CN108385742A - 带筏板基础建筑物的纠偏技术 - Google Patents
带筏板基础建筑物的纠偏技术 Download PDFInfo
- Publication number
- CN108385742A CN108385742A CN201810256595.5A CN201810256595A CN108385742A CN 108385742 A CN108385742 A CN 108385742A CN 201810256595 A CN201810256595 A CN 201810256595A CN 108385742 A CN108385742 A CN 108385742A
- Authority
- CN
- China
- Prior art keywords
- jacking
- forced landing
- concrete
- area
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005516 engineering process Methods 0.000 title abstract description 9
- 238000000034 method Methods 0.000 claims abstract description 20
- 230000007704 transition Effects 0.000 claims abstract description 19
- 239000004033 plastic Substances 0.000 claims description 31
- 229920003023 plastic Polymers 0.000 claims description 31
- 238000010276 construction Methods 0.000 claims description 23
- 239000011449 brick Substances 0.000 claims description 9
- 238000005266 casting Methods 0.000 claims description 9
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 238000004062 sedimentation Methods 0.000 claims description 7
- 230000000694 effects Effects 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 238000001514 detection method Methods 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 28
- 239000002689 soil Substances 0.000 description 28
- 229910052742 iron Inorganic materials 0.000 description 14
- 238000005086 pumping Methods 0.000 description 4
- 239000007921 spray Substances 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 239000004927 clay Substances 0.000 description 3
- 238000005553 drilling Methods 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 238000005507 spraying Methods 0.000 description 2
- 230000001914 calming effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D35/00—Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
- E02D35/005—Lowering or lifting of foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D35/00—Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Foundations (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810256595.5A CN108385742B (zh) | 2016-11-29 | 2016-11-29 | 带筏板基础建筑物的纠偏技术 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810256595.5A CN108385742B (zh) | 2016-11-29 | 2016-11-29 | 带筏板基础建筑物的纠偏技术 |
CN201611135762.8A CN106522293B (zh) | 2016-11-29 | 2016-11-29 | 带筏板基础建筑物的纠偏方法 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611135762.8A Division CN106522293B (zh) | 2016-11-29 | 2016-11-29 | 带筏板基础建筑物的纠偏方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108385742A true CN108385742A (zh) | 2018-08-10 |
CN108385742B CN108385742B (zh) | 2019-09-10 |
Family
ID=58341502
Family Applications (6)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810256806.5A Active CN108385744B (zh) | 2016-11-29 | 2016-11-29 | 建筑物的组合纠偏方法 |
CN201810256772.XA Active CN108385743B (zh) | 2016-11-29 | 2016-11-29 | 建筑物的纠偏技术 |
CN201611135762.8A Active CN106522293B (zh) | 2016-11-29 | 2016-11-29 | 带筏板基础建筑物的纠偏方法 |
CN201810256595.5A Active CN108385742B (zh) | 2016-11-29 | 2016-11-29 | 带筏板基础建筑物的纠偏技术 |
CN201810256839.XA Active CN108385745B (zh) | 2016-11-29 | 2016-11-29 | 建筑物的组合纠偏技术 |
CN201810262680.2A Active CN108396794B (zh) | 2016-11-29 | 2016-11-29 | 建筑物的纠偏方法 |
Family Applications Before (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810256806.5A Active CN108385744B (zh) | 2016-11-29 | 2016-11-29 | 建筑物的组合纠偏方法 |
CN201810256772.XA Active CN108385743B (zh) | 2016-11-29 | 2016-11-29 | 建筑物的纠偏技术 |
CN201611135762.8A Active CN106522293B (zh) | 2016-11-29 | 2016-11-29 | 带筏板基础建筑物的纠偏方法 |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810256839.XA Active CN108385745B (zh) | 2016-11-29 | 2016-11-29 | 建筑物的组合纠偏技术 |
CN201810262680.2A Active CN108396794B (zh) | 2016-11-29 | 2016-11-29 | 建筑物的纠偏方法 |
Country Status (1)
Country | Link |
---|---|
CN (6) | CN108385744B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111608215A (zh) * | 2020-06-16 | 2020-09-01 | 上海工谷土木工程技术有限公司 | 一种建筑物纠偏异步顶升方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0913418A (ja) * | 1995-06-29 | 1997-01-14 | Nitto Techno Group:Kk | コンパクショングラウチングによる建築物の修復工法 |
CN1157873A (zh) * | 1996-12-31 | 1997-08-27 | 林礼 | 软土地基上的房屋倾斜后的矫正方法 |
CN101787717A (zh) * | 2010-03-13 | 2010-07-28 | 中铁西北科学研究院有限公司 | 一种可控精确组合纠倾方法 |
CN101793098A (zh) * | 2010-03-13 | 2010-08-04 | 中铁西北科学研究院有限公司 | 一种协调互动组合纠倾方法 |
CN103290865A (zh) * | 2013-05-11 | 2013-09-11 | 叶长青 | 一种建筑物的纠偏方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100567660C (zh) * | 2007-12-26 | 2009-12-09 | 南京工业大学 | 房屋纠偏的沉井予力作用工法 |
-
2016
- 2016-11-29 CN CN201810256806.5A patent/CN108385744B/zh active Active
- 2016-11-29 CN CN201810256772.XA patent/CN108385743B/zh active Active
- 2016-11-29 CN CN201611135762.8A patent/CN106522293B/zh active Active
- 2016-11-29 CN CN201810256595.5A patent/CN108385742B/zh active Active
- 2016-11-29 CN CN201810256839.XA patent/CN108385745B/zh active Active
- 2016-11-29 CN CN201810262680.2A patent/CN108396794B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0913418A (ja) * | 1995-06-29 | 1997-01-14 | Nitto Techno Group:Kk | コンパクショングラウチングによる建築物の修復工法 |
CN1157873A (zh) * | 1996-12-31 | 1997-08-27 | 林礼 | 软土地基上的房屋倾斜后的矫正方法 |
CN101787717A (zh) * | 2010-03-13 | 2010-07-28 | 中铁西北科学研究院有限公司 | 一种可控精确组合纠倾方法 |
CN101793098A (zh) * | 2010-03-13 | 2010-08-04 | 中铁西北科学研究院有限公司 | 一种协调互动组合纠倾方法 |
CN103290865A (zh) * | 2013-05-11 | 2013-09-11 | 叶长青 | 一种建筑物的纠偏方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111608215A (zh) * | 2020-06-16 | 2020-09-01 | 上海工谷土木工程技术有限公司 | 一种建筑物纠偏异步顶升方法 |
Also Published As
Publication number | Publication date |
---|---|
CN108385745A (zh) | 2018-08-10 |
CN108385743A (zh) | 2018-08-10 |
CN108385744B (zh) | 2020-01-17 |
CN108385743B (zh) | 2020-01-17 |
CN108385742B (zh) | 2019-09-10 |
CN106522293B (zh) | 2018-08-07 |
CN108396794B (zh) | 2020-01-17 |
CN106522293A (zh) | 2017-03-22 |
CN108385744A (zh) | 2018-08-10 |
CN108396794A (zh) | 2018-08-14 |
CN108385745B (zh) | 2020-01-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104612695B (zh) | 一种剧烈垮塌立井井壁修复加固方法 | |
CN113445498A (zh) | 复杂地质岩溶孔桩基础施工工艺 | |
CN107246006A (zh) | 混凝土桩用钢筋笼结构及灌桩方法 | |
CN203795446U (zh) | 一种钢板混凝土沉井 | |
CN107905118A (zh) | 大型桥梁桩基施工方法 | |
CN202370524U (zh) | 回风立井井身工作面防治水施工结构 | |
CN106522293B (zh) | 带筏板基础建筑物的纠偏方法 | |
CN104131571A (zh) | 一种深基坑支护施工方法 | |
CN110565709B (zh) | 一种复合地基建筑物褥垫层取土迫降纠倾方法 | |
CN216586567U (zh) | 一种坑中坑微型桩支护结构 | |
CN205530218U (zh) | 一种适用于高层建筑结构加固纠偏的注浆复合地基 | |
CN201351279Y (zh) | 圆形深基坑支护 | |
CN111962549B (zh) | 邻近基桩作业工况下既有塔吊抗倾覆施工方法 | |
CN108914939A (zh) | 一种大直径超深高压喷射注浆施工方法 | |
CN210216473U (zh) | 用于边坡治理的抗滑桩 | |
CN211849651U (zh) | 旋流池沉井纠偏装置 | |
CN102605787A (zh) | 一种拔除钢板桩时可抑制地基土扰动的装置及其应用方法 | |
CN208039234U (zh) | 一种在溶洞地质内的工程桩 | |
CN111828018A (zh) | 一种防治隧道突涌水迂回导坑施工方法 | |
CN106930288B (zh) | 一种拔桩方法 | |
CN201411707Y (zh) | 塔吊基础 | |
CN206752537U (zh) | 带筏板基础建筑物的纠偏结构 | |
CN205636749U (zh) | 用于砂卵石漂石地质层的基坑支护体系 | |
CN109295943B (zh) | 一种废石渣场用注浆管及注浆使用方法 | |
CN214832734U (zh) | 加筋水泥土型钢组合立柱桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: 245400 building 3, Yaoshun Avenue, Haiyang Town, Xiuning County, Huangshan City, Anhui Province Patentee after: Ye Xiangxiong Address before: No. 26, Tianhe street, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang Province, 325025 Patentee before: Ye Xiangxiong |
|
CP02 | Change in the address of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231212 Address after: 415100 Taohuayuan Road, Hongyun Community, Hongyun Street, Dingcheng District, Changde City, Hunan Province (Room 211, 2nd Floor, Chang'an Jiuli Marketing Center) Patentee after: Hunan Jiacheng Construction Co.,Ltd. Address before: 245400 building 3, Yaoshun Avenue, Haiyang Town, Xiuning County, Huangshan City, Anhui Province Patentee before: Ye Xiangxiong |
|
TR01 | Transfer of patent right |