CN108396955A - Tool-type wall-connecting piece and its construction technology - Google Patents
Tool-type wall-connecting piece and its construction technology Download PDFInfo
- Publication number
- CN108396955A CN108396955A CN201810340834.5A CN201810340834A CN108396955A CN 108396955 A CN108396955 A CN 108396955A CN 201810340834 A CN201810340834 A CN 201810340834A CN 108396955 A CN108396955 A CN 108396955A
- Authority
- CN
- China
- Prior art keywords
- connecting piece
- bar
- wall
- transverse connection
- outrigger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses a kind of tool-type wall-connecting piece and its construction technologies, tool-type wall-connecting piece, including embedded bar, transverse connection and upright bar connector, embedded bar one end is embedded in advance in concrete main body structure, the embedded bar other end stretched out on the outside of concrete main body structure is connected with transverse connection one end, the transverse connection other end is connected with outrigger upright bar by what upright bar connector can be dismantled, and construction method is:First it is fabricated to transverse connection, then outrigger is set up by specification, floor concrete pours and the embedded bar of pre-buried wall-connecting piece, and reinforced bar sleeve is connect with embedded bar and connect lateral connection with outrigger upright bar, when dismounting, first tears transverse connection open and tear reinforced bar sleeve and embedded bar open again with outrigger;Dew part at embedded bar is cut off and is repaired concrete main body structure alien invasion, the present invention can meet the pitch requirements of wall-connecting piece and outrigger host node, and avoid fastener sliding, and reduce the risk for blocking quantities and leakage.
Description
Technical field
The present invention relates to a kind of building engineering construction technique, more particularly to a kind of tool-type wall-connecting piece and its construction technology.
Background technology
Wall-connecting piece, using generally, is applied to external scaffolding, console mode discharging platform and main body more in building engineering construction
The drawknot of structure.The main purpose that wall-connecting piece is set be ensure outrigger and expect platform monolithic stability, prevent its wind load or its
He topples under horizontal loading.According to《Construction fastener type steel pipe scaffold technical specification of security》(JGJ 130-
2011), the arrangement of wall-connecting piece should meet following requirement:
1, should be arranged close to host node, the distance for deviateing host node should not exceed 300mm;
2, it should be started setting up from the first step longitudinal horizontal rod of bottom;
3, preferentially diamond shape should be used to arrange, or uses rectangular, rectangular arrangement;
4, the both ends of open-type scaffold must be provided with wall-connecting piece, and the vertical interval of wall-connecting piece should not exceed the layer of building
Height, and should not exceed 4m;
5, wall-connecting piece should be in horizontally disposed, should be oblique to scaffold one end when that cannot be horizontally disposed with;
6, wall-connecting piece, which must use, can bear pulling force and the construction of pressure.To the double-pole scaffold of height 24m or more, Ying Cai
It is connect with building with rigid connecting tube;
7, the spacing of wall-connecting piece setting should also conform to the regulation of following table in addition to meeting and calculating requirement:
The maximum spacing of wall-connecting piece arrangement
Erection method | Highly | Vertical spacing (h) | Level interval (la) | Every wall-connecting piece area coverage (m2) |
Double landing | ≤50m | 3h | 3la | ≤40 |
Double overhanging | > 50m | 2h | 3la | ≤27 |
It is single | ≤24m | 3h | 3la | ≤40 |
Note:H-step pitch;la- advance
Wall-connecting piece that existing mainstream uses and its there are the problem of it is as follows:
There are many way of present wall-connecting piece, and many companies are proposed the way of Novel wall connector, but all fail generally to push away
Extensively.The wall-connecting piece that mainstream uses at present is still traditional form, is first embedded in 10 top of beam, horizontal round steel using vertical round steel pipe 9
11 both ends of pipe wall-connecting piece are connect with pre-buried vertical round steel pipe and upright bar respectively by fastener 12.
Using above-mentioned traditional wall-connecting piece way, there are the problem of it is as follows:
1, wall-connecting piece is connected by fastener, resists horizontal loading using fastener frictional force, bearing capacity is limited.When building is high
When spending that larger, wind action power is larger, it is difficult to meet the requirements that fastener resisting slipping, which is moved and calculated,;
2, basis《Construction fastener type steel pipe scaffold technical specification of security》(JGJ130-2011), external scaffolding one
As step pitch be 1.8m, and it is more to build floor height situation, and wall-connecting piece setting is in flooring position, it is difficult to ensure that wall-connecting piece and the main section of outrigger
Point distance is not more than 300mm;
3, vertical steel pipe is embedded in top surface of the beam in advance, and in outer-wall building, this part need to be stayed and set hole, after scaffold dismounting, needs
Hole is blocked, construction trouble, and waterproof quality is relatively difficult to guarantee at hole, there are hidden leakage defects;
4, vertical steel pipe uses pre-buried form, when dismounting that can only cut steel pipe, the steel in Transducers Embedded in Concrete agent structure
Pipe can not utilize again, cause a degree of waste.
Invention content
In order to make up the above deficiency, the present invention provides a kind of tool-type wall-connecting piece and its construction technology, which connects
Wall part and its construction technology are applied widely, and outrigger is safe, easy for construction, can effectively avoid building staying for hole by laying bricks or stones and set,
Substantially increase the dismounting efficiency and recycling number of wall-connecting piece.
The present invention in order to solve its technical problem used by technical solution be:A kind of tool-type wall-connecting piece, including it is pre-buried
Reinforcing bar, transverse connection and upright bar connector, described embedded bar one end are embedded in advance in concrete main body structure, and embedded bar is another
The outside of concrete main body texture edge is stretched out in one end, and transverse connection one end is fixedly connected with the embedded bar other end, laterally
The connector other end can be fixedly connected with outrigger upright bar by what upright bar connector can be dismantled.
As a further improvement on the present invention, the embedded bar is located at the formation bending of one end in concrete main body structure
Structure, embedded bar stretch out concrete main body texture edge exterior portion and are horizontal extension.
As a further improvement on the present invention, the L-shaped structure of the embedded bar.
As a further improvement on the present invention, the transverse connection includes angle steel and reinforced bar sleeve, the reinforced bar sleeve
It is fixedly installed in angle steel one end, reinforced bar sleeve fixing sleeve is set to another on the outside of embedded bar stretching concrete main body texture edge
End outside.
As a further improvement on the present invention, the reinforced bar sleeve is connected through a screw thread with the embedded bar other end, reinforcing bar
It uses and is welded to connect between sleeve and angle steel.
As a further improvement on the present invention, the upright bar connector includes U bolt and nut, the U bolt set
On the outside of outrigger upright bar, set on transverse connection side wall there are two spaced horizontal perforation, U bolt both ends are worn respectively
Cross two of transverse connection horizontal perforation, and the bolt structure at U bolt both ends is finally spirally connected with nut, the nut tight against
Transverse connection one side wall, another side wall of transverse connection is tight against outrigger upright bar lateral surface.
As a further improvement on the present invention, the upright bar connector further includes gasket, and gasket is sheathed on U bolt both ends
Outside, and gasket is closely located between transverse connection and nut.
As a further improvement on the present invention, the transverse connection is horizontal linear structure or for by both ends horizontal
The bending structure of linear structure and intermediate fore-and-aft tilt structure composition, and level of the transverse connection close to embedded bar one end is straight
Cable architecture height is higher than transverse connection close to the horizontal linear structure height of outrigger upright bar one end.
A kind of tool-type wall-connecting piece construction method, is as follows:
Step 1:The making and installation of wall-connecting piece:
A. transverse connection makes:By angle steel, size makes as required, and perforation is opened up on angle steel;
B. reinforced bar sleeve is welded on angle steel one end;
C. outrigger spacing positions, and sets up that (if necessary, setting is interim oblique to the above 1.5m of flooring to be onstructed by code requirement
Throw support);
D. floor template installs, reinforcing bar binding, positioning, the embedded bar of pre-buried wall-connecting piece, then concreting;
E. after concrete strength is met the requirements, the reinforced bar sleeve of wall-connecting piece is tightened with embedded bar and is connect, meanwhile, by U
Type bolt sleeve is erected outside on the outside of bar, and U-bolt both ends are inserted into the transverse connection other end perforation of wall-connecting piece, in group
Tighten nut;
Step 2:The dismounting of wall-connecting piece:
A. the U-bolt that is connect with outrigger upright bar of transverse connection is first removed, then by the reinforced bar sleeve of wall-connecting piece from pre-
It buries and is backed out on reinforcing bar;
B. the steel bar end exposed at embedded bar is cut off, then to the concrete main body structure at steel bar end position outside
Facade local route repair;
C. unified collect of the transverse connection of the wall-connecting piece of dismounting and U-bolt and nut is stored, so that next time makes
With.
As a further improvement on the present invention, wall-connecting piece is successively removed with outrigger synchronization in the step 2, first will be forbidden
Outrigger is torn open again after wall-connecting piece flood or several layers of dismounting.
The method have the benefit that:The present invention can substitute traditional form wall-connecting piece, and the present invention uses U bolt
With the Novel connection type of nut cooperation, the pitch requirements of wall-connecting piece and outrigger host node can be met as much as possible, and avoid
The problem of fastener resisting slipping shifting can not meet requirement for bearing capacity, the present invention can be suitable for the outer foot of console mode external scaffolding, overhanging type
Hand cradle, console mode discharging platform etc. and beams of concrete and concrete walls agent structure drawknot, enhance the applicability of wall-connecting piece
And safety;On the other hand, which obviate staying for hole when outer-wall building to set, and quantities and the water-proofing treatment for reducing closure are bad
The risk for causing leakage, improves economy and reliability, in addition, the installation of tool-type wall-connecting piece, the dismounting of the present invention are convenient, and
It is repeatable to utilize, there is greater advantage in economy.
Description of the drawings
Fig. 1 is the principle schematic diagram of traditional wall-connecting piece;
Fig. 2 is the upright bar connecting-piece structure principle schematic of the present invention;
Fig. 3 is the present invention and concrete main body structure connecting node schematic diagram;
Fig. 4 is that the present invention is connected sectional front view with concrete main body structure and outrigger;
Fig. 5 is that the present invention is connected cross sectional plan view with concrete main body structure and outrigger;
Fig. 6 is that the present invention is connected diagrammatic cross-section using oblique transverse connection and agent structure and outrigger.
Specific implementation mode
Embodiment:A kind of tool-type wall-connecting piece, including embedded bar 1, transverse connection and upright bar connector, it is described pre-buried
1 one end of reinforcing bar is embedded in advance in concrete main body structure 2, and 1 other end of embedded bar stretches out the outer of 2 side of concrete main body structure
Side, transverse connection one end are fixedly connected with 1 other end of embedded bar, and the transverse connection other end can be logical with outrigger upright bar 3
That crosses that upright bar connector can dismantle is fixedly connected.
Wall-connecting piece and the connecting portion of concrete main body structure 2 are embedded bar 1, which facilitates construction, and can have
Effect, which avoids staying when outer-wall building, sets hole, and beam side position, beam sides pre-buried steel are changed to by the back position of concrete main body structure 2
Muscle 1, wall-connecting piece can move up and down within the scope of the deck-molding of concrete main body structure 2, must can be satisfied with outrigger host node as far as possible
Between be not more than 300mm required distance.
The embedded bar 1 is located at one end in concrete main body structure 2 and forms bending structure, and embedded bar 1 stretches out mixed
Solidifying soil 2 side exterior portion of agent structure is horizontal extension.The structure can enhance embedded bar 1 in concrete main body knot
Bonding strength in structure 2 avoids being drawn out.
1 L-shaped structure of the embedded bar.L-shaped structure realizes embedded bar 1 and concrete main body by vertical side wall
The superpower connection structure of structure 2.
The transverse connection includes angle steel 4 and reinforced bar sleeve 5, and the reinforced bar sleeve 5 is fixedly installed in 4 one end of angle steel,
5 fixing sleeve of reinforced bar sleeve is set to embedded bar 1 and stretches out on the outside of the other end on the outside of 2 side of concrete main body structure.Embedded bar 1
It is easy to connect with the sleeve connection for being welded in 4 inner wall of equal leg angle, it is easy for installation and removal.
The reinforced bar sleeve 5 is connected through a screw thread with 1 other end of embedded bar, using weldering between reinforced bar sleeve 5 and angle steel 4
It connects in succession.
The upright bar connector includes U bolt 6 and nut 7, and the U bolt 6 is sheathed on 3 outside of outrigger upright bar, horizontal
It is set on connector side wall there are two spaced horizontal perforation, 6 both ends of U bolt are each passed through two of transverse connection
Level perforation, and the bolt structure at 6 both ends of U bolt is finally spirally connected with nut 7, the nut 7 is tight against transverse connection side
Wall, another side wall of transverse connection is tight against 3 lateral surface of outrigger upright bar.
The clamping and positioning for externally erecting bar 3, the company of improving are realized by U bolt 6, nut 7 and transverse connection side wall
Intensity is connect, U-bolt is carried simultaneously by both sides, and bearing capacity is strong, and pressure-bearing and shear resistance are strong.
The upright bar connector further includes gasket 8, and gasket 8 is sheathed on the outside of 6 both ends of U bolt, and 8 close sandwiched of gasket
Between transverse connection and nut 7.It is locking that gasket 8 may be implemented nut 7, and nut 7 is avoided to loosen.
The transverse connection is horizontal linear structure or for by both ends horizontal linear structure and intermediate fore-and-aft tilt
The bending structure of structure composition, and horizontal linear structure height of the transverse connection close to 1 one end of embedded bar connects higher than lateral
Horizontal linear structure height of the fitting close to 3 one end of outrigger upright bar.Can preferably it be met by above-mentioned slanting structure existing
The requirement (between outrigger host node be not more than 300mm) of specification effectively overcomes traditional wall-connecting piece and is unsatisfactory for current specifications and wants
The generalized situations asked.
A kind of tool-type wall-connecting piece construction method, is as follows:
Step 1:The making and installation of wall-connecting piece:
A. transverse connection makes:By angle steel 4, size makes as required, and perforation is opened up on angle steel 4;
B. reinforced bar sleeve 5 is welded on 4 one end of angle steel;
C. outrigger spacing positions, and sets up that (if necessary, setting is interim oblique to the above 1.5m of flooring to be onstructed by code requirement
Throw support);
D. floor template installs, reinforcing bar binding, positioning, the embedded bar 1 of pre-buried wall-connecting piece, then concreting;
E. after concrete strength is met the requirements, the reinforced bar sleeve 5 of wall-connecting piece is tightened with embedded bar 1 and is connect, meanwhile, it will
U-bolt is sleeved on 3 outside of outrigger upright bar, and U-bolt both ends is inserted into the transverse connection other end perforation of wall-connecting piece, group
In tighten nut 7;
4 section model of angle steel, U-bolt model, 1 diameter of embedded bar of wall-connecting piece can be according to actual loadings
Size is determined by checking.
Below with Suzhou District B classes environment, the double-pole scaffold (upright bar advance 1.3m, step pitch 1.8m) of height 30m, even wall
Part selects L40x40x3 equal leg angles 4 (Q235B), two step three of wall-connecting piece for setting, presses《Construction fastener type steel pipe foot
Hand cradle technical specification of security》(JGJ 130-2011) is checked.
(1) the transverse connection section checking of wall-connecting piece:
Wind load height change factor μz=1.39;
Scaffold structural shape factor of wind load
Fundamental wind pressure ω0=0.3kN/m2;
Characteristi cvalue o fwindload ωk=μz·μs·ω0=1.39x1.04x0.3=0.434kN/m2;
Wind load generates wall-connecting piece axial force design value
Nlw=1.4 ωk·Aw=1.4x0.434x3.6x3.9=8.53kN;
Wall-connecting piece constrains axial force N caused by scaffold deformity out of plane0=3kN;
Wall-connecting piece axial force design value Nl=Nlw+N0=8.53+3=11.53kN;
Wall-connecting piece uses L40x40x3 equal leg angles 4, area of section A=2.36cm2, radius of inertia ix=1.23cm;
Wall-connecting piece computational length l0=300mm, slenderness ratio λ=l0/ i=300/12.3=24.4, tables look-up
Strength checking:σ=Nl/Ac=11530/236=48.86N/mm2;
< 0.85f=0.85x205=174.25N/mm2, checking computations satisfaction;
Stability Checking Calculation:
< 0.85f=0.85x205=174.25N/mm2, checking computations satisfaction;
(2) transverse connection of wall-connecting piece is checked with 3 connecting node of outrigger upright bar:
1. bolt strength checks:
U-bolt selects M12 plain bolts,
Single bolt bearing capacity design value calculates as follows:
Shearing resistance:
Pressure-bearing:
Single bolt bearing capacity design value:
U-bolt bearing capacity checks:Checking computations meet;
2. wall-connecting piece strength checking:
Wall-connecting piece uses L40x40x3 equal leg angles 4, opening diameter d at bolt0It is taken as 13.5mm;
Bolt-center is 40/2=20mm with wall-connecting piece Member Lip distance;
Allowable minimum distance is 1.2d0=16.2mm, maximum permissible distances 8t=24mm, meets detailing requiments;
Unilateral net section size is taken to carry out strength checking:
Unilateral net cross-sectional area:Ac=40x3-13.5x3=79.5mm2;
σ=Nl/Ac=11530/79.5=145.03N/mm2;
< 0.85f=0.85x205=174.25N/mm2, checking computations satisfaction;
(3) connecting node of wall-connecting piece and agent structure checks:
1. 1 strength checking strength checking of embedded bar:
Embedded bar 1 selects 1C18, fy=360N/mm2, As=254mm2;
σ=Nl/As=11530/254=45.39N/mm2< fy, checking computations satisfaction;
2. sleeve is checked with wall-connecting piece weld seam:
Wall-connecting piece uses L40x40x3 equal leg angles 4, sleeve outer diameter 27mm, length 45mm;
Sleeve is welded with 4 inner wall of angle steel using two surface sides, Size of welds hfIt is taken as 4mm, fusion length lw=45-2x4=
37mm;
Unilateral weld seam strength checking:Checking computations meet.
Step 2:The dismounting of wall-connecting piece:
A. first remove the U-bolt that is connect with outrigger upright bar 3 of transverse connection, then by the reinforced bar sleeve 5 of wall-connecting piece from
It is backed out on embedded bar 1;
B. the steel bar end exposed at embedded bar 1 is cut off, then to the concrete main body structure 2 at steel bar end position
Alien invasion local route repair;
C. unified collect of the transverse connection of the wall-connecting piece of dismounting and U-bolt and nut 7 is stored, so that next time makes
With.
Wall-connecting piece is successively removed with outrigger synchronization in the step 2, is forbidden after first removing wall-connecting piece flood or several layers again
Tear outrigger open.
Claims (10)
1. a kind of tool-type wall-connecting piece, it is characterized in that:It is described pre- including embedded bar (1), transverse connection and upright bar connector
It buries reinforcing bar one end to be embedded in advance in concrete main body structure (2), the embedded bar other end stretches out the outer of concrete main body texture edge
Side, transverse connection one end are fixedly connected with the embedded bar other end, and the transverse connection other end can be logical with outrigger upright bar (3)
That crosses that upright bar connector can dismantle is fixedly connected.
2. tool-type wall-connecting piece according to claim 1, it is characterized in that:The embedded bar is located at concrete main body structure
Interior one end forms bending structure, and embedded bar stretches out concrete main body texture edge exterior portion and is horizontal extension.
3. tool-type wall-connecting piece according to claim 2, it is characterized in that:The L-shaped structure of embedded bar.
4. tool-type wall-connecting piece according to claim 1, it is characterized in that:The transverse connection includes angle steel (4) and steel
Muscle sleeve (5), the reinforced bar sleeve are fixedly installed in angle steel one end, and reinforced bar sleeve fixing sleeve is set to embedded bar and stretches out concrete
On the outside of the other end on the outside of agent structure side.
5. tool-type wall-connecting piece according to claim 4, it is characterized in that:The reinforced bar sleeve is logical with the embedded bar other end
Threaded connection is crossed, uses and is welded to connect between reinforced bar sleeve and angle steel.
6. tool-type wall-connecting piece according to claim 1 or 4, it is characterized in that:The upright bar connector includes U bolt
(6) with nut (7), the U bolt is sheathed on the outside of outrigger upright bar, sets that there are two spaced on transverse connection side wall
Level perforation, U bolt both ends are each passed through two horizontal perforation of transverse connection, and the bolt structure at U bolt both ends
Finally be spirally connected with nut, the nut tight against transverse connection one side wall, another side wall of transverse connection tight against outrigger upright bar outside
Side.
7. tool-type wall-connecting piece according to claim 6, it is characterized in that:The upright bar connector further includes gasket (8), pad
Piece is sheathed on the outside of U bolt both ends, and gasket is closely located between transverse connection and nut.
8. tool-type wall-connecting piece according to claim 1, it is characterized in that:The transverse connection is horizontal linear structure
Or for by the bending structure of both ends horizontal linear structure and intermediate fore-and-aft tilt structure composition, and transverse connection is close to pre-buried
The horizontal linear structure height of reinforcing bar one end is higher than transverse connection close to the horizontal linear structure height of outrigger upright bar one end.
9. a kind of tool-type wall-connecting piece construction method described in claim 1, it is characterized in that:It is as follows:
Step 1:The making and installation of wall-connecting piece:
A. transverse connection makes:By angle steel, size makes as required, and perforation is opened up on angle steel;
B. reinforced bar sleeve is welded on angle steel one end;
C. outrigger spacing positions, and is set up to the above 1.5m of flooring to be onstructed by code requirement;
D. floor template installs, reinforcing bar binding, positioning, the embedded bar of pre-buried wall-connecting piece, then concreting;
E. after concrete strength is met the requirements, the reinforced bar sleeve of wall-connecting piece is tightened with embedded bar and is connect, meanwhile, by U-shaped spiral shell
Bolt is sleeved on the outside of outrigger upright bar, and U-bolt both ends are inserted into the transverse connection other end perforation of wall-connecting piece, is tightened in group
Nut;
Step 2:The dismounting of wall-connecting piece:
A. the U-bolt that is connect with outrigger upright bar of transverse connection is first removed, then by the reinforced bar sleeve of wall-connecting piece from pre-buried steel
It is backed out on muscle;
B. the steel bar end exposed at embedded bar is cut off, then to the concrete main body structure alien invasion at steel bar end position
Local route repair;
C. unified collect of the transverse connection of the wall-connecting piece of dismounting and U-bolt and nut is stored, so that next time uses.
10. tool-type wall-connecting piece construction method according to claim 9, it is characterized in that:In the step 2 wall-connecting piece with
Outrigger synchronization is successively removed, and forbids to tear outrigger open again after first removing wall-connecting piece flood or several layers.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810340834.5A CN108396955A (en) | 2018-04-17 | 2018-04-17 | Tool-type wall-connecting piece and its construction technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810340834.5A CN108396955A (en) | 2018-04-17 | 2018-04-17 | Tool-type wall-connecting piece and its construction technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108396955A true CN108396955A (en) | 2018-08-14 |
Family
ID=63100076
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810340834.5A Pending CN108396955A (en) | 2018-04-17 | 2018-04-17 | Tool-type wall-connecting piece and its construction technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108396955A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110397263A (en) * | 2019-07-31 | 2019-11-01 | 中国建筑第四工程局有限公司 | A kind of detachable outrigger wall-connecting piece |
CN111364756A (en) * | 2020-03-23 | 2020-07-03 | 北京市建筑工程研究院有限责任公司 | Support type creeping formwork adhesion device |
CN111927103A (en) * | 2020-06-24 | 2020-11-13 | 中国一冶集团有限公司 | Construction method for deep beam steel bar support of conversion layer |
CN113638594A (en) * | 2021-07-16 | 2021-11-12 | 广州市第二建筑工程有限公司 | Construction method of wall connecting piece |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101892738A (en) * | 2010-08-20 | 2010-11-24 | 中太建设集团股份有限公司 | Embedded scaffold connecting tube and construction method thereof |
FR2968694A1 (en) * | 2010-12-10 | 2012-06-15 | Outinord St Amand | Support bracket for fixing cantilevered platform on outer side of wall of building, has pivot blocking support leg against hook and maintaining support leg relative to front portion of body in one position of body |
CN203097262U (en) * | 2013-03-06 | 2013-07-31 | 浙江万诺建设有限公司 | Scaffold with embedded connecting piece |
CN203097249U (en) * | 2013-03-06 | 2013-07-31 | 浙江万诺建设有限公司 | Scaffold with prestress connecting assembly |
CN203257079U (en) * | 2012-08-23 | 2013-10-30 | 通州建总集团有限公司 | Scaffold steel tie fixing device |
CN104675101A (en) * | 2015-02-11 | 2015-06-03 | 浙江省二建建设集团有限公司 | Wall-linking element of scaffold and construction method of wall-linking element |
CN204475820U (en) * | 2014-12-25 | 2015-07-15 | 中建八局第三建设有限公司 | A kind of adjustable universal scaffold wall connecting piece |
CN205276851U (en) * | 2016-01-06 | 2016-06-01 | 浙江万华建设有限公司 | Falsework connecting device |
CN206016231U (en) * | 2016-08-31 | 2017-03-15 | 青岛中建联合建设工程有限公司 | A kind of new type scaffold wall-connecting piece |
CN206385794U (en) * | 2016-11-21 | 2017-08-08 | 中国建筑第二工程局有限公司 | A kind of wall-connecting piece and its connection system |
CN207228607U (en) * | 2017-07-26 | 2018-04-13 | 中国建筑第二工程局有限公司 | A kind of external wall scaffold wall connecting piece |
-
2018
- 2018-04-17 CN CN201810340834.5A patent/CN108396955A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101892738A (en) * | 2010-08-20 | 2010-11-24 | 中太建设集团股份有限公司 | Embedded scaffold connecting tube and construction method thereof |
FR2968694A1 (en) * | 2010-12-10 | 2012-06-15 | Outinord St Amand | Support bracket for fixing cantilevered platform on outer side of wall of building, has pivot blocking support leg against hook and maintaining support leg relative to front portion of body in one position of body |
CN203257079U (en) * | 2012-08-23 | 2013-10-30 | 通州建总集团有限公司 | Scaffold steel tie fixing device |
CN203097262U (en) * | 2013-03-06 | 2013-07-31 | 浙江万诺建设有限公司 | Scaffold with embedded connecting piece |
CN203097249U (en) * | 2013-03-06 | 2013-07-31 | 浙江万诺建设有限公司 | Scaffold with prestress connecting assembly |
CN204475820U (en) * | 2014-12-25 | 2015-07-15 | 中建八局第三建设有限公司 | A kind of adjustable universal scaffold wall connecting piece |
CN104675101A (en) * | 2015-02-11 | 2015-06-03 | 浙江省二建建设集团有限公司 | Wall-linking element of scaffold and construction method of wall-linking element |
CN205276851U (en) * | 2016-01-06 | 2016-06-01 | 浙江万华建设有限公司 | Falsework connecting device |
CN206016231U (en) * | 2016-08-31 | 2017-03-15 | 青岛中建联合建设工程有限公司 | A kind of new type scaffold wall-connecting piece |
CN206385794U (en) * | 2016-11-21 | 2017-08-08 | 中国建筑第二工程局有限公司 | A kind of wall-connecting piece and its connection system |
CN207228607U (en) * | 2017-07-26 | 2018-04-13 | 中国建筑第二工程局有限公司 | A kind of external wall scaffold wall connecting piece |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110397263A (en) * | 2019-07-31 | 2019-11-01 | 中国建筑第四工程局有限公司 | A kind of detachable outrigger wall-connecting piece |
CN111364756A (en) * | 2020-03-23 | 2020-07-03 | 北京市建筑工程研究院有限责任公司 | Support type creeping formwork adhesion device |
CN111927103A (en) * | 2020-06-24 | 2020-11-13 | 中国一冶集团有限公司 | Construction method for deep beam steel bar support of conversion layer |
CN113638594A (en) * | 2021-07-16 | 2021-11-12 | 广州市第二建筑工程有限公司 | Construction method of wall connecting piece |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108396955A (en) | Tool-type wall-connecting piece and its construction technology | |
CN104453197A (en) | High-altitude large-cantilever concrete structure structural steel supporting platform | |
CN101100902A (en) | Inclined drawing steel truss high-supported formwork structure system and construction method thereof | |
CN102444203A (en) | High-altitude long-span overhanging corridor type reinforced concrete structure and construction method | |
CN103291076A (en) | Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame | |
CN208650499U (en) | Tool-type wall-connecting piece | |
CN208502206U (en) | Assembling the shaped steel suspension scaffolding | |
CN106930531A (en) | A kind of pull-up manomelia is encorbelmented the construction method of heavy frame | |
CN104695708A (en) | Construction method for expansion joint formwork erection in narrow space of high-rise building external wall | |
KR101328078B1 (en) | Sleeve usde for fixing reinforcing bar | |
CN108590147A (en) | Assembling the shaped steel suspension scaffolding and its construction method | |
CN111851987B (en) | Construction method of attached short-limb I-shaped steel basket pull rod pull-knot type cantilever frame | |
DE202021102448U1 (en) | Cantilever bracket and flange template for steel-concrete composite girders | |
CN110629882A (en) | Utilize V type to construct anti structure of collapsing of board promotion dog bone formula node | |
CN208949920U (en) | Single side formwork system | |
JP2009250004A (en) | Horizontal member support metal fitting for installing ceiling board and ceiling board installing structure | |
CN203499259U (en) | Tool type cantilevered unloading platform | |
CN111519891A (en) | Anchor ring buckling type rigid outer frame wall connecting piece and construction method thereof | |
CN208310168U (en) | outer scaffold wall connector system | |
CN214785806U (en) | A splint type does not have outrigger construction platform for prefabricated building | |
CN207582953U (en) | For the formwork reinforcement structure of floor junction | |
CN110805256A (en) | Construction process of flower basket pull rod tool type overhanging scaffold | |
CN204174533U (en) | A kind of bridge construction based on FRP material | |
CN215368613U (en) | Shaped steel hangs outrigger external corner construction structures | |
CN211447712U (en) | I-shaped steel beam overhanging scaffold for open caisson |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |