanging ring, installs upper layer built-up thermal insulation board;
S4 is put into reinforcing bar, and steel bar positioning frame is inserted in above the structural wall reinforcing bar that will be poured, to prevent in pouring structure wall Make bar bending in structural wall, displacement, then carry out pouring for concrete, after the completion of pouring, by exterior wall support removing, to the Filling filling thermal insulation material in the hollow structure of a connection piece ontology.In the present invention, specific to use to the first connector ontology Hollow structure in beat the mode of foamed glue, foamed glue is viscous by through-hole on the first connector ontology 2 and built-up thermal insulation board Knot forms heat preservation separation layer, prevents cold-heat bridge from generating;
S5, built-up thermal insulation board outside spread glass fiber reticular cloth, do plastering processing.
It is using advantageous effect caused by above-mentioned technical proposal:Simple in structure, easy to connect, stability is preferable, and And it is easy for installation, cost is relatively low.
Description of the drawings
Fig. 1 is the sectional view of built-up thermal insulation board embodiment 1 of the present invention;
Fig. 2 is the enlarged diagram in the portions A in Fig. 1;
Fig. 3 is the structural schematic diagram of the first connector of built-up thermal insulation board embodiment 1 of the present invention;
Fig. 4 is that built-up thermal insulation board embodiment 1 of the present invention installs the sectional view after rain pipe;
Fig. 5 is the sectional view of built-up thermal insulation board embodiment 2 of the present invention;
Fig. 6 is the portions B enlarged diagram in Fig. 5;
Fig. 7 is the sectional view of built-up thermal insulation board embodiment 3 of the present invention;
Fig. 8 is the portions C enlarged diagram in Fig. 7;
Fig. 9 is the structural schematic diagram of the first connector of built-up thermal insulation board embodiment 3 of the present invention.
In figure:1, the second connector;2, the first connector ontology;3, the first lead screw;4, outer wall bracket;5, the second screw Bar;6, edge is returned;7, rain pipe;8, steel bar;9, screw;10, raised;11, the first screed;12, the first metal mesh sheet;13、 Second screed;14, fireproof heat insulating sandwich layer;15, third screed;16, the second metal mesh sheet;17, the 4th screed;18, One heat preservation core layer;19, the 5th screed;20, third metal mesh sheet;21, the 6th screed;22, the second heat preservation core layer;23, Seven screeds;24, the 4th metal mesh sheet;25, the 8th screed;26, third heat preservation core layer;27, the 9th screed;28, the 5th Metal mesh sheet;29, the tenth screed;30, fireproof heat insulating item;31, nut;32, hollow belt burr fiber-glass pole;33, hanging ring;34、 Small metal mesh sheet.
Specific implementation mode
Embodiments of the present invention are described in further detail with reference to the accompanying drawings and examples.Following embodiment is used for Illustrate the present invention, but cannot be used for limiting the scope of the invention.
Embodiment 1:As shown in Figs 1-4, a kind of built-up thermal insulation board, including sequentially connected fireproof heat insulating structure from left to right Make layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer, and the connection fireproof heat insulating construction The first connector and the second connector 1 of layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer, institute It includes the first connector ontology 2 and the first lead screw 3 to state the first connector, and the first connector ontology 2 runs through the fire prevention Thermal insulation structure layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer, described first lead screw, 3 one end It is connect with the first connector ontology 2,3 other end of the first lead screw stretches out outside built-up thermal insulation board, second connector 1 Run through through the fireproof heat insulating techonosphere, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer or only The right end of second thermal insulation structure layer and third thermal insulation structure layer, second connector 1 is equipped with raised 10 and 2~4 screws 9.So that the second connector 1 is connected firmly with concrete, prevent from falling off, in the present invention, second connector 1 is by anti- Rotten, fire prevention treated round log, the installation ferrule of round log both ends prevents round log from cracking, and is easily installed rain pipe 7 and window Deng.Protrusion 10 forms tenon structure with concrete, and 2~4 screws that raised 10 surroundings are uniformly installed make round log and concrete It is connected firmly, prevents round log from falling off.
The fireproof heat insulating techonosphere includes the first screed 11, the first metal mesh sheet 12, the second screed 13 and fire prevention Heat preservation core layer 14, the first thermal insulation structure layer include third screed 15, the second metal mesh sheet 16, the 4th screed 17 and One heat preservation core layer 18, the second thermal insulation structure layer include the 5th screed 19, third metal mesh sheet 20,21 and of the 6th screed Second heat preservation core layer 22, the third thermal insulation structure layer include the 7th screed 23, the 4th metal mesh sheet 24, the 8th screed 25, third heat preservation core layer 26, the 9th screed 27, fifth metal mesh sheet 28 and the tenth screed 29.The third heat preservation core layer 26 right side is equipped with several metal bowls, and the big mouth in metal bowl bottom is small, is conducive to concrete and assembled passive type house insulation The combination of plate, prevents thermal insulation board from falling off, when casting concrete concreting make concrete and assembled after solidification to metal bowl Thermal insulation board forms tenon structure, enables built-up thermal insulation board be connect with concrete structure more secured.
The first connector ontology 2 is hollow coniform, has several mutually stagger on the first connector ontology 2 The through-hole of setting, the larger diameter end of the first connector ontology 2 is towards left side, the minor diameter of the first connector ontology 2 Towards right side, the smaller diameter end of the first connector ontology 2 is welded with nut 31 at end, described first lead screw, 3 one end and the The nut 31 of 2 smaller diameter end of a connection piece ontology setting is threadedly coupled, and further includes several steel bars 8, and several steel bars 8 pass through the Second screed 13, third screed 15, the 5th screed 19 and are respectively placed in after through-hole on a connection piece ontology 2 In seven screeds 23, and several steel bars 8 are arranged in parallel, and the connection of steel bar 8 and the first connector greatly strengthens the first connector With fireproof heat insulating techonosphere, the bonding strength of the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer.It is described The larger diameter end of first connector ontology 2 is equipped with and returns along 6, and described return is set to along 6 in first screed 11, can be with the One metal mesh sheet 12 blocks, and prevents from falling off.Further include the second lead screw 5, described second lead screw, 5 one end and the first connector sheet The nut 31 of 2 smaller diameter end of body setting is threadedly coupled, and the other end is connect with outer wall bracket 4.
Further, it is equipped with hanging ring 33 in the 4th screed 17 and the 8th screed 25, in order to make hanging ring 33 connect More securely, it is equipped with small metal mesh sheet 34 on 33 right side of the hanging ring.
Further, between 14 and first heat preservation core layer 18 of the fireproof heat insulating sandwich layer, 18 and of the first heat preservation core layer Hollow belt burr Buddhist nun is equipped between second heat preservation core layer 22 and between second heat preservation core layer 22 and third heat preservation core layer 26 The side wall of imperial bar 32, the hollow belt burr fiber-glass pole 32 is equipped with through-hole, is filled out inside the hollow belt burr fiber-glass pole 32 Thermal insulation material is filled, the filling thermal insulation material uses foamed glue in the present embodiment, easy to operation.
Further, the fireproof heat insulating sandwich layer 14 is fireproof heated board, and first heat preservation core layer 18, second keeps the temperature core Layer 22 and third heat preservation core layer 26 are made of several thermal insulation boards, and fireproof heat insulating item 30 is filled between adjacent thermal insulation board.This is anti- Fiery heat preservation strip 30 plays the role of fire-blocking belt, prevents flame from being spread in same layer heat preservation core layer.
The left side of first screed 11 is additionally provided with isolation grid cloth, makes secondary plastering and finishing and assembly after installation is complete The connection of formula thermal insulation board is more secured.
The production method of the built-up thermal insulation board, includes the following steps:
S1 places bed die;
Grid cloth is isolated on bed die upper berth in S2, and such way makes secondary plastering and finishing after installation is complete be connect more with thermal insulation board Securely;
S3 puts the first connector and the second connector 1;
S4, spreads the first screed 11, and mortar requires uniformly to be laid with;
S5 spreads the first metal mesh sheet 12, fixes the position of preformed hole, the first metal mesh sheet 12 cut is taped against the first sand In pulp layer 11;
S6 penetrates first layer steel bar 8 by the through-hole of the first connector, pays attention to that indwelling is wanted to go out centre position when wearing steel bar 8 The second lead screw 5 for connecting outer wall bracket 4 is used;
S7, installation fireproof heat insulating sandwich layer 14, the uniform brushing interfacial agents in fireproof heated board two sides, it is cool set a hour after wait for interfacial agents The second screed 13 is uniformly smeared in fireproof heated board side after drying, the fireproof heated board for wiping the second screed 13 will be applied and pacified It is attached on the first metal mesh sheet 12;(At this time it should be noted that fireproof heated board is in the position of the first connector and the second connector 1 There are holes in advance)
S8 is put into hollow belt burr fiber-glass pole 32, and 32 one end of hollow belt burr fiber-glass pole is made to be inserted at fireproof heated board 2/3;
S9 penetrates second layer steel bar 8 by the through-hole of the first connector, pays attention to that indwelling is wanted to go out centre position when wearing steel bar 8 The second lead screw 5 for connecting outer wall bracket 4 is used;
S10, paving third screed 15, mortar require uniformly to be laid with;
S11 spreads the second metal mesh sheet 16, fixes the position of preformed hole, the second metal mesh sheet 16 cut is taped against third On screed 15;
S12 installs hanging ring 33, and the hanging ring 33 is U-shaped, and U-shaped end is extend out to outside built-up thermal insulation board, facilitates lifting;
S13 spreads small metal mesh sheet 34 in 33 position of installation hanging ring;
S14, install the first heat preservation core layer 18, several uniform brushing interfacial agents in thermal insulation board two sides, it is cool set a hour after wait for interface Agent dry after thermal insulation board side uniformly smear the 4th screed 17, will apply wipe the 4th screed 17 several thermal insulation boards installation Onto the second metal mesh sheet 16,32 other end of hollow belt burr fiber-glass pole is made to be inserted at thermal insulation board 2/3, adjacent thermal insulation board it Between filling fireproof heat insulating item 30, to hollow belt burr fiber-glass pole 32 inside filling filling thermal insulation material;(At this time it should be noted that protecting There are holes in advance in the position of the first connector and the second connector 1 for warm plate)
S15 is put into hollow belt burr fiber-glass pole 32, and 32 one end of hollow belt burr fiber-glass pole is made to be inserted into the first heat preservation core layer 18 At thermal insulation board 2/3;
S16 penetrates third layer steel bar 8 by the through-hole of the first connector, pays attention to that indwelling is wanted to go out centre position when wearing steel bar 8 The second lead screw 5 for connecting outer wall bracket 4 is used;
S17, spreads the 5th screed 19, and mortar requires uniformly to be laid with;
S18, paving third metal mesh sheet 20, fixes the position of preformed hole, the third metal mesh sheet 20 cut is taped against the 5th On screed 19;
S19, install the second heat preservation core layer 22, several uniform brushing interfacial agents in thermal insulation board two sides, it is cool set a hour after wait for interface Agent dry after thermal insulation board side uniformly smear the 6th screed 21, will apply wipe the 6th screed 21 several thermal insulation boards installation Onto third metal mesh sheet 20,32 other end of hollow belt burr fiber-glass pole is made to be inserted at thermal insulation board 2/3, adjacent thermal insulation board it Between filling fireproof heat insulating item 30, to hollow belt burr fiber-glass pole 32 inside filling filling thermal insulation material;(At this time it should be noted that protecting There are holes in advance in the position of the first connector and the second connector 1 for warm plate)
S20 is put into hollow belt burr fiber-glass pole 32, and 32 one end of hollow belt burr fiber-glass pole is made to be inserted into the second heat preservation core layer 22 At thermal insulation board 2/3;
S21 penetrates the 4th layer of steel bar 8 by the through-hole of the first connector, pays attention to that indwelling is wanted to go out centre position when wearing steel bar 8 The second lead screw 5 for connecting outer wall bracket 4 is used;
S22, spreads the 7th screed 23, and mortar requires uniformly to be laid with;
S23 spreads the 4th metal mesh sheet 24, fixes the position of preformed hole, the 4th metal mesh sheet 24 cut is taped against the 7th On screed 23;
S24 installs hanging ring 33, and the hanging ring 33 is U-shaped, and U-shaped end is extend out to outside built-up thermal insulation board, facilitates lifting;
S25 spreads small metal mesh sheet 34 in 33 position of installation hanging ring;
S26, installation third heat preservation core layer 26, several uniform brushing interfacial agents in thermal insulation board two sides, it is cool set a hour after wait for interface Agent uniformly smears 25 other side of the 8th screed in thermal insulation board side after drying and installs metal bowl, and painting is wiped the 8th screed 25 Several thermal insulation boards be installed on the 4th metal mesh sheet 24, so that 32 other end of hollow belt burr fiber-glass pole is inserted into thermal insulation board 2/3 Fireproof heat insulating item 30 is filled at place between adjacent thermal insulation board, to hollow belt burr fiber-glass pole 32 inside filling filling thermal insulation material; It should be noted that thermal insulation board is in the position of the first connector and the second connector 1, there are holes in advance at this time
S27, spreads the 9th screed 27, and mortar requires uniformly to be laid with;
S28, paving fifth metal mesh sheet 28, fixes the position of preformed hole, the fifth metal mesh sheet 28 cut is taped against the 9th On screed 27;
S29, spreads the tenth screed 29, and mortar requires uniformly to be laid with;
S30, natural curing 2~5 days.
The installation method of the built-up thermal insulation board, includes the following steps:
S1, lifting are in place;
S2, supporting are connect by the first lead screw 3 of the first connector with inner template using built-up thermal insulation board as exterior sheathing, Second lead screw 5 is connect with outer wall bracket 4;
S3 after supporting is good, cuts hanging ring 33, installs upper layer built-up thermal insulation board;
S4 is put into reinforcing bar, and steel bar positioning frame is inserted in above the structural wall reinforcing bar that will be poured, to prevent in pouring structure wall Make bar bending in structural wall, displacement, then carries out pouring for concrete, after the completion of pouring, outer wall bracket 4 is removed, to Filling filling thermal insulation material in the hollow structure of first connector ontology 2.In the present embodiment, specific to use to the first connector The mode of foamed glue is beaten in the hollow structure of ontology 2, foamed glue passes through the through-hole and assembled heat insulation on the first connector ontology 2 Plate bonds, and forms heat preservation separation layer, prevents cold-heat bridge from generating;
S5, built-up thermal insulation board outside spread glass fiber reticular cloth, do plastering processing.
Embodiment 2:As shown in Figure 5 and Figure 6, with embodiment 1 difference lies in:Several steel bars 8 pass through first to connect Second screed 13, third screed 15, the 5th screed 19 and the 7th sand are respectively placed in after through-hole on fitting ontology 2 In pulp layer 23, and several steel bars 8 are arranged in a crossed manner, and the connection of steel bar 8 and the first connector greatly strengthens the first connector and prevents The bonding strength of fiery thermal insulation structure layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer.
Embodiment 3:As Figure 7-9, with embodiment 1 difference lies in:The first connector ontology 2 is plate, There are several through-holes on the first connector ontology 2, the left end of the first connector ontology 2, which is equipped with, to be returned along 6, described to return along 6 It is set in first screed 11.It can be blocked with the first metal mesh sheet 12, prevent from falling off.The first connector ontology 2 right end is welded with nut 31,31 screw thread of nut of described first lead screw, 3 one end and the setting of 2 right end of the first connector ontology Connection, further includes several steel bars 8, and several steel bars 8 are respectively placed in described the after passing through the through-hole on the first connector ontology 2 In two screeds 13, third screed 15, the 5th screed 19 and the 7th screed 23.Several steel bars 8 are arranged in parallel, steel bar 8 Connection with the first connector greatly strengthens the first connector and is protected with fireproof heat insulating techonosphere, the first thermal insulation structure layer, second The bonding strength of warm techonosphere and third thermal insulation structure layer.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, it will be understood by those of ordinary skill in the art that:It still may be used To modify to the technical solution recorded in previous embodiment or equivalent replacement of some of the technical features;And These modifications or replacements, the spirit and model of technical solution of the embodiment of the present invention that it does not separate the essence of the corresponding technical solution It encloses.

Claims (10)

1. a kind of built-up thermal insulation board, which is characterized in that protected including sequentially connected fireproof heat insulating techonosphere from left to right, first Warm techonosphere, the second thermal insulation structure layer and third thermal insulation structure layer, and the connection fireproof heat insulating techonosphere, the first heat preservation structure Make the first connector and the second connector of layer, the second thermal insulation structure layer and third thermal insulation structure layer(1), first connector Including the first connector ontology(2)With the first lead screw(3), the first connector ontology(2)Through the fireproof heat insulating structure Make layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer, first lead screw(3)One end and the A connection piece ontology(2)Connection, the other end stretch out outside built-up thermal insulation board, second connector(1)It is protected through the fire prevention Warm techonosphere, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer only run through the second thermal insulation structure layer With third thermal insulation structure layer, second connector(1)Right end be equipped with several screws(9).
2. a kind of built-up thermal insulation board according to claim 1, which is characterized in that the fireproof heat insulating techonosphere includes the One screed(11), the first metal mesh sheet(12), the second screed(13)With fireproof heat insulating sandwich layer(14), the first heat preservation structure It includes third screed to make layer(15), the second metal mesh sheet(16), the 4th screed(17)With the first heat preservation core layer(18), described Second thermal insulation structure layer includes the 5th screed(19), third metal mesh sheet(20), the 6th screed(21)With the second heat preservation core Layer(22), the third thermal insulation structure layer includes the 7th screed(23), the 4th metal mesh sheet(24), the 8th screed(25)、 Third heat preservation core layer(26), the 9th screed(27), fifth metal mesh sheet(28)With the tenth screed(29).
3. a kind of built-up thermal insulation board according to claim 2, which is characterized in that the 4th screed(17)With the 8th Screed(25)In be equipped with hanging ring(33), the hanging ring(33)Right side is equipped with small metal mesh sheet(34).
4. a kind of built-up thermal insulation board according to claim 2, which is characterized in that the fireproof heat insulating sandwich layer(14)With One heat preservation core layer(18)Between, first heat preservation core layer(18)With the second heat preservation core layer(22)Between and it is described second heat preservation Sandwich layer(22)With third heat preservation core layer(26)Between be equipped with hollow belt burr fiber-glass pole(32), the hollow belt burr fiber-glass pole (32)Side wall be equipped with through-hole, the hollow belt burr fiber-glass pole(32)There is filling thermal insulation material in inside.
5. a kind of built-up thermal insulation board according to claim 2, which is characterized in that the fireproof heat insulating sandwich layer(14)It is anti- Fiery thermal insulation board, first heat preservation core layer(18), the second heat preservation core layer(22)With third heat preservation core layer(26)By several heat preservations Plate is constituted, and fireproof heat insulating item is filled between adjacent thermal insulation board(30).
6. a kind of built-up thermal insulation board according to claim 2, which is characterized in that the first connector ontology(2)For Hollow is coniform, the first connector ontology(2)On have several through-holes for mutually staggering setting, the first connector sheet Body(2)Larger diameter end towards left side, the first connector ontology(2)Smaller diameter end towards right side,
The first connector ontology(2)Smaller diameter end be equipped with nut(31), first lead screw(3)One end connects with first Fitting ontology(2)The nut of smaller diameter end setting(31)It is threadedly coupled, further includes several steel bars(8), several steel bars(8)It wears Cross the first connector ontology(2)On through-hole after be respectively placed in second screed(13), third screed(15), the 5th sand Pulp layer(19)With the 7th screed(23)It is interior.
7. a kind of built-up thermal insulation board according to claim 6, which is characterized in that further include the second lead screw(5), described Second lead screw(5)One end and the first connector ontology(2)The nut of smaller diameter end setting(31)Be threadedly coupled, the other end with it is outer Wall bracket(4)Connection.
8. a kind of built-up thermal insulation board according to claim 2, which is characterized in that the first connector ontology(2)For Plate, the first connector ontology(2)On have several through-holes, the first connector ontology(2)Right end be equipped with nut (31), first lead screw(3)One end and the first connector ontology(2)The nut of right end setting(31)It is threadedly coupled, also wraps Include several steel bars(8), several steel bars(8)Across the first connector ontology(2)On through-hole after be respectively placed in described second Screed(13), third screed(15), the 5th screed(19)With the 7th screed(23)It is interior.
9. a kind of production method of built-up thermal insulation board, which is characterized in that include the following steps:
S1 places bed die;
Grid cloth is isolated on bed die upper berth in S2;
S3 puts the first connector and the second connector(1);
S4 spreads the first screed(11);
S5 spreads the first metal mesh sheet(12), the position of preformed hole is fixed, the first metal mesh sheet that will be cut(12)It is taped against One screed(11)On;
S6 penetrates first layer steel bar by the through-hole of the first connector(8);
S7 installs fireproof heat insulating sandwich layer(14), the uniform brushing interfacial agents in fireproof heated board two sides are preventing fires after interfacial agents are dried Uniformly smear the second screed in thermal insulation board side(13), painting is wiped into the second screed(13)Fireproof heated board be installed to first Metal mesh sheet(12)On;
S8 is put into hollow belt burr fiber-glass pole(32), make hollow belt burr fiber-glass pole(32)One end is inserted into fireproof heated board 2/3 Place;
S9 penetrates second layer steel bar by the through-hole of the first connector(8);
S10 spreads third screed(15);
S11 spreads the second metal mesh sheet(16), the position of preformed hole is fixed, the second metal mesh sheet that will be cut(16)It is taped against Third screed(15)On;
S12 installs hanging ring(33);
S13, in installation hanging ring(33)Position spreads small metal mesh sheet(34);
S14 installs the first heat preservation core layer(18), several uniform brushing interfacial agents in thermal insulation board two sides are protecting after interfacial agents are dried Uniformly smear the 4th screed in warm plate side(17), painting is wiped into the 4th screed(17)Several thermal insulation boards be installed to the second gold medal Belong to mesh sheet(16)On, make hollow belt burr fiber-glass pole(32)The other end is inserted at thermal insulation board 2/3, is filled out between adjacent thermal insulation board Fill fireproof heat insulating item(30), to hollow belt burr fiber-glass pole(32)Inside filling filling thermal insulation material;
S15 is put into hollow belt burr fiber-glass pole(32), make hollow belt burr fiber-glass pole(32)One end is inserted into the first heat preservation core layer (18)Thermal insulation board 2/3 at;
S16 penetrates third layer steel bar by the through-hole of the first connector(8);
S17 spreads the 5th screed(19);
S18 spreads third metal mesh sheet(20), the position of preformed hole is fixed, the third metal mesh sheet that will be cut(20)It is taped against 5th screed(19)On;
S19 installs the second heat preservation core layer(22), several uniform brushing interfacial agents in thermal insulation board two sides are protecting after interfacial agents are dried Uniformly smear the 6th screed in warm plate side(21), painting is wiped into the 6th screed(21)Several thermal insulation boards be installed to third gold Belong to mesh sheet(20)On, make hollow belt burr fiber-glass pole(32)The other end is inserted at thermal insulation board 2/3, is filled out between adjacent thermal insulation board Fill fireproof heat insulating item(30), to hollow belt burr fiber-glass pole(32)Inside filling filling thermal insulation material;
S20 is put into hollow belt burr fiber-glass pole(32), make hollow belt burr fiber-glass pole(32)One end is inserted into the second heat preservation core layer (22)Thermal insulation board 2/3 at;
S21 penetrates the 4th layer of steel bar by the through-hole of the first connector(8);
S22 spreads the 7th screed(23);
S23 spreads the 4th metal mesh sheet(24), the position of preformed hole is fixed, the 4th metal mesh sheet that will be cut(24)It is taped against 7th screed(23)On;
S24 installs hanging ring(33);
S25, in installation hanging ring(33)Position spreads small metal mesh sheet(34);
S26 installs third heat preservation core layer(26), several uniform brushing interfacial agents in thermal insulation board two sides are protecting after interfacial agents are dried Uniformly smear the 8th screed in warm plate side(25)Metal bowl is installed in the other side, and painting is wiped the 8th screed(25)Several guarantors Warm plate is installed to the 4th metal mesh sheet(24)On, make hollow belt burr fiber-glass pole(32)The other end is inserted at thermal insulation board 2/3, Fireproof heat insulating item is filled between adjacent thermal insulation board(30), to hollow belt burr fiber-glass pole(32)Inside filling filling thermal insulation material;
S27 spreads the 9th screed(27);
S28 spreads fifth metal mesh sheet(28), the position of preformed hole is fixed, the fifth metal mesh sheet that will be cut(28)It is taped against 9th screed(27)On;
S29 spreads the tenth screed(29);
S30, natural curing 2~5 days.
10. a kind of installation method of built-up thermal insulation board, which is characterized in that include the following steps:
S1, lifting are in place;
S2, supporting, the first lead screw that built-up thermal insulation board is passed through into the first connector as exterior sheathing(3)Connect with inner template It connects, by the second lead screw(5)With outer wall bracket(4)Connection;
S3 cuts hanging ring after supporting is good(33), upper layer built-up thermal insulation board is installed;
S4 is put into reinforcing bar, and steel bar positioning frame is inserted in above the structural wall reinforcing bar that will be poured, to prevent in pouring structure wall Make bar bending in structural wall, displacement, pouring for concrete is then carried out, after the completion of pouring, by outer wall bracket(4)It removes, To the first connector ontology(2)Hollow structure in filling filling thermal insulation material;
S5, built-up thermal insulation board outside spread glass fiber reticular cloth, do plastering processing.
CN201810459741.4A 2018-05-15 2018-05-15 A kind of built-up thermal insulation board and preparation method thereof and installation method Withdrawn CN108425436A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810459741.4A CN108425436A (en) 2018-05-15 2018-05-15 A kind of built-up thermal insulation board and preparation method thereof and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810459741.4A CN108425436A (en) 2018-05-15 2018-05-15 A kind of built-up thermal insulation board and preparation method thereof and installation method

Publications (1)

Publication Number Publication Date
CN108425436A true CN108425436A (en) 2018-08-21

Family

ID=63163084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810459741.4A Withdrawn CN108425436A (en) 2018-05-15 2018-05-15 A kind of built-up thermal insulation board and preparation method thereof and installation method

Country Status (1)

Country Link
CN (1) CN108425436A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775089A (en) * 2018-08-22 2018-11-09 天津城建大学 Active exterior-wall heat insulation cooling system
CN110593644A (en) * 2019-09-27 2019-12-20 保定微展科技股份有限公司 Assembled enclosure structure and manufacturing method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005282141A (en) * 2004-03-30 2005-10-13 Daiwa House Ind Co Ltd Joint structure of mutual members via heat insulation member
CN203977622U (en) * 2014-07-25 2014-12-03 济南城通保温工程有限公司 The heat insulation integrated wall body building structure of compound external mold plate
CN204609012U (en) * 2015-02-01 2015-09-02 江苏卧牛山保温防水技术有限公司 A kind of assembled architecture outer wall heat-insulation system
CN107587654A (en) * 2017-09-27 2018-01-16 河北旭灿科技有限公司 A kind of assembled heat insulation wall and preparation method thereof
CN208329225U (en) * 2018-05-15 2019-01-04 保定微展科技股份有限公司 A kind of built-up thermal insulation board

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005282141A (en) * 2004-03-30 2005-10-13 Daiwa House Ind Co Ltd Joint structure of mutual members via heat insulation member
CN203977622U (en) * 2014-07-25 2014-12-03 济南城通保温工程有限公司 The heat insulation integrated wall body building structure of compound external mold plate
CN204609012U (en) * 2015-02-01 2015-09-02 江苏卧牛山保温防水技术有限公司 A kind of assembled architecture outer wall heat-insulation system
CN107587654A (en) * 2017-09-27 2018-01-16 河北旭灿科技有限公司 A kind of assembled heat insulation wall and preparation method thereof
CN208329225U (en) * 2018-05-15 2019-01-04 保定微展科技股份有限公司 A kind of built-up thermal insulation board

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775089A (en) * 2018-08-22 2018-11-09 天津城建大学 Active exterior-wall heat insulation cooling system
CN110593644A (en) * 2019-09-27 2019-12-20 保定微展科技股份有限公司 Assembled enclosure structure and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN100464043C (en) Bound-type composite heat-insulation wall with support body
CN204804107U (en) Decorate heat preservation template integral structure and structural wall
CN106869439B (en) A kind of fire-resistant insulating composite board and its construction method
CN108425436A (en) A kind of built-up thermal insulation board and preparation method thereof and installation method
CN105672526A (en) Wall door and window structures
CN202809892U (en) Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure
CN106759994A (en) A kind of warming plate with arrangement of reinforcement and its thermal insulation structure construction method in exterior wall concrete section position
CN205663143U (en) Compound incubation outer wall -in -place mould
CN208329225U (en) A kind of built-up thermal insulation board
CN206971434U (en) A kind of surface layer insulated fire plate difficult for drop-off
CN206667507U (en) A kind of warming plate with arrangement of reinforcement
CN108978989A (en) A kind of Assembled self-insulating fire-proof sound insulation wallboard
CN205776871U (en) A kind of heat-preserving wall
CN105696812A (en) Thermal insulation fireproof removable house
CN204919881U (en) Whole wall of assembly spouting lightweight concrete
CN103374980A (en) Block-insulated wall on concrete overhang plate
CN204781427U (en) Sandwich thermal insulation wall connecting piece
CN105041000B (en) A kind of old wall transformation insulation construction
RU90813U1 (en) ENERGY-SAVING HEAT-INSULATING AND DECORATIVE PANEL
CN208899740U (en) A kind of Assembled self-insulating fire-proof sound insulation wallboard
CN208792535U (en) A kind of fire-type building heat preservation wall
CN206753033U (en) Insulation construction integration exempts to tear exterior sheathing open
CN210256666U (en) Non-dismantling template light assembled plate
CN105926781B (en) Waterproof support element, insulation and decoration integrated plate, external thermal insulation system and construction method
CN201148692Y (en) Integral composite thermal insulation wallboard

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180821

WW01 Invention patent application withdrawn after publication