CN110397263A - A kind of detachable outrigger wall-connecting piece - Google Patents

A kind of detachable outrigger wall-connecting piece Download PDF

Info

Publication number
CN110397263A
CN110397263A CN201910701934.0A CN201910701934A CN110397263A CN 110397263 A CN110397263 A CN 110397263A CN 201910701934 A CN201910701934 A CN 201910701934A CN 110397263 A CN110397263 A CN 110397263A
Authority
CN
China
Prior art keywords
steel pipe
connecting piece
wall
detachable
vertical steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910701934.0A
Other languages
Chinese (zh)
Inventor
孙英楠
苏广洪
钟卫
杨叶
马彦清
郑小维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, China Construction Fourth Bureau Fifth Construction Engineering Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201910701934.0A priority Critical patent/CN110397263A/en
Publication of CN110397263A publication Critical patent/CN110397263A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of detachable outrigger wall-connecting pieces, it includes the pre-buried internal thread sleeve being embedded in main structure, which is connect with the detachable vertical steel pipe of outer silk with wall-connecting piece horizontal steel tube by lower end;Wall-connecting piece horizontal steel tube connects external scaffolding;Pre-buried internal thread sleeve includes sleeve edge of a wing reinforcing bar and internal thread sleeve, and detachable vertical steel pipe includes vertical steel pipe solid section and vertical steel pipe hollow parts with outer silk.The solid section of the vertical steel pipe is outer silk, and the hollow parts of steel pipe connect outrigger by fastener.Detachable wall-connecting piece of the invention, is easily installed, dismantles, repeatable to be used in turn convenient for turnover.And this detachable wall-connecting piece reduces the process of traditional wall-connecting piece pipe cutting, environmentally protective, easy to use, save the cost only needs mantle fiber connection to be able to satisfy its function requirement.

Description

A kind of detachable outrigger wall-connecting piece
Technical field
The invention belongs to technical field of building construction, in particular to a kind of detachable outrigger wall-connecting piece.
Background technique
In construction projects, external scaffolding is rigidly connected usually using steel pipe and main structure, and Normal practice is in main body Pre-buried vertical steel pipe in structure.After later period external scaffolding is removed, the vertical steel pipe being embedded in main structure is cut, is not only needed Artificial cutting, and waste tube material, traditional method is time-consuming, laborious, waste wood.
Summary of the invention
The purpose of the present invention is to provide a kind of detachable outrigger wall-connecting pieces, and can have enough to meet the need reuse, save material Material reduces the costs such as construction caused by pipe cutting with this, improves engineering civilized construction perception, while avoiding because of pipe cutting Existing security risk.
Technical scheme is as follows:
A kind of detachable outrigger wall-connecting piece, it includes the pre-buried internal thread sleeve being embedded in main structure, this is pre-buried interior Silk braid cylinder is connect with the detachable vertical steel pipe of outer silk with wall-connecting piece horizontal steel tube by lower end;Wall-connecting piece horizontal steel tube connects Connect external scaffolding;Pre-buried internal thread sleeve includes sleeve edge of a wing reinforcing bar and internal thread sleeve, and detachable vertical steel pipe includes with outer The vertical steel pipe solid section and vertical steel pipe hollow parts of silk.The solid section of the vertical steel pipe be outer silk, steel pipe it is hollow Part connects outrigger by fastener.During erection, the fixation of outrigger and main structure is will be with the removable of outer silk It unloads the rotation of formula vertical steel pipe and is screwed into the pre-buried sleeve with internal thread.
Wherein, it is embedded to pre-buried internal thread sleeve in main structure to pass through on sleeve edge of a wing reinforcing bar stationary body structure reinforcing bars, set Cylinder edge of a wing reinforcing bar upper surface differs a Minimum Concrete Protective Coating Thickness with the height of sleeve top surface and is welded to connect.It is removable It unloads formula vertical steel pipe and is inserted into pre-buried internal thread sleeve using screwed connection;Detachable vertical steel pipe passes through with wall-connecting piece horizontal steel tube Fastener connection;Wall-connecting piece horizontal steel tube is connect with external scaffolding by fastener.Outrigger remove when, only need to will it is detachable vertically Steel pipe rotary, that is, dismountable, and go in week next construction area carry out using.
In addition, the region of detachable vertical steel pipe connection main structure is solid steel tube, guarantee that vertical steel pipe connection can It leans on and increases its service life.
Detachable wall-connecting piece of the invention, is easily installed, dismantles, repeatable to be used in turn convenient for turnover.And this is removable The formula wall-connecting piece of unloading reduces the process of traditional wall-connecting piece pipe cutting, environmentally protective, and easy to use, save the cost only needs mantle fiber Connection is able to satisfy its function requirement.
Detailed description of the invention
Fig. 1 is combination diagram of the invention;
Fig. 2 is pre-buried internal thread sleeve schematic diagram;
Fig. 3 is detachable vertical steel pipe schematic diagram;
The label in accompanying drawing is: the pre-buried internal thread sleeve of 1-, the detachable vertical steel pipe of 2-, 3- wall-connecting piece horizontal steel tube, 4- External scaffolding, 5- main structure, 6- sleeve edge of a wing reinforcing bar, 7- sleeve, 8- vertical steel pipe solid section, 9- vertical steel pipe hollow part Point.
Specific embodiment
Embodiments of the present invention are described in further detail with reference to the accompanying drawings and examples.Following embodiment is used for Illustrate the present invention, but cannot be used to limit the scope of the invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " connected " " connects Connect " it shall be understood in a broad sense, for example, it may be being fixedly connected, it may be a detachable connection, or be integrally connected;It can be machine Tool connection, is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For this field For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
As shown in Figure 1, pre-buried internal thread sleeve 1 is fixed in advance in main structure 5, with the whole coagulation and solid of pouring of main structure Fixed, detachable vertical steel pipe 2 connects pre-buried internal thread sleeve 1 by mantle fiber, and wall-connecting piece horizontal steel tube 3 is connected removable by fastener Formula vertical steel pipe 2 is unloaded, external scaffolding 4 connects wall-connecting piece horizontal steel tube.
Such as Fig. 2, pre-buried internal thread sleeve 1 is welded to form by sleeve edge of a wing reinforcing bar 6 and the sleeve 7 with internal thread, in main body Before structure casting concrete, pre-buried internal thread sleeve 1 is reserved in main structure, upper table of the sleeve edge of a wing reinforcing bar 6 apart from sleeve 7 Sleeve 7 is mainly fixedly connected by the protective layer thickness of structure based on face, sleeve edge of a wing reinforcing bar 6 with main structure.
Such as Fig. 3, detachable vertical steel pipe 2 divide for vertical steel pipe solid section 8 and vertical steel pipe with outer silk it is hollow Part 9, vertical steel pipe solid section 8 are mainly connected to inside pre-buried internal thread sleeve 1 by mantle fiber, vertical steel pipe hollow parts 9 mainly connect outrigger by fastener.
The present invention is connected by the pre-buried internal thread sleeve 1 being reserved in concrete and detachable vertical steel pipe 2 by mantle fiber Fixation is connect, one whole vertical steel pipe that traditional wall-connecting piece is embedded in concrete by the method is split as two parts, avoids the later period Pipe cutting, and it is convenient for disassembly and assembly.It secondary can not be used after conventional wall-connecting piece vertical steel pipe cutting, cause the huge waste of material And consumption manpower, the invention is intended to solve the problems, such as the waste of material, the safety construction and green for also meeting existing popularization are applied Work theory.
The embodiment of the present invention is given for the purpose of illustration and description, and is not exhaustively or by this to send out It is bright to be limited to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art.Choosing Selecting and describe embodiment is and to make those skilled in the art to more preferably illustrate the principle of the present invention and practical application It will be appreciated that the present invention is to design various embodiments suitable for specific applications with various modifications.

Claims (3)

1. a kind of detachable outrigger wall-connecting piece, it is characterised in that: it includes the pre-buried interior silk braid being embedded in main structure (5) Cylinder (1), detachable vertical steel pipe (2) and wall-connecting piece horizontal steel tube of the pre-buried internal thread sleeve (1) by lower end with outer silk (3) it connects;The wall-connecting piece horizontal steel tube (3) connects external scaffolding (4);The pre-buried internal thread sleeve (1) includes the sleeve edge of a wing Reinforcing bar (6) and internal thread sleeve (7), the detachable vertical steel pipe (2) include the vertical steel pipe solid section (8) with outer silk With vertical steel pipe hollow parts (9).
2. detachable outrigger wall-connecting piece according to claim 1, it is characterised in that: pre-buried in the embedment main structure Internal thread sleeve (1) passes through on sleeve edge of a wing reinforcing bar (6) stationary body structure reinforcing bars, sleeve edge of a wing reinforcing bar (6) upper surface and sleeve (7) height of upper surface differs a Minimum Concrete Protective Coating Thickness and is welded to connect.
3. detachable outrigger wall-connecting piece according to claim 1, it is characterised in that: the detachable vertical steel pipe (2) it is inserted into pre-buried internal thread sleeve (1) and uses screwed connection;Detachable vertical steel pipe (2) passes through with wall-connecting piece horizontal steel tube (3) Fastener connection;The wall-connecting piece horizontal steel tube (3) is connect with external scaffolding (4) by fastener.
CN201910701934.0A 2019-07-31 2019-07-31 A kind of detachable outrigger wall-connecting piece Pending CN110397263A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910701934.0A CN110397263A (en) 2019-07-31 2019-07-31 A kind of detachable outrigger wall-connecting piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910701934.0A CN110397263A (en) 2019-07-31 2019-07-31 A kind of detachable outrigger wall-connecting piece

Publications (1)

Publication Number Publication Date
CN110397263A true CN110397263A (en) 2019-11-01

Family

ID=68326913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910701934.0A Pending CN110397263A (en) 2019-07-31 2019-07-31 A kind of detachable outrigger wall-connecting piece

Country Status (1)

Country Link
CN (1) CN110397263A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202577934U (en) * 2012-05-03 2012-12-05 武汉常阳新力建设工程有限公司 Screw thread wall-connection member of scaffold and building
CN107246141A (en) * 2017-07-18 2017-10-13 中建四局第六建筑工程有限公司 A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk and its construction method
CN206903186U (en) * 2017-05-27 2018-01-19 中国一冶集团有限公司 Adjustable detachable wall-connecting device of scaffold
CN108179871A (en) * 2017-12-07 2018-06-19 中建七局(上海)有限公司 A kind of detachable scaffold wall connecting piece structure and its construction method
CN108240106A (en) * 2018-01-17 2018-07-03 十九冶成都建设有限公司 Wall connecting piece structure with detachable embedded part
CN108396955A (en) * 2018-04-17 2018-08-14 江苏九如建设有限公司 Tool-type wall-connecting piece and its construction technology
CN211286574U (en) * 2019-07-31 2020-08-18 中国建筑第四工程局有限公司 Detachable outer frame wall connecting piece

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202577934U (en) * 2012-05-03 2012-12-05 武汉常阳新力建设工程有限公司 Screw thread wall-connection member of scaffold and building
CN206903186U (en) * 2017-05-27 2018-01-19 中国一冶集团有限公司 Adjustable detachable wall-connecting device of scaffold
CN107246141A (en) * 2017-07-18 2017-10-13 中建四局第六建筑工程有限公司 A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk and its construction method
CN108179871A (en) * 2017-12-07 2018-06-19 中建七局(上海)有限公司 A kind of detachable scaffold wall connecting piece structure and its construction method
CN108240106A (en) * 2018-01-17 2018-07-03 十九冶成都建设有限公司 Wall connecting piece structure with detachable embedded part
CN108396955A (en) * 2018-04-17 2018-08-14 江苏九如建设有限公司 Tool-type wall-connecting piece and its construction technology
CN211286574U (en) * 2019-07-31 2020-08-18 中国建筑第四工程局有限公司 Detachable outer frame wall connecting piece

Similar Documents

Publication Publication Date Title
CN104153555B (en) The detachable pre-buried fixing device of overhanging type steel beam containing horizontal fixation kit
CN204001662U (en) A kind of fastening devices external member of Cantilever Beams
CN204040458U (en) A kind of aluminum template system aluminium extruded sections
CN104695708A (en) Construction method for expansion joint formwork erection in narrow space of high-rise building external wall
CN207633740U (en) The novel anchor of builder's jack
CN204081445U (en) To encorbelment i iron anchor device
CN110397263A (en) A kind of detachable outrigger wall-connecting piece
CN205077870U (en) It is split type to drawing screw rod and template drawknot structure
CN110388054A (en) One kind exempting from aperture building engineering structure template system and construction technology
CN208966008U (en) A kind of reusable exterior wall steel pipe scaffold wall-connecting piece device
CN211286574U (en) Detachable outer frame wall connecting piece
CN208633485U (en) A kind of fashioned iron Overhanging Outside Scaffold external corner processing unit being used in turn
CN102926536A (en) Template unilateral reinforcement combination tool and template unilateral reinforcement construction method
CN207999071U (en) A kind of wall column root concrete capping tools
CN206158151U (en) Improvement type is wall spare even
CN206769379U (en) Shear wall formwork exempts from drilling construction structure
CN205476391U (en) Builder's jack
CN204960322U (en) Water -stopping screw rod
CN208056611U (en) A kind of wall-connecting piece being used in turn
CN202559710U (en) Dismountable anchoring device for overhanging type steel-steel beam
CN208702111U (en) Building scaffold
CN208563964U (en) A kind of high-strength building formwork being easily installed
CN206319571U (en) A kind of Novel anti-leakage wall-connecting piece
CN202299432U (en) Waterproof concrete shear wall tool type water-stopping split bolt
CN218029031U (en) Green energy-conserving aluminum alloy building corner template of leak protection thick liquid

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination