CN108316297A - A kind of tubular type soil nailing and its construction method - Google Patents
A kind of tubular type soil nailing and its construction method Download PDFInfo
- Publication number
- CN108316297A CN108316297A CN201810174260.9A CN201810174260A CN108316297A CN 108316297 A CN108316297 A CN 108316297A CN 201810174260 A CN201810174260 A CN 201810174260A CN 108316297 A CN108316297 A CN 108316297A
- Authority
- CN
- China
- Prior art keywords
- flower
- grouting
- steel pipe
- soil
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002689 soil Substances 0.000 title claims abstract description 82
- 238000010276 construction Methods 0.000 title claims abstract description 17
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 122
- 239000010959 steel Substances 0.000 claims abstract description 122
- 238000000034 method Methods 0.000 claims abstract description 14
- 239000002002 slurry Substances 0.000 claims abstract description 14
- 238000004873 anchoring Methods 0.000 claims abstract description 11
- 239000011440 grout Substances 0.000 claims abstract description 7
- 239000011378 shotcrete Substances 0.000 claims description 13
- 239000002344 surface layer Substances 0.000 claims description 11
- 239000004567 concrete Substances 0.000 claims description 6
- 239000004570 mortar (masonry) Substances 0.000 claims description 6
- 238000007789 sealing Methods 0.000 claims description 3
- 238000005507 spraying Methods 0.000 claims description 3
- 238000005553 drilling Methods 0.000 abstract description 7
- 239000002131 composite material Substances 0.000 abstract description 5
- 230000002787 reinforcement Effects 0.000 abstract description 4
- 230000005540 biological transmission Effects 0.000 description 2
- 239000010865 sewage Substances 0.000 description 2
- 238000005406 washing Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000010410 layer Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000002791 soaking Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明涉及一种管式土钉及其施工方法。管式土钉包括花钢管和锚固结构,所述花钢管一端为锥形钻头,另一端为开口端,开口端设有螺纹,花钢管管体表面设有出浆孔,花钢管管体外壁焊接有螺旋式钢肋,所述螺旋式钢肋紧邻锥形钻头;压力注浆时,注浆套管一端与花钢管开口端连接,另一端与注浆软连接;压力注浆完成后,将注浆套管拆下,花钢管开口端安装锚固结构。本发明钢管直接钻入土体,避免钻孔注浆在松软的软土地区施工时,出现塌孔、埋钻及缩颈等问题。采用机械旋转钻入土体,减小钢管入土难度及钢管在入土过程中的损耗,加快施工进度;螺旋式钢肋使的花钢管周边土体变得疏松,在压力注浆时,形成的浆与土体复合加固体直径较大,提高土钉抗拔力。
The invention relates to a tubular soil nail and a construction method thereof. Tubular soil nails include flower steel pipes and anchoring structures, one end of the flower steel pipe is a tapered drill bit, the other end is an open end, the open end is provided with threads, the surface of the flower steel pipe body is provided with a grout hole, and the outer wall of the flower steel pipe is welded There are spiral steel ribs, and the spiral steel ribs are close to the tapered drill bit; during pressure grouting, one end of the grouting sleeve is connected to the open end of the flower pipe, and the other end is softly connected to the grouting; after the pressure grouting is completed, the grouting The slurry casing is removed, and the anchor structure is installed at the open end of the flower pipe. The steel pipe of the present invention is directly drilled into the soil body, avoiding problems such as hole collapse, buried drill and necking when drilling and grouting are performed in soft soil areas. Mechanical rotary drilling is used to drill into the soil, reducing the difficulty of steel pipes entering the soil and the loss of steel pipes in the process of entering the soil, and speeding up the construction progress; the spiral steel ribs make the soil around the flower pipes loose, and the grout formed during pressure grouting Composite reinforcement with soil has a larger diameter, which improves the pullout resistance of soil nails.
Description
技术领域technical field
本发明属于岩土工程领域,具体涉及一种管式土钉及其施工方法。The invention belongs to the field of geotechnical engineering, and in particular relates to a tubular soil nail and a construction method thereof.
背景技术Background technique
基坑、边坡等岩土锚固工程中,土钉的应用非常广泛。传统土钉一般采用钢筋土钉和钢管式土钉,钢筋土钉的施工过程,需要预先机械钻孔,成孔后为防止出现塌孔现象应尽快插入钢筋杆体,同时钢筋需要采取一定措施使其位于孔中心位置,使钢筋完全发挥作用,土钉插入后,注射砂浆使土钉与土体嵌固。这种土钉支护形式,在一些土质较软的地区,例如,回填土、松软的淤泥质土、可液化沙土等,这种土钉支护形式,通常难以形成稳定的钻孔,在机械钻孔过程中易出现塌孔、埋钻及缩颈等问题。现有钢管式土钉(CN 206646502 U)及新型打入式土钉(CN 204849758 U)均采用机械式打入方式,在打入夯击过程中易造成钢管打入部位损坏,同时打入过程中钢管周边土体被压缩,造成砂浆向土体渗透困难,难以保证形成均匀的浆土复合体,并且形成的浆与土体复合加固体直径较小,土钉质量无法保证,造成土钉抗拔力较低。Soil nails are widely used in rock and soil anchoring projects such as foundation pits and slopes. Traditional soil nails generally use reinforced soil nails and steel pipe type soil nails. The construction process of reinforced soil nails requires mechanical drilling in advance. It is located in the center of the hole, so that the steel bar can fully play its role. After the soil nail is inserted, the mortar is injected to make the soil nail and the soil embedded. This form of soil nailing, in some areas with soft soil, such as backfill soil, soft muddy soil, liquefiable sand, etc., this form of soil nailing is usually difficult to form a stable borehole. During the drilling process, problems such as hole collapse, buried drilling and necking are prone to occur. Existing steel pipe type soil nails (CN 206646502 U) and new-type driven soil nails (CN 204849758 U) both adopt a mechanical driving method, which is easy to cause damage to the steel pipe driving part during the driving and tamping process. The soil around the middle steel pipe is compressed, which makes it difficult for the mortar to penetrate into the soil, and it is difficult to ensure the formation of a uniform slurry-soil composite. Moreover, the diameter of the formed composite reinforcement of slurry and soil is small, and the quality of the soil nail cannot be guaranteed, resulting in soil nail resistance. Lower pullout force.
发明内容Contents of the invention
本发明提供一种钢管高压注浆形成的管式土钉及其施工方法。采用新型螺旋钢肋花钢管,便于采用机械方式将钢管旋入土体,减小钢管入土难度及钢管在入土过程中的损耗,避免采用传统方式打入钢管时钢管端头损坏;同时螺旋钢肋在钻入过程中可以使钢管周边土体疏松,在压力注浆过程中,所形成的花钢管周边浆与土体复合加固体直径较大,提高土钉抗拔力。The invention provides a tubular soil nail formed by high-pressure grouting of steel pipes and a construction method thereof. The use of a new type of spiral steel rib pattern steel pipe is convenient for mechanically screwing the steel pipe into the soil, reducing the difficulty of entering the soil and the loss of the steel pipe in the process of entering the soil, and avoiding the damage of the end of the steel pipe when driving the steel pipe in the traditional way; at the same time, the spiral steel rib During the drilling process, the soil around the steel pipe can be loosened. During the pressure grouting process, the diameter of the composite reinforcement formed by the surrounding slurry of the flower pipe and the soil is relatively large, which improves the pullout resistance of the soil nail.
本发明的技术方案如下:Technical scheme of the present invention is as follows:
一种管式土钉,包括花钢管、锚固结构和注浆套管,所述锚固结构包括固定螺帽和钢垫板;所述花钢管一端为锥形端头,另一端为开口端,开口端设有螺纹,花钢管管体表面设有出浆孔,花钢管管体的外壁上焊接有螺旋式钢肋,所述螺旋式钢肋紧邻锥形钻头;花钢管内通过注浆软管先注满浆体;取出注浆软管后,将注浆套筒一端与花钢管开口端连接,另一端连接注浆软管,进行压力注浆;压力注浆完成后,将注浆套管拆下,花钢管开口端安装钢垫板和固定螺帽,所述固定螺帽和花钢管开口端的螺纹相配合。A tubular soil nail, comprising a flower-shaped steel pipe, an anchoring structure and a grouting casing, the anchoring structure includes a fixing nut and a steel backing plate; one end of the flower-shaped steel pipe is a tapered end, the other end is an open end, and the opening The end of the steel pipe is provided with threads, and the surface of the steel pipe body is provided with a grout hole. The outer wall of the steel pipe body is welded with a spiral steel rib, and the spiral steel rib is close to the tapered drill bit; Fill the grout; after taking out the grouting hose, connect one end of the grouting sleeve to the open end of the flower pipe, and connect the other end to the grouting hose for pressure grouting; after the pressure grouting is completed, remove the grouting sleeve Next, a steel backing plate and a fixing nut are installed at the open end of the flower steel pipe, and the fixing nut is matched with the thread at the open end of the flower steel pipe.
优选所述出浆孔采取梅花式或螺旋式布置。避免花钢管同一截面处强度减低较大。Preferably, the pulp outlet holes are arranged in a quincunx or spiral arrangement. Avoid a large reduction in strength at the same section of the flower pipe.
优选出浆孔直径为5-10mm,间距为0.2-0.5m。Preferably, the diameter of the pulp hole is 5-10mm, and the spacing is 0.2-0.5m.
所述注浆套管一端与花钢管开口端由丝扣连接固定,另一端(小口径端)与注浆软由钢丝连接固定。One end of the grouting casing is connected and fixed with the open end of the flower steel pipe by a screw, and the other end (small-diameter end) is connected and fixed with the grouting tube by a steel wire.
花钢管锚固于喷射混凝土面层,所述钢垫板作为锚下传力构件,尺寸为0.3×0.3m,厚10-15mm,中心留有和钢管相同直径的圆孔。The flower steel pipe is anchored to the sprayed concrete surface, and the steel backing plate is used as a force transmission member under the anchor, the size is 0.3×0.3m, the thickness is 10-15mm, and a round hole with the same diameter as the steel pipe is left in the center.
优选所述螺旋式钢肋高度为30-50mm、肋宽3-5mm、间距为100mm,其布置长度约0.5-1.0m,所述开口端螺纹布置长度为50-100mm。Preferably, the height of the spiral steel ribs is 30-50 mm, the rib width is 3-5 mm, and the spacing is 100 mm. The arrangement length is about 0.5-1.0 m, and the arrangement length of the threads at the open end is 50-100 mm.
所述花钢管在混凝土混凝土面层上采用梅花形排列布置,水平间距和竖向间距为0.8-1.5m。The flower-shaped steel pipes are arranged in a quincunx-shaped arrangement on the concrete surface layer, and the horizontal spacing and vertical spacing are 0.8-1.5m.
本发明还提供一种管式土钉的施工方法,包括以下步骤:The present invention also provides a construction method of tubular soil nails, comprising the following steps:
1)喷射混凝土面层:在基坑壁上确定并预留出花钢管孔位,邦扎钢筋网,喷射混凝土,形成喷射混凝土面层;1) Shotcrete surface layer: Determine and reserve the hole position of the flowered steel pipe on the wall of the foundation pit, bonza steel mesh, and shotcrete to form the shotcrete surface layer;
2)花钢管的施工:待混凝土面层强度达到规定强度,将花钢管机械旋转式钻入土体;2) Construction of flower pipes: When the strength of the concrete surface layer reaches the specified strength, the flower pipes are mechanically drilled into the soil;
3)封孔:在花钢管开口端周围封孔,避免压力注浆过程中,砂浆从开口端周围喷出;3) Sealing: Seal the hole around the open end of the flower pipe to avoid the mortar spraying out from around the open end during the pressure grouting process;
4)压力注浆:先采用小直径的注浆软管深入花钢管底部,由里向外逐渐将花钢管内注满浆体,取出注浆软管;将注浆套筒一端与花钢管开口端连接,另一端连接注浆软管,进行压力注浆,注浆压力1-2MPa,稳压5分钟;4) Pressure grouting: first use a small-diameter grouting hose to go deep into the bottom of the flower steel pipe, gradually fill the flower steel pipe with slurry from the inside to the outside, and take out the grouting hose; connect one end of the grouting sleeve to the opening of the flower steel pipe One end is connected, and the other end is connected to the grouting hose for pressure grouting, the grouting pressure is 1-2MPa, and the pressure is stabilized for 5 minutes;
5)安装锚固结构:注浆完成后,拆除注浆套筒,在花钢管开口端安装钢垫板,采用机械设备将固定螺帽旋紧到花钢管开口端的螺纹,提供微预应力,将花钢管与混凝土面层连接为整体,使混凝面层压力传递给钢管土钉,共同受力。5) Install the anchoring structure: After the grouting is completed, remove the grouting sleeve, install a steel backing plate at the open end of the flower steel pipe, and use mechanical equipment to tighten the fixing nut to the thread at the open end of the flower steel pipe to provide micro-prestress, and the flower The steel pipe and the concrete surface are connected as a whole, so that the pressure of the concrete surface is transmitted to the steel pipe and soil nails, and they are jointly stressed.
本发明突出的有益效果在于:The outstanding beneficial effects of the present invention are:
(1)本发明可靠性强,采用钢管式土钉,钢管旋转钻入土体,避免了在松软的软土地区施工时,易出现塌孔、埋钻及缩颈等施工问题;(1) The present invention has strong reliability, adopts steel pipe type soil nails, and the steel pipe is rotated to drill into the soil, which avoids construction problems such as hole collapse, buried drill and necking when construction is carried out in soft soil areas;
(2)钢管入土端头部位采用螺旋式钢肋构造,减小钢管入土难度及钢管在入土过程中的损耗,可以加快施工进度;同时在成型后的土钉结构中提高端部锚固力,防止砂浆体与钢管出现脱离现象;(2) The end of the steel pipe in the soil adopts a spiral steel rib structure, which reduces the difficulty of the steel pipe in the soil and the loss of the steel pipe in the process of entering the soil, and can speed up the construction progress; at the same time, the end anchorage force is improved in the formed soil nail structure, Prevent the mortar body from separating from the steel pipe;
(3)土钉抗拔力高。花钢管在钻进过程中,螺旋式钢肋使的花钢管周边土体变得疏松,在压力注浆时,形成的浆与土体复合加固体直径较大,提高土钉抗拔力;(3) Soil nails have high pull-out resistance. During the drilling process of the steel pipe, the spiral steel rib makes the soil around the steel pipe loose. During the pressure grouting, the composite reinforcement of the slurry and the soil formed has a larger diameter, which improves the pullout resistance of the soil nail;
(4)支护结构变形小。钢管端口螺纹与固定螺帽和钢垫板的配套使用,可以为土钉提供微预应力,以降低支护结构变形;(4) The deformation of the support structure is small. The matching use of steel pipe port threads, fixing nuts and steel backing plates can provide micro-prestress for soil nails to reduce the deformation of the support structure;
(5)压力注浆在土钉周围形成的水泥浆柱状结石,提高土钉的抗剪强度,可阻止土体的下滑,进而提高基坑的稳定性。(5) The columnar concretions of cement slurry formed around the soil nail by pressure grouting can improve the shear strength of the soil nail, prevent the soil from sliding, and then improve the stability of the foundation pit.
(6)实用性强,可广泛应用于回填土,松软的淤泥质土,可液化沙土等土质松软地区。(6) It has strong practicability and can be widely used in soft soil areas such as backfill, soft muddy soil, and liquefiable sandy soil.
附图说明Description of drawings
图1为本发明花钢管及注浆套筒的示意图;Fig. 1 is the schematic diagram of spent steel pipe and grouting sleeve of the present invention;
图2为本发明管式土钉支护完成后的整体结构平面示意图;Fig. 2 is the schematic plan view of the overall structure after the tubular soil nail support of the present invention is completed;
标号及符号说明Labels and symbols
1-花钢管;2-注浆套筒;3-喷射混凝土面层;4-固定螺帽;5-钢垫板;6-螺旋式钢肋;7-锥形端头;8-出浆孔。1-flower steel pipe; 2-grouting sleeve; 3-sprayed concrete surface; 4-fixed nut; 5-steel backing plate; 6-spiral steel rib; 7-tapered end; .
具体实施方式Detailed ways
下面结合附图和具体实施方式对本发明做进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
实施例1Example 1
如图1、图2所示,一种管式土钉,包括花钢管1、锚固结构和注浆套管2,所述锚固结构包括固定螺帽4和钢垫板5;所述花钢管1一端为锥形端头7,另一端为开口端,开口端设有螺纹,花钢管1管体表面设有出浆孔8,用于高压下管内浆体向土层渗透,花钢管1管体外壁上焊接有螺旋式钢肋6,所述螺旋式钢肋6紧邻锥形端头7;花钢管1内通过注浆软管先注满浆体;注浆软管出后将注浆套筒2一端与花钢管1开口端连接,另一端连接注浆软管,进行压力注浆(浆体从管体上的孔渗入土体);压力注浆完成后,将注浆套管2拆下,花钢管1开口端安装钢垫板5和固定螺帽4,所述固定螺帽4和花钢管1开口端的螺纹相配合。所述出浆孔8采取梅花式或螺旋式布置。出浆孔8直径为5-10mm,间距为0.2-0.5m。花钢管1锚固于喷射混凝土面层3,所述钢垫板5作为锚下传力构件,尺寸为0.3×0.3m,厚10-15mm,中心留有和钢管相同直径的圆孔。所述螺旋式钢肋6高度为30-50mm、肋宽3-5mm、间距为100mm,其布置长度约0.5-1.0m;所述开口端的螺纹布置长度为50-100mm。As shown in Figures 1 and 2, a tubular soil nail includes a flowered steel pipe 1, an anchoring structure and a grouting sleeve 2, the anchoring structure includes a fixing nut 4 and a steel backing plate 5; the flowered steel pipe 1 One end is a tapered end 7, the other end is an open end, and the open end is provided with a screw thread. The surface of the pipe body of the flower steel pipe 1 is provided with a slurry outlet hole 8, which is used for the slurry in the pipe to penetrate into the soil layer under high pressure. The body of the flower steel pipe 1 A spiral steel rib 6 is welded on the outer wall, and the spiral steel rib 6 is adjacent to the tapered end 7; the inside of the flower pipe 1 is first filled with slurry through the grouting hose; after the grouting hose comes out, the grouting sleeve 2 One end is connected to the open end of the flower pipe 1, and the other end is connected to the grouting hose for pressure grouting (the grout penetrates into the soil from the holes on the pipe body); after the pressure grouting is completed, remove the grouting sleeve 2 1. A steel backing plate 5 and a fixed nut 4 are installed at the open end of the spent steel pipe 1, and the fixed nut 4 is matched with the threads at the open end of the spent steel tube 1. The pulp outlet holes 8 are arranged in plum blossom or spiral. The diameter of the slurry outlet 8 is 5-10mm, and the spacing is 0.2-0.5m. The flower steel pipe 1 is anchored to the sprayed concrete surface 3, and the steel backing plate 5 is used as a force transmission member under the anchor, the size is 0.3×0.3m, the thickness is 10-15mm, and a circular hole with the same diameter as the steel pipe is left in the center. The height of the spiral steel ribs 6 is 30-50mm, the width of the ribs is 3-5mm, the spacing is 100mm, and the length of the arrangement is about 0.5-1.0m;
花钢管1可采用厚3mm的普通圆钢管加工制作,花钢管1和配套的固定螺帽4及钢垫板5统一由工厂加工制作。Flower steel pipe 1 can be used The common circular steel pipe with a thickness of 3mm is processed and manufactured, and the flowered steel pipe 1, the supporting fixing nut 4 and the steel backing plate 5 are uniformly processed and manufactured by the factory.
所述花钢管1在支护面层上采用梅花形排列布置,水平间距和竖向间距为0.8-1.5m。孔距的允许偏差不大于50mm。The flower-shaped steel pipes 1 are arranged in a quincunx-shaped arrangement on the support surface layer, and the horizontal spacing and vertical spacing are 0.8-1.5m. The allowable deviation of hole distance is not more than 50mm.
管式土钉的施工方法,包括以下步骤:The construction method of tubular soil nailing comprises the following steps:
1.喷射混凝土面层:在基坑壁上确定并预留出花钢管1孔位,邦扎钢筋网,喷射混凝土,形成喷射混凝土面层3;1. Shotcrete surface layer: determine and reserve hole positions for the flowered steel pipe 1 on the foundation pit wall, bonza steel mesh, and shotcrete to form the shotcrete surface layer 3;
2.花钢管1的施工:待混凝土面层3强度达到规定强度,将花钢管1机械旋转式钻入土体;花钢管1钻入土体后,先泵送少量清水,通过注浆管注入孔底,稀释孔底残渣,将泥渣托出,以确保注浆质量;洗孔的长度应与钢管的长度一致;洗孔污水应及时排走,防止边坡因受污水的浸泡坍塌。2. Construction of the flower steel pipe 1: When the strength of the concrete surface layer 3 reaches the specified strength, the flower steel pipe 1 is mechanically drilled into the soil; At the bottom of the hole, dilute the residue at the bottom of the hole and lift out the mud to ensure the quality of grouting; the length of the washing hole should be consistent with the length of the steel pipe; the sewage from the washing hole should be drained in time to prevent the slope from collapsing due to the soaking of sewage.
3.封孔:在花钢管1开口端周围封孔,避免压力注浆过程中,砂浆从开口端周围喷出;3. Hole sealing: Seal the hole around the opening end of the flower pipe 1 to avoid the mortar spraying out from around the opening end during the pressure grouting process;
4.压力注浆:先采用注浆软管深入花钢管底部,由里向外逐渐将花钢管内注满浆体,取出注浆软管;将注浆套筒(10)一端与花钢管(6)开口端连接,另一端连接注浆软管,进行压力注浆,注浆压力1-2MPa,稳压5分钟;4. Pressure grouting: first use the grouting hose to go deep into the bottom of the flower steel pipe, gradually fill the flower steel pipe with slurry from the inside to the outside, and take out the grouting hose; connect one end of the grouting sleeve (10) to the flower steel pipe ( 6) The open end is connected, and the other end is connected to the grouting hose for pressure grouting. The grouting pressure is 1-2MPa, and the pressure is stabilized for 5 minutes;
5.安装锚固结构:注浆完成后,拆除注浆套筒2,在花钢管开口端部在安装钢垫板5,将固定螺帽4旋紧到花钢管开口端的螺纹。5. Install the anchoring structure: After the grouting is completed, remove the grouting sleeve 2, install the steel backing plate 5 at the opening end of the flower pipe, and tighten the fixing nut 4 to the thread at the opening end of the flower pipe.
6.待已施工完的土钉达到70%设计强度后,即土钉施工完6~7天后,可挖土至下一道土钉标高深度,进行下一道土钉的施工。6. After the completed soil nails reach 70% of the design strength, that is, 6 to 7 days after the construction of soil nails, the soil can be excavated to the depth of the next soil nail level, and the construction of the next soil nail can be carried out.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810174260.9A CN108316297A (en) | 2018-03-02 | 2018-03-02 | A kind of tubular type soil nailing and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810174260.9A CN108316297A (en) | 2018-03-02 | 2018-03-02 | A kind of tubular type soil nailing and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108316297A true CN108316297A (en) | 2018-07-24 |
Family
ID=62901862
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810174260.9A Pending CN108316297A (en) | 2018-03-02 | 2018-03-02 | A kind of tubular type soil nailing and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108316297A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109056719A (en) * | 2018-08-09 | 2018-12-21 | 上海二十冶建设有限公司 | It is a kind of to pierce formula steel tube for soil-nail with drill bit conversion attachment device |
CN109252529A (en) * | 2018-11-12 | 2019-01-22 | 同济大学浙江学院 | A kind of end extension slip casting steel tube for soil-nail |
CN111173548A (en) * | 2020-01-20 | 2020-05-19 | 黑龙江工业学院 | A kind of elastic spiral anchoring type well roadway support method |
CN116905465A (en) * | 2023-07-25 | 2023-10-20 | 西南石油大学 | Bionical pipe is used in soil body solidification based on microorganism mineralization technique |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1380472A (en) * | 2002-05-23 | 2002-11-20 | 谭跃虎 | Composite soil nail support construction method and soil nail for support construction |
US20100166506A1 (en) * | 2003-12-18 | 2010-07-01 | R&B Leasing, Llc | Composite self-drilling soil nail and method |
CN203891018U (en) * | 2014-06-16 | 2014-10-22 | 谢时雳 | Self-drilling type drainage anchoring soil nail |
CN204418172U (en) * | 2015-01-06 | 2015-06-24 | 济南轨道交通集团有限公司 | The hollow soil nailing of precast prestressed concrete |
-
2018
- 2018-03-02 CN CN201810174260.9A patent/CN108316297A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1380472A (en) * | 2002-05-23 | 2002-11-20 | 谭跃虎 | Composite soil nail support construction method and soil nail for support construction |
US20100166506A1 (en) * | 2003-12-18 | 2010-07-01 | R&B Leasing, Llc | Composite self-drilling soil nail and method |
CN203891018U (en) * | 2014-06-16 | 2014-10-22 | 谢时雳 | Self-drilling type drainage anchoring soil nail |
CN204418172U (en) * | 2015-01-06 | 2015-06-24 | 济南轨道交通集团有限公司 | The hollow soil nailing of precast prestressed concrete |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109056719A (en) * | 2018-08-09 | 2018-12-21 | 上海二十冶建设有限公司 | It is a kind of to pierce formula steel tube for soil-nail with drill bit conversion attachment device |
CN109252529A (en) * | 2018-11-12 | 2019-01-22 | 同济大学浙江学院 | A kind of end extension slip casting steel tube for soil-nail |
CN109252529B (en) * | 2018-11-12 | 2023-11-28 | 同济大学浙江学院 | End extension grouting steel pipe soil nail |
CN111173548A (en) * | 2020-01-20 | 2020-05-19 | 黑龙江工业学院 | A kind of elastic spiral anchoring type well roadway support method |
CN116905465A (en) * | 2023-07-25 | 2023-10-20 | 西南石油大学 | Bionical pipe is used in soil body solidification based on microorganism mineralization technique |
CN116905465B (en) * | 2023-07-25 | 2024-02-09 | 西南石油大学 | Bionical pipe is used in soil body solidification based on microorganism mineralization technique |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7390144B2 (en) | Pre-cast/pre-stressed concrete and steel pile and method for installation | |
CN101906977B (en) | Method for preventing and treating large deformation and collapse of softrock tunnel | |
CN108316297A (en) | A kind of tubular type soil nailing and its construction method | |
CN107165652A (en) | A kind of tunnel monoblock type collapse after construction method | |
CN101812843B (en) | Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby | |
CN208136918U (en) | A kind of tubular type Soil-Nailing Wall Structure | |
CN114109442B (en) | Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method | |
CN111424669A (en) | Pile end grouting process and device of quick and recyclable grouting device | |
CN103089276A (en) | Deep-shallow hole and high-low pressure coupling grouting technology | |
CN105604065A (en) | Foundation fit support and peat-soil deep-foundation-pit-support high-pressure jet grouting anchoring method | |
CN103911993B (en) | A kind of PHA anchor pole and construction method thereof | |
CN108222022A (en) | A kind of tubular type Soil-Nailing Wall Structure and its construction method | |
CN108677959A (en) | A kind of grouting tube and grouting construction method suitable for mortar depositing construction under the conditions of limited space | |
CN201183950Y (en) | Self-propelling type anchor rod of seamless steel pipe | |
JP7292772B2 (en) | External expansion pipe construction method for drilling in the mining zone | |
CN201033872Y (en) | Slip casting type anchor bar | |
CN110777775A (en) | Foundation pit structure and construction method thereof | |
WO2022134224A1 (en) | Construction method for pre-stressed pull-resistant anchor rod of concrete expansion head | |
CN109854281A (en) | The method for protecting support of the lower rock compound cross-section stratum jacking construction of upper soil | |
CN206144587U (en) | Odd -shaped cross section cavity self -drilling stock | |
CN206256920U (en) | Deformed steel bar high-pressure slip casting stock | |
CN113931179A (en) | Anchor cable pore-forming and grouting construction method | |
CN208136912U (en) | A kind of small pre-stress pipe muscle formula soil nailing | |
CN208219640U (en) | A kind of tubular type soil nailing | |
CN204609814U (en) | A kind of deep thick alluvium bored shaft broken grouting orifice tube is anti-goes out device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180724 |