CN108345292A - A kind of battery management system method for parameter configuration and system - Google Patents
A kind of battery management system method for parameter configuration and system Download PDFInfo
- Publication number
- CN108345292A CN108345292A CN201810122944.4A CN201810122944A CN108345292A CN 108345292 A CN108345292 A CN 108345292A CN 201810122944 A CN201810122944 A CN 201810122944A CN 108345292 A CN108345292 A CN 108345292A
- Authority
- CN
- China
- Prior art keywords
- battery management
- management system
- parameter
- configuration
- systematic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0208—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
- G05B23/0213—Modular or universal configuration of the monitoring system, e.g. monitoring system having modules that may be combined to build monitoring program; monitoring system that can be applied to legacy systems; adaptable monitoring system; using different communication protocols
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/24—Pc safety
- G05B2219/24065—Real time diagnostics
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Power Sources (AREA)
Abstract
The present invention relates to a kind of battery management system method for parameter configuration and systems, and first, battery management system uploads all systematic parameters to system configuration software;Then, system configuration software is according to demand and the systematic parameter of upload, modification do not meet the systematic parameter threshold value of preset need;Modified systematic parameter threshold value is exported, configuration file is generated;And the configuration file of generation is directed into battery management system.The method that the present invention does not use the single parameter configuration that most of producer uses, but use a kind of method that mass is arranged, identical items demand will be met, that is the identical battery of system parameter setting carries out batch setting, to save the time of parameter configuration, the error rate for reducing setting improves setting efficiency, further improves battery management system reliability of operation, Stability and veracity.
Description
Technical field
The invention belongs to battery management system technical fields, and in particular to a kind of battery management system method for parameter configuration and
System.
Background technology
Under the strength promotion for accelerating speedup and national policy with new energy market, new-energy automobile industry development is very fast
Speed.Wherein, core of the battery management system (Battery Management System, BMS) as dynamics of management battery
Point, other than it can acquire the basic functions such as cell voltage, temperature, the accuracy of systematic parameter configuration determines Full Vehicle System charge and discharge
The correctness that computator method, preliminary filling algorithm, SOC algorithms, system failure protection scheduling algorithm are run, error protection is according to parameter threshold
Judged.
In systematic parameter configuration, different BMS producers use different methods, and most of producer is matched using single parameter
It sets, parameter setting is carried out to BMS systems one by one, huge workload causes to waste the more time, take time and effort;Moreover, i.e.
Make be identical items demand BMS setting configuration files still one by one, less efficient, error-prone, error rate is higher.
Invention content
The purpose of the present invention is to provide a kind of battery management system method for parameter configuration and systems, to solve existing skill
Heavy workload, the problem that efficiency is low, error-prone when parameter configuration are carried out in art.
In order to solve the above technical problems, the technical scheme is that:
The present invention provides a kind of battery management system method for parameter configuration, including following method scheme:
Method scheme one, includes the following steps:
Battery management system uploads all systematic parameters to system configuration software;
System configuration software is according to demand and the systematic parameter of upload, modification do not meet the systematic parameter threshold of preset need
Value;
System configuration software exports modified systematic parameter threshold value, generates configuration file;And by the configuration file of generation
It is directed into battery management system.
Method scheme two further includes that system configuration software sends recruitment instruction to battery on the basis of method scheme one
The step of management system:If battery management system is properly received the recruitment instruction, battery management system uploading system parameter is extremely
System configuration software.
Method scheme three, on the basis of method scheme one, system that system configuration software modification does not meet preset need
Further include judging whether successfully modified step according to the modified logo that battery management system uploads when parameter threshold:If modification
It is unsuccessful, then it remodifies;And if it is continuous change three times unsuccessful, judge modification failure.
Method scheme four, on the basis of method scheme one, system configuration software exports one by one according to systematic parameter type
Modified systematic parameter.
Method scheme five, on the basis of method scheme four, when system configuration software exports modified systematic parameter, also
Include that the export mark uploaded according to battery management system judges whether to export successful step:If export is unsuccessful, again
Export;And if it is continuous export three times unsuccessful, judge export failure.
Method scheme six, on the basis of method scheme one, the configuration file of generation is stored with xml formats.
Method scheme seven, on the basis of method scheme four, one by one according to systematic parameter type by the configuration file of generation
It is directed into battery management system.
Method scheme eight, on the basis of method scheme seven, when the configuration file of generation is directed into battery management system,
Further include that the importing mark uploaded according to battery management system judges whether to import successful step:If importing is unsuccessful, weigh
It is new to import;And if it is continuous import three times unsuccessful, judge to import failure.
Method scheme nine passes through CAN on the basis of method scheme one between battery management system and system configuration software
Bus communication.
The present invention also provides a kind of battery management system parameter configuring systems, including following system schema:
System schema one, including battery management system and system configuration software, battery management system and system configuration software
Communication connection;
The battery management system is for uploading all systematic parameters to system configuration software;
The system configuration software for according to demand and upload systematic parameter, change do not meet preset need be
System parameter threshold;Modified systematic parameter threshold value is exported, configuration file is generated;And the configuration file of generation is directed into battery
Management system.
System schema two further includes that system configuration software sends recruitment instruction to battery on the basis of system schema one
Management system:If battery management system is properly received the recruitment instruction, battery management system uploading system parameter to system is matched
Set software.
System schema three, on the basis of system schema one, system that system configuration software modification does not meet preset need
Further include judging whether successfully modified step according to the modified logo that battery management system uploads when parameter threshold:If modification
It is unsuccessful, then it remodifies;And if it is continuous change three times unsuccessful, judge modification failure.
System schema four, on the basis of system schema one, system configuration software exports one by one according to systematic parameter type
Modified systematic parameter.
System schema five, on the basis of system schema four, when system configuration software exports modified systematic parameter, also
Include that the export mark uploaded according to battery management system judges whether to export successful step:If export is unsuccessful, again
Export;And if it is continuous export three times unsuccessful, judge export failure.
System schema six, on the basis of system schema one, the configuration file of generation is stored with xml formats.
System schema seven, on the basis of system schema four, one by one according to systematic parameter type by the configuration file of generation
It is directed into battery management system.
System schema eight, on the basis of system schema seven, when the configuration file of generation is directed into battery management system,
Further include that the importing mark uploaded according to battery management system judges whether to import successful step:If importing is unsuccessful, weigh
It is new to import;And if it is continuous import three times unsuccessful, judge to import failure.
System schema nine passes through CAN on the basis of system schema one between battery management system and system configuration software
Bus communication.
Beneficial effects of the present invention:
The battery management system method for parameter configuration and system of the present invention, in battery management system uploading system parameter to being
Unite configuration software after, system configuration software according to demand and upload systematic parameter, change do not meet preset need system
Parameter threshold, and according to modified systematic parameter threshold value, generate configuration file;And the configuration file of generation is directed into battery
Management system completes whole system configuration process.The method that the present invention does not use the single parameter configuration that most of producer uses,
But using a kind of method that mass is arranged, the problem that setting BMS systematic parameters are error-prone one by one is not only solved, and will
Meet identical items demand, i.e. the identical battery of system parameter setting carries out batch setting, to save parameter configuration when
Between, the error rate of setting is reduced, setting efficiency is improved, further improves battery management system reliability of operation, standard
True property and stability.
Further, the configuration file of generation is stored with xml formats, when something goes wrong convenient for whole system, is asked for analysis
It inscribes reason and foundation, the trackability of problem of implementation is provided.
Description of the drawings
Fig. 1 is the systematic parameter configuration connection diagram of the present invention;
Fig. 2 is system configuration software processing flow figure.
Specific implementation mode
To keep the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, to the present invention
It is described in further detail.
As shown in Figure 1, the battery management system parameter configuring system of the present invention includes battery management system and system configuration
Software, the master that system configuration software passes through CAN bus and battery management system (Battery Management System, BMS)
Control inside modules CAN is communicated.Baud rate using CAN communication is 250kbps.
Based on the system, in order to realize the parameter configuration to battery management system, with the following method.
First, system configuration software according to parameter type send recruitment instruction, BMS main control modules receive the trick survey refer to
After order, corresponding systematic parameter is uploaded to system configuration software.After determining that system configuration software receives these systematic parameters,
It is shown.
Then, system configuration software does not meet parameter item threshold value according to project demands modification, and according to battery management system
The modified logo of upload judges whether successfully modified:If successfully modified, carry out in next step;If modification is unsuccessful, again into
Row modification judges modification failure if continuously failing three times.
Then, after waiting for that whole systematic parameters are changed according to project demands, the configuration file that format is * .xml is generated,
When something goes wrong in order to system, foundation, the trackability of problem of implementation are provided for problem analysis reason.In the process of generation
In, system configuration software exports one by one according to systematic parameter type;Moreover, each systematic parameter corresponds to corresponding export mark.
A kind of type parameter is often exported, whether the export mark integrality all uploaded according to battery management system judges systematic parameter export
Success:If exporting successfully, carry out in next step;If export is unsuccessful, guiding system parameter, loses if continuously exporting three times again
It loses, then decision-making system parameter export failure.Wherein, the path of export is arbitrary.
Finally, the configuration file of generation is imported BMS main control modules by system configuration software, is imported one by one by parameter type.
During importing, each systematic parameter type is corresponding with corresponding import and identifies.Often import a kind of parameter type, all basis
The importing mark integrality that battery management system uploads judges whether configuration file importing succeeds:If importing successfully, ends with system
Parameter configuration;If importing is unsuccessful, importing configuration files again, and if continuously fail three times, final decision-making system configuration text
Part imports failure.
Generally, of the invention that BMS systematic parameters batch importing/export function is realized by CAN communication, and deposited
Storage can improve setting efficiency, reduce setting error rate.Furthermore, it is possible to solve the problems, such as identical items demand, i.e. systematic parameter
Identical problem realizes mass setting.
Although present disclosure is discussed in detail by above preferred embodiment, but it should be appreciated that above-mentioned
Description is not considered as limitation of the present invention.After those skilled in the art have read the above, for the present invention's
A variety of modifications and substitutions all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.
Claims (10)
1. a kind of battery management system method for parameter configuration, which is characterized in that include the following steps:
Battery management system uploads all systematic parameters to system configuration software;
System configuration software is according to demand and the systematic parameter of upload, modification do not meet the systematic parameter threshold value of preset need;
System configuration software exports modified systematic parameter threshold value, generates configuration file;And the configuration file of generation is imported
To battery management system.
2. battery management system method for parameter configuration according to claim 1, which is characterized in that further include that system configuration is soft
Part sends the step of recruitment instruction is to battery management system:If battery management system is properly received the recruitment instruction, cell tube
Reason system uploading system parameter is to system configuration software.
3. battery management system method for parameter configuration according to claim 1, which is characterized in that system configuration software modification
Further include judging whether to repair according to the modified logo that battery management system uploads when not meeting the systematic parameter threshold value of preset need
The step of making work(into:If modification is unsuccessful, remodify;And if it is continuous change three times unsuccessful, judge modification failure.
4. battery management system method for parameter configuration according to claim 1, which is characterized in that system configuration software according to
Systematic parameter type exports modified systematic parameter one by one.
5. battery management system method for parameter configuration according to claim 4, which is characterized in that system configuration software exports
Further include that the export mark uploaded according to battery management system judges whether to export successful step when modified systematic parameter
Suddenly:If export is unsuccessful, export again;And if it is continuous export three times unsuccessful, judge export failure.
6. battery management system method for parameter configuration according to claim 1, which is characterized in that the configuration file of generation with
Xml formats are stored.
7. battery management system method for parameter configuration according to claim 4, which is characterized in that by the configuration file of generation
It is directed into battery management system one by one according to systematic parameter type.
8. battery management system method for parameter configuration according to claim 7, which is characterized in that by the configuration file of generation
Further include that the importing mark uploaded according to battery management system judges whether to import successful step when being directed into battery management system
Suddenly:If importing is unsuccessful, import again;And if it is continuous import three times unsuccessful, judge to import failure.
9. battery management system method for parameter configuration according to claim 1, which is characterized in that battery management system be
It is communicated by CAN bus between system configuration software.
10. a kind of battery management system parameter configuring system, which is characterized in that soft including battery management system and system configuration
Part, battery management system are connected with system configuration software communication;
The battery management system is for uploading all systematic parameters to system configuration software;
The systematic parameter that the system configuration software is used to according to demand and upload, modification do not meet the system ginseng of preset need
Number threshold value;Modified systematic parameter threshold value is exported, configuration file is generated;And the configuration file of generation is directed into battery management
System.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810122944.4A CN108345292A (en) | 2018-02-07 | 2018-02-07 | A kind of battery management system method for parameter configuration and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810122944.4A CN108345292A (en) | 2018-02-07 | 2018-02-07 | A kind of battery management system method for parameter configuration and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108345292A true CN108345292A (en) | 2018-07-31 |
Family
ID=62959712
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810122944.4A Pending CN108345292A (en) | 2018-02-07 | 2018-02-07 | A kind of battery management system method for parameter configuration and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108345292A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112782414A (en) * | 2019-11-11 | 2021-05-11 | 深圳迈瑞生物医疗电子股份有限公司 | Sample analysis system and setting method thereof |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102033762A (en) * | 2010-11-02 | 2011-04-27 | 浪潮电子信息产业股份有限公司 | Method for quickly setting firmware parameters by utilizing configuration file |
CN102255352A (en) * | 2011-05-26 | 2011-11-23 | 南昌大学 | Distributed intelligent power battery pack management system |
US20120151017A1 (en) * | 2010-12-09 | 2012-06-14 | Schneider Electric USA, Inc. | Dynamic Host Profiles for Option Modules |
CN103568863A (en) * | 2013-11-15 | 2014-02-12 | 合肥国轩高科动力能源股份公司 | Real-time monitoring diagnostic system and diagnostic method for electromobile battery management system |
CN204333160U (en) * | 2015-01-27 | 2015-05-13 | 武汉力神动力电池系统科技有限公司 | A kind of BMS monitoring diagnosis system |
CN104636297A (en) * | 2014-12-30 | 2015-05-20 | 郑州宇通客车股份有限公司 | Slave plate encoding method for battery management system |
CN105630562A (en) * | 2016-01-07 | 2016-06-01 | 东莞钜威新能源有限公司 | Method and device for initializing battery management system |
CN105865801A (en) * | 2016-04-05 | 2016-08-17 | 无锡锐祺通讯技术有限公司 | Electric vehicle parameter automatic configuration and test system and automatic configuration and test method |
CN105939378A (en) * | 2016-05-10 | 2016-09-14 | 杭州迪普科技有限公司 | Configuration file exporting method and device, and configuration file importing method and device |
CN106790188A (en) * | 2016-12-30 | 2017-05-31 | 深圳市沃特玛电池有限公司 | The main frame collocation method of battery management system, device and battery management system |
CN106848454A (en) * | 2017-03-20 | 2017-06-13 | 东莞博力威电池有限公司 | A kind of management method of same mouth double cell |
CN106874777A (en) * | 2016-12-31 | 2017-06-20 | 惠州市蓝微新源技术有限公司 | A kind of method and system for preventing configuration file to be tampered, monitoring host computer |
-
2018
- 2018-02-07 CN CN201810122944.4A patent/CN108345292A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102033762A (en) * | 2010-11-02 | 2011-04-27 | 浪潮电子信息产业股份有限公司 | Method for quickly setting firmware parameters by utilizing configuration file |
US20120151017A1 (en) * | 2010-12-09 | 2012-06-14 | Schneider Electric USA, Inc. | Dynamic Host Profiles for Option Modules |
CN102255352A (en) * | 2011-05-26 | 2011-11-23 | 南昌大学 | Distributed intelligent power battery pack management system |
CN103568863A (en) * | 2013-11-15 | 2014-02-12 | 合肥国轩高科动力能源股份公司 | Real-time monitoring diagnostic system and diagnostic method for electromobile battery management system |
CN104636297A (en) * | 2014-12-30 | 2015-05-20 | 郑州宇通客车股份有限公司 | Slave plate encoding method for battery management system |
CN204333160U (en) * | 2015-01-27 | 2015-05-13 | 武汉力神动力电池系统科技有限公司 | A kind of BMS monitoring diagnosis system |
CN105630562A (en) * | 2016-01-07 | 2016-06-01 | 东莞钜威新能源有限公司 | Method and device for initializing battery management system |
CN105865801A (en) * | 2016-04-05 | 2016-08-17 | 无锡锐祺通讯技术有限公司 | Electric vehicle parameter automatic configuration and test system and automatic configuration and test method |
CN105939378A (en) * | 2016-05-10 | 2016-09-14 | 杭州迪普科技有限公司 | Configuration file exporting method and device, and configuration file importing method and device |
CN106790188A (en) * | 2016-12-30 | 2017-05-31 | 深圳市沃特玛电池有限公司 | The main frame collocation method of battery management system, device and battery management system |
CN106874777A (en) * | 2016-12-31 | 2017-06-20 | 惠州市蓝微新源技术有限公司 | A kind of method and system for preventing configuration file to be tampered, monitoring host computer |
CN106848454A (en) * | 2017-03-20 | 2017-06-13 | 东莞博力威电池有限公司 | A kind of management method of same mouth double cell |
Non-Patent Citations (4)
Title |
---|
任圆: "电动汽车分布式电池管理系统设计", 《中国优秀硕士学位论文全文数据库》 * |
李文萱, 冯巧红, 赵新华: "电动汽车分布式能量管理系统软件部分设计与研究", 《韶关学院学报》 * |
王洪利: "动力电池组信息采集及上位机管理软件设计", 《天津理工大学学报》 * |
陶银鹏: "纯电动汽车分布式电池管理系统的设计与实现", 《汽车技术》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112782414A (en) * | 2019-11-11 | 2021-05-11 | 深圳迈瑞生物医疗电子股份有限公司 | Sample analysis system and setting method thereof |
CN112782414B (en) * | 2019-11-11 | 2024-01-23 | 深圳迈瑞生物医疗电子股份有限公司 | Sample analysis system and setting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110266031B (en) | Energy storage grid-connected charging and discharging capacity control method and device, server and storage medium | |
CN106657435A (en) | Automatic addressing method and system for electric automobile cell management system | |
CN101262682A (en) | A configuration management for monitoring batch management of base station devices | |
CN108667054B (en) | Energy storage planning method and device | |
CN101206162A (en) | System for data acquisition and signal treatment of testing flat wheel | |
CN109878369A (en) | A kind of electric car charge and discharge Optimization Scheduling based on fuzzy Spot Price | |
CN103106344A (en) | Method for establishing electrical power system clustering load model | |
CN108108883B (en) | Clustering algorithm-based vehicle scheduling network elastic simplification method | |
CN113285472A (en) | Optimal configuration method and device of energy storage system | |
CN113837423A (en) | Power grid operation situation prediction method based on energy internet electric power big data | |
CN108345292A (en) | A kind of battery management system method for parameter configuration and system | |
CN116470543A (en) | Operation control method, device, equipment and medium of virtual power plant | |
CN106056305A (en) | Power generation system reliability rapid assessment method based on state clustering | |
CN111884214B (en) | Hierarchical optimization scheduling method and device suitable for park energy router cluster | |
CN110929885A (en) | Smart campus-oriented distributed machine learning model parameter aggregation method | |
WO2024056050A1 (en) | Massive flexible load rapid aggregation control method and apparatus | |
CN111861172A (en) | Method and system for formulating charge and discharge service cost of energy storage type charging station | |
CN107069742A (en) | Power system continuous tide computing system based on Python Yu PSD BPA | |
CN114188950B (en) | Power distribution system toughness improving method based on standby mobile energy storage emergency dispatching | |
CN108549546A (en) | A method of Parameter File configuration is realized based on CAN bus | |
CN107482658A (en) | A kind of micro-capacitance sensor energy storage economical operation control method and device | |
Li et al. | A Batch Scheduling Technique of Flexible Job-Shop Based on Improved Genetic Algorithm | |
CN111301214A (en) | Electric automobile ordered charging control method and system | |
CN105356563B (en) | Charging electric vehicle process interface control method | |
CN112124133B (en) | Setting method applied to electric vehicle charging station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180731 |
|
RJ01 | Rejection of invention patent application after publication |