CN108360328A CN201810164453.6A CN201810164453A CN108360328A CN 108360328 A CN108360328 A CN 108360328A CN 201810164453 A CN201810164453 A CN 201810164453A CN 108360328 A CN108360328 A CN 108360328A
Authority
CN
China
Prior art keywords
well lid
well
asphalt
transition
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810164453.6A
Other languages
Chinese (zh)
Other versions
CN108360328B (en
Inventor
粟思橙
曹小康
杨荣强
蔡向昇
邝雁军
韦道孟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCFEB Civil Engineering Co Ltd
Original Assignee
CCFEB Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCFEB Civil Engineering Co Ltd filed Critical CCFEB Civil Engineering Co Ltd
Priority to CN201810164453.6A priority Critical patent/CN108360328B/en
Publication of CN108360328A publication Critical patent/CN108360328A/en
Application granted granted Critical
Publication of CN108360328B publication Critical patent/CN108360328B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Road Repair (AREA)

Abstract

The present invention provides a kind of construction methods of bituminous paving inspection shaft periphery compacting, include the following steps:The covering of transition well lid checks pit shaft;It paves, rolled asphalt cutting optimal;Take out transition well lid;Well seat well lid periphery reinforces;Well seat well lid is installed;Pave asphalt uplayer;Entirety rolls.Inspection pit shaft is covered by transition well lid, well seat well lid periphery pours to be paved with mortar bed under pea gravel concreten reinforcing and well seat well lid and realizes whole roll, the compactness for improving asphalt surface course around inspection shaft solves the problems, such as two class flatness of asphalt surface course around inspection shaft.Transition well lid provided by the invention, simple in structure, lighter in weight can be repeatedly used in turn.

Description

The construction method and transition well lid of bituminous paving inspection shaft periphery compacting
Technical field
The present invention relates to inspection shaft technical field of construction, particularly, are related to a kind of compacting of bituminous paving inspection shaft periphery Construction method and transition well lid.
Background technology
The compacted thickness of asphalt surface course refers to the actual (real) thickness of asphalt surface course after the completion of being rolled according to arrangement and method for construction, Song Puhou Degree is determined by test section, in given asphalt, roll the execution conditions such as equipment, rolling method under pitch mix Material can reach the paving thickness of design thickness after compaction.Between loose laying depth and compacted thickness and do not have accurately, strictly Functional relation, but permitted by asphalt characteristic, construction temperature, compacting equipment combination, debulking methods and compacting counting etc. Multifactor impact, and a kind of mathematical relationship presented with statistical rule.Therefore it during Construction of Asphalt Pavement, is only capable of to pressure Real thickness carries out rough control, it is difficult to strictly control compacted thickness in exact extension completely.
The passage effect of road roller:Road roller is mixed with pitch due to rolling wheel surface in moving forward or back roller compaction process Closing material, there are larger horizontal friction forces, therefore can push asphalt and occur laterally in wavy along road roller travel direction It is mobile, interim well lid or permanent well seat in the case that it is unlocked firmly can be by being conducted through the horizontal load come by asphalt Lotus is subjected to displacement or deforms.The effect control is not in place to easily cause the poor problem of flatness around inspection shaft.
Around inspection shaft asphalt surface course because of the fixation of well lid absolute altitude in roller compaction process and asphalt thickness dynamic and Uncertain variation and the problems such as cause the local protuberance of well week asphalt surface course, pit.Since such problem is in work progress Road roller, asphalt and the triangular dynamic response of well seat are directly contributed and are directly shown after the completion of constructing flat Whole degree problem, referred to as " initial flatness problem ".
Well week, loose, cracking occurred for asphalt surface course and sedimentation can reduce the smooth of asphalt surface course around well during operation Degree, influences vehicle pass-through quality, vehicle is jumped when vehicle being caused to cross.Such problem be since well week asphalt surface course compactness is insufficient or Differential settlement caused by the compactnesss deficiency such as base, roadbed within the scope of person's well week, and gradually develop in the operation phase, cause well all Out-of-flatness and jump vehicle phenomenon, referred to as " later stage flatness problem ".
Generally use of constructing around inspection shaft asphalt surface course at present blocks inspection well head with transition cover board, then successively paves Asphalt surface course, then will check that the pitch near well head is cut off, it is foundation installation check well well seat and well lid with asphalt surface course absolute altitude, Last Manual asphalt, by the method for the vacancy polishing around well seat.
Existing method has the following defects:
1. the asphalt surface course around inspection shaft is cut off together after the completion of two layers of Mian Ceng makings.Installation is complete for well seat Afterwards, the vacancy of surrounding is successively repaired using artificial distributing mode and is rolled.Since inspection shaft well coordinate height is higher than pitch cutting optimal, because Armpit angular position road roller can not roll in place around well seat when this pitch cutting optimal is constructed, and cause pitch cutting optimal compactness at this Deficiency is led to the problem of " later stage flatness ".
2. since excision position range is smaller, it is only capable of rolling using baby roller.It is light to roll equipment tonnage, and rolling wheel Part is rolled across seam on molded asphalt uplayer, is rolled useful load and is further declined, and compactness deficiency is equally easily caused, It leads to the problem of " later stage flatness ".
3. same because excision position range is smaller, in roller compaction process when seam rolls a rolling wheel part be pressed in it is rigid On molded asphalt uplayer, another part is pressed on hot-mix asphalt mixture flexible, and rolling wheel can be past soft under gravity Property asphalt on tilt, form local pit, lead to the problem of " initial flatness ".
4. artificial cloth is difficult to control total dosage, uniformity coefficient and the spreading evenness of bituminous mixture laying, it is easy shadow The flatness to asphalt surface course around well seat is rung, is led to the problem of " initial flatness ".
5. molded asphalt surface course excision needs to remove using milling machine milling, mechanical one-shift is costly.
Well week the asphalt pushing phenomenon and well that are generated in road roller roller compaction process when 6. well seat fixes insecure Seat interaction, easily leads to asphalt local accumulation, to generate protrusion or pit.
Invention content
The present invention provides a kind of construction method of bituminous paving inspection shaft periphery compacting and transition well lids, to solve to check Two class flatness problems of asphalt surface course around well.
The technical solution adopted by the present invention is as follows:
According to an aspect of the invention, there is provided a kind of construction method of bituminous paving inspection shaft periphery compacting, including Following steps:
The covering of transition well lid checks pit shaft;
It paves, rolled asphalt cutting optimal;
Take out transition well lid:The pitch excavated after the completion of rolled asphalt cutting optimal in transition well lid surface and peripheral extent is mixed It closes and expects and take out transition well lid;
Well seat well lid periphery reinforces:Pea gravel concreten is poured in the predetermined installation site periphery of well seat well lid;
Well seat well lid is installed:Well seat well lid is installed, is paved with mortar bed under well seat well lid;
Pave asphalt uplayer:Start the asphalt uplayer that paves before mortar bed initial set;
Entirety rolls:Whole roll is carried out to well seat well lid and asphalt uplayer.
Further, further include being inserted into asphalt with steel bar end to find out before rolled asphalt cutting optimal step The step of crossing the position of well lid and marking.
Further, reinforcing step in well seat well lid periphery includes:In predetermined installation site temporarily putting well seat well lid, in well Seat well lid periphery puts on internal model steel ring and pours pea gravel concreten, takes well seat well lid and internal model steel ring after pea gravel concreten initial set Go out.
Further, installation well seat well lid step includes:Draw cross hairs setting-out predetermined to well seat well lid with flush curb absolute altitude Installation site, and the installed height mark of 3~5mm of lift controls well seat well lid upwards.
Further, further include well seat well lid surface covering fibrous paper, fibrous paper before the asphalt uplayer step that paves The step of external coating Bituminous Isolation Agent.
Further, integrally rolling step includes:Dual-steel wheel road roller is rolled with pneumatic-tired rollers to well seat well lid When, well seat well lid was rolled with the route of face well seat well lid, adjacent wheelmark is avoided well seat well lid position, taking turns around well seat well lid The underlapped part of mark is supplemented by small-sized steel roller along well seat well lid edge and is rolled repeatedly, is cleared up and is pushed away repeatedly in roller compaction process Move on to the asphalt on well seat well lid surface.
According to another aspect of the present invention, a kind of applying applied to the compacting of above-mentioned bituminous paving inspection shaft periphery is provided The transition well lid of work method checks pit shaft for covering, transition well lid include circular cover and below the cover board along cover board Multiple gear legs of circumferential uniform intervals setting, gear leg have for check that pit shaft is contacted and moved horizontally with limiting transition well lid Arc-shaped outer surface.
Further, it is connected with gear leg and intersects at the center of circle of cover board with multiple ribs of support block leg.
Further, the handle of multiple transition well lids easy to remove is equipped with above cover board.
Further, respectively there are one nuts for set at the both ends of handle, and nut-welding is on the cover board.
The invention has the advantages that:
The construction method of bituminous paving inspection shaft provided by the invention periphery compacting, includes the following steps:Transition well lid covers Lid checks pit shaft;It paves, rolled asphalt cutting optimal;Take out transition well lid;Well seat well lid periphery reinforces;Well seat well lid is installed;Booth Black top upper layer;Entirety rolls.It is covered by transition well lid and checks that pit shaft, well seat well lid periphery pour pea gravel concreten and reinforce It is rolled with realization entirety is paved with mortar bed under well seat well lid, improves the compactness of asphalt surface course around inspection shaft, solve Two class flatness problems of asphalt surface course around inspection shaft.Transition well lid provided by the invention, simple in structure, lighter in weight, It can repeatedly be used in turn.
Other than objects, features and advantages described above, the present invention also has other objects, features and advantages. Below with reference to accompanying drawings, the present invention is described in further detail.
Description of the drawings
The attached drawing constituted part of this application is used to provide further understanding of the present invention, schematic reality of the invention Example and its explanation are applied for explaining the present invention, is not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the flow diagram of the construction method of the bituminous paving inspection shaft periphery compacting of the preferred embodiment of the present invention;
Fig. 2 is the schematic diagram that the pitch cutting optimal of the preferred embodiment of the present invention rolls;
Fig. 3 is the schematic diagram that the well seat well lid periphery of the preferred embodiment of the present invention reinforces;
Fig. 4 is the well seat well lid of the preferred embodiment of the present invention and the schematic diagram that asphalt uplayer integrally rolls;
Fig. 5 is the schematic diagram of the transition well lid bottom of the preferred embodiment of the present invention;
Fig. 6 is the schematic diagram at the top of the transition well lid of the preferred embodiment of the present invention;
Fig. 7 is the schematic diagram of the internal model steel ring of the preferred embodiment of the present invention.
Reference sign:
100, transition well lid;110, cover board;120, leg is kept off;121, ribs;130, handle;131, nut;200, it checks Pit shaft;300, base;400, pitch cutting optimal;500, pea gravel concreten;600, internal model steel ring;700, well seat well lid;800, it drips Green upper layer.
Specific implementation mode
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
Referring to Fig.1~4, according to an aspect of the invention, there is provided a kind of compacting of bituminous paving inspection shaft periphery is applied Work method, includes the following steps:
Step S1, the covering of transition well lid 100 check pit shaft 200.
The maintenance of roadbase 300 is completed and is cleaned out, and after the completion of kerbstone peace is built, is carried out pitch cutting optimal 400 and is constructed Preceding covered with transition well lid 100 checks pit shaft 200.
Step S2 paves, rolled asphalt cutting optimal 400.
Step S3 takes out transition well lid 100:Excavate 100 surface of transition well lid and week after the completion of rolled asphalt cutting optimal 400 It encloses the asphalt in range and takes out transition well lid 100.
100 top of transition well lid and the asphalt of surrounding need to excavate after the completion of pitch cutting optimal 400 rolls, and apply The local out-of-flatness of well head can be excavated process elimination during work, not influence flatness after molding.Transition well lid 100 is dripping Green cutting optimal 400 can excavate the pitch of transition well lid 100 top and surrounding covering while hot after the completion of rolling, and go to front week It is continuing with.100 first use amount of transition well lid is small, and single construction can repeatedly have enough to meet the need, and Master Cost is low.Due to being under pitch Transition well lid 100 is dug out before 400 cooling of face layer, small, the easy construction, convenient for promoting of excavating difficulty of asphalt.
Step S4,700 periphery of well seat well lid reinforce:Microlith coagulation is poured in 700 predetermined installation site periphery of well seat well lid Soil 500.
After 500 final set of pea gravel concreten backfilled between well seat well lid 700 and pitch cutting optimal 400, to well seat well lid 700 form lateral constraint, avoid well seat well lid 700 and are displaced sideways under the action of road roller elapses effect, only Allow well seat well lid 700 vertically to sink, alleviates the local protuberance or pit generated because asphalt elapses.Microlith coagulation Soil 500 belongs to the technical program temporary structure required in process, is not sent out with inspection shaft asphalt surface course after the completion of construction It waves and uses function.
Step S5, installation well seat well lid 700:Well seat well lid 700 is installed, is paved with mortar bed under well seat well lid 700.
Step S6, pave asphalt uplayer 800:Start the asphalt uplayer 800 that paves before mortar bed initial set.
Before the mortar bed initial set of 700 bottom of well seat well lid, such as start on pitch in 1 hour after pad mortar bed Face layer 800 paves, and using the plasticity close to limited extent when pre-hardening state of mortar, well seat well lid 700 can be in a certain range It is interior to be settled together with asphalt uplayer 800, roll the condition of providing for well seat well lid 700 and the entirety of asphalt uplayer 800.
The asphalt that the asphalt uplayer 800 that paves after the completion manually trickles down 700 surface of well seat well lid is cleared away, it is ensured that Well seat well lid 700 and asphalt uplayer 800 in the construction process can bulk settling, whole roller-compaction.
Step S7, is integrally rolled:Whole roll is carried out to well seat well lid 700 and asphalt uplayer 800.
Without taking out well seat well lid 700 after the whole roller-compaction of asphalt uplayer 800, mixed without well week pitch is excavated Material is closed, therefore without the technical finesse demand of well week backfill.
Waiting for that asphalt uplayer 800 naturally cools to 50 DEG C or less can open to traffic.
The major function of transition well lid 100 is to prevent from asphalt from falling into check in pit shaft 200, below pitch Layer 400 with machine spreading, roll, one-pass molding, do not influence 400 well week of pitch cutting optimal flatness.Therefore transition well lid 100 is right Rigidity is of less demanding with geometry, and can be adjusted roughly to substantially flat after deformation can satisfy the use demand.
Covered by transition well lid 100 check pit shaft 200,700 periphery of well seat well lid pour pea gravel concreten 500 reinforce and Realization entirety is paved with mortar bed to roll, improve the compactness of asphalt surface course around inspection shaft, solve under well seat well lid 700 Two class flatness problems of asphalt surface course around inspection shaft.Transition well lid 100 provided by the invention, it is simple in structure, weight compared with Gently, it can repeatedly be used in turn.
Preferably, further include being inserted into pitch mixing with steel bar end before 400 step of rolled asphalt cutting optimal with reference to Fig. 2 The step of material is found out the position of transition well lid 100 and is marked.Steel bar end strikes transition well lid 100 and has larger sense of touch simultaneously It makes a sound, can easily find out the position of transition well lid 100.It marks and finds convenient for after and take out transition well lid 100.
Preferably, with reference to Fig. 3,7,700 periphery of well seat well lid reinforces step and includes:In predetermined installation site temporarily putting well Seat well lid 700, in 700 periphery set of well seat well lid, above internal model steel ring 600 pours pea gravel concreten 500, at the beginning of waiting for pea gravel concreten 500 Well seat well lid 700 and internal model steel ring 600 are taken out after solidifying.Internal model steel ring 600 is as the internal model for pouring pea gravel concreten 500, well The positioning of seat well lid 700 and support internal mould steel ring 600.Pea gravel concreten 500 is fitted closely with well seat well lid 700, especially in armpit Angular position, the sorrow of no compactness will not form the weak link of differential settlement.
The thickness of 700 surrounding of well seat well lid backfill pea gravel concreten 500 can be controlled voluntarily, be not necessarily to and pitch cutting optimal 400 Absolute altitude maintains an equal level, therefore when asphalt uplayer 800 paves, well week space it is abundant, without long and narrow and deep well back, be conducive to drip The asphalt of green upper layer 800 backfills and whole roller-compaction, and the well back of the body is not easy to become rejected region.
Preferably, with reference to Fig. 4,700 step of installation well seat well lid includes:Draw cross hairs setting-out to well seat with flush curb absolute altitude 700 predetermined installation site of well lid, and the installed height mark of 3~5mm of lift control well seats well lid 700 upwards.By design flush curb absolute altitude It is flushed with 800 designed elevation of asphalt uplayer, well seat is controlled according to the principle for being higher by 800 3~5mm of designed elevation of asphalt uplayer The absolute altitude of well lid 700.Well seat well lid 700, since the plasticity of mortar bed can settle, finally sinks in whole roller compaction process It is down to 800 designed elevation of asphalt uplayer and is flushed with asphalt uplayer 800.
Preferably, further include the covering of 700 surface of well seat well lid before 800 step of asphalt uplayer that paves with reference to Fig. 4 The step of fibrous paper, fibrous paper surface brushing Bituminous Isolation Agent.Fibrous paper, which is covered in 700 surface of well seat well lid, prevents pitch from mixing 700 surface of material pollution well seat well lid.The Bituminous Isolation Agent is commonly to prevent asphalt from adhering to road roller in bitumen construction The vegetable oil used when rubber tire, main function are to avoid trickling down the fragmentary asphalt adherency on 700 surface of well seat well lid On well seat well lid 700, it is difficult to remove, when leading to whole roll under the action of fragmentary asphalt 700 mistake of well seat well lid Degree sinks, and is less than designed elevation.
Preferably, with reference to Fig. 4, integrally rolling step includes:Dual-steel wheel road roller is rolled with pneumatic-tired rollers to well seat well When near lid 700, well seat well lid 700 was rolled with the route of face well seat well lid 700, adjacent wheelmark avoids well seat well lid 700 Position, the 700 underlapped part of surrounding wheelmark of well seat well lid supplement stone roller repeatedly by small-sized steel roller along 700 edge of well seat well lid It presses, cleaning is pushed to the asphalt on 700 surface of well seat well lid repeatedly in roller compaction process.
Well seat well lid 700 is with surrounding asphalt by dual-steel wheel road roller and pneumatic-tired rollers entirety roller-compaction, pressure Solidity is secure.Asphalt in roller compaction process near well week relies primarily on small-sized steel roller compacting, rationalization Road roller travel route can avoid the stiffness difference because of well seat well lid 700 and asphalt and the stone roller of road roller dead weight initiation Pinch roller tilt phenomenon and the local pit of formation.
Well seat well lid can be realized by arranging special messenger to root out the asphalt on well seat well lid 700 in time with scoop 700 height and the height of asphalt uplayer 800 are always consistent, to evade compactness deficiency and well week flatness The problem of difference.Easy to operate, without installing or being arranged additional auxiliary machine tool, cost is relatively low.
With reference to Fig. 5,6, according to another aspect of the present invention, provide a kind of applied to above-mentioned bituminous paving inspection shaft week The transition well lid 100 of the construction method of side compacting checks pit shaft 200 for covering, and transition well lid 100 includes circular cover 110 With the multiple gear legs 120 being arranged along the circumferential uniform intervals of cover board 110 positioned at the lower section of cover board 110, gear leg 120 have for inspection The contact of pit shaft 200 is looked into limit the arc-shaped outer surface that transition well lid 100 moves horizontally.
Transition well lid 100, which is placed directly in, to be checked on pit shaft 200, and cover board 110 is contacted with pit shaft 200 is checked for face, to keep off leg The horizontal displacement of 120 limitation transition well lids 100, arc-shaped outer surface so that keep off leg 120 also contacts for face with pit shaft 200 is checked, grinds The vertical load of pinch roller, which is largely directly conducted to, to be checked on pit shaft 200, and gear leg 120 of the horizontal load by 110 lower section of cover board passes It passs and checks pit shaft 200,100 stress of transition well lid is good, and the probability of deformation is smaller, and production efficiency is high, of low cost, to transition The rigidity requirement of well lid 100 is relatively low so that rigidity and the contradiction of production efficiency and production cost become tunable.
Preferably, with reference to Fig. 5, it is connected with gear leg 120 and intersects at cover board 110 with multiple ribs 121 of support block leg 120 The center of circle.Ribs 121 can reinforce the structural strength of transition well lid 100, and cover board 110 is made to be unlikely to deform, and keep off the not rapid wear of leg 120 It is bad.
Preferably, with reference to Fig. 6,110 top of cover board is equipped with the handle 130 of multiple transition well lids 100 easy to remove.Handle Transition well lid 100 can be covered easily on inspection pit shaft 200 and take out transition well lid 100 by 130.
Preferably, with reference to Fig. 6, respectively there are one nuts 131, nut 131 to be welded on cover board 110 for set at the both ends of handle 130. Handle 130 can rotate in the hole of nut 131, facilitate the gripping of hand, and handle 130 can be also tightly attached on cover board 110 when not in use, Paving and rolling for pitch cutting optimal 400 is not interfered with.
The construction method of bituminous paving inspection shaft provided by the invention periphery compacting has further the advantage that with transition well lid:
(1) paving for asphalt is controlled by paver completely, and whole process is not necessarily to artificial cloth, and asphalt is always used Amount, paving thickness, the uniformity that paves and spreading evenness are easy to control, and are not in be produced since local asphalt is accumulated Raw flatness problem.
(2) this construction method is without cutting molded asphalt surface course or cold milling, construction is simple, mechanical stage student contributions pooled to pay for class activities With less.
(3) this construction method removes conventional design content, without additional setting permanent device, low engineering cost.It is each simultaneously Item technical measures are easy to operate, low-cost, do not make significant difference to construction cost.
The construction method of bituminous paving inspection shaft provided by the invention periphery compacting passes through one 5.8 kilometers with transition well lid 370 inspection shafts of Municipal Road Engineering Construction practices, by continuously attempting to, optimized technology, adjustment construction parameter simultaneously Sustained improvement forms the present invention.It is verified by practical application, the present invention is improving Asphalt Surface around inspection shaft Meanwhile there is good result for project cost, artificial mechanism cost control, duration guarantee etc..
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of construction method of bituminous paving inspection shaft periphery compacting, which is characterized in that include the following steps:
The covering of transition well lid checks pit shaft;
It paves, rolled asphalt cutting optimal;
Take out transition well lid:The asphalt in transition well lid surface and peripheral extent is excavated after the completion of rolled asphalt cutting optimal And take out transition well lid;
Well seat well lid periphery reinforces:Pea gravel concreten is poured in the predetermined installation site periphery of well seat well lid;
Well seat well lid is installed:Well seat well lid is installed, is paved with mortar bed under well seat well lid;
Pave asphalt uplayer:Start the asphalt uplayer that paves before mortar bed initial set;
Entirety rolls:Whole roll is carried out to well seat well lid and asphalt uplayer.
2. the construction method of bituminous paving inspection shaft according to claim 1 periphery compacting, which is characterized in that
Further include being inserted into the position that asphalt finds out transition well lid with steel bar end before the rolled asphalt cutting optimal step The step of setting and marking.
3. the construction method of bituminous paving inspection shaft according to claim 1 periphery compacting, which is characterized in that
The well seat well lid periphery reinforces step:In predetermined installation site temporarily putting well seat well lid, outside well seat well lid It encloses and puts on internal model steel ring and pour pea gravel concreten, take out well seat well lid and internal model steel ring after pea gravel concreten initial set.
4. the construction method of bituminous paving inspection shaft according to claim 1 periphery compacting, which is characterized in that
The installation well seat well lid step includes:Draw cross hairs setting-out to the predetermined installation site of well seat well lid with flush curb absolute altitude, And 3~5mm of lift controls the installed height mark of well seat well lid upwards.
5. the construction method of bituminous paving inspection shaft according to claim 1 periphery compacting, which is characterized in that
Further include well seat well lid surface covering fibrous paper, fibrous paper surface brushing before the asphalt uplayer step that paves The step of Bituminous Isolation Agent.
6. the construction method of bituminous paving inspection shaft according to claim 1 periphery compacting, which is characterized in that
The entirety rolls step:When dual-steel wheel road roller is rolled with pneumatic-tired rollers to well seat well lid, with face The route of well seat well lid rolled well seat well lid, and adjacent wheelmark avoids well seat well lid position, and wheelmark is underlapped around well seat well lid Part is supplemented by small-sized steel roller along well seat well lid edge repeatedly rolls, and cleaning is pushed to well seat repeatedly in roller compaction process The asphalt on well lid surface.
7. one kind being applied to claim 1~6 any one of them transition well lid (100), pit shaft (200) is checked for covering, It is characterized in that,
The transition well lid (100) includes circular cover (110) and is located at below the cover board (110) along the cover board (110) Circumferential uniform intervals setting multiple gear legs (120), the gear leg (120) have for inspection pit shaft (200) contact with Limit the arc-shaped outer surface that the transition well lid (100) moves horizontally.
8. transition well lid according to claim 7, which is characterized in that
It is connected with the gear leg (120) to support multiple ribs (121) of the gear leg (120) to intersect at the cover board (110) the center of circle.
9. transition well lid according to claim 7, which is characterized in that
The handle (130) of multiple transition well lids (100) easy to remove is equipped with above the cover board (110).
10. transition well lid according to claim 9, which is characterized in that
The both ends of the handle (130) are covered respectively there are one nut (131), and the nut (131) is welded on the cover board (110) On.
CN201810164453.6A 2018-02-27 2018-02-27 Construction method for compacting periphery of asphalt pavement inspection well and transition well cover Active CN108360328B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810164453.6A CN108360328B (en) 2018-02-27 2018-02-27 Construction method for compacting periphery of asphalt pavement inspection well and transition well cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810164453.6A CN108360328B (en) 2018-02-27 2018-02-27 Construction method for compacting periphery of asphalt pavement inspection well and transition well cover

Publications (2)

Publication Number Publication Date
CN108360328A true CN108360328A (en) 2018-08-03
CN108360328B CN108360328B (en) 2021-05-07

Family

ID=63003062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810164453.6A Active CN108360328B (en) 2018-02-27 2018-02-27 Construction method for compacting periphery of asphalt pavement inspection well and transition well cover

Country Status (1)

Country Link
CN (1) CN108360328B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685203A (en) * 2019-09-19 2020-01-14 杭州南岳建设工程有限公司 Method for ensuring compactness of periphery of gully of inspection well
CN112647543A (en) * 2021-01-12 2021-04-13 荆州市路远市政工程有限公司 Rigid mounting construction method for manhole cover
CN114658039A (en) * 2022-04-18 2022-06-24 日照市政工程有限公司 Inspection well protective cover plate and pavement asphalt laying construction method applying same
CN117744858A (en) * 2023-12-04 2024-03-22 南京交科数智科技发展有限公司 Road surface compactness real-time prediction system and method based on big data analysis

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04131407A (en) * 1990-09-22 1992-05-06 Nichireki Chem Ind Co Ltd Method for repairing area around manhole or the like area
JP2007016510A (en) * 2005-07-08 2007-01-25 Hanex Road:Kk Temporary cover for manhole
CN203475479U (en) * 2013-09-18 2014-03-12 南安市方圆水泥制品有限公司 Double-layer dropping and moving prevention well lid
CN104695300A (en) * 2015-02-06 2015-06-10 湖北益通建设股份有限公司 Process for lifting asphalt pavement inspection well and lifting structure
CN205369314U (en) * 2016-01-21 2016-07-06 山东泰山抽水蓄能电站有限责任公司 Water level peephole handhole door of conveniently opening and close
CN206408650U (en) * 2016-12-07 2017-08-15 东南(福建)汽车工业有限公司 A kind of cover plate of handle automatic hidden

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04131407A (en) * 1990-09-22 1992-05-06 Nichireki Chem Ind Co Ltd Method for repairing area around manhole or the like area
JP2007016510A (en) * 2005-07-08 2007-01-25 Hanex Road:Kk Temporary cover for manhole
CN203475479U (en) * 2013-09-18 2014-03-12 南安市方圆水泥制品有限公司 Double-layer dropping and moving prevention well lid
CN104695300A (en) * 2015-02-06 2015-06-10 湖北益通建设股份有限公司 Process for lifting asphalt pavement inspection well and lifting structure
CN205369314U (en) * 2016-01-21 2016-07-06 山东泰山抽水蓄能电站有限责任公司 Water level peephole handhole door of conveniently opening and close
CN206408650U (en) * 2016-12-07 2017-08-15 东南(福建)汽车工业有限公司 A kind of cover plate of handle automatic hidden

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685203A (en) * 2019-09-19 2020-01-14 杭州南岳建设工程有限公司 Method for ensuring compactness of periphery of gully of inspection well
CN112647543A (en) * 2021-01-12 2021-04-13 荆州市路远市政工程有限公司 Rigid mounting construction method for manhole cover
CN114658039A (en) * 2022-04-18 2022-06-24 日照市政工程有限公司 Inspection well protective cover plate and pavement asphalt laying construction method applying same
CN117744858A (en) * 2023-12-04 2024-03-22 南京交科数智科技发展有限公司 Road surface compactness real-time prediction system and method based on big data analysis

Also Published As

Publication number Publication date
CN108360328B (en) 2021-05-07

Similar Documents

Publication Publication Date Title
CN108360328A (en) The construction method and transition well lid of bituminous paving inspection shaft periphery compacting
CN106638696B (en) The construction method of installation of anti-settling manhole cover
CN109972659A (en) The novel municipal administration of one kind checks well construction and construction method
CN102352589B (en) Construction method for road base concrete side mold
CN101691736A (en) Construction method for reconstructing old concrete pavement by paving asphalt-concrete surface layer
CN104695300B (en) The technique of a kind of bituminous paving inspection shaft lifting and lift structure thereof
CN107460890B (en) A kind of city bituminous concrete pavement inspection shaft construction method
CN107761501A (en) A kind of road construction method
CN105544612A (en) Inspection well construction method
CN110499692A (en) One kind pouring into formula composite pavement construction method
CN111648408A (en) Inspection well lifting construction method
CN105274912B (en) Construction method for hardening monolithic track bed of tramcar
Mampearachchi Handbook on concrete block paving
CN110878502A (en) Soft soil matrix pavement asphalt concrete construction method
CN105735079A (en) Treatment method for bituminous pavement transverse reflection cracks
CN115030224A (en) Municipal road inspection well and construction method thereof
CN108797298A (en) Road surface multiple head crushing construction method
Estakhri et al. Guidelines on construction and maintenance of porous friction courses in Texas
CN210684782U (en) Prefabricated adjustable ring
CN108222072A (en) Reinforced construction method is risen after asphalt concrete pavement inspection shaft
CN110499784B (en) Synchronous lifting construction process for manhole cover
CN113417182A (en) Asphalt pavement paving method capable of reducing air bubbles for highway engineering
CN113338103B (en) Premixed foamed asphalt in-situ cold regeneration base layer and bottom surface layer construction method
CN207228166U (en) A kind of town road heavy well cover walling crib ruggedized construction
CN213417457U (en) Highway bituminous paving disease repair brick

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant