CN108331346A - The method for executing indoor pipeline integrated morphology - Google Patents
The method for executing indoor pipeline integrated morphology Download PDFInfo
- Publication number
- CN108331346A CN108331346A CN201711407360.3A CN201711407360A CN108331346A CN 108331346 A CN108331346 A CN 108331346A CN 201711407360 A CN201711407360 A CN 201711407360A CN 108331346 A CN108331346 A CN 108331346A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- casing
- buried
- integrated morphology
- space
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
- E04G15/06—Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
- E04G15/063—Re-usable forms
- E04G15/068—Re-usable forms for channels open towards the surface
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The method for executing indoor pipeline integrated morphology, including:In the beam, plate, column of building body, the casing of pre-buried level-one bigger than pipeline;Hydroelectric line is laid among pre-buried good casing;Some larger-size accessories, such as socket box, water supply angle valve, pre-buried plastics back box and foam insert in main structure body are waited for taking out filler after concreting, then accessory are installed into the position vacated;Deck-siding is suitably increased, then groove is reserved in the fringe region of beam, by pipelining in groove;There are the position that packet builds space, such as pelmet in interior, also using the space as pipelining region;The handing-over position of pipeline and building body is covered using dismountable panel, then brushed surface.The present invention can take into account pipeline beauty and be facilitated with maintenance, and combine closely with the agent structure of building, not influence structure safety and interior space utilization rate.
Description
Technical field
This technology belongs to building engineering field, is related to architectural design and hydroelectric line construction and installation.
Background technology
In traditional architectural design and construction, interior is typically all to be equipped with a large amount of hydroelectric line and accessory, if directly
It is exposed indoors, indoor aesthetics can be seriously affected.Many construction units are in order to hidden by hydroelectric line, often by water power
Pipeline is embedded in floor bed course, furred ceiling, masonry partition wall etc..Although this traditional hydroelectric line installation method can be by pipe
Line secretly applies, but there is also another defects:When being embedded in floor bed course or wall, exist greatly not to maintenance in the future
Just, it needs to demolish walls, excavate floor;Although and pipeline is located at convenient to overhaul in furred ceiling, the furred ceiling added can force down again
Indoor clear height.To sum up, realize the aesthetics of hydroelectric line installation, shooting convenience, and to the clear height of main building
It influences at least, is always the research direction in industry.
Invention content
According to above research direction, new solution below is proposed.The technical solution can take into account pipeline beauty and inspection
Facility is repaiied, and is combined closely with the agent structure of building, does not influence structure safety and interior space utilization rate.
To achieve the above object, the present invention adopts the following technical scheme that:
The method for executing indoor pipeline integrated morphology, including:
S1:In the beam, plate, column of building body, the position of the casing of pre-buried level-one bigger than pipeline, casing must binding reinforcement arrangement
And the density of reinforcing bar, intensity cannot be influenced;
S2:After main body casting concrete, casing can be fixed in main structure body, and it is pre-buried good that hydroelectric line is laid in later
Casing among, some larger-size accessories, such as socket box, water supply angle valve;
S3:Pre-buried plastics back box and foam insert in main structure body;
S4:It waits for taking out filler after concreting, then accessory is installed into the position vacated.
Preferably, the hydroelectric line in the S2 can directly be laid in structural beams, i.e., deck-siding is suitably increased, then existed
The fringe region of beam is slotted, by pipelining in groove.
Preferably, include S11 in above-mentioned S1:There are the position that packet builds space, such as pelmet for some interiors, also may be used
Using the space as pipelining region.
Preferably, the method further includes S5:By hydroelectric line by service sleeve, reserved texture grooves, utilize interior
It is beautiful, smooth to achieve the effect that after packet block space etc. is laid in architecture indoor, it need to also be in the junction of pipeline and building body
Position is covered using dismountable panel, then brushed surface, keeps wall, beam face etc. complete in appearance, smooth.
Compared with the prior art, advantageous effect possessed by the present invention is:
Good enough spaces are reserved in main structure body or indoor special component, hydroelectric line can neatly lay wherein, be convenient for
Pipeline is installed and maintenance is dismantled, and the beauty and utilization rate for not influencing main structure body safety, not influencing interior decoration.
Description of the drawings
Fig. 1 is the structural schematic diagram of one embodiment of the invention;
Fig. 2 is the structural schematic diagram of another embodiment of the present invention;
Fig. 3 is the structural schematic diagram of further embodiment of this invention.
Specific implementation mode
In the following, in conjunction with attached drawing and specific embodiment, the present invention is described further:
As shown in Figure 1, Figure 2, Figure 3 shows, the method for executing indoor pipeline integrated morphology, including:
S1:In the beam, plate, column of building body, the position of the casing of pre-buried level-one bigger than pipeline, casing must binding reinforcement arrangement
And the density of reinforcing bar, intensity cannot be influenced;
S2:After main body casting concrete, casing can be fixed in main structure body, and it is pre-buried good that hydroelectric line is laid in later
Casing among, some larger-size accessories, such as socket box, water supply angle valve;
S3:The fillers such as pre-buried plastic foam in main structure body;
S4:It waits for taking out filler after concreting, then accessory is installed into the position vacated.
As a preferred solution, the hydroelectric line in the S2 can directly be laid in structural beams, i.e., deck-siding is fitted
Work as increasing, then slots in the fringe region of beam, by pipelining in groove.
As a preferred solution, include S11 in above-mentioned S1:There is the position that packet builds space for some interiors, such as
Pelmet etc., also using the space as pipelining region.
As a preferred solution, the method further includes a step S5:Hydroelectric line is passed through into service sleeve, pre-
It is beautiful, smooth to achieve the effect that after staying texture grooves, space etc. is built using indoor packet being laid in architecture indoor, it need to also be in pipe
The handing-over position of line and building body is covered using dismountable panel, then brushed surface, makes wall, beam face etc. in appearance
Completely, smooth.
It will be apparent to those skilled in the art that technical solution that can be as described above and design, make various other
Corresponding change and deformation, and all these changes and deformation should all belong to the protection domain of the claims in the present invention
Within.
Claims (4)
1. the method for executing indoor pipeline integrated morphology, which is characterized in that include the following steps:
S1:In the beam, plate, column of building body, the position of the casing of pre-buried level-one bigger than pipeline, casing must binding reinforcement arrangement
And the density of reinforcing bar, intensity cannot be influenced;
S2:After main body casting concrete, casing can be fixed in main structure body, and it is pre-buried good that hydroelectric line is laid in later
Casing among, some larger-size accessories, such as socket box, water supply angle valve;
S3:The fillers such as pre-buried plastic foam in main structure body;
S4:It waits for taking out filler after concreting, then accessory is installed into the position vacated.
2. the method for executing indoor pipeline integrated morphology as described in claim 1, it is characterised in that:Water power pipe in the S2
Line can directly be laid in structural beams, i.e., deck-siding is suitably increased, and then groove be reserved in the fringe region of beam, by pipelining
In groove.
3. the method for executing indoor pipeline integrated morphology as described in claim 1, it is characterised in that:Include in above-mentioned S1
S11:There are the position that packet builds space, such as pelmet for some interiors, also using the space as pipelining region.
4. the method for executing indoor pipeline integrated morphology as described in claim 1, it is characterised in that:Further include S5:By water power
Pipeline is built by service sleeve, reserved texture grooves, using indoor packet after space etc. is laid in architecture indoor, for reach it is beautiful,
Smooth effect need to also be covered at the handing-over position of pipeline and building body using dismountable panel, then brushed surface, make
Wall, beam face etc. are complete in appearance, smooth.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711407360.3A CN108331346A (en) | 2017-12-22 | 2017-12-22 | The method for executing indoor pipeline integrated morphology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711407360.3A CN108331346A (en) | 2017-12-22 | 2017-12-22 | The method for executing indoor pipeline integrated morphology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108331346A true CN108331346A (en) | 2018-07-27 |
Family
ID=62924344
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711407360.3A Pending CN108331346A (en) | 2017-12-22 | 2017-12-22 | The method for executing indoor pipeline integrated morphology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108331346A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109403621A (en) * | 2018-12-03 | 2019-03-01 | 广州景兴建筑科技有限公司 | A kind of readily removable profile aluminum alloy pattern plate of building water power indent |
CN110645409A (en) * | 2019-08-26 | 2020-01-03 | 广东博意建筑设计院有限公司 | Pipeline routing method for floating platform with hidden pipeline structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201420396Y (en) * | 2009-06-22 | 2010-03-10 | 莱西市建筑总公司 | Pre-embedded box die of concrete wall |
CN102943933A (en) * | 2012-11-28 | 2013-02-27 | 深圳市鹏城建筑集团有限公司 | Method for pre-burying through floor pipeline into floor and sleeve used in method |
CN103174289A (en) * | 2012-10-20 | 2013-06-26 | 中国二十二冶集团有限公司 | Construction method for cave entrance reservation of strong and weak electricity distribution box |
CN104806025A (en) * | 2015-05-26 | 2015-07-29 | 中建五局蚌埠建筑工程有限公司 | Masonry engineering electromechanical pipeline and wire box direct-buried complete construction process |
CN204571289U (en) * | 2015-04-24 | 2015-08-19 | 中建四局第一建筑工程有限公司 | A kind of construction formwork of overhang layer exterior wall preformed hole |
-
2017
- 2017-12-22 CN CN201711407360.3A patent/CN108331346A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201420396Y (en) * | 2009-06-22 | 2010-03-10 | 莱西市建筑总公司 | Pre-embedded box die of concrete wall |
CN103174289A (en) * | 2012-10-20 | 2013-06-26 | 中国二十二冶集团有限公司 | Construction method for cave entrance reservation of strong and weak electricity distribution box |
CN102943933A (en) * | 2012-11-28 | 2013-02-27 | 深圳市鹏城建筑集团有限公司 | Method for pre-burying through floor pipeline into floor and sleeve used in method |
CN204571289U (en) * | 2015-04-24 | 2015-08-19 | 中建四局第一建筑工程有限公司 | A kind of construction formwork of overhang layer exterior wall preformed hole |
CN104806025A (en) * | 2015-05-26 | 2015-07-29 | 中建五局蚌埠建筑工程有限公司 | Masonry engineering electromechanical pipeline and wire box direct-buried complete construction process |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109403621A (en) * | 2018-12-03 | 2019-03-01 | 广州景兴建筑科技有限公司 | A kind of readily removable profile aluminum alloy pattern plate of building water power indent |
CN110645409A (en) * | 2019-08-26 | 2020-01-03 | 广东博意建筑设计院有限公司 | Pipeline routing method for floating platform with hidden pipeline structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103225362B (en) | Assembled light steel keel gypsum plate irregularly-shaped suspended ceiling system | |
CN204163299U (en) | For the indoor integrated finishing assembly of integration | |
CN104032925A (en) | Construction method for CSI residential wall and ground empty space | |
CN106320521A (en) | Pure part plate combined industrialized house assembling structure which can be rapidly erected | |
CN106121231A (en) | A kind of skyscraper interts cross construction method | |
CN103321327A (en) | Unit-assembly-type framework partition wall system and construction method thereof | |
CN105464309A (en) | Integral indoor decorating method and integral indoor decorating component | |
CN108331346A (en) | The method for executing indoor pipeline integrated morphology | |
CN106958358A (en) | The industrialization commercial residential buildings of energy-conserving and environment-protective | |
CN106894538A (en) | Filling wall and agent structure concrete integral shaping method | |
CN206189685U (en) | Integrated floor of modularization and house | |
CN203394108U (en) | Fabricated bathroom | |
RU92037U1 (en) | QUICK BUILDING BUILDING | |
CN205134527U (en) | Three -dimensional building module | |
CN203230084U (en) | Special-shaped suspended ceiling system composed of assembly type light gauge steel keel gypsum boards | |
KR101041582B1 (en) | Prefabricated partition wall for apartment house has a lot of potential for recycling | |
CN205604546U (en) | Link plate system is gone along with sb. to guard him to iteration environmental protection assembled outer wall | |
CN105040815A (en) | Three-dimensional building module and factory building and on-site installing method thereof | |
CN105369955B (en) | A kind of integrated assembled type floor | |
CN203334476U (en) | Unit-assembled framework partition wall system | |
CN109577523A (en) | For spraying the template and construction method of walling body | |
CN205171752U (en) | Prefabricated light steel partition wall and mounting structure thereof | |
RU2732741C1 (en) | Method of erection of multi-storey building with energy-saving multilayer walls | |
CN207878784U (en) | A kind of assembly wall | |
CN112659354A (en) | Machining method of structural electromechanical thermal insulation integrated wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180727 |
|
RJ01 | Rejection of invention patent application after publication |