CN108341033A - Topside always organizes weld seam job platform - Google Patents
Topside always organizes weld seam job platform Download PDFInfo
- Publication number
- CN108341033A CN108341033A CN201810195604.4A CN201810195604A CN108341033A CN 108341033 A CN108341033 A CN 108341033A CN 201810195604 A CN201810195604 A CN 201810195604A CN 108341033 A CN108341033 A CN 108341033A
- Authority
- CN
- China
- Prior art keywords
- hook
- topside
- weld seam
- job platform
- chain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C5/00—Equipment usable both on slipways and in dry docks
- B63C5/02—Stagings; Scaffolding; Shores or struts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C5/00—Equipment usable both on slipways and in dry docks
- B63C5/02—Stagings; Scaffolding; Shores or struts
- B63C2005/025—Stagings, or scaffolding, i.e. constructions providing temporary working platforms on slipways, in building or repair docks, or inside hulls
- B63C2005/027—Stages, platforms, or seats suspended adjacent ship hulls on cables, chains, or the like, e.g. boatswain's chairs
Abstract
The invention discloses a kind of topsides always to organize weld seam job platform, including:Suspension arrangement and the scaffold board being connect with suspension arrangement;Suspension arrangement includes hook, the first chain, the second chain;Hook connects portion and suspension part comprising hook, and hook connects portion's hook on the top edge of side plate;One end of first chain is connect with suspension part, the outer ledge connection of the other end and scaffold board;One end of second chain is connect with suspension part, the inside edge connection of the other end and scaffold board;Include butting section on the inside edge of scaffold board, butting section is resisted against on side plate.It is low that the topside always organizes weld seam job platform construction cost, and using flexible, can be conveniently disposed on side plate, or removed from side plate.And it is possible to reuse, great amount of cost is saved.
Description
Technical field
The present invention relates to shipbuilding fields more particularly to a kind of topside always to organize weld seam job platform.
Background technology
During shipbuilding, because hull is very high, need to set up very high scaffold, sometime up to more than 30 rice,
Workload is huge, and time-consuming, of high cost.And can not reuse, it needs to build scaffold again every time.
Invention content
The technical problem to be solved by the present invention is in order to overcome in the prior art, need to set up very during shipbuilding
High scaffold, the defect that time-consuming, of high cost provide a kind of topside at low cost, easy to use, safe and always organize weld seam
Job platform.
The present invention solves above-mentioned technical problem by the following technical programs:
A kind of topside always organizes weld seam job platform, including:Suspension arrangement and the scaffold board being connect with suspension arrangement;
Suspension arrangement includes hook, the first chain, the second chain;Hook connects portion and suspension part comprising hook, hook connect portion's hook in
On the top edge of side plate;One end of first chain is connect with suspension part, the outer ledge connection of the other end and scaffold board;The
One end of two chains is connect with suspension part, the inside edge connection of the other end and scaffold board;Include on the inside edge of scaffold board
Butting section, butting section are resisted against on side plate.The topside is always organized weld seam job platform and is hung on side plate by hook,
Its is at low cost, and install and use, dismantle movement it is all very convenient.
Preferably, hook is plate.In use, the plane of the platy structure of hook is vertical with side plate, the plate knot
Structure increases the intensity of hook, and when suspension is more safe and reliable.
Preferably, the groove that the hook of hook connects portion is rectangle.The shape of the groove of the rectangle and the top edge of side plate
Matching, the hook for improving hook connect the compactness in portion and the top edge of side plate so that when suspension, hook is not fallen out, no
It easily shakes, improves stability and the safety of suspension.
Preferably, the base angle for the groove that the hook of hook connects portion is provided with arc-shaped stress slot.At the top of the circular arc of stress slot
New stress concentration point can be formed, the stress-sharing excessively concentrated originally is come, avoids hook from connecting and is answered at the base angle of the groove in portion
Power is concentrated, and is damaged.
Preferably, one end of the first chain is bolted with suspension part;One end of second chain is bolted with suspension part.
This kind of bolt fastening structure allows the first chain, the second chain easily to be mounted and dismounted on suspension part, and can be square
Just the length for adjusting chain, to adjust the height that topside always organizes the suspension of weld seam job platform.
Preferably, being provided with the lifting hole(eyelet) passed through for suspension hook on suspension part.It, can after the completion of suspension arrangement is connect with scaffold board
It is sling with using crane that the topside is always organized weld seam job platform, is then installed on side plate.
Preferably, the end that hook connects portion is provided with and the hook transverse slat that connect portion vertical.It is pasted with side plate the end face of the transverse slat
It closes, increases the contact area of hook and side plate in the horizontal, can prevent hook from shaking or sliding so that suspension is more
Securely, safety.
Preferably, hook connects the bolt for being provided with nut in portion and coordinating with nut, bolt resists side plate across nut.
Bolt is tightened, the end of bolt is made to resist side plate, hook can be fastened on side plate so that suspension is more firm
Solid, safety.Hook connects portion both sides and is symmetrically arranged 2 groups of nuts and bolts, and fastening can be made safer and balanced.
Preferably, the quantity of suspension arrangement is 2 groups, 2 groups of suspension arrangements are connect with the both ends of scaffold board respectively.2 groups of suspensions
Device hangs the both ends of scaffold board respectively, scaffold board suspension can be made more to stablize, safety.
Preferably, being provided with protective fence on the outer ledge of scaffold board.Protective fence can prevent construction personnel careless
Fall, increases the safety that topside always organizes weld seam job platform.
The positive effect of the present invention is that:It is low that the topside always organizes weld seam job platform construction cost, and uses spirit
It is living, it can be conveniently disposed on side plate, or removed from side plate.And it is possible to reuse, save a large amount of
Cost.
Description of the drawings
Fig. 1 is that the topside of the preferred embodiment of the present invention always organizes the left view structural representation of weld seam job platform.
Fig. 2 is that the topside of the preferred embodiment of the present invention always organizes the main structure diagram of weld seam job platform.
Fig. 3 is the left view structural representation that the topside of the preferred embodiment of the present invention always organizes the hook of weld seam job platform
Figure.
Fig. 4 is that the hook for the hook that the topside of the preferred embodiment of the present invention always organizes weld seam job platform connects the backsight knot in portion
Structure schematic diagram.
Reference sign
1 suspension arrangement
11 hooks
111 hooks connect portion
112 suspension parts
113 grooves
114 stress slots
115 lifting hole(eyelet)s
116 transverse slats
117 nuts
118 bolts
12 first chains
13 second chains
14 protective fences
2 scaffold boards
21 butting sections
3 side plates
Specific implementation mode
It is further illustrated the present invention below by a preferred embodiment, but does not therefore limit the present invention to the reality
It applies among a range.
The topside of the present embodiment always organizes weld seam job platform, as shown in Figure 1, Figure 2, Figure 3 shows, including:Suspension arrangement 1 and with it is outstanding
The scaffold board 2 that hang device 1 connects.Suspension arrangement 1 includes the 11, first chain 12 of hook, the second chain 13;Hook 11 connects comprising hook
Portion 111 and suspension part 112, hook connect 111 hook of portion on the top edge of side plate 3;One end of first chain 12 and suspension part 112
Connection, the other end are connect with the outer ledge of scaffold board 2;One end of second chain 13 is connect with suspension part 112, the other end and foot
The inside edge of palm 2 connects;Include butting section 21 on the inside edge of scaffold board 2, butting section 21 is resisted against side plate 3
On.The topside is always organized weld seam job platform and is hung on side plate 3 by hook 11, at low cost, and installs and uses, tears open
It is all very convenient to unload movement.By adjusting the length of the first chain 12 and the second chain 13, scaffold board 2 can be made in horizontally disposed.
Construction personnel can carry out constructing operation on scaffold board 2.
In order to improve the intensity of hook 11, hook 11 is plate.As shown in Figure 1, in use, linking up with 11 platy structure
Plane is vertical with side plate 3, which increases the intensity of hook 11, and when suspension is more safe and reliable.
Referring to Fig.1, Fig. 3, the hook for linking up with 11 connect the groove 113 in portion 111 for rectangle.Outside the groove 113 and topside of the rectangle
The shape of the top edge of plate 3 matches, and the hook for improving hook 11 connects the compactness in portion 111 and the top edge of side plate 3 so that
When suspension, hook 11 does not fall out, is not easy to shake, and improves stability and the safety of suspension.
Further, the base angle for the groove 113 that the hook for linking up with 11 connects portion 111 is provided with arc-shaped stress slot 114.Stress
New stress concentration point can be formed at the top of the circular arc of slot 114, the stress-sharing excessively concentrated originally is come, hook is avoided to connect portion
Stress concentration at the base angle of 111 groove 113, damages.
Preferably, one end of the first chain 12 is bolted with suspension part 112;One end and suspension part of second chain 13
112 are bolted.This kind of bolt fastening structure allows the first chain 12, the second chain 13 easily on suspension part 112
Installation and removal, and the length of chain can be easily adjusted, to adjust the height that topside always organizes the suspension of weld seam job platform.
As shown in Figure 1, Figure 3, the lifting hole(eyelet) 115 passed through for suspension hook is provided on suspension part 112.In suspension arrangement 1 and foot hand
After the completion of plate 2 connects, the topside can always be organized into weld seam job platform using crane and sling, is then installed on side plate 3.
Referring to Fig.1, Fig. 3, Fig. 4 (bolt is not shown in Fig. 4), the end that hook connects portion 111 are provided with that connect portion 111 with hook vertical
Transverse slat 116.The end face of the inside of the transverse slat 116 is bonded with side plate 3, increases hook 11 and side plate in the horizontal
3 contact area can prevent hook 11 from shaking or sliding so that hang more secured, safety.
In order to further increase stability and the safety of suspension, as shown in Fig. 1, Fig. 3, Fig. 4, hook connects to be arranged in portion 111
The bolt 118 for having nut 117 and coordinating with nut 117, bolt 118 resist side plate 3 across nut 117.Tighten bolt
118, so that the end of bolt 118 is resisted side plate 3, hook 11 can be fastened on side plate 3 so that suspension is more firm
Solid, safety.Hook connects 111 both sides of portion and is symmetrically arranged 2 groups of nuts 117 and bolt 118, and fastening can be made safer and balanced.
Preferably, as shown in Fig. 2, the quantity of suspension arrangement 1 is 2 groups, 2 groups of suspension arrangements 1 both ends with scaffold board 2 respectively
Connection.2 groups of suspension arrangements 1 hang the both ends of scaffold board respectively, the suspension of scaffold board 2 can be made more to stablize, safety.
Construction personnel falls accidentally in order to prevent, increases the safety that topside always organizes weld seam job platform, institute as shown in Figure 1, Figure 2
Show, protective fence 14 is provided on the outer ledge of scaffold board 2 (in Fig. 2, protective fence 14 makes to be shown in broken lines).
Although specific embodiments of the present invention have been described above, it will be appreciated by those of skill in the art that these
It is merely illustrative of, protection scope of the present invention is defined by the appended claims.Those skilled in the art is not carrying on the back
Under the premise of from the principle and substance of the present invention, many changes and modifications may be made, but these are changed
Protection scope of the present invention is each fallen with modification.
Claims (10)
1. a kind of topside always organizes weld seam job platform, which is characterized in that include:It suspension arrangement and connect with the suspension arrangement
Scaffold board;
The suspension arrangement includes hook, the first chain, the second chain;The hook connects portion and suspension part, the hook comprising hook
Company's portion's hook is on the top edge of side plate;One end of first chain is connect with the suspension part, the other end and the foot
The outer ledge of palm connects;One end of second chain is connect with the suspension part, and the other end is interior with the scaffold board
Lateral edges connect;Include butting section on the inside edge of the scaffold board, the butting section is resisted against on the side plate.
2. topside as described in claim 1 always organizes weld seam job platform, which is characterized in that the hook is plate.
3. topside as described in claim 1 always organizes weld seam job platform, which is characterized in that the hook of the hook connects the groove in portion
For rectangle.
4. topside as claimed in claim 3 always organizes weld seam job platform, which is characterized in that the hook of the hook connects the groove in portion
Base angle be provided with arc-shaped stress slot.
5. topside as described in claim 1 always organizes weld seam job platform, which is characterized in that one end of first chain and institute
Suspension part is stated to be bolted;One end of second chain is bolted with the suspension part.
6. topside as described in claim 1 always organizes weld seam job platform, which is characterized in that be provided on the suspension part for hanging
The lifting hole(eyelet) that hook passes through.
7. topside as described in claim 1 always organizes weld seam job platform, which is characterized in that the end that the hook connects portion is provided with
With the hook transverse slat that connect portion vertical.
8. topside as described in claim 1 always organizes weld seam job platform, which is characterized in that the hook, which connects, is provided with nut in portion
With the bolt coordinated with the nut, the bolt resists the side plate across the nut.
9. topside as described in claim 1 always organizes weld seam job platform, which is characterized in that the quantity of the suspension arrangement is 2
Group, suspension arrangement described in 2 groups are connect with the both ends of the scaffold board respectively.
10. topside as described in claim 1 always organizes weld seam job platform, which is characterized in that the outer ledge of the scaffold board
On be provided with protective fence.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810195604.4A CN108341033A (en) | 2018-03-09 | 2018-03-09 | Topside always organizes weld seam job platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810195604.4A CN108341033A (en) | 2018-03-09 | 2018-03-09 | Topside always organizes weld seam job platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108341033A true CN108341033A (en) | 2018-07-31 |
Family
ID=62957030
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810195604.4A Pending CN108341033A (en) | 2018-03-09 | 2018-03-09 | Topside always organizes weld seam job platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108341033A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109319040A (en) * | 2018-10-10 | 2019-02-12 | 上海江南长兴造船有限责任公司 | A kind of scaffold building method for hull turn of the bilge region |
CN109693759A (en) * | 2018-12-29 | 2019-04-30 | 武汉双柳武船重工有限责任公司 | A kind of taking based on ship plank jumps structure and its takes jump method |
CN109747797A (en) * | 2018-12-20 | 2019-05-14 | 大连中远海运重工有限公司 | Combine hanging tool structure |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050072628A1 (en) * | 2003-09-18 | 2005-04-07 | Riley D. Paul | Hanging scaffold support |
CN201587521U (en) * | 2009-12-11 | 2010-09-22 | 大连船舶重工集团有限公司 | Broadside suspended type platform device for holding welding machine during ship building |
CN201864019U (en) * | 2010-11-11 | 2011-06-15 | 江苏扬子江船厂有限公司 | Temporary scaffold device used in broadside subsection closure |
CN201863994U (en) * | 2010-11-18 | 2011-06-15 | 江苏扬子江船厂有限公司 | Ship hanging basket suspension mechanism |
CN102328737A (en) * | 2010-07-12 | 2012-01-25 | 南通尧盛钢结构有限公司 | Sectional scaffold apparatus for hull |
CN204822025U (en) * | 2015-07-27 | 2015-12-02 | 上海江南长兴重工有限责任公司 | Marine construction platform |
CN205381364U (en) * | 2015-09-11 | 2016-07-13 | 沪东中华造船(集团)有限公司 | Convenient auxiliary fixtures that sets up of outer hanging scaffold of boats and ships topside |
US9849943B1 (en) * | 2015-10-23 | 2017-12-26 | The Foster Bar, LLC | Vessel boarding and disembarking apparatus |
CN208053590U (en) * | 2018-03-09 | 2018-11-06 | 上海外高桥造船有限公司 | Topside always organizes weld seam job platform |
-
2018
- 2018-03-09 CN CN201810195604.4A patent/CN108341033A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050072628A1 (en) * | 2003-09-18 | 2005-04-07 | Riley D. Paul | Hanging scaffold support |
CN201587521U (en) * | 2009-12-11 | 2010-09-22 | 大连船舶重工集团有限公司 | Broadside suspended type platform device for holding welding machine during ship building |
CN102328737A (en) * | 2010-07-12 | 2012-01-25 | 南通尧盛钢结构有限公司 | Sectional scaffold apparatus for hull |
CN201864019U (en) * | 2010-11-11 | 2011-06-15 | 江苏扬子江船厂有限公司 | Temporary scaffold device used in broadside subsection closure |
CN201863994U (en) * | 2010-11-18 | 2011-06-15 | 江苏扬子江船厂有限公司 | Ship hanging basket suspension mechanism |
CN204822025U (en) * | 2015-07-27 | 2015-12-02 | 上海江南长兴重工有限责任公司 | Marine construction platform |
CN205381364U (en) * | 2015-09-11 | 2016-07-13 | 沪东中华造船(集团)有限公司 | Convenient auxiliary fixtures that sets up of outer hanging scaffold of boats and ships topside |
US9849943B1 (en) * | 2015-10-23 | 2017-12-26 | The Foster Bar, LLC | Vessel boarding and disembarking apparatus |
CN208053590U (en) * | 2018-03-09 | 2018-11-06 | 上海外高桥造船有限公司 | Topside always organizes weld seam job platform |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109319040A (en) * | 2018-10-10 | 2019-02-12 | 上海江南长兴造船有限责任公司 | A kind of scaffold building method for hull turn of the bilge region |
CN109747797A (en) * | 2018-12-20 | 2019-05-14 | 大连中远海运重工有限公司 | Combine hanging tool structure |
CN109693759A (en) * | 2018-12-29 | 2019-04-30 | 武汉双柳武船重工有限责任公司 | A kind of taking based on ship plank jumps structure and its takes jump method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108341033A (en) | Topside always organizes weld seam job platform | |
JP5522812B1 (en) | Bucket fittings | |
CN208053590U (en) | Topside always organizes weld seam job platform | |
CN204899274U (en) | Prefabricated concrete structure goes along with sb. to guard him frame outward | |
CN111517234A (en) | Supporting structure of tower crane operation platform, operation platform and rapid lifting method | |
CN106499201A (en) | A kind of dismountable safety rope tool-type holding clamp and its using method | |
KR101029583B1 (en) | Jig for transporting derrick structure using floatingcrane | |
CN110640383A (en) | Container ship ligature bridge weldment work platform | |
CN212559222U (en) | Fast-assembling quick detach promotes formula tower crane operation platform bearing structure soon and operation platform | |
CN209583386U (en) | Prefabricated part hanging tool and Lift-on/Lift-off System | |
CN207903744U (en) | A kind of filter plate special hanger | |
CN211594756U (en) | Lifting tool for steel pipe | |
CN204251194U (en) | A kind of Novel hanging tool | |
CN217102788U (en) | Gantry crane landing leg hard support fixed connection device | |
CN215907581U (en) | Detachable cabin lifting opening safety protection device of wind generating set | |
CN110228563A (en) | A kind of barge is with can fall rail post | |
CN207618879U (en) | Horizontal hanging beam hoisting structure | |
CN206255763U (en) | A kind of dismountable type steel construction piece is started shipment and stands up suspension bracket | |
JPH0317350A (en) | Scaffold for building structure | |
DK2853512T3 (en) | A device for connecting a lifting means, such as a crane, to an object to be lifted | |
CN205591172U (en) | Detachable rubber fender installation device | |
CN208193452U (en) | Packaged type water hose box bracket | |
CN209525079U (en) | Load test Combined door type supporting structure | |
US20230322526A1 (en) | Lifting apparatus for hoisting a gyratory crusher spider | |
CN212655373U (en) | Anti-shaking device for hoisting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |