CN108361547A - Novel LNG gas stations and its working method - Google Patents

Novel LNG gas stations and its working method Download PDF

Info

Publication number
CN108361547A
CN108361547A CN201810105285.3A CN201810105285A CN108361547A CN 108361547 A CN108361547 A CN 108361547A CN 201810105285 A CN201810105285 A CN 201810105285A CN 108361547 A CN108361547 A CN 108361547A
Authority
CN
China
Prior art keywords
lng
storage tank
tank
bog
surge tanks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810105285.3A
Other languages
Chinese (zh)
Other versions
CN108361547B (en
Inventor
陈维银
林冬娅
胡术生
冯波
李鸿军
孙鹏
唐永东
刘太平
杨昌文
简栋如
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Endurance Industry Stock Co Ltd
Original Assignee
Chongqing Endurance Industry Stock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Endurance Industry Stock Co Ltd filed Critical Chongqing Endurance Industry Stock Co Ltd
Priority to CN201810105285.3A priority Critical patent/CN108361547B/en
Publication of CN108361547A publication Critical patent/CN108361547A/en
Application granted granted Critical
Publication of CN108361547B publication Critical patent/CN108361547B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C7/00Methods or apparatus for discharging liquefied, solidified, or compressed gases from pressure vessels, not covered by another subclass
    • F17C7/02Discharging liquefied gases
    • F17C7/04Discharging liquefied gases with change of state, e.g. vaporisation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/02Special adaptations of indicating, measuring, or monitoring equipment
    • F17C13/026Special adaptations of indicating, measuring, or monitoring equipment having the temperature as the parameter
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/04Arrangement or mounting of valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C5/00Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
    • F17C5/02Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures for filling with liquefied gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/01Shape
    • F17C2201/0104Shape cylindrical
    • F17C2201/0109Shape cylindrical with exteriorly curved end-piece
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/03Orientation
    • F17C2201/035Orientation with substantially horizontal main axis
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2201/00Vessel construction, in particular geometry, arrangement or size
    • F17C2201/05Size
    • F17C2201/054Size medium (>1 m3)
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/03Fluid connections, filters, valves, closure means or other attachments
    • F17C2205/0302Fittings, valves, filters, or components in connection with the gas storage device
    • F17C2205/0323Valves
    • F17C2205/0329Valves manually actuated
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • F17C2223/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/01Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the phase
    • F17C2225/0107Single phase
    • F17C2225/0123Single phase gaseous, e.g. CNG, GNC
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/01Propulsion of the fluid
    • F17C2227/0128Propulsion of the fluid with pumps or compressors
    • F17C2227/0157Compressors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/04Indicating or measuring of parameters as input values
    • F17C2250/0404Parameters indicated or measured
    • F17C2250/0439Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/06Fluid distribution
    • F17C2265/063Fluid distribution for supply of refuelling stations
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0165Applications for fluid transport or storage on the road
    • F17C2270/0168Applications for fluid transport or storage on the road by vehicles
    • F17C2270/0171Trucks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a kind of novel LNG gas stations, including LNG tank cars, LNG storage tank, LNG filling machines, storage tank supercharging gasifier, supercharging gasifier of unloading, and further include BOG recycling compressor, multiple LNG surge tanks;LNG storage tank is connect with LNG tank cars by feed liquor house steward and gas pipeline, and LNG storage tank, BOG recycle compressor, the gas phase mouth of LNG tank cars is sequentially communicated by pipeline;Multiple LNG surge tanks are in parallel by pipeline with LNG storage tank, and each LNG surge tanks are sequentially communicated to form forward and reverse two accesses by different pipelines from BOG recycling compressor, LNG storage tank respectively;Each LNG surge tanks are also sequentially communicated with LNG filling machines, LNG storage tank by pipeline respectively;It is both provided with valve on aforementioned each pipeline, to realize the LNG or BOG circulation route choosing needs when different working condition.Also disclose the working method of the novel LNG gas stations.

Description

Novel LNG gas stations and its working method
Technical field
The present invention relates to LNG gas stations technical fields, and in particular to a kind of novel LNG gas stations and its working method.
Background technology
LNG (liquefied natural gas, liquefied natural gas) be it is a kind of cleaning, the efficient energy.Natural gas conduct Clean energy resource is more and more favored, and LNG is all classified as preferred fuels by many countries, and ratio of the natural gas in energy supply is fast Speed increases.Liquefied natural gas just with every year about 12% rapid growth, becomes the whole world and increases most swift and violent one of energy industry. LNG automobiles are as national clean energy resource vehicle, the development advanced by leaps and bounds in recent years, while LNG gas stations are also as after rain The construction of large area has been carried out as spring bamboo.
BOG (Boil offGas, flashed vapour) refers to that LNG liquid is pressurizeed the low temperature gas after being gasified below critical-temperature Body, since LNG is cryogen, although LNG filling gas station equipments have good insulation, in the process for storing and operating In, due to natural heat transfer and system cooling required, a certain number of gases, i.e. BOG are all inevitably resulted from, with The increase for BOG quantity makes the temperature and pressure in LNG storage tank tank increase, when reaching a certain level, it has to release BOG with Reduce pressure inside the tank.
Currently, mainstream LNG gas stations mostly use equipment of the LNG immersed pumps as LNG pressurizing processes on the market.Existing for it Disadvantage includes:One, it is difficult to meet LNG immersed pumps pond feed liquor demand when LNG storage tank is in low liquid level, be easy to cause the latent liquid of LNG It is evacuated when pump operation;Two, LNG immersed pumps outlet pressure is affected by LNG storage tank pressure and LNG liquid temperature, in LNG storage tank pressure In the case that low, the vehicle-mounted bottle pressure height of LNG, LNG liquid temperature are low, conventional LNG immersed pumps are relatively difficult to guarantee outlet pressure to meet LNG vehicles It carries bottle and fills demand.
Invention content
It is an object of the invention in view of the above-mentioned problems, offer is a kind of to utilize low temperature BOG recycling compressors and LNG surge tanks Instead of the novel LNG gas stations and its working method of LNG immersed pumps.
For this purpose, the technical solution adopted in the present invention is:
A kind of novel LNG gas stations, including LNG tank cars, LNG storage tank, LNG filling machines, storage tank supercharging gasifier, increasing of unloading Gasifier, the LNG storage tank is pressed to connect storage tank by pipeline and be pressurized gasifier, be provided on the LNG tank cars and unload liquid mouth, gas phase Mouth, boost port, the boost port connect supercharging gasifier of unloading with gas phase mouth by pipeline respectively, further include BOG recycling compressions Machine, multiple LNG surge tanks;
LNG storage tank is connect with LNG tank cars by feed liquor house steward and gas pipeline, and the feed liquor house steward unloads liquid mouth company with described It connects, the gas pipeline is connect with the gas phase mouth of LNG tank cars, and feed liquor house steward is connected to gas pipeline by branch pipe, LNG storages Tank, BOG recycle compressor, the gas phase mouth of LNG tank cars is sequentially communicated by pipeline so that the BOG in LNG storage tank can be through BOG Recycling compressor enters in LNG tank cars;
Multiple LNG surge tanks are in parallel by pipeline with LNG storage tank, each LNG surge tanks respectively with BOG recycling compressor, LNG storage tank is sequentially communicated to form forward and reverse two accesses by different pipelines, and the BOG in forward path in LNG surge tanks is logical It crosses BOG recycling compressors and enters LNG storage tank, the BOG in backward channel in LNG storage tank recycles compressor by BOG and enters LNG In surge tank;Each LNG surge tanks are also sequentially communicated with LNG filling machines, LNG storage tank by pipeline respectively;
It is both provided with valve on aforementioned each pipeline, to realize the LNG or BOG circulation route choosings when different working condition It needs.
In the above-mentioned technical solutions, the valve on each pipeline is hand-operated valve and/or pneumatic operated valve, passes through control valve Open and close realize the selection of different LNG BOG flow routes, hand-operated valve or pneumatic operated valve be easy to buy on the market, it is at low cost, It is easy to operate.
Preferably, the quantity of the LNG surge tanks is two, and two LNG surge tanks can meet making for gas station With demand, ensure the continuous of the continuous and LNG vehicle-mounted bottles filling of LNG filling machines precooling using double buffering tank.And two LNG bufferings Tank is convenient for arranged, spatial design reasonable.
Preferably, the feed liquor house steward branches into two feed liquor branch pipes being connect with LNG storage tank so that feed liquor of unloading More efficient, shortening is unloaded the time;It is both provided with hand-operated valve and pneumatic operated valve on described two feed liquor branch pipes, it is easy to use.
Preferably, the BOG recycling compressor is that low temperature recycles compressor, and work efficiency is high, technology maturation, is easy It buys.
Preferably, pressure sensor and liquid level sensor are provided in the LNG storage tank, LNG surge tanks are returned with BOG It receives on the pipeline between compressor and is provided with temperature sensor on the pipeline between LNG and storage tank LNG surge tanks.Sensor Use make the work of gas station obtain close real time monitoring, prevent mistake and accident occur, can accomplish accurate precision Control ensures safety.
It is both provided with check valve on pipeline between the feed liquor house steward, LNG surge tanks and LNG filling machines, anti-backflow, Ensure safety.
A kind of working method of the novel LNG gas stations of claim 1 to 7 any one of them, includes the following steps:
One, LNG unloads:
(1) self-balancing:Open the valve on the gas pipeline between LNG storage tank and LNG tank cars so that in LNG storage tank BOG is entered by pipeline in LNG tank cars;(2) it recycles:After the completion of self-balancing, LNG storage tank-BOG recycling compressors-LNG is opened The valve of tank car access closes other valves so that and the BOG in LNG storage tank is recovered to through BOG recycling compressors in LNG tank cars, Pressure in LNG storage tank is further decreased, LNG slot interior pressures are increased;(3) from supercharging:Using unloading, supercharging gasifier realizes LNG Tank car is pressurized certainly;(4) it unloads:When LNG slot interior pressures reach setting value, the valve opened in feed liquor house steward makes LNG slots Interior LNG stream enters in LNG storage tank, and realization is unloaded;LNG tank cars can pass through the supercharging of supercharging gasifier or the profit of unloading during unloading BOG in LNG storage tank is recycled to LNG tank cars with BOG recycling compressors and realizes supercharging;
Two, LNG is filled:
(1) LNG surge tanks fill and pressurize:Open the valve on the pipeline between LNG storage tank and one of LNG surge tanks Door so that LNG stream enters in LNG surge tanks in LNG storage tank, when in LNG surge tanks pressure higher than pressure in LNG storage tank cause LNG without When method flows into, BOG in LNG surge tanks is recycled in LNG storage tank using BOG recycling compressors, reduces and is pressed in LNG surge tanks Power ensures the continuous of feed liquor;After liquid level is met the requirements in LNG surge tanks, stop feed liquor, compressor is recycled by LNG using BOG BOG is recycled in LNG surge tanks in storage tank, by boost in pressure in LNG surge tanks to aerating pressure;It can be according to this step method Pressurization is filled one by one to multiple LNG surge tanks;In LNG surge tank filling processes, gasifier can be pressurized by storage tank, LNG is stored up Tank is pressurized;
(2) LNG filling machines are pre-chilled:It opens on one of LNG surge tanks-LNG filling machines-LNG storage tank path conduits LNG in LNG surge tanks is delivered in LNG filling machines after cycle using pressure difference and is returned in LNG storage tank, to add to LNG by valve Mechanism of qi is pre-chilled, and when pressure is relatively low in LNG surge tanks in precooling process, is returned BOG in LNG storage tank using BOG recycling compressors It receives to LNG surge tanks, improves LNG buffer tank pressures;When LNG surge tanks liquid level is relatively low in precooling process, by LNG filling machines Precooling switched to by another LNG surge tank feed flow by the LNG surge tank feed flows, while to the LNG surge tanks carry out LNG benefits It fills;
(3) LNG filling machines fill:The valve on the pipeline between one of LNG surge tanks and LNG filling machines is opened, LNG in LNG surge tanks is delivered in LNG filling machines using pressure difference and enters LNG vehicle-mounted bottles after metering, as LNG in filling process When buffer tank pressure is relatively low, BOG in LNG storage tank is recycled in LNG surge tanks using BOG recycling compressors, improves LNG bufferings Pressure tank;When LNG surge tanks liquid level is relatively low in filling process, the filling of LNG vehicle-mounted bottles is switched by the LNG surge tank feed flows LNG supplements are carried out by LNG storage tank to by another LNG surge tank feed flow, while to first LNG surge tank.
The beneficial effects of the invention are as follows:The present invention replaces the latent liquid of LNG using low temperature BOG recycling compressors and LNG surge tanks The LNG gas stations technique of pump, pressure is difficult to meet in some cases for avoidable LNG storage tank low liquid level evacuation and LNG immersed pumps The problem of use.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention.
Specific implementation mode
By way of example and in conjunction with the accompanying drawings, the invention will be further described:
1 novel LNG gas stations of embodiment
A kind of novel LNG gas stations as shown in Figure 1, mainly by LNG tank cars 1, LNG storage tank 2, LNG filling machines 3, storage tank Supercharging gasifier 4, supercharging gasifier 5 of unloading, BOG recycling 6, two LNG surge tanks 7 of compressor form, and BOG recycles compressor 6 Compressor is recycled for low temperature.LNG storage tank 2 connects storage tank by pipeline and is pressurized gasifier 4, be provided on LNG tank cars 1 unload liquid mouth, Gas phase mouth, boost port, boost port and gas phase mouth connect supercharging gasifier 5 of unloading by pipeline respectively.
LNG storage tank 2 is connect with LNG tank cars 1 by feed liquor house steward 8 and gas pipeline 9, feed liquor house steward 8 and LNG tank cars 1 The connection of liquid mouth is unloaded, gas pipeline 9 is connect with the gas phase mouth of LNG tank cars 1, and feed liquor house steward 8 and gas pipeline 9 pass through branch pipe 10 Connection, feed liquor house steward 8 branch into two feed liquor branch pipes 11 being connect with LNG storage tank 2, hand are both provided on two feed liquor branch pipes 11 Dynamic valve and pneumatic operated valve.LNG storage tank 2, BOG recycle compressor 6, the gas phase mouth of LNG tank cars 1 is sequentially communicated by pipeline so that LNG BOG in storage tank 2 can recycle compressor 6 through BOG and enter in LNG tank cars 1.
Two LNG surge tanks 7 are in parallel by pipeline with LNG storage tank 2, and each LNG surge tanks 7 are recycled with BOG respectively to be compressed Machine 6, LNG storage tank 2 are sequentially communicated to form forward and reverse two accesses by different pipelines, in forward path in LNG surge tanks 7 BOG compressor 6 recycled by BOG enter LNG storage tank 2, BOG in backward channel in LNG storage tank 2 passes through BOG recycling pressures Contracting machine 6 enters in LNG surge tanks 7;Each LNG surge tanks 7 are also connected with LNG filling machines 3, LNG storage tank 2 by pipeline successively respectively It is logical.
Pressure sensor 12 and liquid level sensor 13 are provided in LNG storage tank 2, LNG surge tanks 7 and BOG recycles compressor 6 Between pipeline on and the pipeline between LNG storage tank 2 and LNG surge tanks 7 on be provided with temperature sensor 14.Feed liquor house steward 8, It is both provided with check valve on pipeline between LNG surge tanks 7 and LNG filling machines 3.
It is both provided with valve on above-mentioned each pipeline, to realize the LNG or BOG circulation route choosings when different working condition It needs, the valve of setting mainly has:It is provided with the on pipeline between the boost port and supercharging gasifier 5 of unloading of LNG tank cars 1 One hand-operated valve 15a.On gas pipeline 9 the is disposed with to close to one end of LNG storage tank 2 from close to one end of LNG tank cars 1 Two hand-operated valve 15b, the 5th hand-operated valve 15e, the 4th pneumatic operated valve 16d.In feed liquor house steward 8 from close to one end of LNG tank cars 1 to by One end of nearly LNG storage tank 2 is disposed with third hand-operated valve 15c, third check valve 17c.On two feed liquor branch pipes 11 respectively It is provided with the second pneumatic operated valve 16b, third pneumatic operated valve 16c, hand-operated valve is additionally provided on feed liquor branch pipe 11.It is provided on branch pipe 10 4th hand-operated valve 15d.It is recycled in the 4th pneumatic operated valve 16d and BOG and is provided with the 13rd gas on the pipeline between the entrance of compressor 6 Dynamic valve 16m, the 14th pneumatic operated valve is provided on the pipeline for connecting the outlet that the 13rd pneumatic operated valve 16m and BOG recycles compressor 6 16n is recycled in connection gas pipeline 9 and BOG and is provided with the 7th hand-operated valve 15g on the pipeline between the entrance of compressor 6, even It connects and is provided with the 6th hand-operated valve 15f on the pipeline between gas pipeline 9 and the outlet of BOG recycling compressors 6.LNG storage tank 2 with It is provided with the first pneumatic operated valve 16a on total pipeline between two LNG surge tanks 7, total pipeline branches into that be separately connected two LNG slow The branch pipeline for rushing tank 7 is respectively arranged with the 5th pneumatic operated valve 16e, the 9th pneumatic operated valve 16i, first on two branch pipelines It is disposed with the tenth pneumatic operated valve 16j, the second check valve 17b on pipeline between LNG surge tank 7a and LNG filling machine 3, It is disposed with the 6th pneumatic operated valve 16f, the first check valve 17a on pipeline between two LNG surge tank 7b and LNG filling machines 3. It is provided with the 7th pneumatic operated valve 16g on pipeline between the entrance of 2nd LNG surge tanks 7b and BOG recycling compressor 6, is returned in BOG It receives and is provided with the 8th pneumatic operated valve 16h on the pipeline between the outlet of compressor 6 and the 2nd LNG surge tanks 7b.It is buffered in the first LNG It is provided with the 11st pneumatic operated valve 16k on pipeline between the entrance of tank 7a and BOG recycling compressor 6, compressor 6 is recycled in BOG Outlet and the first LNG surge tanks 7a between pipeline on be provided with the 12nd pneumatic operated valve 16l, be pressurized in LNG storage tank 2 and storage tank The 15th pneumatic operated valve 16o is provided on pipeline between gasifier 4.The working method of 2 novel LNG gas stations of embodiment
The work of the novel LNG gas stations of embodiment 1 includes mainly:LNG unloads, LNG is filled, LNG storage tank is pressurized (it is in the open state to give tacit consent to each storage tank root valve).The groundwork method and step of the novel LNG gas stations of embodiment 1 is:
One, LNG unloads:
(1) self-balancing:Carry out which valve selection opens according to the liquid temperature in LNG tank cars 1, if liquid temperature is higher than setting Value then opens the 5th hand-operated valve 15e, the second hand-operated valve 15b and the 4th pneumatic operated valve 16d, if liquid temperature is less than setting value, opens Third hand-operated valve 15c, the 4th hand-operated valve 15d and the 4th pneumatic operated valve 16d so that BOG enters LNG slots by pipeline in LNG storage tank 2 In vehicle 1, on the one hand by pressure reduction in LNG storage tank 2, on the other hand pressure in LNG tank cars 1 is increased;(2) it recycles:When certainly flat After the completion of weighing apparatus, the 5th hand-operated valve 15e is closed, opens the 6th hand-operated valve 15f and the 13rd pneumatic operated valve 16m, is recycled using low temperature BOG BOG in LNG storage tank 2 is recovered in LNG tank cars 1 by compressor, further decreases pressure in LNG storage tank 2, is increased in LNG tank cars 1 Pressure;(3) from supercharging:First manual valve 15a, the second hand-operated valve 15b are opened, tank car booster is entered to LNG in LNG tank cars 1 Gasify, realizes tank car from supercharging;(4) it unloads:When pressure is higher in LNG tank cars 1, third hand-operated valve 15c and the is opened LNG stream enters in LNG storage tank 2 in two pneumatic operated valve 16b, third pneumatic operated valve 16c, LNG tank car 1, and realization is unloaded.LNG during unloading Tank car 1 is pressurized:It, on the one hand can be by opening first manual valve in order to keep the pressure in LNG tank cars 1 during unloading After 15a, the second hand-operated valve 15b, realize that tank car from being pressurized, on the other hand can open the 6th hand using supercharging gasifier 5 of unloading Dynamic valve 15f and the 4th pneumatic operated valve 16d, the 13rd pneumatic operated valve 16m are returned BOG in LNG storage tank 2 using low temperature BOG recycling compressors It receives to LNG tank cars 1 and realizes.(5) after the completion of unloading, the second hand-operated valve 15b, the 7th hand-operated valve 15g is opened, is remained in LNG tank cars 1 BOG entered in LNG storage tank 2 by the 14th pneumatic operated valve 16n.
Two, LNG is filled:
(1) the first LNG surge tanks 7a fills and pressurizes
1) the first LNG surge tank 7a slack tanks fill:The first pneumatic operated valve 16a, the 9th pneumatic operated valve 16i are opened, due to LNG storage tank Pressure is higher in 2, so LNG stream enters in the first LNG surge tanks 7a in LNG storage tank 2, when in the first LNG surge tanks 7a pressure compared with When height leads to that LNG cannot further flow into LNG storage tank 2, the 4th pneumatic operated valve 16d, the 11st pneumatic operated valve 16k, the 14th are opened BOG in first LNG surge tanks 7a is recycled in LNG storage tank 2, to drop by pneumatic operated valve 16n using low temperature BOG recycling compressors Pressure in low first LNG surge tanks 7a, to ensure the continuous of feed liquor.After liquid level is met the requirements in the first LNG surge tanks 7a, close The first pneumatic operated valve 16a, the 9th pneumatic operated valve 16i are closed, and opens the 4th pneumatic operated valve 16d, the 12nd pneumatic operated valve 16l, the 13rd pneumatically BOG in LNG storage tank 2 is recycled in the first LNG surge tanks 7a using low temperature BOG recycling compressors, the first LNG is delayed by valve 16m Boost in pressure is rushed in tank 7a to aerating pressure.
2) it is filled in the first LNG surge tank 7a operational process:Open the 4th pneumatic operated valve 16d, the 11st pneumatic operated valve 16k, BOG in first LNG surge tanks 7a is recycled in LNG storage tank 2 using low temperature BOG recycling compressors, is dropped by 14 pneumatic operated valve 16n Pressure in low first LNG surge tanks 7a opens the first pneumatic operated valve 16a, the 9th pneumatic operated valve when its pressure is less than LNG storage tank 2 16i, since pressure is higher in LNG storage tank 2, so LNG stream enters in the first LNG surge tanks 7a in LNG storage tank 2.When the first LNG is slow It rushes in tank 7a after liquid level is met the requirements, closes the first pneumatic operated valve 16a, the 9th pneumatic operated valve 16i, and open the 4th pneumatic operated valve 16d, the BOG in LNG storage tank 2 is recycled to first by 12 pneumatic operated valve 16l, the 13rd pneumatic operated valve 16m using low temperature BOG recycling compressors In LNG surge tanks 7a, by boost in pressure in the first LNG surge tanks 7a to aerating pressure.
(2) the 2nd LNG surge tanks 7b fill and pressurize
1) the 2nd LNG surge tank 7b slack tanks fill:The first pneumatic operated valve 16a, the 5th pneumatic operated valve 16e are then opened, since LNG is stored up Pressure is higher in tank 2, so LNG stream enters in the 2nd LNG surge tanks 7b in LNG storage tank 2, when pressure in the 2nd LNG surge tanks 7b It is higher when leading to that LNG cannot further flow into LNG storage tank 2, open the 4th pneumatic operated valve 16d, the 7th pneumatic operated valve 16g, the 14th BOG in 2nd LNG surge tanks 7b is recycled in LNG storage tank 2, to drop by pneumatic operated valve 16n using low temperature BOG recycling compressors Pressure in low 2nd LNG surge tanks 7b, to ensure the continuous of feed liquor.After liquid level is met the requirements in the 2nd LNG surge tanks 7b, close The first pneumatic operated valve 16a, the 5th pneumatic operated valve 16e are closed, and opens the 4th pneumatic operated valve 16d, the 8th pneumatic operated valve 16h, the 13rd pneumatic operated valve BOG in LNG storage tank 2 is recycled in the 2nd LNG surge tanks 7b using low temperature BOG recycling compressors, the 2nd LNG is buffered by 16m Boost in pressure is to aerating pressure in tank 7b.
2) it is filled in the 2nd LNG surge tank 7b operational process:Open the 4th pneumatic operated valve 16d, the 7th pneumatic operated valve 16g, the tenth BOG in 2nd LNG surge tanks 7b is recycled in LNG storage tank 2 using low temperature BOG recycling compressors, is reduced by four pneumatic operated valve 16n Pressure in 2nd LNG surge tanks 7b opens the first pneumatic operated valve 16a, the 5th pneumatic operated valve 16e when its pressure is less than LNG storage tank 2, Since pressure is higher in LNG storage tank 2, so LNG stream enters in the first LNG surge tanks 7a in LNG storage tank 2.When the 2nd LNG surge tanks After liquid level is met the requirements in 7b, the first pneumatic operated valve 16a, the 5th pneumatic operated valve 16e are closed, and open the 4th pneumatic operated valve 16d, the 8th gas BOG in LNG storage tank 2 is recycled to the 2nd LNG using low temperature BOG recycling compressors and buffered by dynamic valve 16h, the 13rd pneumatic operated valve 16m In tank 7b, by boost in pressure in the 2nd LNG surge tanks 7b to aerating pressure.
In technical process, when need to allow pressure increase in LNG storage tank 2 when, open the 15th pneumatic operated valve 16o, LNG storage tank LNG stream enters storage tank supercharging gasifier 4 in 2, realizes storage tank from supercharging.
(3) LNG filling machines 3 are pre-chilled:When LNG filling machines 3 are pre-chilled, the second pneumatic operated valve 16b, the tenth pneumatic operated valve 16j are opened, Since the first LNG surge tank 7a pressure is higher than LNG storage tank 2, LNG in the first LNG surge tanks 7a is delivered to LNG using pressure difference and is added 2 bottom of LNG storage tank is returned to after being recycled in mechanism of qi 3, to be pre-chilled to LNG filling machines 3, when the first LNG surge tanks in precooling process When 7a pressure is relatively low, the 4th pneumatic operated valve 16d, the 12nd pneumatic operated valve 16l, the 13rd pneumatic operated valve 16m are opened, is returned using low temperature BOG It receives compressor BOG in LNG storage tank 2 is recycled in the first LNG surge tanks 7a, improves the first LNG surge tank 7a pressure.Work as precooling When the first LNG surge tank 7a liquid levels are relatively low in the process, the 6th pneumatic operated valve 16f is opened, and simultaneously close off the tenth pneumatic operated valve 16j, it will The precooling of LNG filling machines 3 switches to the 2nd LNG surge tank 7b by the first LNG surge tank 7a feed flows, while being buffered to the first LNG Tank 7a carries out LNG supplements using 1) method.When the 2nd LNG surge tank 7b pressure or relatively low liquid level, buffered according to the first LNG The method of operation that tank 7a goes wrong switches over, repeatedly.Ensure the continuous of 3 precooling of LNG filling machines using double buffering tank.
(4) LNG filling machines 3 fill:It is similar it to be pre-chilled pattern with LNG filling machines 3, when LNG 3 aeratings of filling machine, opens the Two pneumatic operated valve 16b, the tenth pneumatic operated valve 16j, since the first LNG surge tank 7a pressure is higher than LNG vehicle-mounted bottles, using pressure difference by first LNG, which is delivered in LNG filling machines 3, in LNG surge tanks 7a enters LNG vehicle-mounted bottles after metering, to be filled to LNG vehicle-mounted bottles, when When the first LNG surge tank 7a pressure is relatively low in filling process, the 4th pneumatic operated valve 16d, the 12nd pneumatic operated valve 16l, the 13rd are opened BOG in LNG storage tank 2 is recycled in the first LNG surge tanks 7a by pneumatic operated valve 16m using low temperature BOG recycling compressor, improves the One LNG surge tank 7a pressure.When the first LNG surge tank 7a liquid levels are relatively low in filling process, the 6th pneumatic operated valve 16f is opened, and The tenth pneumatic operated valve 16j is simultaneously closed off, the filling of LNG vehicle-mounted bottles is switched into the 2nd LNG bufferings by the first LNG surge tank 7a feed flows Tank 7b, while LNG supplements are carried out using the method for front to the first LNG surge tanks 7a.When the 2nd LNG surge tank 7b pressure or liquid When position is relatively low, switched over according to the first LNG surge tanks 7a methods of operation to go wrong, repeatedly.Utilize double buffering tank Ensure the continuous of LNG vehicle-mounted bottles filling.
Liquid level, pressure and temperature sensor detection and chain control operation in each technological process operational process.

Claims (8)

1. a kind of novel LNG gas stations, including LNG tank cars, LNG storage tank, LNG filling machines, storage tank supercharging gasifier, supercharging of unloading Gasifier, the LNG storage tank connect storage tank by pipeline and are pressurized gasifier, be provided on the LNG tank cars and unload liquid mouth, gas phase Mouth, boost port, the boost port connect supercharging gasifier of unloading with gas phase mouth by pipeline respectively, it is characterised in that:Further include BOG recycles compressor, multiple LNG surge tanks;
LNG storage tank is connect with LNG tank cars by feed liquor house steward and gas pipeline, and the feed liquor house steward is connect with the liquid mouth that unloads, The gas pipeline is connect with the gas phase mouth of LNG tank cars, and feed liquor house steward is connected to gas pipeline by branch pipe, LNG storage tank, BOG recycles compressor, the gas phase mouth of LNG tank cars is sequentially communicated by pipeline so that the BOG in LNG storage tank can be recycled through BOG Compressor enters in LNG tank cars;
Multiple LNG surge tanks are in parallel by pipeline with LNG storage tank, and each LNG surge tanks are stored up with BOG recycling compressor, LNG respectively Tank is sequentially communicated to form forward and reverse two accesses by different pipelines, and the BOG in forward path in LNG surge tanks passes through BOG Recycling compressor enters LNG storage tank, and the BOG in backward channel in LNG storage tank recycles compressor by BOG and enters LNG bufferings In tank;Each LNG surge tanks are also sequentially communicated with LNG filling machines, LNG storage tank by pipeline respectively;
It is both provided with valve on aforementioned each pipeline, to realize the LNG or BOG circulation route choosing need when different working condition It wants.
2. novel LNG gas stations as described in claim 1, it is characterised in that:Valve on each pipeline be hand-operated valve and/ Or pneumatic operated valve.
3. novel LNG gas stations as described in claim 1, it is characterised in that:The quantity of the LNG surge tanks is two.
4. novel LNG gas stations as described in claim 1, it is characterised in that:The feed liquor house steward is branched into be connected with LNG storage tank The two feed liquor branch pipes connect are both provided with hand-operated valve and pneumatic operated valve on described two feed liquor branch pipes.
5. novel LNG gas stations as described in claim 1, it is characterised in that:The BOG recycling compressor is low temperature recycling pressure Contracting machine.
6. novel LNG gas stations as described in claim 1, it is characterised in that:It is provided with pressure sensor in the LNG storage tank And liquid level sensor, LNG surge tanks and BOG are recycled on the pipeline between compressor and between LNG storage tank and LNG surge tanks Temperature sensor is provided on pipeline.
7. novel LNG gas stations as described in claim 1, it is characterised in that:The feed liquor house steward, LNG surge tanks and LNG add It is both provided with check valve on pipeline between mechanism of qi.
8. a kind of working method of the novel LNG gas stations of claim 1 to 7 any one of them, it is characterised in that:Including as follows Step:
One, LNG unloads:
(1) self-balancing:Open the valve on the gas pipeline between LNG storage tank and LNG tank cars so that the BOG in LNG storage tank is logical Piping enters in LNG tank cars;(2) it recycles:After the completion of self-balancing, opens LNG storage tank-BOG and recycle compressor-LNG tank cars The valve of access closes other valves so that the BOG in LNG storage tank is recovered to through BOG recycling compressors in LNG tank cars, into one Step reduces pressure in LNG storage tank, increases LNG slot interior pressures;(3) from supercharging:Using unloading, supercharging gasifier realizes LNG tank cars From supercharging;(4) it unloads:When LNG slot interior pressures reach setting value, the valve opened in feed liquor house steward makes in LNG tank cars LNG stream enters in LNG storage tank, and realization is unloaded;LNG tank cars can pass through the supercharging of supercharging gasifier or the utilization of unloading during unloading BOG recycles compressor and BOG in LNG storage tank is recycled to the realization supercharging of LNG tank cars;
Two, LNG is filled:
(1) LNG surge tanks fill and pressurize:The valve opened on the pipeline between LNG storage tank and one of LNG surge tanks makes It obtains LNG stream in LNG storage tank to enter in LNG surge tanks, when pressure causes LNG that can not flow higher than pressure in LNG storage tank in LNG surge tanks It is fashionable, BOG in LNG surge tanks is recycled in LNG storage tank using BOG recycling compressors, pressure in LNG surge tanks is reduced, protects Demonstrate,prove the continuous of feed liquor;After liquid level is met the requirements in LNG surge tanks, stop feed liquor, compressor is recycled by LNG storage tank using BOG Interior BOG is recycled in LNG surge tanks, by boost in pressure in LNG surge tanks to aerating pressure;It can be according to this step method to more A LNG surge tanks fill pressurization one by one;In LNG surge tank filling processes, gasifier can be pressurized by storage tank, LNG storage tank is increased Pressure;
(2) LNG filling machines are pre-chilled:The valve on one of LNG surge tanks-LNG filling machines-LNG storage tank path conduits is opened, LNG in LNG surge tanks is delivered in LNG filling machines after cycle using pressure difference and is returned in LNG storage tank, to give LNG filling machines BOG in LNG storage tank is recycled to when pressure is relatively low in LNG surge tanks in precooling process using BOG recycling compressors by precooling In LNG surge tanks, LNG buffer tank pressures are improved;When LNG surge tanks liquid level is relatively low in precooling process, by the pre- of LNG filling machines It is cold to be switched to by another LNG surge tank feed flow by the LNG surge tank feed flows, while LNG supplements are carried out to the LNG surge tanks;
(3) LNG filling machines fill:The valve on the pipeline between one of LNG surge tanks and LNG filling machines is opened, is utilized LNG in LNG surge tanks is delivered in LNG filling machines by pressure difference enters LNG vehicle-mounted bottles after metering, when LNG is buffered in filling process When pressure tank is relatively low, BOG in LNG storage tank is recycled in LNG surge tanks using BOG recycling compressors, improves LNG surge tank pressures Power;When LNG surge tanks liquid level is relatively low in filling process, by the filling of LNG vehicle-mounted bottles by the LNG surge tank feed flows switch to by Another LNG surge tank feed flow, while LNG supplements are carried out by LNG storage tank to first LNG surge tank.
CN201810105285.3A 2018-02-02 2018-02-02 Novel LNG (liquefied Natural gas) filling station and working method thereof Active CN108361547B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810105285.3A CN108361547B (en) 2018-02-02 2018-02-02 Novel LNG (liquefied Natural gas) filling station and working method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810105285.3A CN108361547B (en) 2018-02-02 2018-02-02 Novel LNG (liquefied Natural gas) filling station and working method thereof

Publications (2)

Publication Number Publication Date
CN108361547A true CN108361547A (en) 2018-08-03
CN108361547B CN108361547B (en) 2023-12-15

Family

ID=63004324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810105285.3A Active CN108361547B (en) 2018-02-02 2018-02-02 Novel LNG (liquefied Natural gas) filling station and working method thereof

Country Status (1)

Country Link
CN (1) CN108361547B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108799825A (en) * 2018-09-03 2018-11-13 张家港富瑞深冷科技有限公司 LNG tank formula container charging system
CN110736026A (en) * 2019-10-24 2020-01-31 邳州亚联环保科技有限公司 residual liquid recycling system
CN110792925A (en) * 2019-11-15 2020-02-14 辽宁忠旺集团有限公司 Self-pressurization gas supply system and gas supply method
CN111306440A (en) * 2018-12-12 2020-06-19 张家港中集圣达因低温装备有限公司 Liquid discharge metering device
CN111336403A (en) * 2020-03-30 2020-06-26 日照海达尔加气设备有限公司 Filling method of micro-power-consumption low-temperature liquid filling system
CN111457246A (en) * 2020-04-01 2020-07-28 江苏国富氢能技术装备有限公司 Hydrogen storage type hydrogen filling station
CN112460476A (en) * 2019-09-09 2021-03-09 安瑞科(廊坊)能源装备集成有限公司 LNG filling device and filling method
CN112460474A (en) * 2019-09-09 2021-03-09 安瑞科(廊坊)能源装备集成有限公司 LNG filling device and filling method
WO2023096972A1 (en) * 2021-11-23 2023-06-01 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Liquid hydrogen trailer loading procedure for hydrogen and refrigeration recovery

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010031904A (en) * 2008-07-25 2010-02-12 Tokyo Electric Power Co Inc:The Vaporized gas supply system of low-temperature liquid
CN102635783A (en) * 2012-04-11 2012-08-15 重庆巨创计量设备股份有限公司 Safe energy-saving LNG (Liquefied Natural Gas) skid-mounted filling station
CN105179930A (en) * 2015-09-30 2015-12-23 赛鼎工程有限公司 Liquefied natural gas tank car unloading device of liquefied natural gas and compressed natural gas cooperative station and application
CN106287202A (en) * 2016-08-10 2017-01-04 日照海达尔加气设备有限公司 A kind of storage tank reclaims BOG without discharge LNG aerator and method
KR101748784B1 (en) * 2016-03-25 2017-06-19 한국해양대학교 산학협력단 Boil-off-gas treatment system of lng bunkering ship
CN207975477U (en) * 2018-02-02 2018-10-16 重庆耐德能源装备集成有限公司 Novel LNG gas stations

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010031904A (en) * 2008-07-25 2010-02-12 Tokyo Electric Power Co Inc:The Vaporized gas supply system of low-temperature liquid
CN102635783A (en) * 2012-04-11 2012-08-15 重庆巨创计量设备股份有限公司 Safe energy-saving LNG (Liquefied Natural Gas) skid-mounted filling station
CN105179930A (en) * 2015-09-30 2015-12-23 赛鼎工程有限公司 Liquefied natural gas tank car unloading device of liquefied natural gas and compressed natural gas cooperative station and application
KR101748784B1 (en) * 2016-03-25 2017-06-19 한국해양대학교 산학협력단 Boil-off-gas treatment system of lng bunkering ship
CN106287202A (en) * 2016-08-10 2017-01-04 日照海达尔加气设备有限公司 A kind of storage tank reclaims BOG without discharge LNG aerator and method
CN207975477U (en) * 2018-02-02 2018-10-16 重庆耐德能源装备集成有限公司 Novel LNG gas stations

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108799825A (en) * 2018-09-03 2018-11-13 张家港富瑞深冷科技有限公司 LNG tank formula container charging system
CN108799825B (en) * 2018-09-03 2024-04-09 张家港富瑞深冷科技有限公司 LNG tank container filling system
CN111306440B (en) * 2018-12-12 2022-02-01 张家港中集圣达因低温装备有限公司 Liquid discharge metering device
CN111306440A (en) * 2018-12-12 2020-06-19 张家港中集圣达因低温装备有限公司 Liquid discharge metering device
CN112460476A (en) * 2019-09-09 2021-03-09 安瑞科(廊坊)能源装备集成有限公司 LNG filling device and filling method
CN112460474A (en) * 2019-09-09 2021-03-09 安瑞科(廊坊)能源装备集成有限公司 LNG filling device and filling method
CN110736026A (en) * 2019-10-24 2020-01-31 邳州亚联环保科技有限公司 residual liquid recycling system
CN110792925B (en) * 2019-11-15 2022-01-28 辽宁忠旺集团有限公司 Self-pressurization gas supply system and gas supply method
CN110792925A (en) * 2019-11-15 2020-02-14 辽宁忠旺集团有限公司 Self-pressurization gas supply system and gas supply method
CN111336403A (en) * 2020-03-30 2020-06-26 日照海达尔加气设备有限公司 Filling method of micro-power-consumption low-temperature liquid filling system
CN111336403B (en) * 2020-03-30 2021-09-21 日照市海达尔能源装备科技股份有限公司 Filling method of micro-power-consumption low-temperature liquid filling system
CN111457246A (en) * 2020-04-01 2020-07-28 江苏国富氢能技术装备有限公司 Hydrogen storage type hydrogen filling station
WO2023096972A1 (en) * 2021-11-23 2023-06-01 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Liquid hydrogen trailer loading procedure for hydrogen and refrigeration recovery

Also Published As

Publication number Publication date
CN108361547B (en) 2023-12-15

Similar Documents

Publication Publication Date Title
CN108361547A (en) Novel LNG gas stations and its working method
CN111457246B (en) Hydrogen storage type hydrogen filling station
CN108561750A (en) A kind of L-CNG loading systems
CN105864636B (en) LNG filling stations unload without pump, fill, charging system and fill technique
CN203731088U (en) LNG receiving station process system for recovering BOG based on normal temperature compressor
CN111256028A (en) Hydrogen filling system
CN103672394A (en) Pump-free LNG gas-filling system and liquefied natural gas processing method
CN105179930A (en) Liquefied natural gas tank car unloading device of liquefied natural gas and compressed natural gas cooperative station and application
CN219013995U (en) Cold energy recovery type liquid hydrogen hydrogenation station filling system
CN115875595A (en) Comprehensive hydrogen source hydrogen filling station and control method and control system thereof
CN113983352A (en) Hydrogen cooling system of hydrogenation and liquefied natural gas combined station
CN207975477U (en) Novel LNG gas stations
CN105020574A (en) L-CNG gas station
CN107676623A (en) A kind of differential LNG loading systems
CN115388324A (en) Gas-liquid hydrogen combined supply hydrogenation station
CN212537494U (en) Discharging pressure regulating system applied to hydrogen storage type hydrogen adding station
CN210601032U (en) Novel liquefied natural gas unloading system capable of being started quickly
CN207687667U (en) A kind of differential LNG loading systems
CN102032437A (en) Unloading and pressure regulating composite booster for liquefied natural gas filling station
CN204387673U (en) LNG skid gas station
CN207394353U (en) A kind of differential LNG tank cars charging system
CN217208898U (en) Control system of hydrogen production and hydrogenation integrated station
CN111365610B (en) Discharging pressure regulating system applied to hydrogen storage type hydrogenation station
CN204534110U (en) Hydraulic type air entraining substation
CN205137064U (en) Liquefied natural gas tank wagon that liquefied natural gas and CNG built station jointly device of unloading

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant