CN108425436A - A kind of built-up thermal insulation board and preparation method thereof and installation method - Google Patents
A kind of built-up thermal insulation board and preparation method thereof and installation method Download PDFInfo
- Publication number
- CN108425436A CN108425436A CN201810459741.4A CN201810459741A CN108425436A CN 108425436 A CN108425436 A CN 108425436A CN 201810459741 A CN201810459741 A CN 201810459741A CN 108425436 A CN108425436 A CN 108425436A
- Authority
- CN
- China
- Prior art keywords
- thermal insulation
- screed
- connector
- insulation board
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000009413 insulation Methods 0.000 title claims abstract description 186
- 238000009434 installation Methods 0.000 title claims abstract description 27
- 238000000034 method Methods 0.000 title claims abstract description 9
- 238000002360 preparation method Methods 0.000 title abstract description 4
- 239000010410 layer Substances 0.000 claims description 110
- 239000002184 metal Substances 0.000 claims description 82
- 229910052751 metal Inorganic materials 0.000 claims description 82
- 238000004321 preservation Methods 0.000 claims description 67
- 239000012792 core layer Substances 0.000 claims description 55
- 229910000831 Steel Inorganic materials 0.000 claims description 47
- 239000010959 steel Substances 0.000 claims description 47
- 239000011152 fibreglass Substances 0.000 claims description 45
- 239000003795 chemical substances by application Substances 0.000 claims description 24
- 239000012774 insulation material Substances 0.000 claims description 17
- 230000001680 brushing effect Effects 0.000 claims description 12
- 239000004744 fabric Substances 0.000 claims description 8
- 230000002265 prevention Effects 0.000 claims description 8
- 238000010422 painting Methods 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 239000004576 sand Substances 0.000 claims description 4
- 238000005452 bending Methods 0.000 claims description 3
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 239000003365 glass fiber Substances 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 claims 2
- 239000010931 gold Substances 0.000 claims 2
- 229910052737 gold Inorganic materials 0.000 claims 2
- 239000004570 mortar (masonry) Substances 0.000 description 17
- 239000003292 glue Substances 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000001035 drying Methods 0.000 description 5
- 238000005336 cracking Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 238000002955 isolation Methods 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 238000007711 solidification Methods 0.000 description 2
- 230000008023 solidification Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/78—Heat insulating elements
- E04B1/80—Heat insulating elements slab-shaped
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/762—Exterior insulation of exterior walls
- E04B1/7629—Details of the mechanical connection of the insulation to the wall
Abstract
The invention discloses a kind of built-up thermal insulation board and preparation method thereof and installation methods, built-up thermal insulation board includes fireproof heat insulating techonosphere, first thermal insulation structure layer, second thermal insulation structure layer and third thermal insulation structure layer, and first connector and the second connector, first connector includes the first connector ontology and the first lead screw, first connector ontology runs through fireproof heat insulating techonosphere, first thermal insulation structure layer, second thermal insulation structure layer and third thermal insulation structure layer, first lead screw one end is connect with the first connector ontology, the other end stretches out outside built-up thermal insulation board, second connector runs through fireproof heat insulating techonosphere, first thermal insulation structure layer, second thermal insulation structure layer and third thermal insulation structure layer only run through the second thermal insulation structure layer and third thermal insulation structure layer, the right end of second connector is equipped with several screws.The configuration of the present invention is simple, easy to connect, stability is preferable, and easy for installation, and cost is relatively low.
Description
Technical field
The invention belongs to heat-preserving wall technical fields more particularly to a kind of built-up thermal insulation board and preparation method thereof and installation
Method.
Background technology
In traditional architecture, air-tightness bad by heat preservation and insulations such as wall, door and windows be bad and the shadows such as cold-heat bridge effect
It rings, room temperature is influenced very greatly by temperature, and especially in two season of summer in winter, people have to adjust room temperature by external force.Thus, not only
Increase energy consumption, it is also possible to health can be influenced.Conventional vacuum plate physical stability is poor, is easy damaged, cracking, is easy to take off
It falls and keeps the temperature and flameproof effect is all bad.
Invention content
It is an object of the invention in view of the above shortcomings of the prior art, provide a kind of built-up thermal insulation board and its making side
Method and installation method.
To solve the above problems, the technical solution used in the present invention is:
In a first aspect, a kind of built-up thermal insulation board is provided, including sequentially connected fireproof heat insulating techonosphere, first protect from left to right
Warm techonosphere, the second thermal insulation structure layer and third thermal insulation structure layer, and the connection fireproof heat insulating techonosphere, the first heat preservation structure
Make the first connector and the second connector of layer, the second thermal insulation structure layer and third thermal insulation structure layer, the first connector packet
The first connector ontology and the first lead screw are included, the first connector ontology is protected through the fireproof heat insulating techonosphere, first
Warm techonosphere, the second thermal insulation structure layer and third thermal insulation structure layer, first lead screw one end connect with the first connector ontology
It connects, the first lead screw other end stretches out outside built-up thermal insulation board, and second connector is constructed through the fireproof heat insulating
Layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer only run through the second thermal insulation structure layer and third
The right end of thermal insulation structure layer, second connector is equipped with protrusion and several screws.If the second connector right end protrusion and
Dry screw makes the second connector be connected firmly with concrete, prevents from falling off, and in the present invention, second connector is to pass through
Anti-corrosion, fire prevention treated round log, the installation ferrule of round log both ends prevent round log from cracking.Protrusion forms mortise and tenon knot with concrete
Structure.Uniformly 2~4 screws of installation make round log holder be connected firmly with concrete to raised surrounding, prevent round log from falling off.
Preferably, the fireproof heat insulating techonosphere includes the first screed, the first metal mesh sheet, the second screed and fire prevention
Heat preservation core layer, the first thermal insulation structure layer include third screed, the second metal mesh sheet, the 4th screed and the first heat preservation core
Layer, the second thermal insulation structure layer include the 5th screed, third metal mesh sheet, the 6th screed and the second heat preservation core layer, institute
It includes the 7th screed, the 4th metal mesh sheet, the 8th screed, third heat preservation core layer, the 9th mortar to state third thermal insulation structure layer
Layer, fifth metal mesh sheet and the tenth screed.The right side of the third heat preservation core layer is equipped with several metal bowls, when casting concrete
Concreting makes concrete form tenon structure with built-up thermal insulation board to metal bowl after solidification, enable built-up thermal insulation board with
Concrete structure connection is more secured.
Preferably, it is equipped with hanging ring in the 4th screed and the 8th screed, in order to keep hanging ring connection more secured,
Small metal mesh sheet is equipped on the right side of the hanging ring.
Preferably, between the fireproof heat insulating sandwich layer and the first heat preservation core layer, first heat preservation core layer and the second heat preservation
Hollow belt burr fiber-glass pole, the hollow belt are equipped between sandwich layer and between second heat preservation core layer and third heat preservation core layer
The side wall of burr fiber-glass pole is equipped with through-hole, has filling thermal insulation material inside the hollow belt burr fiber-glass pole.In the present invention
The filling thermal insulation material uses foamed glue, easy to operation.
Preferably, the fireproof heat insulating sandwich layer is fireproof heated board, first heat preservation core layer, the second heat preservation core layer and the
Three heat preservation core layers are made of several thermal insulation boards, and fireproof heat insulating item is filled between adjacent thermal insulation board.This fireproof heat insulating item plays
Fire-blocking belt acts on, and prevents flame from being spread in same layer heat preservation core layer.
Preferably, the first connector ontology is hollow coniform, has several phases on the first connector ontology
The through-hole of mutual stagger setting, the larger diameter end of the first connector ontology towards left side, the first connector ontology it is small
Diameter end is equipped with nut, first lead screw one end and first towards right side, the smaller diameter end of the first connector ontology
The nut thread connection of connector ontology smaller diameter end setting, further includes several steel bars, and several steel bars pass through the first connection
It is respectively placed in after through-hole on part ontology in second screed, third screed, the 5th screed and the 7th screed.
Several steel bars are parallel or arranged in a crossed manner, and the connection of steel bar and the first connector greatly strengthens the first connector and fireproof heat insulating structure
Make the bonding strength of layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer.
Preferably, the larger diameter end of the first connector ontology, which is equipped with, returns edge, and the edge of returning is set to first sand
In pulp layer.It can be blocked with the first metal mesh sheet, prevent from falling off.
Preferably, further include the second lead screw, second lead screw one end is set with the first connector ontology smaller diameter end
The nut thread connection set, the other end are connect with outer wall bracket.
Preferably, the first connector ontology is plate, there is several through-holes on the first connector ontology, described the
The left end of a connection piece ontology, which is equipped with, returns edge, and the edge of returning is set in first screed.It can be with the first metal mesh sheet
It blocks, prevents from falling off.The right end of the first connector ontology is equipped with nut, first lead screw one end and the first connector
The nut thread connection of ontology right end setting, further includes several steel bars, several steel bars pass through on the first connector ontology
It is respectively placed in after through-hole in second screed, third screed, the 5th screed and the 7th screed.Several steel bars are flat
The connection of row setting, steel bar and the first connector greatly strengthens the first connector and fireproof heat insulating techonosphere, the first heat preservation structure
Make the bonding strength of layer, the second thermal insulation structure layer and third thermal insulation structure layer.
Preferably, it is additionally provided with isolation grid cloth on the left of first screed, makes secondary plastering and finishing after installation is complete
It is connect with built-up thermal insulation board more secured.
Second aspect provides a kind of production method of built-up thermal insulation board, includes the following steps:
S1 places bed die;
Grid cloth is isolated on bed die upper berth in S2, and such way makes secondary plastering and finishing after installation is complete be connect more with thermal insulation board
Securely;
S3 puts the first connector and the second connector;
S4, spreads the first screed, and mortar requires uniformly to be laid with;
S5 spreads the first metal mesh sheet, fixes the position of preformed hole, the first metal mesh sheet cut is taped against the first screed
On;
S6 penetrates first layer steel bar by the through-hole of the first connector, pay attention to wanting when wearing steel bar indwelling go out centre position with
For connecting the second lead screw of outer wall bracket;
S7, install fireproof heat insulating sandwich layer, the uniform brushing interfacial agents in fireproof heated board two sides, it is cool set a hour after wait for that interfacial agents are dried in the air
The second screed is uniformly smeared in fireproof heated board side after dry, will be applied and be wiped the fireproof heated board of the second screed and be installed to the
On one metal mesh sheet;(At this time it should be noted that fireproof heated board is in the advance indwelling in the position of the first connector and the second connector
Hole)
S8 is put into hollow belt burr fiber-glass pole, and hollow belt burr fiber-glass pole one end is made to be inserted at fireproof heated board 2/3;
S9 penetrates second layer steel bar by the through-hole of the first connector, pay attention to wanting when wearing steel bar indwelling go out centre position with
For connecting the second lead screw of outer wall bracket;
S10, spreads third screed, and mortar requires uniformly to be laid with;
S11 spreads the second metal mesh sheet, fixes the position of preformed hole, the second metal mesh sheet cut is taped against third mortar
On layer;
S12 installs hanging ring, and the hanging ring is U-shaped, and U-shaped end is extend out to outside built-up thermal insulation board, facilitates lifting;
S13 spreads small metal mesh sheet in installation hanging ring position;
S14, install the first heat preservation core layer, several uniform brushing interfacial agents in thermal insulation board two sides, it is cool set a hour after wait for interfacial agents
The 4th screed is uniformly smeared in thermal insulation board side after drying, several thermal insulation boards for wiping the 4th screed will be applied and be installed to second
On metal mesh sheet, the hollow belt burr fiber-glass pole other end is made to be inserted at thermal insulation board 2/3, fire prevention is filled between adjacent thermal insulation board
Heat preservation strip, to hollow belt burr fiber-glass pole inside filling filling thermal insulation material;(At this time it should be noted that thermal insulation board is in the first connection
The advance indwelling hole in the position of part and the second connector)
S15 is put into hollow belt burr fiber-glass pole, and hollow belt burr fiber-glass pole one end is made to be inserted into the thermal insulation board of the first heat preservation core layer
At 2/3;
S16 penetrates third layer steel bar by the through-hole of the first connector, pay attention to wanting when wearing steel bar indwelling go out centre position with
For connecting the second lead screw of outer wall bracket;
S17, spreads the 5th screed, and mortar requires uniformly to be laid with;
S18 spreads third metal mesh sheet, fixes the position of preformed hole, the third metal mesh sheet cut is taped against the 5th mortar
On layer;
S19, install the second heat preservation core layer, several uniform brushing interfacial agents in thermal insulation board two sides, it is cool set a hour after wait for interfacial agents
The 6th screed is uniformly smeared in thermal insulation board side after drying, several thermal insulation boards for wiping the 6th screed will be applied and be installed to third
On metal mesh sheet, the hollow belt burr fiber-glass pole other end is made to be inserted at thermal insulation board 2/3, fire prevention is filled between adjacent thermal insulation board
Heat preservation strip, to hollow belt burr fiber-glass pole inside filling filling thermal insulation material;(At this time it should be noted that thermal insulation board is in the first connection
There are holes in advance for the position of part and the second connector)
S20 is put into hollow belt burr fiber-glass pole, and hollow belt burr fiber-glass pole one end is made to be inserted into the thermal insulation board of the second heat preservation core layer
At 2/3;
S21 penetrates the 4th layer of steel bar by the through-hole of the first connector, pay attention to wanting when wearing steel bar indwelling go out centre position with
For connecting the second lead screw of outer wall bracket;
S22, spreads the 7th screed, and mortar requires uniformly to be laid with;
S23 spreads the 4th metal mesh sheet, fixes the position of preformed hole, the 4th metal mesh sheet cut is taped against the 7th mortar
On layer;
S24 installs hanging ring, and the hanging ring is U-shaped, and U-shaped end is extend out to outside built-up thermal insulation board, facilitates lifting;
S25 spreads small metal mesh sheet in installation hanging ring position;
S26, install third heat preservation core layer, several uniform brushing interfacial agents in thermal insulation board two sides, it is cool set a hour after wait for interfacial agents
The 8th screed other side uniformly being smeared in thermal insulation board side after drying and metal bowl being installed, painting is wiped into the several of the 8th screed
Thermal insulation board is installed on the 4th metal mesh sheet, so that the hollow belt burr fiber-glass pole other end is inserted at thermal insulation board 2/3, in adjacent guarantor
Between warm plate fill fireproof heat insulating item, to hollow belt burr fiber-glass pole inside filling filling thermal insulation material;(At this time it should be noted that
There are holes in advance in the position of the first connector and the second connector for thermal insulation board)
S27, spreads the 9th screed, and mortar requires uniformly to be laid with;
S28 spreads fifth metal mesh sheet, fixes the position of preformed hole, the fifth metal mesh sheet cut is taped against the 9th mortar
On layer;
S29, spreads the tenth screed, and mortar requires uniformly to be laid with;
S30, natural curing 2~5 days.
The third aspect provides a kind of installation method of built-up thermal insulation board, includes the following steps:
S1, lifting are in place;
S2, supporting are connect by the first lead screw of the first connector with inner template using built-up thermal insulation board as exterior sheathing, will
Second lead screw is connect with outer wall bracket;
S3 after supporting is good, cuts hanging ring, installs upper layer built-up thermal insulation board;
S4 is put into reinforcing bar, and steel bar positioning frame is inserted in above the structural wall reinforcing bar that will be poured, to prevent in pouring structure wall
Make bar bending in structural wall, displacement, then carry out pouring for concrete, after the completion of pouring, by exterior wall support removing, to the
Filling filling thermal insulation material in the hollow structure of a connection piece ontology.In the present invention, specific to use to the first connector ontology
Hollow structure in beat the mode of foamed glue, foamed glue is viscous by through-hole on the first connector ontology 2 and built-up thermal insulation board
Knot forms heat preservation separation layer, prevents cold-heat bridge from generating;
S5, built-up thermal insulation board outside spread glass fiber reticular cloth, do plastering processing.
It is using advantageous effect caused by above-mentioned technical proposal:Simple in structure, easy to connect, stability is preferable, and
And it is easy for installation, cost is relatively low.
Description of the drawings
Fig. 1 is the sectional view of built-up thermal insulation board embodiment 1 of the present invention;
Fig. 2 is the enlarged diagram in the portions A in Fig. 1;
Fig. 3 is the structural schematic diagram of the first connector of built-up thermal insulation board embodiment 1 of the present invention;
Fig. 4 is that built-up thermal insulation board embodiment 1 of the present invention installs the sectional view after rain pipe;
Fig. 5 is the sectional view of built-up thermal insulation board embodiment 2 of the present invention;
Fig. 6 is the portions B enlarged diagram in Fig. 5;
Fig. 7 is the sectional view of built-up thermal insulation board embodiment 3 of the present invention;
Fig. 8 is the portions C enlarged diagram in Fig. 7;
Fig. 9 is the structural schematic diagram of the first connector of built-up thermal insulation board embodiment 3 of the present invention.
In figure:1, the second connector;2, the first connector ontology;3, the first lead screw;4, outer wall bracket;5, the second screw
Bar;6, edge is returned;7, rain pipe;8, steel bar;9, screw;10, raised;11, the first screed;12, the first metal mesh sheet;13、
Second screed;14, fireproof heat insulating sandwich layer;15, third screed;16, the second metal mesh sheet;17, the 4th screed;18,
One heat preservation core layer;19, the 5th screed;20, third metal mesh sheet;21, the 6th screed;22, the second heat preservation core layer;23,
Seven screeds;24, the 4th metal mesh sheet;25, the 8th screed;26, third heat preservation core layer;27, the 9th screed;28, the 5th
Metal mesh sheet;29, the tenth screed;30, fireproof heat insulating item;31, nut;32, hollow belt burr fiber-glass pole;33, hanging ring;34、
Small metal mesh sheet.
Specific implementation mode
Embodiments of the present invention are described in further detail with reference to the accompanying drawings and examples.Following embodiment is used for
Illustrate the present invention, but cannot be used for limiting the scope of the invention.
Embodiment 1:As shown in Figs 1-4, a kind of built-up thermal insulation board, including sequentially connected fireproof heat insulating structure from left to right
Make layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer, and the connection fireproof heat insulating construction
The first connector and the second connector 1 of layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer, institute
It includes the first connector ontology 2 and the first lead screw 3 to state the first connector, and the first connector ontology 2 runs through the fire prevention
Thermal insulation structure layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer, described first lead screw, 3 one end
It is connect with the first connector ontology 2,3 other end of the first lead screw stretches out outside built-up thermal insulation board, second connector 1
Run through through the fireproof heat insulating techonosphere, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer or only
The right end of second thermal insulation structure layer and third thermal insulation structure layer, second connector 1 is equipped with raised 10 and 2~4 screws
9.So that the second connector 1 is connected firmly with concrete, prevent from falling off, in the present invention, second connector 1 is by anti-
Rotten, fire prevention treated round log, the installation ferrule of round log both ends prevents round log from cracking, and is easily installed rain pipe 7 and window
Deng.Protrusion 10 forms tenon structure with concrete, and 2~4 screws that raised 10 surroundings are uniformly installed make round log and concrete
It is connected firmly, prevents round log from falling off.
The fireproof heat insulating techonosphere includes the first screed 11, the first metal mesh sheet 12, the second screed 13 and fire prevention
Heat preservation core layer 14, the first thermal insulation structure layer include third screed 15, the second metal mesh sheet 16, the 4th screed 17 and
One heat preservation core layer 18, the second thermal insulation structure layer include the 5th screed 19, third metal mesh sheet 20,21 and of the 6th screed
Second heat preservation core layer 22, the third thermal insulation structure layer include the 7th screed 23, the 4th metal mesh sheet 24, the 8th screed
25, third heat preservation core layer 26, the 9th screed 27, fifth metal mesh sheet 28 and the tenth screed 29.The third heat preservation core layer
26 right side is equipped with several metal bowls, and the big mouth in metal bowl bottom is small, is conducive to concrete and assembled passive type house insulation
The combination of plate, prevents thermal insulation board from falling off, when casting concrete concreting make concrete and assembled after solidification to metal bowl
Thermal insulation board forms tenon structure, enables built-up thermal insulation board be connect with concrete structure more secured.
The first connector ontology 2 is hollow coniform, has several mutually stagger on the first connector ontology 2
The through-hole of setting, the larger diameter end of the first connector ontology 2 is towards left side, the minor diameter of the first connector ontology 2
Towards right side, the smaller diameter end of the first connector ontology 2 is welded with nut 31 at end, described first lead screw, 3 one end and the
The nut 31 of 2 smaller diameter end of a connection piece ontology setting is threadedly coupled, and further includes several steel bars 8, and several steel bars 8 pass through the
Second screed 13, third screed 15, the 5th screed 19 and are respectively placed in after through-hole on a connection piece ontology 2
In seven screeds 23, and several steel bars 8 are arranged in parallel, and the connection of steel bar 8 and the first connector greatly strengthens the first connector
With fireproof heat insulating techonosphere, the bonding strength of the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer.It is described
The larger diameter end of first connector ontology 2 is equipped with and returns along 6, and described return is set to along 6 in first screed 11, can be with the
One metal mesh sheet 12 blocks, and prevents from falling off.Further include the second lead screw 5, described second lead screw, 5 one end and the first connector sheet
The nut 31 of 2 smaller diameter end of body setting is threadedly coupled, and the other end is connect with outer wall bracket 4.
Further, it is equipped with hanging ring 33 in the 4th screed 17 and the 8th screed 25, in order to make hanging ring 33 connect
More securely, it is equipped with small metal mesh sheet 34 on 33 right side of the hanging ring.
Further, between 14 and first heat preservation core layer 18 of the fireproof heat insulating sandwich layer, 18 and of the first heat preservation core layer
Hollow belt burr Buddhist nun is equipped between second heat preservation core layer 22 and between second heat preservation core layer 22 and third heat preservation core layer 26
The side wall of imperial bar 32, the hollow belt burr fiber-glass pole 32 is equipped with through-hole, is filled out inside the hollow belt burr fiber-glass pole 32
Thermal insulation material is filled, the filling thermal insulation material uses foamed glue in the present embodiment, easy to operation.
Further, the fireproof heat insulating sandwich layer 14 is fireproof heated board, and first heat preservation core layer 18, second keeps the temperature core
Layer 22 and third heat preservation core layer 26 are made of several thermal insulation boards, and fireproof heat insulating item 30 is filled between adjacent thermal insulation board.This is anti-
Fiery heat preservation strip 30 plays the role of fire-blocking belt, prevents flame from being spread in same layer heat preservation core layer.
The left side of first screed 11 is additionally provided with isolation grid cloth, makes secondary plastering and finishing and assembly after installation is complete
The connection of formula thermal insulation board is more secured.
The production method of the built-up thermal insulation board, includes the following steps:
S1 places bed die;
Grid cloth is isolated on bed die upper berth in S2, and such way makes secondary plastering and finishing after installation is complete be connect more with thermal insulation board
Securely;
S3 puts the first connector and the second connector 1;
S4, spreads the first screed 11, and mortar requires uniformly to be laid with;
S5 spreads the first metal mesh sheet 12, fixes the position of preformed hole, the first metal mesh sheet 12 cut is taped against the first sand
In pulp layer 11;
S6 penetrates first layer steel bar 8 by the through-hole of the first connector, pays attention to that indwelling is wanted to go out centre position when wearing steel bar 8
The second lead screw 5 for connecting outer wall bracket 4 is used;
S7, installation fireproof heat insulating sandwich layer 14, the uniform brushing interfacial agents in fireproof heated board two sides, it is cool set a hour after wait for interfacial agents
The second screed 13 is uniformly smeared in fireproof heated board side after drying, the fireproof heated board for wiping the second screed 13 will be applied and pacified
It is attached on the first metal mesh sheet 12;(At this time it should be noted that fireproof heated board is in the position of the first connector and the second connector 1
There are holes in advance)
S8 is put into hollow belt burr fiber-glass pole 32, and 32 one end of hollow belt burr fiber-glass pole is made to be inserted at fireproof heated board 2/3;
S9 penetrates second layer steel bar 8 by the through-hole of the first connector, pays attention to that indwelling is wanted to go out centre position when wearing steel bar 8
The second lead screw 5 for connecting outer wall bracket 4 is used;
S10, paving third screed 15, mortar require uniformly to be laid with;
S11 spreads the second metal mesh sheet 16, fixes the position of preformed hole, the second metal mesh sheet 16 cut is taped against third
On screed 15;
S12 installs hanging ring 33, and the hanging ring 33 is U-shaped, and U-shaped end is extend out to outside built-up thermal insulation board, facilitates lifting;
S13 spreads small metal mesh sheet 34 in 33 position of installation hanging ring;
S14, install the first heat preservation core layer 18, several uniform brushing interfacial agents in thermal insulation board two sides, it is cool set a hour after wait for interface
Agent dry after thermal insulation board side uniformly smear the 4th screed 17, will apply wipe the 4th screed 17 several thermal insulation boards installation
Onto the second metal mesh sheet 16,32 other end of hollow belt burr fiber-glass pole is made to be inserted at thermal insulation board 2/3, adjacent thermal insulation board it
Between filling fireproof heat insulating item 30, to hollow belt burr fiber-glass pole 32 inside filling filling thermal insulation material;(At this time it should be noted that protecting
There are holes in advance in the position of the first connector and the second connector 1 for warm plate)
S15 is put into hollow belt burr fiber-glass pole 32, and 32 one end of hollow belt burr fiber-glass pole is made to be inserted into the first heat preservation core layer 18
At thermal insulation board 2/3;
S16 penetrates third layer steel bar 8 by the through-hole of the first connector, pays attention to that indwelling is wanted to go out centre position when wearing steel bar 8
The second lead screw 5 for connecting outer wall bracket 4 is used;
S17, spreads the 5th screed 19, and mortar requires uniformly to be laid with;
S18, paving third metal mesh sheet 20, fixes the position of preformed hole, the third metal mesh sheet 20 cut is taped against the 5th
On screed 19;
S19, install the second heat preservation core layer 22, several uniform brushing interfacial agents in thermal insulation board two sides, it is cool set a hour after wait for interface
Agent dry after thermal insulation board side uniformly smear the 6th screed 21, will apply wipe the 6th screed 21 several thermal insulation boards installation
Onto third metal mesh sheet 20,32 other end of hollow belt burr fiber-glass pole is made to be inserted at thermal insulation board 2/3, adjacent thermal insulation board it
Between filling fireproof heat insulating item 30, to hollow belt burr fiber-glass pole 32 inside filling filling thermal insulation material;(At this time it should be noted that protecting
There are holes in advance in the position of the first connector and the second connector 1 for warm plate)
S20 is put into hollow belt burr fiber-glass pole 32, and 32 one end of hollow belt burr fiber-glass pole is made to be inserted into the second heat preservation core layer 22
At thermal insulation board 2/3;
S21 penetrates the 4th layer of steel bar 8 by the through-hole of the first connector, pays attention to that indwelling is wanted to go out centre position when wearing steel bar 8
The second lead screw 5 for connecting outer wall bracket 4 is used;
S22, spreads the 7th screed 23, and mortar requires uniformly to be laid with;
S23 spreads the 4th metal mesh sheet 24, fixes the position of preformed hole, the 4th metal mesh sheet 24 cut is taped against the 7th
On screed 23;
S24 installs hanging ring 33, and the hanging ring 33 is U-shaped, and U-shaped end is extend out to outside built-up thermal insulation board, facilitates lifting;
S25 spreads small metal mesh sheet 34 in 33 position of installation hanging ring;
S26, installation third heat preservation core layer 26, several uniform brushing interfacial agents in thermal insulation board two sides, it is cool set a hour after wait for interface
Agent uniformly smears 25 other side of the 8th screed in thermal insulation board side after drying and installs metal bowl, and painting is wiped the 8th screed 25
Several thermal insulation boards be installed on the 4th metal mesh sheet 24, so that 32 other end of hollow belt burr fiber-glass pole is inserted into thermal insulation board 2/3
Fireproof heat insulating item 30 is filled at place between adjacent thermal insulation board, to hollow belt burr fiber-glass pole 32 inside filling filling thermal insulation material;
It should be noted that thermal insulation board is in the position of the first connector and the second connector 1, there are holes in advance at this time
S27, spreads the 9th screed 27, and mortar requires uniformly to be laid with;
S28, paving fifth metal mesh sheet 28, fixes the position of preformed hole, the fifth metal mesh sheet 28 cut is taped against the 9th
On screed 27;
S29, spreads the tenth screed 29, and mortar requires uniformly to be laid with;
S30, natural curing 2~5 days.
The installation method of the built-up thermal insulation board, includes the following steps:
S1, lifting are in place;
S2, supporting are connect by the first lead screw 3 of the first connector with inner template using built-up thermal insulation board as exterior sheathing,
Second lead screw 5 is connect with outer wall bracket 4;
S3 after supporting is good, cuts hanging ring 33, installs upper layer built-up thermal insulation board;
S4 is put into reinforcing bar, and steel bar positioning frame is inserted in above the structural wall reinforcing bar that will be poured, to prevent in pouring structure wall
Make bar bending in structural wall, displacement, then carries out pouring for concrete, after the completion of pouring, outer wall bracket 4 is removed, to
Filling filling thermal insulation material in the hollow structure of first connector ontology 2.In the present embodiment, specific to use to the first connector
The mode of foamed glue is beaten in the hollow structure of ontology 2, foamed glue passes through the through-hole and assembled heat insulation on the first connector ontology 2
Plate bonds, and forms heat preservation separation layer, prevents cold-heat bridge from generating;
S5, built-up thermal insulation board outside spread glass fiber reticular cloth, do plastering processing.
Embodiment 2:As shown in Figure 5 and Figure 6, with embodiment 1 difference lies in:Several steel bars 8 pass through first to connect
Second screed 13, third screed 15, the 5th screed 19 and the 7th sand are respectively placed in after through-hole on fitting ontology 2
In pulp layer 23, and several steel bars 8 are arranged in a crossed manner, and the connection of steel bar 8 and the first connector greatly strengthens the first connector and prevents
The bonding strength of fiery thermal insulation structure layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer.
Embodiment 3:As Figure 7-9, with embodiment 1 difference lies in:The first connector ontology 2 is plate,
There are several through-holes on the first connector ontology 2, the left end of the first connector ontology 2, which is equipped with, to be returned along 6, described to return along 6
It is set in first screed 11.It can be blocked with the first metal mesh sheet 12, prevent from falling off.The first connector ontology
2 right end is welded with nut 31,31 screw thread of nut of described first lead screw, 3 one end and the setting of 2 right end of the first connector ontology
Connection, further includes several steel bars 8, and several steel bars 8 are respectively placed in described the after passing through the through-hole on the first connector ontology 2
In two screeds 13, third screed 15, the 5th screed 19 and the 7th screed 23.Several steel bars 8 are arranged in parallel, steel bar 8
Connection with the first connector greatly strengthens the first connector and is protected with fireproof heat insulating techonosphere, the first thermal insulation structure layer, second
The bonding strength of warm techonosphere and third thermal insulation structure layer.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, it will be understood by those of ordinary skill in the art that:It still may be used
To modify to the technical solution recorded in previous embodiment or equivalent replacement of some of the technical features;And
These modifications or replacements, the spirit and model of technical solution of the embodiment of the present invention that it does not separate the essence of the corresponding technical solution
It encloses.
Claims (10)
1. a kind of built-up thermal insulation board, which is characterized in that protected including sequentially connected fireproof heat insulating techonosphere from left to right, first
Warm techonosphere, the second thermal insulation structure layer and third thermal insulation structure layer, and the connection fireproof heat insulating techonosphere, the first heat preservation structure
Make the first connector and the second connector of layer, the second thermal insulation structure layer and third thermal insulation structure layer(1), first connector
Including the first connector ontology(2)With the first lead screw(3), the first connector ontology(2)Through the fireproof heat insulating structure
Make layer, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer, first lead screw(3)One end and the
A connection piece ontology(2)Connection, the other end stretch out outside built-up thermal insulation board, second connector(1)It is protected through the fire prevention
Warm techonosphere, the first thermal insulation structure layer, the second thermal insulation structure layer and third thermal insulation structure layer only run through the second thermal insulation structure layer
With third thermal insulation structure layer, second connector(1)Right end be equipped with several screws(9).
2. a kind of built-up thermal insulation board according to claim 1, which is characterized in that the fireproof heat insulating techonosphere includes the
One screed(11), the first metal mesh sheet(12), the second screed(13)With fireproof heat insulating sandwich layer(14), the first heat preservation structure
It includes third screed to make layer(15), the second metal mesh sheet(16), the 4th screed(17)With the first heat preservation core layer(18), described
Second thermal insulation structure layer includes the 5th screed(19), third metal mesh sheet(20), the 6th screed(21)With the second heat preservation core
Layer(22), the third thermal insulation structure layer includes the 7th screed(23), the 4th metal mesh sheet(24), the 8th screed(25)、
Third heat preservation core layer(26), the 9th screed(27), fifth metal mesh sheet(28)With the tenth screed(29).
3. a kind of built-up thermal insulation board according to claim 2, which is characterized in that the 4th screed(17)With the 8th
Screed(25)In be equipped with hanging ring(33), the hanging ring(33)Right side is equipped with small metal mesh sheet(34).
4. a kind of built-up thermal insulation board according to claim 2, which is characterized in that the fireproof heat insulating sandwich layer(14)With
One heat preservation core layer(18)Between, first heat preservation core layer(18)With the second heat preservation core layer(22)Between and it is described second heat preservation
Sandwich layer(22)With third heat preservation core layer(26)Between be equipped with hollow belt burr fiber-glass pole(32), the hollow belt burr fiber-glass pole
(32)Side wall be equipped with through-hole, the hollow belt burr fiber-glass pole(32)There is filling thermal insulation material in inside.
5. a kind of built-up thermal insulation board according to claim 2, which is characterized in that the fireproof heat insulating sandwich layer(14)It is anti-
Fiery thermal insulation board, first heat preservation core layer(18), the second heat preservation core layer(22)With third heat preservation core layer(26)By several heat preservations
Plate is constituted, and fireproof heat insulating item is filled between adjacent thermal insulation board(30).
6. a kind of built-up thermal insulation board according to claim 2, which is characterized in that the first connector ontology(2)For
Hollow is coniform, the first connector ontology(2)On have several through-holes for mutually staggering setting, the first connector sheet
Body(2)Larger diameter end towards left side, the first connector ontology(2)Smaller diameter end towards right side,
The first connector ontology(2)Smaller diameter end be equipped with nut(31), first lead screw(3)One end connects with first
Fitting ontology(2)The nut of smaller diameter end setting(31)It is threadedly coupled, further includes several steel bars(8), several steel bars(8)It wears
Cross the first connector ontology(2)On through-hole after be respectively placed in second screed(13), third screed(15), the 5th sand
Pulp layer(19)With the 7th screed(23)It is interior.
7. a kind of built-up thermal insulation board according to claim 6, which is characterized in that further include the second lead screw(5), described
Second lead screw(5)One end and the first connector ontology(2)The nut of smaller diameter end setting(31)Be threadedly coupled, the other end with it is outer
Wall bracket(4)Connection.
8. a kind of built-up thermal insulation board according to claim 2, which is characterized in that the first connector ontology(2)For
Plate, the first connector ontology(2)On have several through-holes, the first connector ontology(2)Right end be equipped with nut
(31), first lead screw(3)One end and the first connector ontology(2)The nut of right end setting(31)It is threadedly coupled, also wraps
Include several steel bars(8), several steel bars(8)Across the first connector ontology(2)On through-hole after be respectively placed in described second
Screed(13), third screed(15), the 5th screed(19)With the 7th screed(23)It is interior.
9. a kind of production method of built-up thermal insulation board, which is characterized in that include the following steps:
S1 places bed die;
Grid cloth is isolated on bed die upper berth in S2;
S3 puts the first connector and the second connector(1);
S4 spreads the first screed(11);
S5 spreads the first metal mesh sheet(12), the position of preformed hole is fixed, the first metal mesh sheet that will be cut(12)It is taped against
One screed(11)On;
S6 penetrates first layer steel bar by the through-hole of the first connector(8);
S7 installs fireproof heat insulating sandwich layer(14), the uniform brushing interfacial agents in fireproof heated board two sides are preventing fires after interfacial agents are dried
Uniformly smear the second screed in thermal insulation board side(13), painting is wiped into the second screed(13)Fireproof heated board be installed to first
Metal mesh sheet(12)On;
S8 is put into hollow belt burr fiber-glass pole(32), make hollow belt burr fiber-glass pole(32)One end is inserted into fireproof heated board 2/3
Place;
S9 penetrates second layer steel bar by the through-hole of the first connector(8);
S10 spreads third screed(15);
S11 spreads the second metal mesh sheet(16), the position of preformed hole is fixed, the second metal mesh sheet that will be cut(16)It is taped against
Third screed(15)On;
S12 installs hanging ring(33);
S13, in installation hanging ring(33)Position spreads small metal mesh sheet(34);
S14 installs the first heat preservation core layer(18), several uniform brushing interfacial agents in thermal insulation board two sides are protecting after interfacial agents are dried
Uniformly smear the 4th screed in warm plate side(17), painting is wiped into the 4th screed(17)Several thermal insulation boards be installed to the second gold medal
Belong to mesh sheet(16)On, make hollow belt burr fiber-glass pole(32)The other end is inserted at thermal insulation board 2/3, is filled out between adjacent thermal insulation board
Fill fireproof heat insulating item(30), to hollow belt burr fiber-glass pole(32)Inside filling filling thermal insulation material;
S15 is put into hollow belt burr fiber-glass pole(32), make hollow belt burr fiber-glass pole(32)One end is inserted into the first heat preservation core layer
(18)Thermal insulation board 2/3 at;
S16 penetrates third layer steel bar by the through-hole of the first connector(8);
S17 spreads the 5th screed(19);
S18 spreads third metal mesh sheet(20), the position of preformed hole is fixed, the third metal mesh sheet that will be cut(20)It is taped against
5th screed(19)On;
S19 installs the second heat preservation core layer(22), several uniform brushing interfacial agents in thermal insulation board two sides are protecting after interfacial agents are dried
Uniformly smear the 6th screed in warm plate side(21), painting is wiped into the 6th screed(21)Several thermal insulation boards be installed to third gold
Belong to mesh sheet(20)On, make hollow belt burr fiber-glass pole(32)The other end is inserted at thermal insulation board 2/3, is filled out between adjacent thermal insulation board
Fill fireproof heat insulating item(30), to hollow belt burr fiber-glass pole(32)Inside filling filling thermal insulation material;
S20 is put into hollow belt burr fiber-glass pole(32), make hollow belt burr fiber-glass pole(32)One end is inserted into the second heat preservation core layer
(22)Thermal insulation board 2/3 at;
S21 penetrates the 4th layer of steel bar by the through-hole of the first connector(8);
S22 spreads the 7th screed(23);
S23 spreads the 4th metal mesh sheet(24), the position of preformed hole is fixed, the 4th metal mesh sheet that will be cut(24)It is taped against
7th screed(23)On;
S24 installs hanging ring(33);
S25, in installation hanging ring(33)Position spreads small metal mesh sheet(34);
S26 installs third heat preservation core layer(26), several uniform brushing interfacial agents in thermal insulation board two sides are protecting after interfacial agents are dried
Uniformly smear the 8th screed in warm plate side(25)Metal bowl is installed in the other side, and painting is wiped the 8th screed(25)Several guarantors
Warm plate is installed to the 4th metal mesh sheet(24)On, make hollow belt burr fiber-glass pole(32)The other end is inserted at thermal insulation board 2/3,
Fireproof heat insulating item is filled between adjacent thermal insulation board(30), to hollow belt burr fiber-glass pole(32)Inside filling filling thermal insulation material;
S27 spreads the 9th screed(27);
S28 spreads fifth metal mesh sheet(28), the position of preformed hole is fixed, the fifth metal mesh sheet that will be cut(28)It is taped against
9th screed(27)On;
S29 spreads the tenth screed(29);
S30, natural curing 2~5 days.
10. a kind of installation method of built-up thermal insulation board, which is characterized in that include the following steps:
S1, lifting are in place;
S2, supporting, the first lead screw that built-up thermal insulation board is passed through into the first connector as exterior sheathing(3)Connect with inner template
It connects, by the second lead screw(5)With outer wall bracket(4)Connection;
S3 cuts hanging ring after supporting is good(33), upper layer built-up thermal insulation board is installed;
S4 is put into reinforcing bar, and steel bar positioning frame is inserted in above the structural wall reinforcing bar that will be poured, to prevent in pouring structure wall
Make bar bending in structural wall, displacement, pouring for concrete is then carried out, after the completion of pouring, by outer wall bracket(4)It removes,
To the first connector ontology(2)Hollow structure in filling filling thermal insulation material;
S5, built-up thermal insulation board outside spread glass fiber reticular cloth, do plastering processing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810459741.4A CN108425436A (en) | 2018-05-15 | 2018-05-15 | A kind of built-up thermal insulation board and preparation method thereof and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810459741.4A CN108425436A (en) | 2018-05-15 | 2018-05-15 | A kind of built-up thermal insulation board and preparation method thereof and installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108425436A true CN108425436A (en) | 2018-08-21 |
Family
ID=63163084
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810459741.4A Withdrawn CN108425436A (en) | 2018-05-15 | 2018-05-15 | A kind of built-up thermal insulation board and preparation method thereof and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108425436A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108775089A (en) * | 2018-08-22 | 2018-11-09 | 天津城建大学 | Active exterior-wall heat insulation cooling system |
CN110593644A (en) * | 2019-09-27 | 2019-12-20 | 保定微展科技股份有限公司 | Assembled enclosure structure and manufacturing method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005282141A (en) * | 2004-03-30 | 2005-10-13 | Daiwa House Ind Co Ltd | Joint structure of mutual members via heat insulation member |
CN203977622U (en) * | 2014-07-25 | 2014-12-03 | 济南城通保温工程有限公司 | The heat insulation integrated wall body building structure of compound external mold plate |
CN204609012U (en) * | 2015-02-01 | 2015-09-02 | 江苏卧牛山保温防水技术有限公司 | A kind of assembled architecture outer wall heat-insulation system |
CN107587654A (en) * | 2017-09-27 | 2018-01-16 | 河北旭灿科技有限公司 | A kind of assembled heat insulation wall and preparation method thereof |
CN208329225U (en) * | 2018-05-15 | 2019-01-04 | 保定微展科技股份有限公司 | A kind of built-up thermal insulation board |
-
2018
- 2018-05-15 CN CN201810459741.4A patent/CN108425436A/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005282141A (en) * | 2004-03-30 | 2005-10-13 | Daiwa House Ind Co Ltd | Joint structure of mutual members via heat insulation member |
CN203977622U (en) * | 2014-07-25 | 2014-12-03 | 济南城通保温工程有限公司 | The heat insulation integrated wall body building structure of compound external mold plate |
CN204609012U (en) * | 2015-02-01 | 2015-09-02 | 江苏卧牛山保温防水技术有限公司 | A kind of assembled architecture outer wall heat-insulation system |
CN107587654A (en) * | 2017-09-27 | 2018-01-16 | 河北旭灿科技有限公司 | A kind of assembled heat insulation wall and preparation method thereof |
CN208329225U (en) * | 2018-05-15 | 2019-01-04 | 保定微展科技股份有限公司 | A kind of built-up thermal insulation board |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108775089A (en) * | 2018-08-22 | 2018-11-09 | 天津城建大学 | Active exterior-wall heat insulation cooling system |
CN110593644A (en) * | 2019-09-27 | 2019-12-20 | 保定微展科技股份有限公司 | Assembled enclosure structure and manufacturing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100464043C (en) | Bound-type composite heat-insulation wall with support body | |
CN204804107U (en) | Decorate heat preservation template integral structure and structural wall | |
CN106869439B (en) | A kind of fire-resistant insulating composite board and its construction method | |
CN108425436A (en) | A kind of built-up thermal insulation board and preparation method thereof and installation method | |
CN105672526A (en) | Wall door and window structures | |
CN202809892U (en) | Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure | |
CN106759994A (en) | A kind of warming plate with arrangement of reinforcement and its thermal insulation structure construction method in exterior wall concrete section position | |
CN205663143U (en) | Compound incubation outer wall -in -place mould | |
CN208329225U (en) | A kind of built-up thermal insulation board | |
CN206971434U (en) | A kind of surface layer insulated fire plate difficult for drop-off | |
CN206667507U (en) | A kind of warming plate with arrangement of reinforcement | |
CN108978989A (en) | A kind of Assembled self-insulating fire-proof sound insulation wallboard | |
CN205776871U (en) | A kind of heat-preserving wall | |
CN105696812A (en) | Thermal insulation fireproof removable house | |
CN204919881U (en) | Whole wall of assembly spouting lightweight concrete | |
CN103374980A (en) | Block-insulated wall on concrete overhang plate | |
CN204781427U (en) | Sandwich thermal insulation wall connecting piece | |
CN105041000B (en) | A kind of old wall transformation insulation construction | |
RU90813U1 (en) | ENERGY-SAVING HEAT-INSULATING AND DECORATIVE PANEL | |
CN208899740U (en) | A kind of Assembled self-insulating fire-proof sound insulation wallboard | |
CN208792535U (en) | A kind of fire-type building heat preservation wall | |
CN206753033U (en) | Insulation construction integration exempts to tear exterior sheathing open | |
CN210256666U (en) | Non-dismantling template light assembled plate | |
CN105926781B (en) | Waterproof support element, insulation and decoration integrated plate, external thermal insulation system and construction method | |
CN201148692Y (en) | Integral composite thermal insulation wallboard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180821 |
|
WW01 | Invention patent application withdrawn after publication |