CN108331566B - A kind of hot dry rock Reservoir Fracture forming method - Google Patents

A kind of hot dry rock Reservoir Fracture forming method Download PDF

Info

Publication number
CN108331566B
CN108331566B CN201810185454.9A CN201810185454A CN108331566B CN 108331566 B CN108331566 B CN 108331566B CN 201810185454 A CN201810185454 A CN 201810185454A CN 108331566 B CN108331566 B CN 108331566B
Authority
CN
China
Prior art keywords
well
net horizontal
horizontal section
injection well
hot dry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810185454.9A
Other languages
Chinese (zh)
Other versions
CN108331566A (en
Inventor
窦斌
田红
高辉
徐超
刘恒伟
蒋国盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Geosciences
Original Assignee
China University of Geosciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Geosciences filed Critical China University of Geosciences
Priority to CN201810185454.9A priority Critical patent/CN108331566B/en
Publication of CN108331566A publication Critical patent/CN108331566A/en
Application granted granted Critical
Publication of CN108331566B publication Critical patent/CN108331566B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/255Methods for stimulating production including the injection of a gaseous medium as treatment fluid into the formation

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention provides a kind of hot dry rock Reservoir Fracture forming method, comprising: S1 determines injection well position and in Drilling injection well in hot dry rock, and injection well includes vertical well section and n net horizontal section, wherein n >=1;S2 surrounds n producing well of injection well Drilling, and producing well includes vertical well section and corresponds and be respectively arranged at immediately below n net horizontal section of injection well with net horizontal section, the net horizontal section of a producing well of n and n net horizontal section of injection well;S3 constructs several detonation vestibules straight down, and several detonation vestibules in the net horizontal section of each producing well construction straight up in the net horizontal section of injection well;S4 transfers demolition set in n net horizontal section of injection well and the net horizontal section of n producing well, and ignition demolition set, which releases carbon dioxide gas expansion generation pressure, to be made to generate crack in hot dry rock.The advantages of beneficial effects of the present invention: having rock breaking capacity strong, and seam is uniform, and burst pressure is controllable, and device is simple, environmental protection and economy.

Description

A kind of hot dry rock Reservoir Fracture forming method
Technical field
The present invention relates to geothermal energy development technical field more particularly to a kind of hot dry rock Reservoir Fracture forming methods.
Background technique
Hot dry rock is part most potential in geothermal energy as clean renewable energy, and restricting dry-hot-rock geothermal can open The bottleneck of hair is manually to build the Fracture Networks effectively passed through for heat-conducting medium on a large scale.Currently used heat reservori builds hand Section is hydraulic fracturing technology, and disadvantage is prominent: broken rock surge pressure is insufficient, and water body leak-off is serious, and big to reservoir damage, reservoir is all Multiple location cannot be excited effectively, and heat storage is adopted heat and is restricted.There is an urgent need to new effective broken rock development tools.Carbon dioxide Explosion is anti-reflection in coal seam, has comparable application in shallow-layer rock mining, with the obvious advantage: rock breaking capacity is strong, and seam is uniform, burst pressure Power is controllable, and device is simple, environmental protection and economy.In order to create the effective heat transfer space of sufficiently large reservoir, by carbon dioxide explosive applications Building in hot dry rock Fracture Networks is a kind of feasible trial.
Summary of the invention
In view of this, the embodiment provides a kind of hot dry rock Reservoir Fracture forming methods.
The embodiment of the present invention provides a kind of hot dry rock Reservoir Fracture forming method, comprising:
S1 determines injection well position and in Drilling injection well in hot dry rock rock mass, and the injection well includes vertical well section and n A net horizontal section, the vertical well section are connected to the n net horizontal sections respectively, wherein n >=1;
S2 surround described n producing well of injection well Drilling, each producing well include vertical well section and with the Vertical Well Mono- net horizontal section of Duan Liantong, the net horizontal section of the n producing wells correspond and divide with n net horizontal section of the injection well It is not set to immediately below n net horizontal section of the injection well;
S3 constructs several detonation vestibules straight down in the net horizontal section of the injection well, and in each producing well Net horizontal section construction several detonation vestibules straight up;
S4 transfers demolition set in the net horizontal section of n net horizontal section and the n producing well of the injection well, institute Stating demolition set includes carbon dioxide fracturing device and electromagnetism initiator, starts all electromagnetism initiators, ignites all carbon dioxide Fracturing device releases carbon dioxide gas, and gas expansion generates pressure and acts on hot dry rock rock mass, makes to generate in hot dry rock rock mass Crack.
Further, intracavitary using the crack formed in hydraulic fracturing extension S4 in all detonation holes, and in all levels Well section transfers floral tube.
Further, the gap between each floral tube and hot dry rock rock mass is filled with sandstone.
Further, all detonation vestibules are constructed using pulse perforating technology.
Further, n net horizontal section of the injection well is divided into n-layer along vertical direction.
Further, the n producing wells are uniformly distributed around the injection well.
Further, the adjacent detonation cavity spacing on each net horizontal section is equal.
Further, two net horizontal sections of the injection well arbitrary neighborhood in the projection angle on horizontal plane be 360 °/n, Wherein n >=2.
The technical solution that the embodiment of the present invention provides has the benefit that a kind of hot dry rock Reservoir Fracture of the present invention Forming method solves hot dry rock reservoir and builds hand in the quick-fried artificial Fracture Networks of formation of hot dry rock rock mass inner utilization carbon dioxide The effective pressure break reservoir of Duan Wufa, big to reservoir damage, technical costs is high, the technical problem of fluid heat transfer low efficiency, has broken rock The advantages of ability is strong, and seam is uniform, and burst pressure is controllable, and device is simple, environmental protection and economy has to pushing hot dry rock commercialization to exploit There is important technological progress meaning.
Detailed description of the invention
Fig. 1 is a kind of flow chart of hot dry rock Reservoir Fracture forming method of the present invention;
Fig. 2 is the arrangement schematic diagram of injection well and producing well;
Fig. 3 is hot dry rock Reservoir Fracture network formation process schematic diagram.
In figure: 1- injection well, 2- producing well, 3- vertical well section, 4- net horizontal section, 5- detonation vestibule.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention Formula is further described.
Referring to FIG. 1, the embodiment provides a kind of hot dry rock Reservoir Fracture forming methods, comprising:
S1 determines injection well position and in Drilling injection well in hot dry rock rock mass, and the injection well includes vertical well section and n A net horizontal section, the vertical well section are connected to the n net horizontal sections respectively, wherein n >=1;
S2 surround described n producing well of injection well Drilling, each producing well include vertical well section and with the Vertical Well Mono- net horizontal section of Duan Liantong, the net horizontal section of the n producing wells correspond and divide with n net horizontal section of the injection well It is not set to immediately below n net horizontal section of the injection well;
S3 constructs several detonation vestibules straight down in the net horizontal section of the injection well, and in each producing well Net horizontal section construction several detonation vestibules straight up;
S4 transfers demolition set in the net horizontal section of n net horizontal section and the n producing well of the injection well, institute Stating demolition set includes carbon dioxide fracturing device and electromagnetism initiator, starts all electromagnetism initiators, ignites all carbon dioxide The carbon dioxide gas that fracturing device releases, gas expansion generate pressure and act on hot dry rock rock mass, make to produce in hot dry rock rock mass Raw crack.
It illustrates below and the above method is illustrated,
Referring to figure 2. and Fig. 3, determine that dry-hot-rock geothermal can develop work area and carry out well group arrangement in the underground heat target area of delineation, As needed, plan arranges an injection well 1 in center, arranges that five producing wells 2, five producing wells 2 are arranged as around injection well Regular pentagon, construction procedure are as follows:
(1) in underground heat target area hot dry rock rock mass center Drilling injection well 1, the injection well 1 includes 3 He of vertical well section Five net horizontal sections 4, the vertical well section 3 are connected to five net horizontal sections 4 respectively, five net horizontal sections, 4 edge of the injection well 1 Vertical direction be divided into five layers, two net horizontal sections 4 of 1 arbitrary neighborhood of injection well are equal in the projection angle on horizontal plane, It is 72 °;
(2) with the injection well 1 for five producing well 2 of center Drilling, five producing wells 2 are arranged in regular pentagon, each Distance L is determined according to underground heat target area area between the producing well 2 and the injection well 1, and the producing well 2 includes the vertical of connection Well section 3 and net horizontal section 4, the net horizontal section of five producing wells 2 and five net horizontal sections of the injection well 1 correspond, and five The net horizontal section 4 of the producing well 2 is respectively arranged at immediately below five net horizontal section 4 of the injection well 1;
(3) pulse perforating technology, several blast holes of the construction of net horizontal section 4 of Yu Suoshu injection well 1 straight down are used Chamber 5, and in the net horizontal section 4 of each producing well 2 construction several detonation vestibules 5 straight up, the injection well 1 it is each The detonation vestibule 5 of net horizontal section 4 and the detonation vestibule 5 of the net horizontal section 4 of each producing well 2 are oppositely arranged;
(4) five net horizontal sections 4 of Yu Suoshu injection well 1 and the net horizontal section 4 of five producing wells 2 transfer explosion dress It sets, the demolition set includes carbon dioxide fracturing device and electromagnetism initiator, the carbon dioxide fracturing device explosion design flow root It is determined according to each 4 volume of net horizontal section, starts all electromagnetism initiators, ignite all carbon dioxide fracturing devices release two Carbon oxide gas, gas expansion generate pressure and act on hot dry rock rock mass, make to generate crack in hot dry rock rock mass;
(5) carbon dioxide bursting work effect is monitored, step (4) can be repeated several times until crack meets in detonation vestibule 5 Until design requirement;
(6) in all detonation vestibules 5 use hydraulic fracturing extension the intracorporal crack of hot dry rock rock form artificial fracture network Network penetrates through the net horizontal section 4 of each producing well 2 and the net horizontal section 4 of the injection well 1 right above it, reaches fluid The good result that medium sufficiently exchanges heat, and floral tube is transferred in all net horizontal sections 4, between each floral tube and hot dry rock rock mass Gap is filled with sandstone, forms sandstone filter screen.
Cold fluid is injected in 1 well head of injection well, cold fluid flows into 1 net horizontal section 4 of injection well, by hot dry rock Artificial Fracture Networks reach each 2 net horizontal section 4 of producing well, are then discharged by each 2 well head of producing well, wherein cold fluid Heat is carried out with hot dry rock rock mass to exchange, and is obtained enough heats and is taken ground to and the commercial exploitations such as is generated electricity or warmed oneself.
Herein, the nouns of locality such as related front, rear, top, and bottom are to be located in figure with components in attached drawing and zero Part mutual position defines, only for the purpose of expressing the technical solution clearly and conveniently.It should be appreciated that the noun of locality Use should not limit the claimed range of the application.
In the absence of conflict, the feature in embodiment and embodiment herein-above set forth can be combined with each other.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of hot dry rock Reservoir Fracture forming method characterized by comprising
S1 determines injection well position and in Drilling injection well in hot dry rock rock mass, and the injection well includes vertical well section and n water Horizontal well section, the vertical well section are connected to the n net horizontal sections respectively, wherein n >=1;
S2 surrounds described n producing well of injection well Drilling, and each producing well includes vertical well section and connects with the vertical well section A logical net horizontal section, the net horizontal section of the n producing wells are corresponded with n net horizontal section of the injection well and are set respectively It is placed in immediately below n net horizontal section of the injection well;
S3 constructs several detonation vestibules straight down in the net horizontal section of the injection well, and in the water of each producing well Several detonation vestibules of horizontal well section construction straight up;
S4 transfers demolition set in the net horizontal section of n net horizontal section and the n producing well of the injection well, described quick-fried Breaking device includes carbon dioxide fracturing device and electromagnetism initiator, starts all electromagnetism initiators, ignites all carbon dioxide fracturings Device releases carbon dioxide gas, and gas expansion generates pressure and acts on hot dry rock rock mass, makes to generate crack in hot dry rock rock mass.
2. a kind of hot dry rock Reservoir Fracture forming method as described in claim 1, which is characterized in that the method also includes:
S5 is intracavitary using the crack formed in hydraulic fracturing extension S4 in all detonation holes, and lets off fireworks under all net horizontal sections Pipe.
3. a kind of hot dry rock Reservoir Fracture forming method as claimed in claim 2, it is characterised in that: each floral tube with it is xeothermic Gap between rock rock mass is filled with sandstone.
4. a kind of hot dry rock Reservoir Fracture forming method as described in claim 1, it is characterised in that: all detonation vestibules use Pulse perforating technology construction.
5. a kind of hot dry rock Reservoir Fracture forming method as described in claim 1, it is characterised in that: n of the injection well Net horizontal section is divided into n-layer along vertical direction.
6. a kind of hot dry rock Reservoir Fracture forming method as described in claim 1, it is characterised in that: the n producing wells enclose It is uniformly distributed around the injection well.
7. a kind of hot dry rock Reservoir Fracture forming method as described in claim 1, it is characterised in that: on each net horizontal section Adjacent detonation vestibule spacing it is equal.
8. a kind of hot dry rock Reservoir Fracture forming method as described in claim 1, it is characterised in that: any phase of injection well Two adjacent net horizontal sections are 360 °/n in the projection angle on horizontal plane, wherein n >=2.
CN201810185454.9A 2018-03-07 2018-03-07 A kind of hot dry rock Reservoir Fracture forming method Active CN108331566B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810185454.9A CN108331566B (en) 2018-03-07 2018-03-07 A kind of hot dry rock Reservoir Fracture forming method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810185454.9A CN108331566B (en) 2018-03-07 2018-03-07 A kind of hot dry rock Reservoir Fracture forming method

Publications (2)

Publication Number Publication Date
CN108331566A CN108331566A (en) 2018-07-27
CN108331566B true CN108331566B (en) 2019-06-25

Family

ID=62930541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810185454.9A Active CN108331566B (en) 2018-03-07 2018-03-07 A kind of hot dry rock Reservoir Fracture forming method

Country Status (1)

Country Link
CN (1) CN108331566B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577930A (en) * 2018-12-13 2019-04-05 苏州峰极电磁科技有限公司 Two-way geothermal well and hoistway fracturing crack method for communicating
CN110541696A (en) * 2019-07-15 2019-12-06 河南理工大学 carbon dioxide blasting-hydraulic fracturing reconstruction yield increasing method for oil and gas well

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437497A (en) * 2016-09-23 2017-02-22 太原理工大学 Method for constructing hot dry rock artificial geothermal reservoir through water pressure blasting fracturing
CN106481328A (en) * 2016-09-23 2017-03-08 太原理工大学 A kind of utilization graininess dry ice builds the hot dry rock method that manually heat is stored up
CN107100605A (en) * 2017-04-21 2017-08-29 中国石油大学(北京) A kind of method that dual horizontal well circulation supercritical carbon dioxide develops hot dry rock
CN107288606A (en) * 2017-08-07 2017-10-24 吉林大学 A kind of method of artificial construction hot dry rock heat reservori

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2005258224A1 (en) * 2004-06-23 2006-01-05 Terrawatt Holdings Corporation Method of developingand producing deep geothermal reservoirs

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437497A (en) * 2016-09-23 2017-02-22 太原理工大学 Method for constructing hot dry rock artificial geothermal reservoir through water pressure blasting fracturing
CN106481328A (en) * 2016-09-23 2017-03-08 太原理工大学 A kind of utilization graininess dry ice builds the hot dry rock method that manually heat is stored up
CN107100605A (en) * 2017-04-21 2017-08-29 中国石油大学(北京) A kind of method that dual horizontal well circulation supercritical carbon dioxide develops hot dry rock
CN107288606A (en) * 2017-08-07 2017-10-24 吉林大学 A kind of method of artificial construction hot dry rock heat reservori

Also Published As

Publication number Publication date
CN108331566A (en) 2018-07-27

Similar Documents

Publication Publication Date Title
CN201620848U (en) Vertical well orientation multi-pulse increase-benefit perforating device
CN205748141U (en) A kind of Tunnel Blasting charge constitution
CN106437497B (en) Hydraulic pressure demolition fracturing builds the hot dry rock method that manually heat is stored up
CN109098695B (en) A kind of perforating and fracturing integrated apparatus and method based on carbon dioxide blasting technique
CN108331566B (en) A kind of hot dry rock Reservoir Fracture forming method
CN109931060A (en) A kind of gas-liquid combination orientation fracturing device and method
WO2021135003A1 (en) Method for constructing hot dry rock artificial geothermal reservoir by means of cooperation of hydraulic fracturing and millisecond blasting
CN201574735U (en) Inclined shaft azimuthal orientation multilevel pulse benefit increment perforating device
CN102839957A (en) Pulse detonation fracturing device for ultra high-temperature high-pressure well
CN110306967A (en) A kind of coal seam hydraulic fracture couples anti-reflection method and device with hydraulic pressure demolition
CN208168927U (en) Hypotonic coal seam electric detonation shake and microwave-assisted frozen-thawed permeability improvement device
CN114876434B (en) In-situ combustion explosion fracturing method for methane in shale gas reservoir seam
CN104975838B (en) A kind of method for preventing high enegry gas fracturing existing crack from closing
CN109025941A (en) Explosion fracturing and hydraulic blow pressure break axle-linked cable-car and connection make method
CN113982556A (en) Step-by-step energy-gathering blasting fracturing unconventional gas reservoir enhanced extraction system and method
CN102337878B (en) Thermal-ignition high-energy gas pulse fracturing device
CN206581900U (en) A kind of multistage ignites the safe tubing string of explosion fracturing step by step
CN103541696B (en) A kind of classification supercharging composite perforator
CN201531256U (en) Dynamic seal press device for improving fracturing effect of composite perforation
CN107288606A (en) A kind of method of artificial construction hot dry rock heat reservori
CN103104239B (en) One buries sand process for fracturing energetic gas
CN2630491Y (en) Multi-pulse multi-stage control fracturing device
CN105275435A (en) Accurate time-delay presplitting blasting reinforcement coal seam gas extraction method
CN112502684A (en) Oil and gas reservoir transformation process, method for creating complex fracture and self-explosion type propping agent
CN204238920U (en) Seam net pressure break normal surface perforator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20180727

Assignee: JIANGSU HEXIN PETROLEUM MACHINERY Co.,Ltd.

Assignor: CHINA University OF GEOSCIENCES (WUHAN CITY)

Contract record no.: X2022420000014

Denomination of invention: A method for forming fractures in dry hot rock reservoir

Granted publication date: 20190625

License type: Exclusive License

Record date: 20220225

EE01 Entry into force of recordation of patent licensing contract