CN108361476A - A kind of heat preservation color separation identification upper hose and upper hose keep the temperature color separation identification technique - Google Patents

A kind of heat preservation color separation identification upper hose and upper hose keep the temperature color separation identification technique Download PDF

Info

Publication number
CN108361476A
CN108361476A CN201810145677.2A CN201810145677A CN108361476A CN 108361476 A CN108361476 A CN 108361476A CN 201810145677 A CN201810145677 A CN 201810145677A CN 108361476 A CN108361476 A CN 108361476A
Authority
CN
China
Prior art keywords
upper hose
water pipe
color separation
insulating tube
heat preservation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810145677.2A
Other languages
Chinese (zh)
Inventor
徐国俭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JUTONG DECORATION GROUP Co Ltd
Original Assignee
SHANGHAI JUTONG DECORATION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JUTONG DECORATION GROUP Co Ltd filed Critical SHANGHAI JUTONG DECORATION GROUP Co Ltd
Priority to CN201810145677.2A priority Critical patent/CN108361476A/en
Publication of CN108361476A publication Critical patent/CN108361476A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L59/00Thermal insulation in general
    • F16L59/02Shape or form of insulating materials, with or without coverings integral with the insulating materials
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/0243Laying or reclaiming pipes on land, e.g. above the ground above ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/0243Laying or reclaiming pipes on land, e.g. above the ground above ground
    • F16L1/0246Laying or reclaiming pipes on land, e.g. above the ground above ground at a certain height off the ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors

Abstract

The present invention relates to a kind of decoration technology, especially a kind of heat preservation color separation identification upper hose and upper hose keep the temperature color separation identification technique.The heat preservation color separation of the present invention identifies upper hose, including cold water pipe, hot-water line, circulating water pipe and pure water pipe, and insulating tube is cased with outside upper hose, the insulating tube of cold water pipe is black, the insulating tube of hot-water line is red, and the insulating tube of circulating water pipe is blue, and the insulating tube of pure water pipe is white.The insulating tube that technical scheme of the present invention passes through the different colours in upper hose outer cover; it is not only that upper hose provides the functions such as heat preservation, sound insulation and noise reduction, outer protection; and it is provided for different types of upper hose and facilitates identification; installation connection is carried out according to upper hose color when construction, it will not misconnection pipeline;Meanwhile when carrying out Inspection and maintenance in use, it is convenient to carry out demolition and maintenance for the pipeline for needing to safeguard according to color identification, eliminate the step of searching confirms, save the time of repair and maintenance, improve efficiency.

Description

A kind of heat preservation color separation identification upper hose and upper hose keep the temperature color separation identification technique
Technical field
The present invention relates to a kind of fitting-up technique, especially a kind of heat preservation color separation identification upper hose and upper hose heat preservation point Color identification technique.
Background technology
Indoors in decorations field, upper hose is also referred to as feed pipe, and the water pipe of water is exactly provided for industry or resident, Upper hose is pressure-bearing pipe, is exactly to need that pressure can be born with the maximum difference of drainpipe, the mechanical property to material and erector Skill require it is high, if it is having also needed to the Testing index such as sanitary index, nontoxic and pollution-free in water engineering.Upper hose is pressed in industry Purposes can be divided into following type:Hot-water line and cold water pipe, are respectively used to hot-water supply and cold water;Circulating water pipe is used primarily in cold But in water system, cooling water is used not to be discharged not instead of at once later, by circulating water pipe recycling, reaches using water wisely Purpose;Pure water pipe is connected with pipe type water purification apparatus, is purified to tap water, removes the suspended matter in water removal(Particulate matter), glue Body, organic matter, hardness, microorganism etc. provide pure water up to standard for different process production.
For heat preservation, the needs of noise reduction, thermal insulation material is usually cased with outside upper hose, common thermal insulation material has rubber and plastic extra large Silk floss, alumina silicate felt, superfine glass face, rock wool, polyurethane tile fragment and polyurethane foam material etc., thermal insulation material have following work With:1, it keeps the temperature, it is too fast that hot-water line heat preservation prevents water temperature to be lost in, and cold water pipe heat preservation can prevent pipe outer wall from condensing condensed water;2, every Sound noise reduction can greatly reduce the sound of flow;3, outer protection is acted on, the appearance aging of pipeline can be slowed down.However, passing The upper hose external insulation layer of system is usually all unified color, and easy wrong, uses in the future when causing piping connection installation When, it is possible that flowing out in hot water, pure water pipe the case where flowing out recirculated water in cold water pipe, impact, needs to industrial production Pipeline construction is re-started, not only happy mistake normally produces, but also cost is caused to increase significantly.
Invention content
For the above demand, the present invention provides a kind of heat preservation color separation identification upper hoses and upper hose heat preservation color separation to identify work Skill, upper hose thermal insulation material are distinguish in different colors, and color separation is bright and clear when not only constructing, and avoids pipeline misconnection, uses process It is also simple and convenient when middle maintenance and inspection, easily operated.
The technical scheme is that:
A kind of heat preservation color separation identifies upper hose, and the upper hose includes cold water pipe, hot-water line, circulating water pipe and pure water pipe, described Insulating tube is cased with outside upper hose, the insulating tube of the cold water pipe is black, and the insulating tube of hot-water line is red, circulating water pipe Insulating tube is blue, and the insulating tube of pure water pipe is white.
The adjacent upper hose clear distance is at least 10mm.
The upper hose is bright dress or concealed installation.
It states clearly and loads onto water pipe and fixed with cutting ferrule uniform intervals.
The cold water pipe and pure water pipe cutting ferrule spacing are not more than 60 centimetres, and hot-water line cutting ferrule spacing is not more than 40 centimetres, follows Ring water pipe cutting ferrule spacing is 40-60 centimetres.
The tube seat depth of the concealed installation upper hose is more than upper hose outer diameter at least 40mm, and tube seat width is more than upper hose outer diameter The sum of at least 50mm, upper hose outer surface be less than tube seat wall face at least 10mm.
The tube seat inner surface brushing waterproof coating of the concealed installation upper hose.
The concealed installation upper hose is fixed with clip uniform intervals, and constant spacing is 60-80 centimetres.
A kind of upper hose heat preservation color separation identification technique, includes the following steps:
Step 1:It determines watering pipeline quantity, put in order from left to right;
Step 2:It moves towards to lay pipeline, snap the line setting-out by upper hose, water pipe moves towards smooth vertical and horizontal;
Step 3:Upper hose is installed;
Step 4:Upper hose outer cover insulating tube, specially:Cold water pipe sleeve black insulating tube, the red insulating tube of hot-water line set, is followed Ring water pipe sleeve blue insulating tube, water purification pipe sleeve white insulating tube;
Step 5:It is fixed along upper hose uniform intervals with cutting ferrule or clip.
The upper hose is concealed installation, further includes between the step 2 and step 3:It cuts and slots by snap the line position;The step Further include after rapid 5:Tube seat is blocked with cement mortar extremely to flush with wall.
Technical scheme of the present invention is by the insulating tube of the different colours in upper hose outer cover, and only upper hose does not provide Functions such as heat preservation, sound insulation and noise reduction, outer protection, and provided for different types of upper hose and facilitate identification, when construction according to Upper hose color carries out installation connection, will not misconnection pipeline, occur wrong water outlet phenomenon when avoiding using;Meanwhile watering pipeline exists Maintenance and inspection are frequently necessary to during use, have the identification of different colours to distinguish, can be easily directed to when inspection is safeguarded and need to tie up The pipeline of shield carries out demolition and maintenance, eliminates the step of searching confirms, saves the time of repair and maintenance, improves efficiency.
Description of the drawings
Fig. 1 is that present invention heat preservation color separation identifies upper hose stereogram.
Specific implementation mode
The technique effect of the design of the present invention, concrete structure and generation is described further below with reference to attached drawing, with It is fully understood from the purpose of the present invention, feature and effect.
With reference to figure 1, heat preservation color separation of the invention identifies upper hose, including cold water pipe 11, hot-water line 12,13 and of circulating water pipe Pure water pipe 14 is cased with insulating tube 10 outside upper hose, and the insulating tube 10 of the cold water pipe 11 is black, the insulating tube of hot-water line 12 10 be red, and the insulating tube 10 of circulating water pipe 13 is blue, and the insulating tube 10 of pure water pipe 14 is white.
The insulating tube 10 of different colours in upper hose outer cover, only upper hose does not provide heat preservation, sound insulation and noise reduction, outside The functions such as protection, and provide for different types of upper hose and facilitate identification, and when construction is installed according to upper hose color Connection, will not misconnection pipeline, occur wrong water outlet phenomenon when avoiding using;Meanwhile watering pipeline is frequently necessary in use Maintenance and inspection have the identification of different colours to distinguish, and checking easily be directed to when safeguarding needs the pipeline safeguarded to carry out dismounting dimension Shield eliminates the step of searching confirms, saves the time of repair and maintenance, improves efficiency.
With reference to figure 1, upper hose of the invention keeps the temperature color separation identification technique, includes the following steps:
Step 1:It determines watering pipeline quantity, put in order from left to right, respectively hot-water line 12, circulating water pipe 13, cold water pipe 11 and pure water pipe 14, it influences each other caused by being transmitted in order to avoid heat, adjacent upper hose clear distance is at least 10mm.
Step 2:It moves towards to lay pipeline by upper hose, with ink fountain or laser leveler snap the line setting-out, water pipe trend is answered It is smooth vertical and horizontal, it is not only neat and artistic, but also facilitate subsequent construction, hard draw or distortion water pipe are avoided, causes water outlet and metope not It is parallel, influence beautiful and tap installation;Meanwhile smooth vertical and horizontal trend is easy to judge, just can determine whether line by socket node Road is moved towards, and punching nailing is easy to avoid water lines on wall, and maintenance in the future is looked for a little also more simple and efficient.
In home decoration, ground is not walked on water pipe top most convenient for walking, because water pipe installation is on the ground, to bear ceramic tile and people above Pressure, have and step on the danger for splitting water pipe.In addition, since the characteristic of water is toward lower stream, leak once occurs for the pipeline for walking underground, It is difficult to find in time, only water overflows Kingsoft or floor deformation, can just find leak, be set at this time to ground decoration and earth's surface It applies and damages;And the water pipe for walking underground can only be concealed installation mode, once leak is difficult to find leakage point, repetition test be needed to arrange It looks into.And water pipe walk top can then overcome disadvantages described above, have it is bright dress and concealed installation two ways, bright dress mode simple installation, maintenance dimension Shield is convenient.
Finally, waterpipe must not install close to power supply, and in conduit in the following, the two need to use gap bridge degree of bending through when intersecting; The spacing of water pipe and Gas Pipe should be not less than 50mm.Control has water to the water lines of the parallel cabling of palpus in 60-90 centimetres of height without exception The pipeline of tap must be vertical.
Step 3:Upper hose is installed;Upper hose generally uses PPR tempreature bulbs, good airproof performance, but installation speed cannot be too fast, uses Power not just in the case of, may make to block in pipe, flow is caused to reduce.
The system of laying of water supply pipeline is divided into bright dress and concealed installation, if upper hose is concealed installation, is needed by snap the line before installation Position cutting fluting.It is slotted to wall using Portable electro-dynamic cutting machine, size and depth carry out as requested, when picking chisel It must not excessively exert oneself, make the oversized influence wall quality of fluting, when cutting groove corner, manually be coordinated with chisel and repaired, make slot Mouth slot bottom is straight.Groove depth is not greater than 1/3 wall thickness, and wall thickness, must not two-way split wire casing less than or equal to 120mm.It opens Slot, which finishes, to be cleaned out in slot, and watering moistening, brush plain-water slurry articulamentum is together.
In order to ensure firmly installing, the tube seat depth of concealed installation upper hose is more than upper hose outer diameter at least 40mm, tube seat width More than the sum of upper hose outer diameter at least 50mm;In order to avoid leak, upper hose outer surface is less than tube seat wall face at least 10mm, In, batch grieshoch after 14 pipe laying of cold water pipe 11 and pure water pipe is greater than 10mm, and batch grieshoch after 12 pipe laying of hot-water line is greater than 15mm, crowd grieshoch 10-15mm after 13 pipe laying of circulating water pipe.
Opened pipe-line tank must make water-proofing treatment after camber line is smooth, tube seat inner surface brushing waterproof coating, in order to ensure Waterproof effect, waterproof coating thickness are not less than 20mm.Mounted cold water pipe 11, hot-water line 12, circulating water pipe 13, pure water pipe 14 Tube head height should on the same horizontal plane, later install respective switch just can beauty.After water pipe installs, pipe should be used immediately It is stifled that tube head is blocked up, avoid sundries from falling into.
Step 4:Upper hose outer cover insulating tube 10, specially:11 sets of black insulating tubes 10 of cold water pipe, 12 red chromatography of hot-water line Color insulating tube 10,13 sets of blue insulating tubes 10 of circulating water pipe, 14 sets of white insulating tubes 10 of pure water pipe;It can be the pipe of insulating tube 10 Son is cut off, and then the equal spoon of glue is applied on the section cut off, and both sides will apply, and is allowed to dry after a few minutes and is pressed again Conjunction bonds together.It can be with section construction if upper hose is long.
Step 5:It is fixed along upper hose uniform intervals with the cutting ferrule 15 of profession or clip, can't use and hook nail, to prevent stopping loss Bad water pipe reduces water tube life-span.Bright water pipe of loading onto is fixed with 15 uniform intervals of cutting ferrule, between 14 cutting ferrule 15 of cold water pipe 11 and pure water pipe It is 50 ± 5cm away from routine, is not more than 60 centimetres;12 cutting ferrule of hot-water line, 15 spacing is 35 ± 5cm, is not more than 40 centimetres;Recirculated water 13 cutting ferrule of pipe, 15 spacing is 40-60 centimetres.If 15 quantity of cutting ferrule is very few, fixation is not in place, water pipe can be caused to shake, generation is made an uproar Sound.Concealed installation upper hose is fixed with clip uniform intervals, and after being installed due to concealed installation waterpipe, tube seat is blocked with cement mortar, Constant spacing can be widened slightly, be 60-80 centimetres.
Step 6:Upper hose is after installation is complete, it is necessary to suppress test, the installed each fusion point of upper hose of detection is It is no up to standard, there are Mei You Seepage water or drainage.When suppressing test, the pressure of stamper has to reach maximum possible operating pressure 1.5 times, wait for 20-30 minutes or more, if the pointer position of pressure gauge does not change, just illustrate installed upper hose It is sealing.In pressure test, pipeline air in purging line after filling water then closes water meter main valve, it is necessary to make With the pressure gauge that measurement accuracy is 0.1 pa, pressure gauge is mounted on to the minimum point of entire pipe-line system as far as possible.
Step 7:Concealed installation tube seat is blocked with cement mortar and is repaired to wall and flushed.It is divided into tube seat to block and secondary Tube seat is repaired, and internal layer plugging material parches after shrinking and just carries out outer layer repairing, when necessary, the tube seat face among two steps On add enhancing cloth, even if water supply pipeline because expand with heat and contract with cold be deformed or various construction materials, binding material due to shrink Rate is different, produces different degrees of contraction, and internal layer plugged zone will not synchronous distending or contraction with outer layer repair layer;Enhancing cloth exists Among rendering layer, play the role of drawknot, internal layer plugged zone can be transmitted to the Stress decomposition come, reduced, outer layer repair layer is avoided to exist It flakes, crack with the generation of wall joining place in tube seat fluting position.
Disclosed above is only the embodiment of the present invention, and still, the present invention is not limited to this, the technology of any this field What personnel can think variation should all fall into protection scope of the present invention.

Claims (10)

1. a kind of heat preservation color separation identifies upper hose, the upper hose includes cold water pipe(11), hot-water line(12), circulating water pipe(13) And pure water pipe(14), insulating tube is cased with outside the upper hose(10), which is characterized in that the cold water pipe(11)Insulating tube (10)For black, hot-water line(12)Insulating tube(10)For red, circulating water pipe(13)Insulating tube(10)For blue, pure water pipe (14)Insulating tube(10)For white.
2. heat preservation color separation according to claim 1 identifies upper hose, which is characterized in that the adjacent upper hose clear distance is at least For 10mm.
3. heat preservation color separation according to claim 1 identifies upper hose, which is characterized in that the upper hose is bright dress or dark Dress.
4. heat preservation color separation according to claim 3 identifies upper hose, which is characterized in that state clearly and load onto water pipe with cutting ferrule (15)Uniform intervals are fixed.
5. heat preservation color separation according to claim 4 identifies upper hose, which is characterized in that the cold water pipe(11)And pure water pipe (14)Cutting ferrule spacing is not more than 60 centimetres, hot-water line(12)Cutting ferrule spacing is not more than 40 centimetres, circulating water pipe(13)Cutting ferrule spacing It is 40-60 centimetres.
6. heat preservation color separation according to claim 3 identifies upper hose, which is characterized in that the tube seat of the concealed installation upper hose is deep Degree is more than upper hose outer diameter at least 40mm, and tube seat width is more than the sum of upper hose outer diameter at least 50mm, upper hose outer surface and is less than Tube seat wall face at least 10mm.
7. heat preservation color separation according to claim 3 identifies upper hose, which is characterized in that in the tube seat of the concealed installation upper hose External coating waterproof coating.
8. heat preservation color separation according to claim 3 identifies upper hose, which is characterized in that the concealed installation upper hose is equal with clip Even interval is fixed, and constant spacing is 60-80 centimetres.
9. a kind of upper hose keeps the temperature color separation identification technique, which is characterized in that include the following steps:
Step 1:It determines watering pipeline quantity, put in order from left to right;
Step 2:It moves towards to lay pipeline, snap the line setting-out by upper hose, water pipe moves towards smooth vertical and horizontal;
Step 3:Upper hose is installed;
Step 4:Upper hose outer cover insulating tube(10), specially:Cold water pipe(11)Cover black insulating tube(10), hot-water line(12) The red insulating tube of set(10), circulating water pipe(13)The blue insulating tube of set(10), pure water pipe(14)The white insulating tube of set(10);
Step 5:With cutting ferrule(15)Or clip is fixed along upper hose uniform intervals.
10. upper hose according to claim 9 keeps the temperature color separation identification technique, which is characterized in that the upper hose is concealed installation, Further include between the step 2 and step 3:It cuts and slots by snap the line position;Further include after the step 5:With cement mortar Tube seat is blocked extremely to flush with wall.
CN201810145677.2A 2018-02-12 2018-02-12 A kind of heat preservation color separation identification upper hose and upper hose keep the temperature color separation identification technique Pending CN108361476A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810145677.2A CN108361476A (en) 2018-02-12 2018-02-12 A kind of heat preservation color separation identification upper hose and upper hose keep the temperature color separation identification technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810145677.2A CN108361476A (en) 2018-02-12 2018-02-12 A kind of heat preservation color separation identification upper hose and upper hose keep the temperature color separation identification technique

Publications (1)

Publication Number Publication Date
CN108361476A true CN108361476A (en) 2018-08-03

Family

ID=63006055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810145677.2A Pending CN108361476A (en) 2018-02-12 2018-02-12 A kind of heat preservation color separation identification upper hose and upper hose keep the temperature color separation identification technique

Country Status (1)

Country Link
CN (1) CN108361476A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103904522A (en) * 2012-12-27 2014-07-02 重庆兴达得誉科技有限公司 Technological method of wire harness
CN105178403A (en) * 2015-06-17 2015-12-23 青岛海川建设集团有限公司 Indoor water supply and drainage system concealed layout construction method
CN106122610A (en) * 2016-08-10 2016-11-16 徐军 A kind of guiding corrugated bushing for pre-buried water supply pipe system
CN106401148A (en) * 2016-08-31 2017-02-15 杭州构家网络科技有限公司 Indoor water pipe construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103904522A (en) * 2012-12-27 2014-07-02 重庆兴达得誉科技有限公司 Technological method of wire harness
CN105178403A (en) * 2015-06-17 2015-12-23 青岛海川建设集团有限公司 Indoor water supply and drainage system concealed layout construction method
CN106122610A (en) * 2016-08-10 2016-11-16 徐军 A kind of guiding corrugated bushing for pre-buried water supply pipe system
CN106401148A (en) * 2016-08-31 2017-02-15 杭州构家网络科技有限公司 Indoor water pipe construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宜居网: "《网页www.360doc.com/content/13/1020/08/256395_322718426.shtml》", 20 October 2013 *

Similar Documents

Publication Publication Date Title
CN108868176B (en) Construction method of kitchen and bathroom water leakage repairing system
CN103206062B (en) Radiant heating construction method for floor comprising modular composite heat-insulation plates
CN103437556B (en) Building water supply and drainage and heating engineering waterproofing and insulation construction method
CN205090098U (en) Pipeline hangs hole block structure
CN109404608A (en) Water supply thin-walled stainless steel tube cartridge connection construction
CN207959289U (en) Structure is repaired in a kind of leak for basement post-pouring zone position
CN108361476A (en) A kind of heat preservation color separation identification upper hose and upper hose keep the temperature color separation identification technique
CN111075991B (en) Water pipeline laying method
CN110748015A (en) Novel waterproof structure of toilet and construction process thereof
CN101352603B (en) Automatic spray conduit system and installation method thereof
CN104406007A (en) Vacuum heat-insulating steam-conveying pipeline
CN104235551A (en) Technology for maintaining water leakage part of building water pipe without removing floor tiles
CN108149864A (en) Exempt from exhaust hole roofing construction technique
KR100780797B1 (en) That inspect piping of wall reclamation styleand form of double pipe
CN112787289A (en) Wire tube pre-embedding construction process
CN206036410U (en) Pre -buried leak protection water is direct
CN206829623U (en) A kind of feed pipe wall ground leakproof tube seat structure
CN206943599U (en) Floor drainage pipeline service sleeve
CN102322131B (en) Obstructing and water retaining method for residential waterproof construction
CN103195261B (en) The benefit anti-leaking method of roof sewer mouth annulus
CN101200968B (en) Antiseep connector for protrudent part of roofing water supply pipe and water drain pipe
CN204491912U (en) Curtain wall structure between architecture pipe
CN215802143U (en) Secondary drainage stagnant water structure
CN204491725U (en) The non-current water service pipe of a kind of severe cold area roofing antifreeze protection insulation ditch
CN108193784A (en) A kind of upper and lower conduit slot antiseep technique

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180803

WD01 Invention patent application deemed withdrawn after publication