CN206916733U - The diaphram wall reserved grouting tubular construction of steel reinforcement cage - Google Patents

The diaphram wall reserved grouting tubular construction of steel reinforcement cage Download PDF

Info

Publication number
CN206916733U
CN206916733U CN201720891707.5U CN201720891707U CN206916733U CN 206916733 U CN206916733 U CN 206916733U CN 201720891707 U CN201720891707 U CN 201720891707U CN 206916733 U CN206916733 U CN 206916733U
Authority
CN
China
Prior art keywords
reinforcement cage
steel reinforcement
cylindrical portion
grout pipe
round platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720891707.5U
Other languages
Chinese (zh)
Inventor
罗海腾
黄茂兴
唐武兴
谢志杰
张润德
蔡凯祥
萧敏权
梁何龙
刘忠干
黄跃成
杨鹏尊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuan Tian Engineering Co Ltd Of Guangdong Province
Guangdong Yuantian Engineering Co Ltd
Original Assignee
Yuan Tian Engineering Co Ltd Of Guangdong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuan Tian Engineering Co Ltd Of Guangdong Province filed Critical Yuan Tian Engineering Co Ltd Of Guangdong Province
Priority to CN201720891707.5U priority Critical patent/CN206916733U/en
Application granted granted Critical
Publication of CN206916733U publication Critical patent/CN206916733U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model proposes a kind of diaphram wall reserved grouting tubular construction of steel reinforcement cage, it includes steel reinforcement cage and grout pipe, 2~3 grout pipes are longitudinally isometric to be connected in steel reinforcement cage, the lower end of the grout pipe has cylindrical portion and round platform portion successively, coaxially same footpath, length are 50~100mm to cylindrical portion with grout pipe, round platform portion and cylindrical portion are coaxial, and the length in round platform portion is 50~100mm, small end and the same footpath of cylindrical portion, taper 1:2~3, concrete chock plug fills up cylindrical portion and the round platform portion of grout pipe, the utility model is for carrying out the engineering that bottom uses high pressure jet grouting to form water-stop curtain during construction diaphram wall in layer deeper, it both can ensure that concrete did not entered in grout pipe during construction of diaphragm wall, it is again convenient after the completion of the construction of underground continuous wall body, grout pipe is run through to probing below wall body and irrigates grouting operation, improve rate of penetration and save the expense of drilled drawing-core, water-stop curtain construction speed is accelerated, improves excavation of foundation pit safety coefficient.

Description

The diaphram wall reserved grouting tubular construction of steel reinforcement cage
Technical field
It the utility model is related to the steel reinforcement cage of underground continuous wall construction technique, more particularly to diaphram wall.
Background technology
For complicated in engineering geology, solution cavity, fluid bowl, lapies development are irregular(Containing beading)And bury deeper stratum In carry out construction diaphram wall.Because engineering geological condition is complicated, solution cavity, fluid bowl, the uncertainty of lapies development, scar rise It is very big to lie prostrate drop, and diaphram wall toe of wall only needs to be embedded in certain rock stratum can meet deep pit monitor and force request, without complete Penetrate karst strata entirely.But it is limited by solution cavity, lapies, the uncertainty of fluid bowl development, diaphram wall(Or foundation ditch)Bottom is present Infiltration, water gushing channelway, underground continuous wall bottom perimeter can not form water-stop curtain, to solve ground-connecting-wall ground swell water, seepage problem, Ensure that effective water-stop curtain is formed on diaphram wall and its bottom, after construction of diaphragm wall according to grouting process and its Pressure carries out brill injected hole according to certain size again cloth hole and using engineering geological drilling rig, then using these injected holes to this Diaphram wall bottom, which carries out slip casting, makes to be formed effective water-stop curtain, and this kind of construction method duration is time-consuming long, efficiency is low, it is impossible to and Shi Jinhang grout sealings reach water-stagnating effect, while slip casting hole perpendicularity can not ensure, construction costs is high, to influence of foundation excavation Greatly.
In recent years, in the construction of diaphragm wall of water conservancy construction engineering, grouting tubular construction is reserved frequently with steel reinforcement cage, i.e., Diaphram wall uses reinforced concrete structure, and grout pipe is welded in steel reinforcement cage, steel reinforcement cage is buried in concrete during construction Interior, grout pipe runs through diaphragm wall from top to bottom, after the completion of construction of diaphragm wall, reserves grout pipe and is used as in diaphram wall in advance The injected hole of brill, then extended downwardly using engineering geological drilling rig along these injected holes and bore bottom injected hole.Utilize these injected holes Carrying out the slip casting of diaphram wall makes to form effective water-stop curtain.This construction method greatly reduces again cloth hole and bores slip casting The time and duration in hole take, it is ensured that and perpendicularity, the low engineering cost of injected hole are small to influence of foundation excavation.This method Endcapped processing is carried out to reserved grout pipe between construction of diaphragm wall, otherwise concrete is poured into grout pipe, is in the milk Pipe loses the effect for serving as injected hole.It is not ideal enough to the processing of grout pipe endcapped in the prior art, only with simple fiber Cloth wrapping is handled, often because endcapped is dealt with improperly(Or fiber cloth comes off or perforated)And grout pipe loses and serves as injected hole Effect.
Utility model content
The purpose of this utility model is to propose a kind of reserved grouting tubular construction of diaphram wall steel reinforcement cage, and it is by grout pipe End is closed with concrete chock plug, both can ensure that concrete did not entered in grout pipe during construction of diaphragm wall, and conveniently After the completion of the construction of underground continuous wall body, grout pipe is run through to probing below wall body and irrigates grouting operation.
The purpose of this utility model can be realized by following technical solution.
The diaphram wall reserved grouting tubular construction of steel reinforcement cage, includes steel reinforcement cage and grout pipe, steel reinforcement cage includes phase The longitudinal reinforcement and transverse steel to connect, 2~3 grout pipes are longitudinally isometric to be connected in steel reinforcement cage, under the grout pipe End has cylindrical portion and round platform portion successively, and coaxially same footpath, length are 50~100mm, round platform portion and circle to cylindrical portion with grout pipe Cylinder portion is coaxial, and the length in round platform portion is 50~100mm, small end and the same footpath of cylindrical portion, taper 1:2~3.
Prioritization scheme is:Concrete chock plug fills up cylindrical portion and the round platform portion of grout pipe, or prefabricated mortar internal model and mixed Coagulate cylindrical portion and round platform portion that native chock plug fills up grout pipe.
Further prioritization scheme is:The steel reinforcement cage used a phase groove section, the second stage of groove section respective side weldering of the steel reinforcement cage It is connected to I-shaped steel joint.
Compared with prior art, the utility model has the advantages that:
The utility model is irregular for solution cavity, fluid bowl, lapies development(Containing beading)And bury and enter in deeper stratum The engineering of water-stop curtain is formed using high pressure jet grouting on bottom during row construction diaphram wall, solves in the prior art to filling The problem of pipe end Seal treatment is not ideal enough is starched, it both can ensure that concrete did not entered grouting during construction of diaphragm wall In pipe, and conveniently after the completion of the construction of underground continuous wall body, grout pipe is run through to probing below wall body and irrigates grouting Operation, improves rate of penetration and has saved the expense of drilled drawing-core, accelerates water-stop curtain construction speed, improves excavation of foundation pit Safety coefficient.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is grout pipe structural representation of the present utility model.
Embodiment
With specific embodiment, the utility model is described in further detail below:
With reference to figure 1 and Fig. 2, a kind of diaphram wall reserved grouting tubular construction of steel reinforcement cage, include steel reinforcement cage and grouting Pipe 1,3,2 grout pipes 1 of longitudinal reinforcement 2 and transverse steel that steel reinforcement cage includes interconnection are spaced longitudinal direction and isometric are connected to steel In muscle cage, the interior diameter of the grout pipe 1 used in the present embodiment is 150mm, the coating steel pipe that wall thickness is 4.5mm.
The lower end of the grout pipe 1 has the cylindrical portion 10 that length is 75mm and the round platform portion that length is 75mm successively 11, the coaxial same footpath of cylindrical portion 10 and grout pipe 1, round platform portion 11 and cylindrical portion 10 are coaxial, and the length in round platform portion 11 is 75mm, small end With 10 same footpath of cylindrical portion, taper 1:2.5, i.e. the large port interior diameter in round platform portion is 180mm.
Prefabricated mortar internal model 13 and concrete chock plug 12 fill up cylindrical portion 10 and the round platform portion 11 of grout pipe 1, prefabricated mortar The thickness of internal model 13 is 25mm.
The present embodiment is the steel reinforcement cage that a phase groove section uses, and the second stage of groove section respective side of the steel reinforcement cage is welded with I-steel Joint 4(The steel reinforcement cage of the second stage of groove section does not have I-shaped steel joint).
First, after the completion of the diaphram wall of the second stage of groove section is all constructed using steel reinforcement cage of the present utility model, stop in construction Need only to drill underground continuous wall bottom during water curtain with lower part grout hole, effectively save drilled drawing-core quantities (Note:The general effective wall depth of ground-connecting-wall is 35~55m), improve rate of penetration and saved the expense of drilled drawing-core, add Fast sealing progress, accelerates excavation of foundation pit progress, improves excavation of foundation pit safety coefficient indirectly.

Claims (4)

1. the diaphram wall reserved grouting tubular construction of steel reinforcement cage, includes steel reinforcement cage and grout pipe(1), steel reinforcement cage includes phase The longitudinal reinforcement to connect(2)And transverse steel(3), 2~3 grout pipes(1)Longitudinal direction is isometric to be connected in steel reinforcement cage, its feature It is:The grout pipe(1)Lower end there is cylindrical portion successively(10)With round platform portion(11), cylindrical portion(10)With grout pipe (1)Coaxial same footpath, length are 50~100mm, round platform portion(11)With cylindrical portion(10)Coaxially, length be 50~100mm, small end with Cylindrical portion(10)Same footpath, taper 1:2~3.
2. the diaphram wall according to claim 1 reserved grouting tubular construction of steel reinforcement cage, it is characterised in that:Concrete plug Head(12)Fill up grout pipe(1)Cylindrical portion(10)With round platform portion(11).
3. the diaphram wall according to claim 1 reserved grouting tubular construction of steel reinforcement cage, it is characterised in that:Prefabricated mortar Internal model(13)With concrete chock plug(12)Fill up grout pipe(1)Cylindrical portion(10)With round platform portion(11).
4. the diaphram wall reserved grouting tubular construction of steel reinforcement cage according to claim 1 or 2 or 3, it is characterised in that:It is right The steel reinforcement cage that one phase groove section uses, the second stage of groove section respective side of the steel reinforcement cage are welded with I-shaped steel joint(4).
CN201720891707.5U 2017-07-21 2017-07-21 The diaphram wall reserved grouting tubular construction of steel reinforcement cage Active CN206916733U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720891707.5U CN206916733U (en) 2017-07-21 2017-07-21 The diaphram wall reserved grouting tubular construction of steel reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720891707.5U CN206916733U (en) 2017-07-21 2017-07-21 The diaphram wall reserved grouting tubular construction of steel reinforcement cage

Publications (1)

Publication Number Publication Date
CN206916733U true CN206916733U (en) 2018-01-23

Family

ID=61347777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720891707.5U Active CN206916733U (en) 2017-07-21 2017-07-21 The diaphram wall reserved grouting tubular construction of steel reinforcement cage

Country Status (1)

Country Link
CN (1) CN206916733U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112411557A (en) * 2020-09-21 2021-02-26 广东华隧建设集团股份有限公司 Underground continuous wall and micro-disturbance omnibearing jet grouting pile combined water stopping method
CN113653030A (en) * 2021-07-22 2021-11-16 中国建筑第八工程局有限公司 Construction method of underground continuous wall of ultra-low clearance and ultra-deep foundation pit under high-voltage line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112411557A (en) * 2020-09-21 2021-02-26 广东华隧建设集团股份有限公司 Underground continuous wall and micro-disturbance omnibearing jet grouting pile combined water stopping method
CN113653030A (en) * 2021-07-22 2021-11-16 中国建筑第八工程局有限公司 Construction method of underground continuous wall of ultra-low clearance and ultra-deep foundation pit under high-voltage line

Similar Documents

Publication Publication Date Title
CN204112308U (en) A kind of simple and easy sleeve valve grouting device based on bowlder stone, Thief zone coefficient stratum
CN102691296A (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN102296621B (en) Construction method of ground sectional water-stop curtain
CN108166483A (en) Bored pile construction method
CN208136918U (en) A kind of tubular type Soil-Nailing Wall Structure
CN103031847B (en) Reducing overlap joint combined type orifice pipe grouting method
CN206942786U (en) A kind of advanced pre-add fixing structure of high-moisture percentage loess tunnel
CN206916733U (en) The diaphram wall reserved grouting tubular construction of steel reinforcement cage
CN109487777A (en) A method of a reinforcing deep soft soil foundation of filling the span of a man's arms is formed using slip casing by pressure
CN202644538U (en) A grouting device used for a water-rich quicksand stratum
CN111364449A (en) Construction method and structure for penetrating karst cave of precast tubular pile
CN201826315U (en) Grouting sleeve valve pipe
CN107237339A (en) A kind of concrete cut increases leakage preventing structure and its construction method
CN102995647B (en) Underground water control method used for grouting and seepage insulation of pile hole
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
CN106759295A (en) The quiet combined pile and its construction method for boring extruding-enlarging branch tray and pile tube
CN203161250U (en) Deep hole grouting reinforcing system for tunnel
CN212052717U (en) Structure for penetrating karst cave of precast tubular pile
CN113266417A (en) Construction method of karst cave pile foundation
CN108222022A (en) A kind of tubular type Soil-Nailing Wall Structure and its construction method
CN106677190A (en) Grouting construction method for underwater pebble bed foundation pit curtain
CN106120714A (en) A kind of device improving hollow pile bearing capacity and using method thereof
CN110630273A (en) Construction method of totally weathered granite ground layer bias shallow tunnel
CN215718763U (en) Shield constructs end reinforced structure
CN205713982U (en) A kind of pile foundation construction drilling equipment being applicable to karst area

Legal Events

Date Code Title Description
GR01 Patent grant