CN205976914U - Assembled windowsill structure of bearing down on one - Google Patents

Assembled windowsill structure of bearing down on one Download PDF

Info

Publication number
CN205976914U
CN205976914U CN201620345861.8U CN201620345861U CN205976914U CN 205976914 U CN205976914 U CN 205976914U CN 201620345861 U CN201620345861 U CN 201620345861U CN 205976914 U CN205976914 U CN 205976914U
Authority
CN
China
Prior art keywords
windowsill
section
construction
anchor block
anchoring block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620345861.8U
Other languages
Chinese (zh)
Inventor
秦孟良
姜正贵
邓宏
吴生久
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
No 3 Construction Co Ltd of Chongqing Construction Engineering Group
Original Assignee
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd filed Critical CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Priority to CN201620345861.8U priority Critical patent/CN205976914U/en
Application granted granted Critical
Publication of CN205976914U publication Critical patent/CN205976914U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model belongs to the technical field of the construction, concretely relates to assembled windowsill structure of bearing down on one. It includes anchoring block, the section of pouring and connecting reinforcement, and anchoring block is two, connects the section of pouring between the anchoring block, and connecting reinforcement inlays and establishes in the junction of anchoring block with the section of pouring. Utilize above -mentioned technical scheme, can together build anchoring block by laying bricks or stones the wall when wall masonry, then utilize connecting reinforcement to connect the section of pouring, can guarantee the continuity of the whole process of building a wall like this, it bears down on one to break to the window form on purpose no longer to need simultaneously builds the process by laying bricks or stones, has avoided the work holdup, has reduced the construction process, saves the engineering time, reduces construction cost. Utilize anchoring block simultaneously, can guarantee the windowsill anchor end quality of bearing down on one, guarantee the construction quality that the windowsill bears down on one.

Description

Assembled windowsill coping structure
Technical field
The invention belongs to technical field of building construction is and in particular to assembled windowsill coping structure.
Background technology
At present in building engineering construction, the exterior window of masonry panel has been generally designed windowsill and has beared down on one, the construction that windowsill bears down on one Common fault projects, can't meet the quality requirement all the time, and existing method is many to be beared down on one using first building a wall to pour into a mould afterwards.Disposably continuously build by laying bricks or stones More than body of wall 1.4m (exceedes windowsill height, the highly general 0.9m of windowsill), and therefore, windowsill bears down on one when constructing it is impossible to want by design Ask and anchor into window abutment wall, do not meet design requirement, potential safety hazard and common quality defect project.In order to prevent and treat the asking of can not anchoring of bearing down on one Topic, build a wall construction when, minority unit in charge of construction takes when building a wall construction, reserves anchoring breach in windowsill position of bearing down on one.But, by Square recess in forming breach, bear down on one concreting when it is impossible to effective filling pours closely knit, anchored end mass defect is dashed forward Go out.In order to prevent the common quality defect that bears down on one, existing method just can only interrupt the seriality of building construction, is once to build a wall to windowsill The lower mouth bearing down on one, bears down on one after the completion of pouring, then masonry panel upwards.Though this way can guarantee that the construction quality beared down on one, beat Break and built the seriality of operation by laying bricks or stones, caused the work holdup, complex procedures, work consuming takes, construction cost is high.
Content of the invention
The technical problem to be solved is the method that existing windowsill bears down on one using headspace and discontinuously builds by laying bricks or stones, This kind of method destroys the seriality building operation by laying bricks or stones, causes the work holdup, complex procedures, work consuming takes, construction cost is high.
In order to solve above-mentioned technical problem, the present invention provides following technical scheme:Assembled windowsill coping structure, its feature It is, including anchor block, pour section and connect reinforcing bar, anchor block is two pieces, connects and pour section between anchor block, connects reinforcing bar embedding The junction being located at anchor block and pouring section.Using technique scheme, together anchor block can be built by laying bricks or stones in building wall Wall, then pours section using connection bar connecting, so can ensure that the seriality of operation of entirely building a wall, be no longer necessary to spy simultaneously Meaning is beared down on one to interrupt for forms and is built operation by laying bricks or stones, it is to avoid the work holdup, decreases working procedure, saving engineering time, reduction is constructed into This.Simultaneously using anchor block it is ensured that windowsill bears down on one anchored end quality it is ensured that the construction quality beared down on one of windowsill.
Further, the length range of the length, width and height of described anchor block be respectively 220mm-250mm, 180mm-240mm and 100mm-130mm, so can meet the specification demands that most of windowsills bear down on one.
Further, described connection reinforcing bar is rectangular is uniformly embedded it is ensured that anchor block and the structural stability pouring section.
Further, the using method that assembled windowsill bears down on one, comprises the following steps:A, using existing concrete clout prefabricated Anchor block, reserved connection reinforcing bar on anchor block;B, anchor block is built by laying bricks or stones together with wall brick simultaneously, anchor block is built by laying bricks or stones in window Platform bears down on one end;C, continue masonry panel until that hits the target construction section builds work by laying bricks or stones;D, the pressure of unified this construction section of colligation A section reinforcing bar is built in top casting, and cast-in-place concrete forms and pours section;E, finishing windowsill bear down on one, and complete component construction of bearing down on one.Ensure to build a wall work The seriality of sequence, improves work efficiency, has prevented and treated the purpose of common quality defect;Meanwhile, the anchored end that windowsill bears down on one makes anchoring Block, can utilize in main structure construction structural concrete clout to make, realize solid waste and recycle, economize on resources, green construction.
Further, in described step a anchor block carried out according to the specification of different windowsills prefabricated, anchor block be located at same level Line is it is ensured that the position level beared down on one of windowsill.
Brief description
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description:
Fig. 1 is the schematic diagram of embodiment of the present invention assembled windowsill coping structure;
Fig. 2 builds position view by laying bricks or stones for embodiment of the present invention assembled windowsill coping structure.
Specific embodiment
As shown in Figure 1, 2:Assembled windowsill coping structure, including anchor block 1, pours section 2 and connects reinforcing bar 3, anchor block 1 For two pieces, connect between anchor block 1 and pour section 2, connect reinforcing bar 3 and be embedded in anchor block 1 and the junction pouring section 2.Described anchor Gu the length range of the length, width and height of block 1 is respectively 220mm-250mm, 180mm-240mm and 100mm-130mm.Described connection steel Muscle 3 is rectangular to be uniformly embedded.The using method that assembled windowsill bears down on one, comprises the following steps:A, utilize existing concrete clout Prefabricated anchor block 1, reserved connection reinforcing bar 3 on anchor block 1, anchor block 1 carries out prefabricated, anchor block 1 according to the specification of different windowsills Positioned at same horizontal line;B, anchor block 1 is built by laying bricks or stones together with wall brick simultaneously, anchor block 1 is built by laying bricks or stones and bears down on one end in windowsill; C, continue masonry panel until that hits the target construction section builds work by laying bricks or stones;D, unified bearing down on one of this construction section of colligation pour Duan Gang Muscle, cast-in-place concrete forms and pours section;E, finishing windowsill bear down on one, and complete component construction of bearing down on one.
During work, together anchor block 1 can be built by laying bricks or stones wall in building wall, then be connected using connection reinforcing bar 3 and pour Section 2, so can ensure that the seriality of operation of entirely building a wall, being no longer necessary to specially bears down on one to interrupt for forms simultaneously builds work by laying bricks or stones Sequence, it is to avoid the work holdup, decreases working procedure, saves the engineering time, reduces construction cost.Filled out using building by laying bricks or stones of anchor block 1 simultaneously Filling the place it is ensured that windowsill bears down on one is not in termination leakiness it is ensured that the construction quality beared down on one of windowsill.Described anchor block 1 The length range of length, width and height is respectively 220mm-250mm, 180mm-240mm and 100mm-130mm, so can meet great majority The specification demands that windowsill bears down on one.Described connect that reinforcing bar 3 is rectangular is uniformly embedded, coordinate it is ensured that anchor block 1 with pouring 2 arrangement of reinforcement phases With the structural stability pouring section 2.The using method beared down on one using this assembled windowsill it is ensured that the seriality of operation of building a wall, Improve work efficiency, prevent and treat the purpose of common quality defect;Meanwhile, the anchored end that windowsill bears down on one makes anchor block 1, can be in main body Utilize structural concrete clout to make during structure construction, realize solid waste and recycle, economize on resources, green construction.In described step a Anchor block 1 carries out prefabricated according to the specification of different windowsills, and anchor block 1 is located at same horizontal line it is ensured that the position water that bears down on one of windowsill Flat.
Above-described is only the preferred embodiment of the present invention it is noted that for a person skilled in the art, On the premise of without departing from present configuration, some deformation can also be made and improve, also should be considered as the protection model of the present invention Enclose, these are all without the effect affecting present invention enforcement and practical applicability.

Claims (3)

1. assembled windowsill coping structure it is characterised in that include anchor block, pour section and connect reinforcing bar, anchor block be two pieces, Connect between anchor block and pour section, connect reinforcing bar and be embedded in anchor block and the junction pouring section.
2. assembled windowsill coping structure according to claim 1 it is characterised in that:The length of the length, width and height of described anchor block Degree scope is respectively 220mm-250mm, 180mm-240mm and 100mm-130mm.
3. assembled windowsill coping structure according to claim 1 it is characterised in that:Described connection reinforcing bar is rectangular uniformly It is embedded.
CN201620345861.8U 2016-04-21 2016-04-21 Assembled windowsill structure of bearing down on one Expired - Fee Related CN205976914U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620345861.8U CN205976914U (en) 2016-04-21 2016-04-21 Assembled windowsill structure of bearing down on one

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620345861.8U CN205976914U (en) 2016-04-21 2016-04-21 Assembled windowsill structure of bearing down on one

Publications (1)

Publication Number Publication Date
CN205976914U true CN205976914U (en) 2017-02-22

Family

ID=58018896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620345861.8U Expired - Fee Related CN205976914U (en) 2016-04-21 2016-04-21 Assembled windowsill structure of bearing down on one

Country Status (1)

Country Link
CN (1) CN205976914U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804583A (en) * 2016-04-21 2016-07-27 重庆建工第三建设有限责任公司 Assembled sill coping structure and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804583A (en) * 2016-04-21 2016-07-27 重庆建工第三建设有限责任公司 Assembled sill coping structure and using method thereof

Similar Documents

Publication Publication Date Title
CN206319886U (en) Tunnel lining structure
CN206956565U (en) A kind of steel box girder bridge hogging moment area pre-stress system
CN209339466U (en) A kind of assembled parapet constructing structure
CN107119901A (en) The cast-in-place system of formwork structure and shear wall and construction method of shear wall angle node
CN106088447B (en) A kind of exterior wall builder's jack shaped steel hole eye protection brick device and construction method
CN104295003A (en) Structural column construction method
CN206888506U (en) The cast-in-place system of formwork structure and shear wall of shear wall angle node
CN205976914U (en) Assembled windowsill structure of bearing down on one
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN108625531A (en) A kind of construction method pouring constructional column concrete non-dismantling formwork
CN110004974A (en) A kind of prefabricated waterproof Retaining wall plate structure and its construction method
CN105804583A (en) Assembled sill coping structure and using method thereof
CN106320529A (en) Recyclable latticed column and floor slab connecting system and construction method
CN107975152A (en) The ductility connecting structure and construction method of first floor vertical member and basement roof
CN105041340A (en) Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering
CN205714221U (en) A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN102937024B (en) A kind of pick block method of waterproof lock room
CN105780938B (en) A kind of Super High core tube end plate vertical construction joint construction method
CN104712087A (en) Superimposed floor slab connecting method
CN204941567U (en) A kind of structure accelerating construction of tunnel vault pouring concrete speed
CN211774796U (en) Cross wall connection department constructional column exempts from formwork structure
CN107299596A (en) Support beam template system and its construction method under concrete support trestle plate
CN109026031B (en) Reconstruction construction method for collapsed section of gas tunnel after strong earthquake
CN207846656U (en) A kind of strong ties construction of assembled vertical member and basis

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222

Termination date: 20190421