CN101352603B - Automatic spray conduit system and installation method thereof - Google Patents
Automatic spray conduit system and installation method thereof Download PDFInfo
- Publication number
- CN101352603B CN101352603B CN200810195719XA CN200810195719A CN101352603B CN 101352603 B CN101352603 B CN 101352603B CN 200810195719X A CN200810195719X A CN 200810195719XA CN 200810195719 A CN200810195719 A CN 200810195719A CN 101352603 B CN101352603 B CN 101352603B
- Authority
- CN
- China
- Prior art keywords
- pipeline
- keel
- installation
- communicated
- bye
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
Abstract
The invention relates to an automatic spraying pipeline system, which can reduce the installation difficulty of the pipeline and independently carry out construction with an easy control over the construction, thus guaranteeing the construction period of the system and the installation quality of the pipeline system. The invention also provides an installation method of the automatic spraying pipeline system. The automatic spraying pipeline system comprises a main pipeline, a stem pipeline, a fire-fighting hose, fittings fixed on a keel and a shower nozzle, and is characterized in that: the main pipeline and the stem pipeline are arranged inside a roof truss layer above a static pressure box; one end of the fire-fighting hose is connected with the stem pipeline and the other end is communicated with a branch pipeline through bends and short tubes; the short tubes pass through the roof of the static pressure box; the other end of the branch pipeline is connected and communicated with the shower nozzle fixed on the keel. When in installation, the main pipeline and the stem pipeline inside the roof truss layer above the static pressure box are installed at a certain place; the fire-fighting hose is installed with one end being connected with the stem pipeline; the stem pipeline is installed at the place and is communicated with the other end of the fire-fighting hose through the short tubes and the bends; connectors fixed on the keel are installed and a FFU keel is connected with the branch pipeline through the connectors of the keel; the air pressure and the water pressure of regional pipelines are tested; the shower nozzle is installed.
Description
(1) technical field
The present invention relates to a kind of automatic spray conduit system and installation method thereof, be used for the automatic sprinkler fire-extinguishing system pipeline engineering in the plenum chamber form clean room.
(2) background technology
Present domestic clean room, see Fig. 1,2, furred ceiling is the FFU keel under general the employing, last furred ceiling is the double-deck furred ceiling large bay plenum chamber form of sandwich color steel plate, automatic sprinkler system wherein, all be arranged in the plenum chamber at the trunk pipeline that is connected with spray head in the Workshop Production district, in addition, in the highest clean rank is ISO-2 grade clean room, in order to guarantee the safety of production equipment, automatic sprinkler fire-extinguishing system multiselect preact formula, promptly pour gas in the pipe-line system at ordinary times, be generally compressed air, mainly be to be reasons such as anti-locking system wrong report or pipe-line system leakage at ordinary times, cause system's damage process equipment that leaks, when breaking out of fire, spray pump is opened, system's bath, in order to guarantee that water can normally enter system, at the peak of each partition system electric-powered air release valve and main system interlock are set, so that discharge air in the system during bath, so the interior pipe fitting of its pipe-line system, valve is more, add that this type of clean room adds that headroom is very high, the trunk pipeline of spray system is arranged in the plenum chamber, and it is big to be responsible for difficulty of construction, and amount of high-altitude operation is very big, be absolutely unsafe, efficiency of construction is very low; Secondly often wide with other specialties (as purifying finishing, HVAC, specialty such as electric) cross-operation when carrying out the installation of spray system pipeline in plenum chamber, the construction sequencing of each specialty is difficult to arrange, and causes construction speed to be difficult to control; The spray system line arrangement make that the pipeline node in plenum chamber is many, thereby leakage point is many in plenum chamber in addition, and the safety of process equipment in the factory building is caused great threat.Fig. 1 is the clean room structural representation, and 1 is the roof truss layer among the figure, and 2 is the plenum chamber top board, and 3 is the return air passageway, and 4 is the plenum chamber layer, and 5 is the FFU keel, and 6 is clean zone, and 7 is raised floor, and 8 is interlayer under the toilet, and 9 is ground; Fig. 2 is traditional automatic spray conduit system schematic diagram, and 1 is the plenum chamber top board among the figure, and 2 is C shaped steel, and 3 is suspension and support, and 4 are the spray person in charge, and 5 are the spray main, and 6 are the fire-fighting special hose, and 7 is FFU keel connectors, and 8 is the FFU keel, and 9 is spray head.
(3) summary of the invention
At the problems referred to above, the invention provides a kind of clean room automatic spray conduit system and installation method thereof, by this installation method, can reduce the pipeline installation difficulty, can independently construct, Construction control is easy, guaranteed the installation quality of system construction duration and pipe-line system.
Its technical scheme of automatic spray conduit system is as follows, it comprises main line, main road, fire hose, is fixed on pipe fitting, spray head on the keel, it is characterized in that: described main line and main road are positioned at the above roof truss floor of plenum chamber, described fire hose one end connects the main road, the other end is by elbow, short tube connected component pipeline, described short tube passes the plenum chamber top board, and the described bye-pass other end is connected with described spray head on being fixed on keel and communicates.
It is further characterized in that: the prefabricated outer silk of described fire hose one end is communicated with the threeway on described main road, and the prefabricated internal thread articulation of the other end is communicated with described elbow; Described fire hose adopts the SUS304 stainless steel to make, and inside is corrugated stainless steel tubing; Described pipeline encapsulant anaerobic adhesive.
The installation method of automatic spray conduit system is characterized in that: realize by following steps: main line installation in place in the roof truss layer of a. more than plenum chamber; B. main road installation in place in the roof truss floor more than plenum chamber; C. fire hose is installed, and the one end connects the main road; D. bye-pass installation in place, bye-pass are communicated with the other end of fire hose by short tube, elbow; E. the connector that is fixed on the keel is installed, and the FFU keel are connected with bye-pass by the keel connector; F. the zone duct air pressure and the water pressure test; G. spray head is installed: spray head is fixed on the keel and is communicated with bye-pass.
After adopting the present invention, main line and main road are arranged in the above roof truss floor of plenum chamber, can treat to construct again after the plenum chamber top board construction finishes, the workmen just can stand directly on and carry out installation on the plenum chamber top board, thereby make difficulty of construction reduce, amount of high-altitude operation reduces, improve efficiency of construction when guaranteeing construction safety, more than plenum chamber, carry out pipeline construction, can independently carry out, do not need to consider with plenum chamber in other each professional crossed construction problem, can shorten construction period greatly, help construction progress control, the spray pipeline is arranged in more than the plenum chamber, make that the spray pipeline node in plenum chamber is few, leakage point reduces, and has guaranteed the safety of process equipment in the factory building effectively, thereby by the present invention, can reduce the pipeline installation difficulty, can independently construct, Construction control is easy, has guaranteed the installation quality of system construction duration and pipe-line system; Allow the prefabricated internal thread articulation of the fire hose other end be connected in addition with arm, be to consider to have in the actual installation certain distance to need to adjust, can between this internal thread and arm, add short tube and come connecting line according to actual conditions, make construction quality control easily, install in the connection at pipe fitting, adopt the encapsulant of anaerobic adhesive as pipeline, except guaranteeing the requirement of pipeline pressure grade and sealing, can also guarantee the cleanliness factor of toilet, by above structure and installation method, guarantee that Construction control becomes easily, guaranteed the installation quality of system construction duration and pipe-line system.
(4) description of drawings
Fig. 1 is the clean room structural representation;
Fig. 2 is traditional automatic spray conduit system schematic diagram;
Fig. 3 is a spray piping schematic diagram of the present invention;
Fig. 4 is a spray piping generalized section of the present invention.
(5) specific embodiment
See Fig. 3, Fig. 4, spray piping of the present invention comprises main line 1, main road 2, fire hose 3, is fixed on pipe fitting 8, spray head 10 on the keel 9, main line 1 and main road 2 are positioned at the roof truss floor 14 of plenum chamber more than 13, fire hose 3 is by short tube 12, elbow 5 connected component pipelines 7, short tube 12 passes plenum chamber top board 11, and bye-pass 7 other ends are connected with spray head 10 on being fixed on keel and communicate.The prefabricated outer silk of fire hose 3 one ends is connected with threeway 4 on the main road 2, and the prefabricated internal thread articulation of fire hose 3 other ends is communicated with elbow 5, fire hose 3 employing SUS304 stainless steels making, and inside is corrugated stainless steel tubing; During pipe fitting is installed and connected, adopt the encapsulant of anaerobic adhesive as pipeline, 6 is C shaped steel among Fig. 3,4, and 15 is support among Fig. 4, and 16 is steel roof truss, and 17 is clean zone.
The installation method of spray piping of the present invention, realize by following concrete steps:
Main line installation in place in a, the roof truss layer more than plenum chamber: be included in main line 1 unwrapping wire location in the roof truss layer 14 of plenum chamber more than 13, install, get final product according to conventional standard construction, promptly earlier that pipeline is in place according to the position of unwrapping wire in advance, then according to being successively placed on the support by the order of bassoon to tubule, again according to by bassoon to the order of tubule connection fittings successively; Pipeline generally adopts the connected mode of clip, flange, screw thread; Seepage can appear in pipeline unavoidable seam crossing in installation process, and maintenance must be provided with flange or articulation at the pipe branch place, so that can dismantle repairing for convenience; In addition, selecting for use of encapsulant is even more important, fire protection pipeline system design temperature height, sealing must be tight, the cleanliness factor requirement is arranged in the workshop, toilet, and generally be the preact system, dry at ordinary times in the pipe, therefore the seal for pipe joints material must guarantee all can not leak gas with having under the regimen condition dry, infiltration, and can not produce dirt, so encapsulant can not adopt conventional flax silk to add the form (the hemp silk can shrink, and reduces sealing property, has dust simultaneously and produces) of white paste paint under drying condition, can not adopt polytetrafluoroethylraw raw material band (raw material band is difficult to guarantee the sealing under the pressure more than the 1.0MPa), can only adopt other materials to replace,, have good toughness as anaerobic adhesive, the intensity height, do not produce advantages such as dirt.
Main road installation in place in b, the roof truss floor more than plenum chamber, identical with main line mounting means in place, other are according to standard construction.
The installation of c, fire hose: the prefabricated outer silk of fire hose 3 one ends is communicated with threeway 4 on the main road 2, and the prefabricated internal thread articulation of fire hose 3 other ends is communicated with elbow 5; Fire hose 3 adopts the SUS304 stainless steel to make and inside is corrugated stainless steel tubing, be since Fire Control System Design pressure all than higher, for guaranteeing that pipe-line system can not be corroded, wear out, can bring into play its normal fire-extinguishing function concurrently for a long time, it mainly acts on the fire hose here and be: (1) is used for adjusting the error that exists in the actual installation between the elbow of wearing plenum chamber top board place arm and the flexible pipe; (2) reduce the displacement that pipeline is produced because of hydraulic blow or mechanical collision; (3) can make the standpipe of wearing top board can be because of the person in charge does not rock, the sealing of perforate part can not destroyed yet, and sealing effectiveness is very good, thereby the cleanliness factor of toilet is not had any influence.
D, bye-pass installation in place: bye-pass 7 is communicated with fire hose 3 by short tube 12, elbow 5, wherein short tube 12 passes plenum chamber top board 11, because pipeline is in light weight, support 15 can be directly installed on the plenum chamber ceiling board, this section of tubing is installed and is carried out in the zone, toilet, must strictly observe the construction requirement of toilet during installation, enter all material and the necessary scrub of facility of toilet, must not in the toilet, carry out pipeline cutting, polishing operation.When standpipe is worn the top board perforate, must be equipped with the special-purpose dust catcher in toilet, the pollutant that produces during with perforate is removed, and standpipe should adopt trim or other similar materials and fluid sealant that hole is sealed after wearing the top board installation immediately, in order to avoid dust granules enters the toilet.
E, the connector that is fixed on the keel are installed: FFU keel 9 are connected with bye-pass 7 by keel connector 8, and the connector on the keel must strictly observe the construction requirement of toilet when installing, note finished product protection, does not destroy the FFU keel.
F, zone duct air pressure and the water pressure test: after all mains on trunk line, arm etc. install, errorlessly on inspection get final product pressure testing, pressure test pressure carries out according to design and code requirement; Damage process equipment or other professional finished products when avoiding pressure test because of leaking, should advanced promoting the circulation of qi press test, carry out the water pressure test again, operating personnel, inspection personnel must operate in strict accordance with the specific requirement of toilet's construction, guarantee the clean environment of factory building.
The g spray head is installed: spray head 10 is fixed on the keel 9 and is communicated with bye-pass 7, clean herein regional 17 internal cause FFU spine arrangement rates are than higher, even the part is abound with FFU, and the room standard width of a room in an old-style house is bigger, consider the attractive in appearance of room entire arrangement, spray head 10 can only be fixed on the crosspoint of FFU keel; Loine pressure test and wash and spray head 10 could be installed after qualified in addition will be noted the branch of " going up spray " and " spray down " during installation, adorn mistake, and will adopt the installation of spray head special spanner, otherwise can damage spray head 10.
Claims (5)
1. automatic spray conduit system, it comprises main line, main road, fire hose, is fixed on pipe fitting, spray head on the keel, it is characterized in that: described main line and main road are positioned at the above roof truss floor of plenum chamber, described fire hose one end connects the main road, the other end is by elbow, short tube connected component pipeline, described short tube passes the plenum chamber top board, and the described bye-pass other end is connected with described spray head on being fixed on keel and communicates.
2. according to the described automatic spray conduit system of claim 1, it is characterized in that: the prefabricated outer silk of described fire hose one end is communicated with the threeway on described main road, and the prefabricated internal thread articulation of the other end is communicated with described elbow.
3. according to the described automatic spray conduit system of claim 2, it is characterized in that: described fire hose adopts the SUS304 stainless steel to make, and inside is corrugated stainless steel tubing.
4. according to the described automatic spray conduit system of claim 3, it is characterized in that: described main line, main road and bye-pass seal with the encapsulant anaerobic adhesive.
5. the installation method of automatic spray conduit system is characterized in that: realize by following steps: main line installation in place in the roof truss layer of a. more than plenum chamber; B. main road installation in place in the roof truss floor more than plenum chamber; C. fire hose is installed, and the one end connects the main road; D. bye-pass installation in place, bye-pass are communicated with the other end of fire hose by short tube, elbow; E. the connector that is fixed on the keel is installed, and the FFU keel are connected with bye-pass by the keel connector; F. the zone duct air pressure and the water pressure test; G. spray head is installed: spray head is fixed on the keel and is communicated with bye-pass.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810195719XA CN101352603B (en) | 2008-08-28 | 2008-08-28 | Automatic spray conduit system and installation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810195719XA CN101352603B (en) | 2008-08-28 | 2008-08-28 | Automatic spray conduit system and installation method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101352603A CN101352603A (en) | 2009-01-28 |
CN101352603B true CN101352603B (en) | 2011-06-22 |
Family
ID=40305777
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200810195719XA Active CN101352603B (en) | 2008-08-28 | 2008-08-28 | Automatic spray conduit system and installation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101352603B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5633202B2 (en) * | 2010-06-11 | 2014-12-03 | 株式会社内山産業 | Ceiling fire extinguishing system |
CN103405869A (en) * | 2013-08-20 | 2013-11-27 | 国家电网公司 | High-pressure water mist fire extinguishing system installation and debugging method for underground substation |
CN117605214B (en) * | 2024-01-22 | 2024-04-05 | 四川省材科院消防科技有限公司 | Fire-fighting suspended ceiling and installation method |
-
2008
- 2008-08-28 CN CN200810195719XA patent/CN101352603B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN101352603A (en) | 2009-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101352603B (en) | Automatic spray conduit system and installation method thereof | |
CN204689452U (en) | Multipurpose tower machine | |
CN109316698B (en) | Dry-type water fire-fighting system for double-tunnel double-channel partition relay water supplementing pipeline | |
CN108591634A (en) | Mechanism glass-magnesium composite plate air hose construction | |
CN201260859Y (en) | Automatic spraying conduit system | |
KR20100006171U (en) | sprinkler with water drain device of head | |
CN206261970U (en) | Spray equipment and air film spray equipment | |
CN204352419U (en) | A kind of construction exterior rack Multi-functional spray system | |
KR100643084B1 (en) | Piping system and the form of construction work of building | |
CN109681700A (en) | A kind of floor heating pipe with leakage-proof structure | |
CN104314311B (en) | For the liftable level of tower machine of constructing 360 ° of spray equipments | |
CN201474307U (en) | Water-drenching device on exterior wall of high-rise building | |
CN207796374U (en) | Municipal drainage blow-off line | |
US20220178486A1 (en) | Methods and systems for sealing a premise-side pipe | |
CN1821648A (en) | No-damage repairing method for buried water pipe | |
CN207331865U (en) | A kind of flexibility tube-in-tube water supply component | |
CN205235746U (en) | Desulfurization absorption tower thick liquid spray set | |
CN105414119A (en) | Steam sweeping and blowing method at purification section of wet process phosphoric acid | |
CN204357130U (en) | For the liftable level of tower machine of constructing 360 ° of spray equipments | |
CN202972263U (en) | Embedded-type anti-seismic and leak-proof pipe joint | |
CN205606745U (en) | Quick connected system of fan coil | |
CN103362148A (en) | Pressure monitoring console | |
CN219743735U (en) | Fire extinguishing system for waste water and waste organic matter storage tank | |
CN220891264U (en) | Indoor water supply pipeline laying structure | |
RU2724093C1 (en) | Pipeline system for fire extinguishing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |