CN108411859A - A kind of overflow weir structure construction method for mountain area hydropower station pressure forebay - Google Patents

A kind of overflow weir structure construction method for mountain area hydropower station pressure forebay Download PDF

Info

Publication number
CN108411859A
CN108411859A CN201810221219.2A CN201810221219A CN108411859A CN 108411859 A CN108411859 A CN 108411859A CN 201810221219 A CN201810221219 A CN 201810221219A CN 108411859 A CN108411859 A CN 108411859A
Authority
CN
China
Prior art keywords
side wall
forebay
flat plate
plate bottom
mountain area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810221219.2A
Other languages
Chinese (zh)
Inventor
周琼
王玲玲
张瑜
苏盼
赵通阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Vocational College of Water Conservancy and Environment
Original Assignee
Henan Vocational College of Water Conservancy and Environment
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Vocational College of Water Conservancy and Environment filed Critical Henan Vocational College of Water Conservancy and Environment
Priority to CN201810221219.2A priority Critical patent/CN108411859A/en
Publication of CN108411859A publication Critical patent/CN108411859A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/16Fixed weirs; Superstructures or flash-boards therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/06Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Sewage (AREA)

Abstract

Tablet downflow weir is arranged in a kind of overflow weir structure construction method for mountain area hydropower station pressure forebay provided by the invention, simple in structure, convenient for construction, serrated-surface is arranged in flat plate bottom upper surface, collision is generated when making to let out under flow, is convenient for energy dissipating;Safeguard structure is set on downflow weir, when safeguard structure destroys, is conveniently replaceable, project cost is saved.

Description

A kind of overflow weir structure construction method for mountain area hydropower station pressure forebay
Technical field
The present invention relates to a kind of hydraulic engineering downflow weirs, are to be related to one kind to press for mountain area power station more specifically The overflow weir structure construction method of power forebay.
Background technology
Small hydropower station is the common power station form in China, and is mostly with plant without storage in small hydropower station Main, these power stations itself do not have Regulation Function, are all to carry out generator operation by natural runoff.Not due to natural runoff Certainty causes to need to lead water off when water is more, therefore, generally requires setting overflow weir structure.
It is that water mainly to water-drawing channel carries out advection for forebay, due to its limited volume, because This, cannot effectively store water.Such as channel water, when being 10m3/s, water power packs hair flow 8m3/s, then must So cause 2 flow power stations that can not utilize, it is therefore necessary to design a kind of overflow weir structure of forebay.
The overflow weir structure of forebay due to needing letdown flow, the water impact and water pressure born Larger, therefore, it is necessary to design a kind of tablet overflow weir structure of simple and practicable forebay, carrying out flow to it leads off, And necessary protection is carried out to weir body structure.
Invention content
The present invention in view of the above technical problems, provides a kind of overflow weir structure for mountain area hydropower station pressure forebay and repaiies Construction method.
The present invention provides a kind of overflow weir structure construction method for mountain area hydropower station pressure forebay, which is flat Plate weir structure, forebay include channel intake, power station irrigating gate, the forebay include left side wall, right side wall and Antetheca, the power station irrigating gate are located on left side wall or right side wall, and the antetheca is opposite with channel intake, tablet downflow weir It is arranged on the antetheca, the tablet downflow weir includes flat plate bottom, the first side wall and second sidewall, and the flat plate bottom is A part for forebay antetheca, the flat plate bottom, the first side wall and second sidewall are concave-shaped structure, it is characterised in that: The construction method includes the following steps:
S1:Basement process handles the ground residing for the antetheca, for mountain area rock foundation, using blast working, And the plane of fracture is cleaned, the cleaning is cleaned using giant, and the rubble that explosion is generated is cleared up, later after explosion Rock foundation face on carry out concrete base pour, embedded bar is arranged when pouring in the concrete base;
S2:Downflow weir flat plate bottom pours, on the embedded bar, binding positioning framework, and the assembling reinforcement on positioning framework, Formed flat plate bottom framework of steel reinforcement, the embedded bar with the framework of steel reinforcement by connecting bar connecting, it is described to be connected as welding Connect in succession, the framework of steel reinforcement generally concave-shaped structure, the two sides framework of steel reinforcement of the concave-shaped structure respectively with pressure The reserved steel bar welding of the left side wall and right side wall of forebay, the upper surface of the concave-shaped structure is the first side wall and second The framework of steel reinforcement on the surface of the flat plate bottom between side wall, the upper surface of the concave-shaped structure is zigzag, in order to be formed Zigzag stereochemical structure;Shuttering, casting concrete, the concrete upper surface pours as zigzag structure, in the saw Several first built-in fittings are set in tooth-shape structure, while being also provided with several second built-in fittings on the first side wall and second sidewall;
S3:The first safeguard structure to match with zigzag structure is made, first safeguard structure includes the first fixing piece, institute The first fixing piece is stated with first built-in fitting to coordinate;The second protection to match with the first side wall and second sidewall is made to tie Structure, setting and matched second fixing piece of the second built-in fitting on second safeguard structure;
S4:First safeguard structure is fixed on the zigzag structure, it is described to be fixed as the first fixing piece and described first in advance Embedded part is fixedly connected;Second safeguard structure is fixed in the first side wall and second sidewall, it is described to be fixed as second Fixing piece is fixedly connected with second built-in fitting.
Preferably, the concrete strength is not less than C30.
Preferably, first safeguard structure, the second safeguard structure are rubber elastomeric material.
Preferably, the side of the flat plate bottom is trapezoidal, to form the small force structure in the big top in lower part, improve Stress performance.
Preferably, second safeguard structure can be L-shaped structure, it is set to the side of the first side wall or second sidewall The top surface and.
It summarizes advantages of the present invention and technique effect is as follows:
Tablet overflow is arranged in a kind of overflow weir structure construction method for mountain area hydropower station pressure forebay provided by the invention Weir, it is simple in structure, convenient for construction, serrated-surface is set in flat plate bottom upper surface, collision is generated when making to let out under flow, is convenient for Energy dissipating;Safeguard structure is set on downflow weir, when safeguard structure destroys, is conveniently replaceable, project cost is saved.
Description of the drawings:
Fig. 1 is the forebay schematic diagram of the present invention;
Fig. 2 is tablet overflow weir structure schematic diagram;
Fig. 3 is downflow weir sectional view.
Specific implementation mode:Below in conjunction with specification specific implementation mode, describe in detail to the present invention.
The present invention provides a kind of overflow weir structure construction method for mountain area hydropower station pressure forebay 1, which is Tablet weir structure, forebay include channel intake 2, power station irrigating gate 3, and the forebay includes left side wall 4, right side Wall 5 and antetheca 6, the power station irrigating gate 3 are located on left side wall 4 or right side wall 5, the antetheca 6 and 2 phase of channel intake Right, tablet downflow weir is arranged on the antetheca 6, and the tablet downflow weir includes flat plate bottom 7, the first side wall 8 and the second side Wall 9, the flat plate bottom 7 are a part for forebay antetheca 6, and the flat plate bottom 7, the first side wall 8 and second sidewall 9 are Concave-shaped structure, it is characterised in that:The construction method includes the following steps:
S1:Basement process handles the ground residing for the antetheca 6, for mountain area rock foundation, is applied using explosion Work, and the plane of fracture is cleaned, the cleaning is cleaned using giant, and the rubble that explosion is generated is cleared up, later quick-fried It carries out concrete base on rock foundation face after broken to pour, embedded bar is arranged when pouring in the concrete base;
S2:Downflow weir flat plate bottom pours, on the embedded bar, binding positioning framework, and the assembling reinforcement on positioning framework, Formed flat plate bottom framework of steel reinforcement, the embedded bar with the framework of steel reinforcement by connecting bar connecting, it is described to be connected as welding Connect in succession, the framework of steel reinforcement generally concave-shaped structure, the two sides framework of steel reinforcement of the concave-shaped structure respectively with pressure The reserved steel bar welding of the left side wall 4 and right side wall 5 of forebay, the upper surface of the concave-shaped structure is 8 He of the first side wall The framework of steel reinforcement on the surface of the flat plate bottom 7 between second sidewall 9, the upper surface of the concave-shaped structure is zigzag, so as to In the zigzag stereochemical structure of formation;Shuttering, casting concrete, the concrete upper surface pour as zigzag structure 10, Several first built-in fittings are set in the zigzag structure 10, while being also provided with several on the first side wall and second sidewall Two built-in fittings;
S3:The first safeguard structure 11 to match with zigzag structure is made, first safeguard structure 11 includes the first fixation Part, first fixing piece coordinate with first built-in fitting;Make second to match with the first side wall 8 and second sidewall 9 Safeguard structure, setting and matched second fixing piece of the second built-in fitting on second safeguard structure;
S4:First safeguard structure 11 is fixed on the zigzag structure 10, it is described to be fixed as the first fixing piece and described the One built-in fitting is fixedly connected;Second safeguard structure 12 is fixed on the first side wall 8 and second sidewall 9, it is described solid It is set to the second fixing piece to be fixedly connected with second built-in fitting.
Preferably, the concrete strength is not less than C30.
Preferably, first safeguard structure 11, the second safeguard structure 12 are rubber elastomeric material.
Preferably, the side of the flat plate bottom 7 is trapezoidal, to form the small force structure in the big top in lower part, carry High stress performance.
Preferably, second safeguard structure can be L-shaped structure, it is set to the side of the first side wall or second sidewall The top surface and.
Wherein, length may be used in order to form zigzag when binding in the framework of steel reinforcement of the concave-shaped structure Not equal arrangement.
First built-in fitting, second built-in fitting can be pre-embedded bolt or embedded sleeve barrel.
Content described in this specification embodiment is only enumerating to the way of realization of inventive concept, protection of the invention Range is not construed as being only limitted to the concrete form that embodiment is stated, protection scope of the present invention also includes art technology Personnel according to present inventive concept it is conceivable that equivalent technologies mean.

Claims (5)

1. a kind of overflow weir structure construction method for mountain area hydropower station pressure forebay, which is tablet weir structure, pressure Power forebay includes channel intake, power station irrigating gate, and the forebay includes left side wall, right side wall and antetheca, the water Power station irrigating gate is located on left side wall or right side wall, and the antetheca is opposite with channel intake, and tablet downflow weir is arranged described On antetheca, the tablet downflow weir includes flat plate bottom, the first side wall and second sidewall, and the flat plate bottom is before forebay A part for wall, the flat plate bottom, the first side wall and second sidewall are concave-shaped structure, it is characterised in that:The side of building Method includes the following steps:
S1:Basement process handles the ground residing for the antetheca, for mountain area rock foundation, using blast working, And the plane of fracture is cleaned, the cleaning is cleaned using giant, and the rubble that explosion is generated is cleared up, later after explosion Rock foundation face on carry out concrete base pour, embedded bar is arranged when pouring in the concrete base;
S2:Downflow weir flat plate bottom pours, on the embedded bar, binding positioning framework, and the assembling reinforcement on positioning framework, Formed flat plate bottom framework of steel reinforcement, the embedded bar with the framework of steel reinforcement by connecting bar connecting, it is described to be connected as welding Connect in succession, the framework of steel reinforcement generally concave-shaped structure, the two sides framework of steel reinforcement of the concave-shaped structure respectively with pressure The reserved steel bar welding of the left side wall and right side wall of forebay, the upper surface of the concave-shaped structure is the first side wall and second The framework of steel reinforcement on the surface of the flat plate bottom between side wall, the upper surface of the concave-shaped structure is zigzag, in order to be formed Zigzag stereochemical structure;Shuttering, casting concrete, the concrete upper surface pours as zigzag structure, in the saw Several first built-in fittings are set in tooth-shape structure, while being also provided with several second built-in fittings on the first side wall and second sidewall;
S3:The first safeguard structure to match with zigzag structure is made, first safeguard structure includes the first fixing piece, institute The first fixing piece is stated with first built-in fitting to coordinate;The second protection to match with the first side wall and second sidewall is made to tie Structure, setting and matched second fixing piece of the second built-in fitting on second safeguard structure;
S4:First safeguard structure is fixed on the zigzag structure, it is described to be fixed as the first fixing piece and described first in advance Embedded part is fixedly connected;Second safeguard structure is fixed in the first side wall and second sidewall, it is described to be fixed as second Fixing piece is fixedly connected with second built-in fitting.
2. a kind of overflow weir structure construction method for mountain area hydropower station pressure forebay as described in claim 1, feature It is:The concrete strength is not less than C30.
3. a kind of overflow weir structure construction method for mountain area hydropower station pressure forebay as described in claim 1, feature It is:First safeguard structure, the second safeguard structure are rubber elastomeric material.
4. a kind of overflow weir structure construction method for mountain area hydropower station pressure forebay as described in claim 1, feature It is:The side of the flat plate bottom is trapezoidal, to form the small force structure in the big top in lower part, improves stress performance.
5. a kind of overflow weir structure construction method for mountain area hydropower station pressure forebay as described in claim 1, feature It is:Second safeguard structure can be L-shaped structure, be set to the side and top surface of the first side wall or second sidewall.
CN201810221219.2A 2018-03-17 2018-03-17 A kind of overflow weir structure construction method for mountain area hydropower station pressure forebay Pending CN108411859A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810221219.2A CN108411859A (en) 2018-03-17 2018-03-17 A kind of overflow weir structure construction method for mountain area hydropower station pressure forebay

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810221219.2A CN108411859A (en) 2018-03-17 2018-03-17 A kind of overflow weir structure construction method for mountain area hydropower station pressure forebay

Publications (1)

Publication Number Publication Date
CN108411859A true CN108411859A (en) 2018-08-17

Family

ID=63131991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810221219.2A Pending CN108411859A (en) 2018-03-17 2018-03-17 A kind of overflow weir structure construction method for mountain area hydropower station pressure forebay

Country Status (1)

Country Link
CN (1) CN108411859A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208549A (en) * 2018-09-26 2019-01-15 水利部交通运输部国家能源局南京水利科学研究院 Novel fabricated landscape overflow weir
CN114032856A (en) * 2021-12-18 2022-02-11 河南省水利第二工程局 Construction method of channel and pressure forebay connecting part reinforcing device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1133574A (en) * 1997-07-24 1999-02-09 Sekisui Chem Co Ltd Disinfection tank overflow weir structure
CN204198484U (en) * 2014-08-04 2015-03-11 江苏川源环保设备有限公司 A kind of two-stage water inlet cloth weir board structure
CN104563267A (en) * 2015-01-30 2015-04-29 中国水利水电科学研究院 Compound key overflow weir type siphon well and method implemented by same
CN104695390A (en) * 2015-01-30 2015-06-10 中国水利水电科学研究院 Integrated super-discharge energy-dissipation flood-overflowing unit and method
CN205501958U (en) * 2016-04-11 2016-08-24 河南省郑州水利学校 Power station forebay water inlet protective structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1133574A (en) * 1997-07-24 1999-02-09 Sekisui Chem Co Ltd Disinfection tank overflow weir structure
CN204198484U (en) * 2014-08-04 2015-03-11 江苏川源环保设备有限公司 A kind of two-stage water inlet cloth weir board structure
CN104563267A (en) * 2015-01-30 2015-04-29 中国水利水电科学研究院 Compound key overflow weir type siphon well and method implemented by same
CN104695390A (en) * 2015-01-30 2015-06-10 中国水利水电科学研究院 Integrated super-discharge energy-dissipation flood-overflowing unit and method
CN205501958U (en) * 2016-04-11 2016-08-24 河南省郑州水利学校 Power station forebay water inlet protective structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
唐天保;: "采用虹吸进水方式的电站前池设计经验剖析", 黑龙江水利科技 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208549A (en) * 2018-09-26 2019-01-15 水利部交通运输部国家能源局南京水利科学研究院 Novel fabricated landscape overflow weir
CN109208549B (en) * 2018-09-26 2020-10-23 水利部交通运输部国家能源局南京水利科学研究院 Novel assembled view overflow weir
CN114032856A (en) * 2021-12-18 2022-02-11 河南省水利第二工程局 Construction method of channel and pressure forebay connecting part reinforcing device

Similar Documents

Publication Publication Date Title
CN105370290B (en) A kind of correcting and then reinforcing method of shield tunnel
CN106014446B (en) A kind of reinforcement means of enhancing high ground stress soft rock stress tunnel inverted arch structural stability
CN103669356B (en) Large volume normal concrete thick layer casting method
WO2020048094A1 (en) Method of recovering room-and-pillar coal pillar by using external replacement supports
CN108411859A (en) A kind of overflow weir structure construction method for mountain area hydropower station pressure forebay
CN207260148U (en) Service sleeve pile crown integrally abolishes device
CN104594389A (en) Post-cast strip external wall plugging structure with elastic water stoppers
CN103510458B (en) Pile type continuous rigid frame bridge and construction method thereof
CN204000861U (en) Bored pile casing in a kind of water
CN104712087A (en) Superimposed floor slab connecting method
CN202039866U (en) Waterproof air bag for hole-entrance of shield
CN101649746B (en) Method for arranging drain plug peripheral water stopping sheet of tunnel plug
CN204780894U (en) Can dismantle steel protects wound packages and puts
CN103397661A (en) Construction technology of underground combined profile steel-concrete outer wall structure
CN208039182U (en) A kind of tablet overflow weir structure for hydropower station pressure forebay
CN208618433U (en) Basement water collection pit underwater construction steel form
CN106351183A (en) Bottom microarch-type gallery structure of HCRFD (High Core Rockfill Dam)
CN112376600A (en) Safe anti-seismic building pile
CN205954659U (en) Integral mandrel combination of stylopodium cushion cap rim of a cup
CN207348874U (en) A kind of tunnel trolley seaming die anti-crack device
CN208996737U (en) A kind of stress buffer device and stress buffer structure with thickness adjustment structure
CN207376762U (en) A kind of flood control electricity row station
CN207160075U (en) A kind of pore-forming templates easy to use
CN205976914U (en) Assembled windowsill structure of bearing down on one
CN205638456U (en) High -efficient cut -off trench of whole template of vertical

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180817