CN108397218A - Based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force - Google Patents

Based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force Download PDF

Info

Publication number
CN108397218A
CN108397218A CN201810429690.0A CN201810429690A CN108397218A CN 108397218 A CN108397218 A CN 108397218A CN 201810429690 A CN201810429690 A CN 201810429690A CN 108397218 A CN108397218 A CN 108397218A
Authority
CN
China
Prior art keywords
top plate
support system
anchor cable
force
crossheading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810429690.0A
Other languages
Chinese (zh)
Inventor
张琨
任建喜
宋勇军
胡梦玲
毕冉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Science and Technology
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN201810429690.0A priority Critical patent/CN108397218A/en
Publication of CN108397218A publication Critical patent/CN108397218A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0093Accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention discloses a kind of based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, include that the side side support system of side, and the pressure relief groove that is opened on gate road bottom plate are helped for the roof timbering system of supporting gate road top plate and for supporting gate road two;Roof timbering system includes the short anchor cable of multiple top plates and absorption cell, and the short anchor cable of two neighboring top plate extended along gate road length direction is connected by top plate spill channel steel, and top plate pressure relief hole is opened up on top plate;Side side support system includes the short anchor cable in multiple side sides and absorption cell, and the two neighboring short anchor cable in side side laid along side side short transverse is by helping the connection of side spill channel steel, gate road two to help to offer side side pressure relief vent on side.The composite support system for principle, can effectively inhibit the overall deformation in tunnel with " unloading strong branch, damping energy-absorbing by force ", can reduce the injury to personnel and equipment when bump occurs, while effectively inhibiting the bottom distension in tunnel.

Description

Based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force
Technical field
The invention belongs to bump timbering technology in coal mine field, it is specifically related to that a kind of strong branch is theoretical to rush based on unloading by force Press coal mine rectangle crossheading composite support system with hitting.
Background technology
Currently, rock blast hazard has become and takes place frequently in buried high seam coal road recovery process and insoluble main disasters Evil.Live a large amount of monitoring data show that under the influence of strong dynamic pressure, relaxation zone range has been more than anchor rod anchored range, causes majority Anchor pole fails, and can not provide good support action.Roadway deformation is violent, and wall caving bottom distension phenomenon is difficult to solve, traditional supporting Means can not ensure the safety in production of coal working face.This not only influences mining progress, but also usually threatens digging people The safety of member and equipment.Therefore, a kind of new support system of design ensures that safe and efficient production is necessary.
Invention content
It is an object of the invention to overcome above-mentioned deficiency in the prior art, provide that a kind of strong branch is theoretical to rush based on unloading by force Press coal mine rectangle crossheading composite support system with hitting.The composite support system with " unloading strong branch, damping energy-absorbing by force " be principle, can Effectively inhibit the overall deformation in tunnel, the injury to personnel and equipment, while effectively suppression can be reduced when bump occurs The bottom distension in tunnel is made.
To achieve the above object, the technical solution adopted by the present invention is:Based on the bump coal mine for unloading strong branch theory by force Rectangle crossheading composite support system, it is characterised in that:Include the roof timbering system for supporting gate road top plate and suction Energy part and the side side support system and absorption cell that side is helped for supporting gate road two, and it is opened in gate road bottom plate On pressure relief groove;The roof timbering system includes the short anchor cable of multiple top plates for stretching into top plate, along gate road length side It is connected to the short anchor cable of two neighboring top plate of extension by top plate spill channel steel, top plate pressure relief hole is offered on the top plate; The side side support system includes multiple short anchor cables in side side that side is helped for stretching into gate road two, along side side short transverse cloth If the two neighboring short anchor cable in side side by help side spill channel steel be connected, the gate road two help side on offer side Side pressure relief vent.
It is above-mentioned based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, it is characterised in that: The short anchor cable of multiple top plates extended along gate road width direction is connected by reinforcing connect band.
It is above-mentioned based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, it is characterised in that: The reinforcement connect band is W steel band of model.
It is above-mentioned based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, it is characterised in that: Top plate absorption cell is provided in the top plate spill channel steel, one end of the short anchor cable of top plate sequentially passes through top plate pallet, top plate Absorption cell, top plate spill channel steel and reinforce connect band and stretch into top plate, the top plate pallet far from the top plate absorption cell one Side is provided with the short Anchor Cable Anchorage of top plate for applying pretightning force to the short anchor cable of the top plate.
It is above-mentioned based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, it is characterised in that: The top plate absorption cell is back of the body wood.
It is above-mentioned based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, it is characterised in that: Side side absorption cell is provided in the spill channel steel of the side side, one end of the side short anchor cable in side sequentially passes through side side pallet, side side Absorption cell and side side spill channel steel simultaneously stretch into side side, and side of the side side pallet far from the side side absorption cell, which is provided with, to be used for Apply the short Anchor Cable Anchorage in side side of pretightning force to the short anchor cable in the side side.
It is above-mentioned based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, it is characterised in that: The side side absorption cell is back of the body wood.
It is above-mentioned based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, it is characterised in that: The base angle of the gate road is provided with the pipe seam anchor bar for tilting down laying, and cement mortar is marked in the pipe seam anchor bar.
It is above-mentioned based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, it is characterised in that: The length of the short anchor cable of top plate and the side short anchor cable in side is 3m~5m.
It is above-mentioned based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, it is characterised in that: The drystone ashes for absorbing moisture is covered in the pressure relief groove, the pressure relief groove passes through cover closure;It is opened up on the cover board The water for being useful for making thereon falls into the osculum in pressure relief groove.
Compared with the prior art, the present invention has the following advantages:
1, the composite support system of the invention is by tunneling boring cable bolting, effectively to inhibit the overall deformation in tunnel, and And the technological means of release is pressed by allowing, pressure can be effectively laid down, is avoided on the top plate in gate road, side side and bottom plate Bottom distension phenomenon occurs.
2, the present invention, can be under bump effect by opening up pressure relief groove, and bottom distension caused by bottom plate is to pressure relief groove Interior movement.
3, the present invention reinforces connect band by setting, can the short anchor cable of top plate be effectively connected as entirety, low impacting When pressure is given birth to, the short anchor cable of multiple top plates is enabled to carry out effective cooperative transformation, and then reduce the overall deformation in tunnel.
4, the present invention can not only quickly be absorbed harmful in rock mass by the way that top plate absorption cell and side side absorption cell is arranged Energy accomplishes effective damping energy-absorbing, additionally it is possible to the effective loss for reducing prestressd anchor cable, it in addition can also be in impact load Under avoid spill channel steel from causing damages pallet.
5, the present invention is top plate absorption cell by using back of the body carpentery workshop, is effectively utilized the good compression strength of back of the body wood and can press The characteristics of compression deformation energy-absorbing, therefore in bump generating process, back of the body wood can step down release in time, quickly absorb rock mass In harmful energy, to alleviate the excessive pressure on support system, protection whole system is injury-free or destroys.
6, the present invention uses this short anchor cable, constructs more convenient, and can reach good anchoring effect.
Below by drawings and examples, technical scheme of the present invention will be described in further detail.
Description of the drawings
It, below will be to embodiment or the prior art in order to illustrate more clearly of the present invention or technical solution in the prior art Attached drawing needed in description is briefly described, it should be apparent that, drawings discussed below is only the one of the present invention A little embodiments for those skilled in the art without creative efforts, can also be according to these attached drawings Obtain other attached drawings.
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the plane artwork of roof timbering system of the present invention.
Fig. 3 is the plane artwork of present invention side side support system.
Fig. 4 is the position relationship schematic diagram of top plate absorption cell of the present invention, top plate spill channel steel and top plate pallet.
Fig. 5 is present invention side side absorption cell, side side spill channel steel and the position relationship schematic diagram for helping side pallet.Reference numeral Explanation:
1-gate road;1-1-top plate;1-2-side side;
1-3-bottom plate;2-pipe seam anchor bars;3-side short the anchor cables in side;
4-side side pressure relief vents;5-side side spill channel steels;6-top plate spill channel steels;
The short anchor cable of 7-top plates;8-top plate pressure relief holes;9-reinforce connect band;
10-cover boards;101-osculums;11-pressure relief grooves;
12-drystone ashes;13-top plate pallets;The short Anchor Cable Anchorage of 14-top plates;
15-top plate absorption cells;16-side side absorption cells;17-side short the Anchor Cable Anchorages in side;
18-side side pallets.
Specific implementation mode
Below in conjunction with the attached drawing in the present invention, the technical solution in the present invention is clearly and completely described, is shown So, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the reality in the present invention Example is applied, all other embodiment that those of ordinary skill in the art are obtained without creative efforts all belongs to In the scope of protection of the invention.
As shown in Figure 1, Figure 2 and Figure 3 is a kind of based on the bump coal mine rectangle crossheading composite support for unloading strong branch theory by force Watch box system, the composite support system are theoretical based on strong branch is unloaded by force comprising are used for the top plate of 1 top plate 1-1 of supporting gate road Support system and side side support system for side of 1 liang of supporting gate road side side 1-2, and it is opened in 1 bottom plate of gate road Pressure relief groove 11 on 1-3;The roof timbering system includes for stretching into the short anchor cable 7 of multiple top plates of top plate 1-1, along crossheading lane The short anchor cable of two neighboring top plate that road 1 length direction extends 7 is connected by top plate spill channel steel 6, is opened up on the top plate 1-1 There is top plate pressure relief hole 8;The side side support system includes multiple short anchors in side side for stretching into 1 liang of side of side side 1-2 of gate road Rope 3, the short anchor cable in two neighboring side side 3 laid along side side 1-2 short transverses are described suitable by helping side spill channel steel 5 to be connected Side side pressure relief vent 4 is offered on side of the side side 1-2 of 1 liang of slot tunnel.
In the present embodiment, the composite support system by roof timbering system for 1 top plate 1-1 of supporting gate road and Side side support system for 1 liang of side of side side 1-2 of supporting gate road constitutes tunneling boring cable bolting, this tunneling boring anchor cable branch Shield can effectively inhibit the overall deformation in tunnel, and by the way that top plate pressure relief hole 8 and side side pressure relief vent 4 and crossheading lane is arranged Offer pressure relief groove 11 on the bottom plate 1-3 in road 1, can effectively lay down pressure, avoid gate road 1 top plate 1-1, side side Bottom distension phenomenon occurs on 1-2 and bottom plate 1-3, and by opening up pressure relief groove 11, can be under bump effect, bottom plate 1-3 Generated bottom distension is moved into pressure relief groove 11.
In the present embodiment, which for principle, can effectively inhibit the whole of tunnel to become with " unloading strong branch by force " Shape can reduce the injury to personnel and equipment when bump occurs, while effectively inhibit the bottom distension in tunnel.
As shown in Figure 1, connected by reinforcing connect band 9 along the short anchor cable 7 of multiple top plates that 1 width direction of gate road extends It connects.
In the present embodiment, connect band 9 is reinforced by setting, can the short anchor cable of top plate 7 be effectively connected as entirety, rushed When hitting low pressure and occurring, the short anchor cable of multiple top plates 7 is enabled to carry out effective cooperative transformation, and then reduce the whole of tunnel and become Shape.
In the present embodiment, the reinforcement connect band 9 is W steel band of model.Using W steel band of model as reinforcement connect band 9.
As shown in figure 4, be provided with top plate absorption cell 15 in the top plate spill channel steel 6, one end of the short anchor cable of the top plate 7 It sequentially passes through top plate pallet 13, top plate absorption cell 15, top plate spill channel steel 6 and reinforces connect band 9 and stretch into top plate 1-1, it is described Side of the top plate pallet 13 far from the top plate absorption cell 15 is provided with the top for applying pretightning force to the short anchor cable 7 of the top plate The short Anchor Cable Anchorage of plate 14.
In the present embodiment, by the setting top plate absorption cell 15 in top plate spill channel steel 6, the suction of top plate absorption cell 15 is utilized Can feature, therefore in bump generating process, top plate absorption cell 15 can step down release in time, quickly absorb in rock mass Harmful energy, to alleviate the excessive pressure on support system, protection whole system is injury-free or destroys.And due to passing In the anchor cable beam of system, the real contact area very little of top plate pallet 13 and top plate spill channel steel 6, this combination causes to pre-tighten The transmission effects of power is relatively low, and under irregular Impact Load, loss of prestress is apparent.On the other hand, top plate is recessed A big gap can be formed in shape channel steel 6 and top plate pallet 13, top plate 1-1 holds very much come two legs of top plate spill channel steel 6 when pressing Easily top plate pallet 13 is caused to damage.It follows that by the way that top plate absorption cell 15 is arranged, can not only quickly absorb in rock mass Harmful energy, additionally it is possible to it is effective to reduce the short 7 prestressed loss of anchor cable of top plate, in addition can also be avoided under impact load Top plate spill channel steel 6 causes damages to top plate pallet 13.
In the present embodiment, the top plate absorption cell 15 is back of the body wood.Since the back of the body is wooden with good compression strength and compressible The characteristics of deforming energy-absorbing, therefore in bump generating process, back of the body wood can step down release in time, quickly absorb in rock mass Harmful energy, to alleviate the excessive pressure on support system, protection whole system is injury-free or destroys.
As shown in figure 5, side side absorption cell 16 is provided in side side spill channel steel 5, one end of the side short anchor cable in side 3 It sequentially passes through side side pallet 18, side side absorption cell 16 and side side spill channel steel 5 and stretches into side side 1-2, the side side pallet 18 is remote Side from the side side absorption cell 16 is provided with the short Anchor Cable Anchorage in side side for applying pretightning force to the short anchor cable 3 in the side side 17。
Top plate absorption cell 15 is set similarly in top plate spill channel steel 6, in the present embodiment, by side side spill channel steel It is provided with side side absorption cell 16 in 5, can not only quickly absorb harmful energy in rock mass, additionally it is possible to is effective to reduce side side In addition the 3 prestressed loss of short anchor cable can also avoid side side spill channel steel 5 from causing to damage to side side pallet 18 under impact load It loses.
In the present embodiment, the side side absorption cell 16 is back of the body wood.It is also with the good compression strength of back of the body wood and can The characteristics of compressive deformation energy-absorbing, therefore in bump generating process, back of the body wood can step down release in time, quickly absorb rock Harmful energy in body, to alleviate the excessive pressure on support system, protection whole system is injury-free or destroys.
In the present embodiment, not only it is made up of roof timbering system and side side support system the composite support system complete Section cable bolting, to play the purpose of strong supporting, and by top plate pressure relief hole 8 and side side pressure relief vent 4 and it is set by Top plate absorption cell 15 helps side absorption cell 16 to carry out effective damping energy-absorbing made of back of the body wood, to reach it is effective " unload by force strong branch, The purpose of damping energy-absorbing " realizes effective combination of strong supporting and damping energy-absorbing, and then effectively inhibits the overall deformation in tunnel, energy When bump occurs, the injury to personnel and equipment is reduced, while effectively inhibiting the bottom distension in tunnel.
As shown in Figure 1, the base angle of the gate road 1 is provided with the pipe seam anchor bar 2 for tilting down laying, the pipe seam anchor It is marked with cement mortar in bar 2.The pipe seam anchor bar 2 of laying is tilted down by setting, the level that can effectively reduce bottom plate 1-3 is answered Power, and by bottom hole explosion emission levels stress, increasing wall-rock crack, and then strengthen the slip casting effect of cement mortar.
In the present embodiment, the length of the short anchor cable of the short anchor cable 7 of the top plate and the side side 3 is 3m~5m.Using this Short anchor cable constructs more convenient, and can reach good anchoring effect.
As shown in Figure 1, being covered with the drystone ashes 12 for absorbing moisture in the pressure relief groove 11, the pressure relief groove 11 passes through Cover board 10 is closed, and the osculum 101 that the water for making thereon is fallen into pressure relief groove 11 is offered on the cover board 10.
In the present embodiment, by uniformly spreading the drystone ashes 12 of one layer of 100mm thickness in pressure relief groove 11 and being compacted, such energy The moisture in 11 slot bottom of pressure relief groove and air is set to completely cut off, to keep the drying of pressure relief groove 11, and by cover board 10 by pressure relief groove 11 Closing, to facilitate going together for people and equipment, in addition, by opening up osculum 101 on cover board 10, and then cover board 10 can be made On moisture fall into pressure relief groove 11, it is ensured that the drying of cover board 10.
In the present embodiment, which specifically follows the steps below in construction:
First, tunneling boring cable bolting is carried out.Every two anchor cables are connected using a spill channel steel, i.e.,:Two top plates are short Anchor cable 7 is connected by top plate spill channel steel 6, and two side short anchor cables in sides 3 are by helping side spill channel steel 5 to be connected, wherein top plate Short anchor cable 7 passes through W shaped steel band connections, wherein is put into back of the body wood in top plate spill channel steel 6 and side side spill channel steel 5, carries on the back the lower peace of wood High strength pallet is set, pretightning force is fixed by anchorage and applied to last short anchor cable, and pretightning force is not less than 200Kn.
Then, in the sides of top plate 1-1 and two, side 1-2 beats pressure relief vent.It is bored and is punched using φ 42, hole depth is not less than 3500mm.
Next, tunnel base angle both sides carry out locking angle anchor bolt construction.Specific construction sequence be:Punching, bottom hole explosion, installation Pipe seam anchor bar 2 and slip casting.Wherein, the first step is punching, is bored and is punched using φ 42, hole depth is not less than 3500mm.Second step is hole Bottom explosion, each hole carry out bottom hole explosion with a roll of mining emulsion.Third step is installation pipe seam anchor bar 2 and slip casting, will be managed Seam anchor pole 2 is installed in the hole after explosion, and grouting pump is used in combination to carry out slip casting, and the ratio of mud of cement mortar, which is controlled 0.5-0.7, is Preferably.
Finally, then the bottom plate 1-3 of gate road 1 starts discharging indent 11.Pressure relief groove 11 is excavated, mode of grooving is using pneumatic pick The method loosen, manually slagged tap.Such as occurs ponding in work progress, it is necessary to water be discharged immediately, moist quarrel stone is removed.It unloads After the completion of indent 11, uniformly spreads one layer of 100mm drystones ashes 12 and be compacted, cover board 10, cover board are finally covered on pressure relief groove 11 Osculum 101 should be beaten on 10 in order to drain.
The above is only presently preferred embodiments of the present invention, is not imposed any restrictions to the present invention, every according to the present invention Technical spirit still falls within skill of the present invention to any simple modification, change and equivalent structure transformation made by above example In the protection domain of art scheme.

Claims (10)

1. based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, it is characterised in that:Including being used for The roof timbering system of supporting gate road (1) top plate (1-1) and the side that side (1-2) is helped for supporting gate road (1) two Side support system, and the pressure relief groove (11) that is opened on gate road (1) bottom plate (1-3);The roof timbering system includes The short anchor cable of multiple top plates (7) for stretching into top plate (1-1), the two neighboring top plate extended along gate road (1) length direction Short anchor cable (7) is connected by top plate spill channel steel (6), and top plate pressure relief hole (8) is offered on the top plate (1-1);The side Side support system includes multiple short anchor cables in side side (3) that side (1-2) is helped for stretching into gate road (1) two, along side side (1-2) The two neighboring short anchor cable in side side (3) that short transverse is laid is by helping side spill channel steel (5) to be connected, the gate road (1) Side side pressure relief vent (4) is offered in two sides side (1-2).
2. it is according to claim 1 based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, It is characterized in that:The short anchor cable of multiple top plates (7) extended along gate road (1) width direction is connected by reinforcing connect band (9) It connects.
3. it is according to claim 2 based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, It is characterized in that:The reinforcement connect band (9) is W steel band of model.
4. it is according to claim 2 based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, It is characterized in that:It is provided with top plate absorption cell (15), one end of the short anchor cable of top plate (7) in the top plate spill channel steel (6) It sequentially passes through top plate pallet (13), top plate absorption cell (15), top plate spill channel steel (6) and reinforces connect band (9) and stretch into top plate (1-1), side of the top plate pallet (13) far from the top plate absorption cell (15) are provided with for the short anchor cable of the top plate (7) apply the short Anchor Cable Anchorage of top plate (14) of pretightning force.
5. it is according to claim 4 based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, It is characterized in that:The top plate absorption cell (15) is back of the body wood.
6. it is according to claim 1 based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, It is characterized in that:Side side absorption cell (16), one end of the side short anchor cable in side (3) are provided in the side side spill channel steel (5) It sequentially passes through side side pallet (18), side side absorption cell (16) and side side spill channel steel (5) and stretches into side side (1-2), the side side Side of the pallet (18) far from the side side absorption cell (16) is provided with for applying pretightning force to the side short anchor cable in side (3) Help the short Anchor Cable Anchorage in side (17).
7. it is according to claim 6 based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, It is characterized in that:The side side absorption cell (16) is back of the body wood.
8. it is according to claim 1 based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, It is characterized in that:The base angle of the gate road (1) is provided with the pipe seam anchor bar (2) for tilting down laying, the pipe seam anchor bar (2) cement mortar is marked in.
9. it is according to claim 1 based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, It is characterized in that:The length of the short anchor cable of top plate (7) and the side short anchor cable in side (3) is 3m~5m.
10. it is according to claim 1 based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force, It is characterized in that:The drystone ashes (12) for absorbing moisture is covered in the pressure relief groove (11), the pressure relief groove (11) passes through Cover board (10) is closed;The osculum (101) that the water for making thereon is fallen into pressure relief groove (11) is offered on the cover board (10).
CN201810429690.0A 2018-05-08 2018-05-08 Based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force Pending CN108397218A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810429690.0A CN108397218A (en) 2018-05-08 2018-05-08 Based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810429690.0A CN108397218A (en) 2018-05-08 2018-05-08 Based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force

Publications (1)

Publication Number Publication Date
CN108397218A true CN108397218A (en) 2018-08-14

Family

ID=63101941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810429690.0A Pending CN108397218A (en) 2018-05-08 2018-05-08 Based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force

Country Status (1)

Country Link
CN (1) CN108397218A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184737A (en) * 2018-09-30 2019-01-11 山东建筑大学 The tunnel prestressing force constraint of pressure energy-absorbing can be allowed to fill liner supporting system and technique
CN109268017A (en) * 2018-09-14 2019-01-25 中国矿业大学 A method of control high stress breaking surrounding rock main entry pucking
CN109268047A (en) * 2018-11-01 2019-01-25 天地科技股份有限公司 Laminated structure and method are unloaded in a kind of supporting in bump tunnel
CN111608707A (en) * 2020-04-29 2020-09-01 临沂矿业集团菏泽煤电有限公司 Rock burst dangerous roadway support method based on double-cylinder protection theory
CN111608663A (en) * 2020-04-29 2020-09-01 临沂矿业集团菏泽煤电有限公司 Omnibearing pressure relief method for rock burst dangerous roadway of thick coal seam working face
CN112127909A (en) * 2020-09-08 2020-12-25 河海大学 Accurate grouting repairing and reinforcing method for broken surrounding rock of tunnel
CN116838317A (en) * 2023-06-30 2023-10-03 陕煤集团神木张家峁矿业有限公司 Three-dimensional dynamic loading device for simulating underground rock burst and rock burst prediction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2177550C1 (en) * 2000-06-28 2001-12-27 Государственный научно-исследовательский институт горной геомеханики и маркшейдерского дела - Межотраслевой научный центр (ВНИМИ) Method of mine workings support
CN1693670A (en) * 2005-05-19 2005-11-09 中国矿业大学 Three-anchor coupling supporting method for high stress tunnel break wall rock
CN101713290A (en) * 2009-12-10 2010-05-26 天地科技股份有限公司 Method for clearing rock burst of full-mine laneway deep in mine
CN102900445A (en) * 2012-11-12 2013-01-30 淮南矿业(集团)有限责任公司 Temporary supporting device for anchor net roadway
CN202851027U (en) * 2012-07-23 2013-04-03 西安科技大学 Support system treating soft rock roadway floor heaves
CN104806265A (en) * 2015-03-31 2015-07-29 辽宁工程技术大学 Impact ground pressure preventing method of full seam gateway
CN106894833A (en) * 2017-01-23 2017-06-27 山东科技大学 Gob side entry driving unbalanced support structure and construction method under the unstable overlying strata in deep
CN208252137U (en) * 2018-05-08 2018-12-18 西安科技大学 Based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2177550C1 (en) * 2000-06-28 2001-12-27 Государственный научно-исследовательский институт горной геомеханики и маркшейдерского дела - Межотраслевой научный центр (ВНИМИ) Method of mine workings support
CN1693670A (en) * 2005-05-19 2005-11-09 中国矿业大学 Three-anchor coupling supporting method for high stress tunnel break wall rock
CN101713290A (en) * 2009-12-10 2010-05-26 天地科技股份有限公司 Method for clearing rock burst of full-mine laneway deep in mine
CN202851027U (en) * 2012-07-23 2013-04-03 西安科技大学 Support system treating soft rock roadway floor heaves
CN102900445A (en) * 2012-11-12 2013-01-30 淮南矿业(集团)有限责任公司 Temporary supporting device for anchor net roadway
CN104806265A (en) * 2015-03-31 2015-07-29 辽宁工程技术大学 Impact ground pressure preventing method of full seam gateway
CN106894833A (en) * 2017-01-23 2017-06-27 山东科技大学 Gob side entry driving unbalanced support structure and construction method under the unstable overlying strata in deep
CN208252137U (en) * 2018-05-08 2018-12-18 西安科技大学 Based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109268017A (en) * 2018-09-14 2019-01-25 中国矿业大学 A method of control high stress breaking surrounding rock main entry pucking
CN109184737A (en) * 2018-09-30 2019-01-11 山东建筑大学 The tunnel prestressing force constraint of pressure energy-absorbing can be allowed to fill liner supporting system and technique
CN109184737B (en) * 2018-09-30 2023-11-03 山东建筑大学 Tunnel prestress constraint filling lining support system capable of yielding and absorbing energy and process
CN109268047A (en) * 2018-11-01 2019-01-25 天地科技股份有限公司 Laminated structure and method are unloaded in a kind of supporting in bump tunnel
CN111608707A (en) * 2020-04-29 2020-09-01 临沂矿业集团菏泽煤电有限公司 Rock burst dangerous roadway support method based on double-cylinder protection theory
CN111608663A (en) * 2020-04-29 2020-09-01 临沂矿业集团菏泽煤电有限公司 Omnibearing pressure relief method for rock burst dangerous roadway of thick coal seam working face
CN112127909A (en) * 2020-09-08 2020-12-25 河海大学 Accurate grouting repairing and reinforcing method for broken surrounding rock of tunnel
CN116838317A (en) * 2023-06-30 2023-10-03 陕煤集团神木张家峁矿业有限公司 Three-dimensional dynamic loading device for simulating underground rock burst and rock burst prediction method
CN116838317B (en) * 2023-06-30 2024-05-07 陕煤集团神木张家峁矿业有限公司 Three-dimensional dynamic loading device for simulating underground rock burst and rock burst prediction method

Similar Documents

Publication Publication Date Title
CN108397218A (en) Based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force
CN204780994U (en) Underground continuous wall lining wall construction structure
US11248464B2 (en) Method of treating tunnel collapse with roof-contacted shield support
AU2020385366B2 (en) Method of treating tunnel collapse using pavilion support
CN203756206U (en) Novel soft-rock roadway floor heave governing structure
CN108087008B (en) A kind of three-soft seam gob side entry method for protecting support
KR100855098B1 (en) Strut structure as temporary system using a vertical truss at the end and the method thereof
KR20060059833A (en) Tunnelling method using pre-support concept and an adjustable apparatus thereof
CN107119799A (en) The prestressing force assembling type node construction and its construction method of beam-ends friction energy-dissipating
CN112252342B (en) Steel wire grid net protection and construction method for rock slope broken rock mass
CN208252137U (en) Based on the bump coal mine rectangle crossheading composite support system for unloading strong branch theory by force
CN103388481A (en) Combined prefabricated slab for governing floor heave and method for governing floor heave
CN106930436B (en) Reinforced concrete shear wall with built-in prestressed steel diagonal bracing
EA031926B1 (en) Method for forming a pillar part and reinforcing adjacently constructed parallel tunnels with reinforcing rods
CN106836036A (en) A kind of elastic energy dissipating tunnel shed hole structure and construction method
CN204098523U (en) Punch after a kind of reinforced concrete floor and add beam reinforced structure
CN101349155A (en) Apparatus for controlling laneway bottom heave
CN210395412U (en) Prestressed anchor pile uplift foundation suitable for overhead transmission line in mountain area
CN109736889A (en) A kind of mining shock resistance type fire dam and its building method
CN105201525B (en) A kind of recoverable preventing and treating pucking method
CN106761841A (en) Working face tailgate fractured coal grouting reinforcement method
CN201314241Y (en) Built-in three-dimensional strengthening rib-strengthened filled wall structure for roadway retained for next sublevel
CN217841008U (en) Reinforced structure that shear force wall node concrete intensity is not enough
KR20120047438A (en) Surface pressing rock-bolting method
CN108677933A (en) A kind of transmission line of electricity under swelled ground geological conditions subtracts swollen bored concrete pile foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180814