CN108316142A - A kind of paving structure and method of Steel Bridge - Google Patents

A kind of paving structure and method of Steel Bridge Download PDF

Info

Publication number
CN108316142A
CN108316142A CN201810125764.1A CN201810125764A CN108316142A CN 108316142 A CN108316142 A CN 108316142A CN 201810125764 A CN201810125764 A CN 201810125764A CN 108316142 A CN108316142 A CN 108316142A
Authority
CN
China
Prior art keywords
epoxy adhesive
component
parts
bituminous
steel bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810125764.1A
Other languages
Chinese (zh)
Other versions
CN108316142B (en
Inventor
李纪芳
郑伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Jifang
Wang Guojun
Zheng Wei
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810125764.1A priority Critical patent/CN108316142B/en
Publication of CN108316142A publication Critical patent/CN108316142A/en
Application granted granted Critical
Publication of CN108316142B publication Critical patent/CN108316142B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B26/00Compositions of mortars, concrete or artificial stone, containing only organic binders, e.g. polymer or resin concrete
    • C04B26/02Macromolecular compounds
    • C04B26/26Bituminous materials, e.g. tar, pitch
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Road Paving Structures (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The paving structure of Steel Bridge provided by the invention includes epoxy adhesive metalling, bituminous concrete adhesive layer and bitumastic concrete layer successively from top to bottom, the epoxy adhesive of the epoxy adhesive metalling has higher high temperature cohesive strength, flexibility and extensibility, high strength bond can be realized with Steel Bridge, there is non-sagging performance simultaneously, ensure big longitudinal slope minor radius Steel Bridge during pavement construction, adhesive will not trickle, the uniformity for ensureing epoxy adhesive metalling, improves the quality of bridge floor;The bituminous epoxy adhesive of the bituminous concrete adhesive layer has the characteristics that high bond strength, high tenacity and good endurance life, bituminous epoxy adhesive and gather materials can secure bond, prevent the transmission of interlayer heat, convenience provided for subsequent construction;The bitumastic concrete surface roughness is high, traffic safety;Steel bridge deck paving structure security performance provided by the invention is high, economic and environment-friendly, durable.

Description

A kind of paving structure and method of Steel Bridge
Technical field
The invention belongs to the construction fields of road and bridge, and in particular to a kind of paving structure and method of Steel Bridge.
Background technology
So far, China only has the research of paving steel bridge deck the history of more than ten years.Initially, the concrete such as highway Double-layer asphalt matizhi concrete (SMA) mixture that road surface generally uses is applied to mating formation for steel bridge.Due to Steel Bridge Deck Characteristic understanding is insufficient, and it is more serious that paving mix making causes the deck paving of early stage to damage, such as Bridge of Xiling Yangtze River Bridge, the Humen Bridge.Cast-type and U.S.'s epoxy asphalt pavement technology have then been introduced, has been applied widely, is still continuing to use so far.However Due to being not suitable with the special circumstances such as China's high temperature heavy load, both methods also has respective problem, as Jiangyin Bridge (pours for 1999 Note formula) and Baishazhou bridge (U.S.'s epoxy in 2009), all there are the harm such as passage crack in road surface soon after being open to traffic.
During deeply putting into practice above-mentioned three kinds of schemes with studying, domestic professional person has found the double-deck SMA mixing Material can not be successfully applied to the basic reason of China's Steel Bridge Deck, i.e.,:Interfacial structure material cannot be satisfied requirement of mating formation.It is specific and Speech, the boundary material that Steel Bridge Deck that SMA mats formation uses are composite modified high-viscosity asphalts, it, which is coated on steel plate, makes its will SMA bonds the common stress of one with steel plate.However, this modified high-viscosity asphalt binder is with steel plate temperature to the cohesive force of steel plate The raising of degree and reduce rapidly.When steel billet temperature reaches 60 DEG C, only has 0.2MPa or so to the cohesive force of steel plate, drawing is cut Stress is then lower, cannot be satisfied bonding naturally and requires.Then, just generate slide displacement on the steel plate for SMA layers, occur pushing away gather around it is convex Packet, tail portion then generates wider selenodont crack.Once crack generates, since the immersion of road table water further weakens interface remnants Cohesive force, SMA sliding it is more serious, can not check.Then SMA mats formation just by comprehensive destruction.
The major advantage of U.S.'s epoxy asphalt pavement system:Intensity of mating formation is high, good integrity, when high temperature anti-creeping and permanent Deformability is strong.Low-temperature cracking-resistance is good, antifatigue, chemically resistant material corrodes.Major defect:Cost is high, and difficulty of construction is big.To applying Work environmental requirement is harsh.Construction control is not sternly the main reason for being damaged of mating formation.It is big that difficulty is repaired after damage, is not had also at present Have and occurs the restorative procedure after damage for bituminous epoxy.In addition, U.S.'s bituminous epoxy does not adapt to big longitudinal slope, minor radius steel bridge The requirement of mating formation in face.
Britain's cast asphalt pavement technique advantage is very prominent.Porosity is bordering on zero, has good water-proof anti-aging Energy.Cracking resistance is strong, good to steel plate following.The disadvantage is that:Poor high temperature stability easily forms track.Construction needs a series of Special equipment, construction organization it is complex.Mixture temperature can not be ignored Bridge Influence up to 240 DEG C or more when construction.It is suitable The property used:This pavement technique is suitable for the less high countries and regions of summer temp.Such as moral, U.S., some countries of Northern Europe.
To sum up, it needs to develop a kind of steel deck paving package material, the special national conditions of China's high temperature heavy load can be met and keeps away Exempt from the shortcomings that both the above is introduced technology.
Invention content
Had enough using section in order to solve the above technical problems, the present invention provides a kind of temperature in steel bridge deck pavement Cohesive force and shear resistance, realize pavement material and steel plate tight bond paving structure.
The object of the present invention is to provide a kind of paving structures of Steel Bridge.
It is a further object of the present invention to provide a kind of method for paving of Steel Bridge.
It is not strong in order to solve cohesive force existing for superstructure, the technical barrier of high temperature heavy load, this hair cannot be born Bright to provide a kind of paving structure of Steel Bridge, the structure includes successively from top to bottom:Epoxy adhesive metalling, pitch are mixed Solidifying soil adhesive layer and bitumastic concrete layer;
The epoxy adhesive metalling includes epoxy adhesive and rubble;
The epoxy adhesive includes first component and second component, and the weight ratio of the first component and second component is:1.5- 1.8:1;The first component includes the component of following parts by weight:75-95 parts of bisphenol A type epoxy resin, 2-3 parts of KH560, gas phase 0-3 parts of silica, modified hydrogenated castor oil 0-3 parts;The second component includes the component of following parts by weight:Toughener 30-60 Part, 30-50 parts of curing agent, 4-7 parts of dyestuff, 5-6 parts of DMP-30;
The bituminous concrete adhesive layer includes bituminous epoxy adhesive and gather materials;
The bituminous epoxy adhesive includes the third component and B-B fraction, and the weight ratio of third component and B-B fraction is 1:1- 1.5, third component includes the component of following parts by weight:75-80 parts of bisphenol A type epoxy resin, trimethylolpropane tris shrink 12-16 parts of glycerin ether, 3-4 parts of KH560;B-B fraction includes the component of following parts by weight:37-43 parts of pitch, toughener 20-40 Part, 12-32 parts of curing agent, 5-9 parts of DMP-30.
Epoxy adhesive provided by the invention includes first component and second component, and bituminous epoxy adhesive includes the third component and fourth Component, both adhesives have good viscosity and mechanical property, test its pull strength by GB/T5210, pass through GB/T 7124 test its tensile-sbear strength, and testing it by finger dry method refers to the dry time, its fracture strength and fracture are tested by GB/T 528 Elongation observes its viscosity by range estimation, and the result is shown in Tables 1 and 2s.
Preferably, the toughener in second component and B-B fraction is strange scholar QS-030N toughener.Usually in asphalt mixtures modified by epoxy resin The toughener used in fat is mostly the rubbers such as carboxyl liquid nitrile rubber, carboxyl-terminated liguid nitrile rubber, polysulfide rubber, and this The QS-030N toughener that invention provides is a kind of pale-coloured low viscosity liquid, can be entered inside epoxy molecule, by flexible chain Section is introduced into epoxy resin, improves the fracture toughness of epoxy resin.
Preferably, the usage amount of the epoxy adhesive is 0.9-1.1kg/m2
Preferably, the rubble is basalt and/or diabase, and the grain size of the rubble is 3-5mm, and the rubble makes Dosage is 3.5-4kg/m2, the laying area of the rubble is 85% or more of epoxy adhesive coated area.Due to constructing Epoxy adhesive needs to coat entire Steel Bridge in the process, therefore the laying area of the rubble is epoxy adhesive coated side Long-pending 85% or more.
Preferably, the bituminous epoxy adhesive and the weight ratio gathered materials are 9-10:100.
Preferably, the usage amount of the bituminous epoxy adhesive is 0.4-0.6kg/m2
Preferably, the second component further includes 4-7 parts of dyestuff.
Preferably, the curing agent in the second component and B-B fraction is modified alicyclic ring amine hardener, modified aromatic amine curing One kind in agent and phenolic aldehyde amine curing agent.
The present invention provides a kind of method for paving of Steel Bridge, includes the following steps:
(1) first component and second component are weighed, is proportionally uniformly mixed, the epoxy adhesive is obtained;
(2) epoxy adhesive is coated on Steel Bridge, then rubble is uniformly laid on the epoxy adhesive, Solidification, obtains epoxy adhesive metalling;
(3) the third component and B-B fraction are weighed, is proportionally uniformly mixed, the bituminous epoxy adhesive is obtained;
(4) by bituminous epoxy adhesive that step (3) obtains with it is described gather materials be uniformly mixed, be then laid on step (2) On obtained epoxy adhesive metalling, solidification forms bituminous concrete adhesive layer;
(5) it is laid with bitumastic concrete layer on the bituminous concrete adhesive layer that step (4) obtains, forms steel bridge bridge Face.
Preferably, in step (2), the coated weight of the epoxy adhesive is 0.9-1.1kg/m2, the laying of the rubble Area is 85% or more of steel bridge area.
Preferably, in step (4), the thickness of the bituminous concrete adhesive layer of formation is 20-30mm.
Preferably, in step (5), the thickness of the bitumastic concrete layer of formation is 30-40mm.
Beneficial effects of the present invention are:
The paving structure of Steel Bridge provided by the invention is mixed including epoxy adhesive metalling, pitch successively from top to bottom Solidifying soil adhesive layer and bitumastic concrete layer, the epoxy adhesive metalling include epoxy adhesive and rubble, epoxy Adhesive has higher adhesion strength and high temperature cohesive strength and flexibility and extensibility, can be real between Steel Bridge Existing high strength bond, while there is non-sagging performance, ensure big longitudinal slope minor radius Steel Bridge during pavement construction, gluing Agent will not trickle, and ensure the uniformity of epoxy adhesive metalling, reduce difficulty of construction, improve the matter of construction efficiency and bridge floor Amount;The bituminous concrete adhesive layer includes bituminous epoxy adhesive and gathers materials, and the bituminous epoxy adhesive is by various ingredients Composition, has the characteristics that higher adhesion strength, high tenacity and good endurance life, after normal temperature cure, bituminous epoxy Adhesive can prevent the transmission of interlayer heat with secure bond of gathering materials, and be provided conveniently for subsequent construction;The bitumastic Concrete layer is functional layer, has the characteristics of surface roughness is high, traffic safety;Steel bridge deck paving structure provided by the invention Security performance is high, economic and environment-friendly, durable practicality.
One, epoxy adhesive metalling
Epoxy adhesive provided by the invention has high bond strength, and high temperature cohesive strength is big, and flexibility and extensibility are good It is good, and epoxy adhesive provided by the invention has the characteristics that non-sagging performance and economic and environment-friendly.
1) high bond strength of epoxy adhesive and steel plate, excellent flexibility and non-sagging performance, normal temperature cure are relied on Rubble forms coarse waterproof, anti-corrosion antiskid layer with adhesive, adhesive and steel plate secure bond afterwards, to realize steel bridge paving Fill waterproof and the anti-shearing resistance sliding at interface;
2) high temperature cohesive strength for relying on epoxy adhesive is big, wherein at 70 DEG C, tests its shearing strength and reaches 5.32MPa ensure that adhesive metalling has enough bondings and shear resistance in the temperature in use section that steel plate surface is mated formation;
3) the good flexibility of epoxy adhesive and elongation percentage are relied on, wherein its fracture elongation reaches 22.14%, ensures Adhesive metalling disclosure satisfy that the needs of steel bridge deformation;
4) the non-sagging performance for relying on epoxy adhesive, when ensure that big longitudinal slope minor radius paving steel bridge deck construction, gluing Agent will not trickle, and to ensure that the uniformity after the solidification of epoxy adhesive metalling, and then ensure that epoxy adhesive rubble The performance of layer.
5) raw material of epoxy adhesive all domesticize, and supply is reliable, environmental-friendly, comprehensive cost economy.
Two, asphalt concrete layer
Bituminous concrete adhesive layer provided by the invention includes bituminous epoxy adhesive and gathers materials, the bituminous epoxy gluing Agent has the advantages that high bond strength, high tenacity, endurance.
1) high bond strength of dependence bituminous epoxy adhesive, high tenacity, fatigue proof feature, epoxy drips after normal temperature cure Green adhesive and bonding securely of gathering materials form united layer, and united layer prevents the transmission of heat, protects in the construction process Epoxy adhesive metalling is not influenced by SMA construction temperatures, reduces the unfavorable factors such as water, air, temperature in use Damage to epoxy adhesive metalling;
2) bituminous epoxy adhesive and rubble raised on epoxy adhesive metalling are used in bituminous concrete adhesive layer Primary load bearing layer is collectively formed, as steel in epoxy adhesive metalling and bituminous concrete adhesive layer tight bond by collective effect The structure function layer of deck paving, there is longer service life and service life, when the use functional layer on road surface is used through certain After the time limit is impaired, SMA layers can be only replaced, which forms cost relative moderate, performance is good, comparative lifetime is long and ties up Repair convenient paving steel bridge deck;
3) finger for relying on bituminous epoxy adhesive is done and hardening time can be changed by being formulated fine tuning so that bituminous epoxy glue Glutinous agent concrete layer is adapted to the needs of different zones Various Seasonal paving steel bridge deck construction;
4) it relies on the normal temperature cure of bituminous epoxy adhesive, there is no particular/special requirement to construction environment and technique, thus need not be special Different construction equipment can carry out mix by the method for asphalt concrete and pave and roller compaction construction.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Obtain other attached drawings according to these attached drawings.
Fig. 1 is the relative position of loading wheel and face of mating formation.
Wherein, 1, epoxy adhesive metalling;2, bituminous concrete adhesive layer;3, bitumastic concrete layer;4, steel Bridge.
Specific implementation mode
To make the object, technical solutions and advantages of the present invention clearer, technical scheme of the present invention will be carried out below Detailed description.Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Base Embodiment in the present invention, those of ordinary skill in the art are obtained all without making creative work Other embodiment belongs to the range that the present invention is protected.
Embodiment 1
The paving structure of Steel Bridge, the structure include successively from top to bottom:Epoxy adhesive metalling 1, pitch are mixed Solidifying soil adhesive layer 2 and bitumastic concrete layer 3;
The epoxy adhesive metalling 1 is made of epoxy adhesive and rubble, and the usage amount of the epoxy adhesive is 0.9kg/m2, the rubble is basalt, and the grain size of the rubble is 3-5mm, and the usage amount of the rubble is 3.5kg/m2, institute That states rubble is laid with area as the 85% of epoxy adhesive coated area;
The epoxy adhesive includes first component and second component, and the weight ratio of the first component and second component is:1.8:1; The first component includes the component of following parts by weight:75 parts of bisphenol A type epoxy resin, 3 parts of KH560,2 parts of aerosil, 3 parts of modified hydrogenated castor oil;The second component includes the component of following parts by weight:Strange 42 parts of scholar QS-030N toughener, modified virtue 35 parts of fragrant amine hardener, 6 parts, DMP-305 parts of dyestuff;
The bituminous concrete adhesive layer 2 is made of bituminous epoxy adhesive with gathering materials, the bituminous epoxy adhesive with The weight ratio gathered materials is 9:100, the usage amount of the bituminous epoxy adhesive is 0.4kg/m2
The bituminous epoxy adhesive includes the third component and B-B fraction, and the weight ratio of third component and B-B fraction is 1:1, Third component includes the component of following parts by weight:80 parts of bisphenol A type epoxy resin, trihydroxymethylpropanyltri diglycidyl ether 16 Part, 4 parts of KH560;B-B fraction includes the component of following parts by weight:43 parts of pitch, strange 20 parts of scholar QS-030N toughener, modified virtue 32 parts of fragrant amine hardener, 5 parts of DMP-30.
The method for paving of above-mentioned Steel Bridge, includes the following steps:
(1) first component and second component are weighed, is proportionally uniformly mixed, the epoxy adhesive is obtained;
(2) epoxy adhesive is coated on Steel Bridge, then rubble is uniformly laid on the epoxy adhesive, Solidification, obtains epoxy adhesive metalling 1;
(3) the third component and B-B fraction are weighed, is proportionally uniformly mixed, the bituminous epoxy adhesive is obtained;
(4) by bituminous epoxy adhesive that step (3) obtains with it is described gather materials be uniformly mixed, be then laid on step (2) On obtained epoxy adhesive metalling 1, solidification forms bituminous concrete adhesive layer 2, the bituminous concrete adhesive layer 2 Thickness is 20mm;
(5) bitumastic concrete layer 3, the pitch are laid on the bituminous concrete adhesive layer 2 that step (4) obtains The thickness of matizhi concrete layer 3 is 30mm, forms Steel Bridge.
Embodiment 2
The paving structure of Steel Bridge, the structure include successively from top to bottom:Epoxy adhesive metalling 1, pitch are mixed Solidifying soil adhesive layer 2 and bitumastic concrete layer 3;
The epoxy adhesive metalling 1 is made of epoxy adhesive and rubble, and the usage amount of the epoxy adhesive is 1.1kg/m2, the rubble is diabase, and the grain size of the rubble is 3-5mm, and the usage amount of the rubble is 4kg/m2, described Rubble is laid with area as the 90% of epoxy adhesive coated area;
The epoxy adhesive includes first component and second component, and the weight ratio of the first component and second component is:1.5:1; The first component includes the component of following parts by weight:86 parts of bisphenol A type epoxy resin, 2 parts of KH560,3 parts of aerosil; The second component includes the component of following parts by weight:Strange 30 parts of scholar QS-030N toughener, modified 50 parts of alicyclic ring amine hardener, dye 4 parts of material, 5 parts of DMP-30;
The bituminous concrete adhesive layer 2 is made of bituminous epoxy adhesive with gathering materials, the bituminous epoxy adhesive with The weight ratio gathered materials is 10:100, the usage amount of the bituminous epoxy adhesive is 0.6kg/m2
The bituminous epoxy adhesive includes the third component and B-B fraction, and the weight ratio of third component and B-B fraction is 1: 1.5, third component includes the component of following parts by weight:75 parts of bisphenol A type epoxy resin, trimethylolpropane tris glycidol 12 parts of ether, 3 parts of KH560;B-B fraction includes the component of following parts by weight:37 parts of pitch, strange 25.5 parts of scholar QS-030N toughener, Modified 28.5 parts, DMP-309 parts of alicyclic ring amine hardener.
The method for paving of above-mentioned Steel Bridge, includes the following steps:
(1) first component and second component are weighed, is proportionally uniformly mixed, the epoxy adhesive is obtained;
(2) epoxy adhesive is coated on Steel Bridge, then rubble is uniformly laid on the epoxy adhesive, Solidification, obtains epoxy adhesive metalling 1;
(3) the third component and B-B fraction are weighed, is proportionally uniformly mixed, the bituminous epoxy adhesive is obtained;
(4) by bituminous epoxy adhesive that step (3) obtains with it is described gather materials be uniformly mixed, be then laid on step (2) On obtained epoxy adhesive metalling 1, solidification forms bituminous concrete adhesive layer 2, the bituminous concrete adhesive layer 2 Thickness is 30mm;
(5) bitumastic concrete layer 3, the pitch are laid on the bituminous concrete adhesive layer 2 that step (4) obtains The thickness of matizhi concrete layer 3 is 40mm, forms Steel Bridge.
Embodiment 3
The paving structure of Steel Bridge, the structure include successively from top to bottom:Epoxy adhesive metalling 1, pitch are mixed Solidifying soil adhesive layer 2 and bitumastic concrete layer 3;
The epoxy adhesive metalling 1 is made of epoxy adhesive and rubble, and the usage amount of the epoxy adhesive is 1.0kg/m2, the rubble is basalt and diabase, and the grain size of the rubble is 3-5mm, and the usage amount of the rubble is 3.9kg/m2, the laying area of the rubble is the 92% of epoxy adhesive coated area;
The epoxy adhesive includes first component and second component, and the weight ratio of the first component and second component is:1.7:1; The first component includes the component of following parts by weight:95 parts of bisphenol A type epoxy resin, 3 parts of KH560;The second component include with The component of lower parts by weight:Strange 60 parts of scholar QS-030N toughener, 30 parts of phenolic aldehyde amine curing agent, 7 parts of dyestuff, 6 parts of DMP-30;
The bituminous concrete adhesive layer 2 is made of bituminous epoxy adhesive with gathering materials, the bituminous epoxy adhesive with The weight ratio gathered materials is 10:100, the usage amount of the bituminous epoxy adhesive is 0.5kg/m2
The bituminous epoxy adhesive includes the third component and B-B fraction, and the weight ratio of third component and B-B fraction is 1: 1.2, third component includes the component of following parts by weight:80 parts of bisphenol A type epoxy resin, trimethylolpropane tris glycidol 16 parts of ether, 4 parts of KH560;B-B fraction includes the component of following parts by weight:41 parts of pitch, strange 40 parts of scholar QS-030N toughener, phenol 12 parts of aldehyde amines curing agent, 6 parts of DMP-30.
The method for paving of above-mentioned Steel Bridge, includes the following steps:
(1) first component and second component are weighed, is proportionally uniformly mixed, the epoxy adhesive is obtained;
(2) epoxy adhesive is coated on Steel Bridge, then rubble is uniformly laid on the epoxy adhesive, Solidification, obtains epoxy adhesive metalling 1;
(3) the third component and B-B fraction are weighed, is proportionally uniformly mixed, the bituminous epoxy adhesive is obtained;
(4) by bituminous epoxy adhesive that step (3) obtains with it is described gather materials be uniformly mixed, be then laid on step (2) On obtained epoxy adhesive metalling 1, solidification forms bituminous concrete adhesive layer 2, the bituminous concrete adhesive layer 2 Thickness is 25mm;
(5) bitumastic concrete layer 3, the pitch are laid on the bituminous concrete adhesive layer 2 that step (4) obtains The thickness of matizhi concrete layer 3 is 35mm, forms Steel Bridge.
Test example
Using paving structure provided by the invention:Epoxy adhesive metalling+2.5cm bituminous concrete adhesive layers+3.5cm + 2.5 pouring type of bitumastic concrete layer (SMA) (hereinafter referred to as test group) and use Britain ELIMINATOR waterproof systems Bituminous concrete+3.5cmSMA structures (hereinafter referred to as contrast groups), to the especially big Steel Bridge in the corniche road Liaohe River of mating formation.Utilize acceleration Load test detects two kinds of paving structures, the strength retrogression of bridge floor, fatigue rupture.
Accelerating and loading test scheme is shown in Table 3, and the depth calculations of main load phase track are shown in Table 4, loading wheel and paving The relative position in dress face is shown in Fig. 1.
1 epoxy adhesive performance of table
The performance of 2 bituminous epoxy adhesive of table
Epoxy adhesive and bituminous epoxy adhesive provided by the invention is can be seen that for steel from the result of Tables 1 and 2 The deck structure that bridge deck paving is formed has higher pull strength, tensile-sbear strength and fracture strength.Wherein epoxy adhesive 5.32MPa can be reached in 70 DEG C of pull strengths, tensile-sbear strength can reach 3.31MPa;Exist in 25 DEG C of pull strengths 11.26MPa can be reached, tensile-sbear strength can reach 12.24MPa can reach 9.34MPa, fracture strength;Bituminous epoxy Adhesive can reach 12.24MPa in 25 DEG C of fracture strength, far above the index of the technology requirement of national standard.
3 accelerating and loading test scheme of table
4 main load phase rutting depth result of calculation of table
From the results shown in Table 4, the paving structure of Steel Bridge provided by the invention is accelerating to add by 2,900,000 times After carrying experiment, the depth of net track is 16.6mm, and uses the paving structure of contrast groups, is saying 2,900,000 accelerated loadings After experiment, the depth of net track is 20mm, and in the test result of different load numbers, the rutting depth of test group is all Depth than the track of control group is small, this illustrates that steel bridge deck paving structure provided by the invention has good intensity and resistance to Fatigue rupture intensity.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (10)

1. a kind of paving structure of Steel Bridge, which is characterized in that the structure includes successively from top to bottom:Epoxy adhesive is broken Rock layers, bituminous concrete adhesive layer and bitumastic concrete layer;
The epoxy adhesive metalling includes epoxy adhesive and rubble;
The epoxy adhesive includes first component and second component, and the weight ratio of the first component and second component is:1.5-1.8:1; The first component includes the component of following parts by weight:75-95 parts of bisphenol A type epoxy resin, 2-3 parts of KH560, gas phase titanium dioxide 0-3 parts of silicon, modified hydrogenated castor oil 0-3 parts;The second component includes the component of following parts by weight:30-60 parts of toughener, solidification 30-50 parts of agent, 5-6 parts of DMP-30;
The bituminous concrete adhesive layer includes bituminous epoxy adhesive and gathers materials;
The bituminous epoxy adhesive includes the third component and B-B fraction, and the weight ratio of third component and B-B fraction is 1:1-1.5 Third component includes the component of following parts by weight:75-80 parts of bisphenol A type epoxy resin, trimethylolpropane tris glycidol 12-16 parts of ether, 3-4 parts of KH560;B-B fraction includes the component of following parts by weight:37-43 parts of pitch, 20-40 parts of toughener, Gu 12-32 parts of agent, 5-9 parts of DMP-30.
2. the paving structure of Steel Bridge according to claim 1, which is characterized in that the usage amount of the epoxy adhesive For 0.9-1.1kg/m2
3. the paving structure of Steel Bridge according to claim 1, which is characterized in that the rubble be basalt and/or The grain size of diabase, the rubble is 3-5mm, and the usage amount of the rubble is 3.5-4kg/m2, the laying area of the rubble It is 85% or more of epoxy adhesive coated area.
4. the paving structure of Steel Bridge according to claim 1, which is characterized in that the bituminous epoxy adhesive and institute It is 9-10 to state the weight ratio gathered materials:100.
5. the paving structure of Steel Bridge according to claim 1, which is characterized in that the bituminous epoxy adhesive makes Dosage is 0.4-0.6kg/m2
6. the paving structure of Steel Bridge according to claim 1, which is characterized in that the second component further includes dyestuff 4- 7 parts.
7. the paving structure of Steel Bridge according to claim 1, which is characterized in that in the second component and B-B fraction Curing agent is one kind in modified alicyclic ring amine hardener, curing agent and phenolic aldehyde amine curing agent.
8. the method for paving of the paving structure of any Steel Bridges of claim 1-7, which is characterized in that including following step Suddenly:
(1) first component and second component are weighed, is proportionally uniformly mixed, the epoxy adhesive is obtained;
(2) epoxy adhesive is coated on Steel Bridge, then rubble is uniformly laid on the epoxy adhesive, Gu Change, obtains epoxy adhesive metalling;
(3) the third component and B-B fraction are weighed, is proportionally uniformly mixed, the bituminous epoxy adhesive is obtained;
(4) by bituminous epoxy adhesive that step (3) obtains with it is described gather materials be uniformly mixed, be then laid on step (2) and obtain Epoxy adhesive metalling on, solidification, formed bituminous concrete adhesive layer;
(5) it is laid with bitumastic concrete layer on the bituminous concrete adhesive layer that step (4) obtains, forms Steel Bridge.
9. the method for paving of the paving structure of Steel Bridge according to claim 8, which is characterized in that in step (2), institute The coated weight for stating epoxy adhesive is 0.9-1.1kg/m2, the area that is laid with of the rubble is epoxy adhesive coated area 85% or more.
10. the method for paving of the paving structure of Steel Bridge according to claim 8, which is characterized in that in step (4), The thickness of the bituminous concrete adhesive layer of formation is 20-30mm.
CN201810125764.1A 2018-02-06 2018-02-06 A kind of paving structure and method of Steel Bridge Active CN108316142B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810125764.1A CN108316142B (en) 2018-02-06 2018-02-06 A kind of paving structure and method of Steel Bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810125764.1A CN108316142B (en) 2018-02-06 2018-02-06 A kind of paving structure and method of Steel Bridge

Publications (2)

Publication Number Publication Date
CN108316142A true CN108316142A (en) 2018-07-24
CN108316142B CN108316142B (en) 2019-05-31

Family

ID=62903005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810125764.1A Active CN108316142B (en) 2018-02-06 2018-02-06 A kind of paving structure and method of Steel Bridge

Country Status (1)

Country Link
CN (1) CN108316142B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030761A (en) * 2020-09-01 2020-12-04 浙江世润建创科技发展有限公司 Steel bridge full-section cleaning, paint spraying and stone scattering assembly and disassembly integrated machine and use method thereof
CN113250078A (en) * 2021-04-20 2021-08-13 东南大学 Flexible waterproof protection structure for railway steel bridge deck and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203546588U (en) * 2013-10-23 2014-04-16 张锡祥 FES (FRP (Fiber Reinforced Polymer)-EBM (Epoxy Bond Metal)-SMA (Stone Matrix Asphalt)) steel bridge floor pavement structure
KR20140050824A (en) * 2012-10-22 2014-04-30 주식회사한수나텍 Binder composition for repairing asphalt pavement and repairing composition containing therof
KR101438499B1 (en) * 2014-02-11 2014-09-12 (주)대한하이텍건설 Eco-Friendly Ascon Composition for Paving Bridge Using Seaweeds and Constructing Methods Using Thereof
CN204212056U (en) * 2014-11-14 2015-03-18 任丘市永基建筑安装工程有限公司 A kind of can the bridge deck pavement structure of draining
CN105401519A (en) * 2015-12-17 2016-03-16 中北大学 Anti-knocking steel box beam bridge deck paving structure and paving method
CN205999737U (en) * 2016-08-31 2017-03-08 龙建路桥股份有限公司 Deck installation structure
CN106495563A (en) * 2016-10-19 2017-03-15 山西省交通科学研究院 A kind of environmental protection freeze-thawing resistant type porous pavement pavement material and preparation method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140050824A (en) * 2012-10-22 2014-04-30 주식회사한수나텍 Binder composition for repairing asphalt pavement and repairing composition containing therof
CN203546588U (en) * 2013-10-23 2014-04-16 张锡祥 FES (FRP (Fiber Reinforced Polymer)-EBM (Epoxy Bond Metal)-SMA (Stone Matrix Asphalt)) steel bridge floor pavement structure
KR101438499B1 (en) * 2014-02-11 2014-09-12 (주)대한하이텍건설 Eco-Friendly Ascon Composition for Paving Bridge Using Seaweeds and Constructing Methods Using Thereof
CN204212056U (en) * 2014-11-14 2015-03-18 任丘市永基建筑安装工程有限公司 A kind of can the bridge deck pavement structure of draining
CN105401519A (en) * 2015-12-17 2016-03-16 中北大学 Anti-knocking steel box beam bridge deck paving structure and paving method
CN205999737U (en) * 2016-08-31 2017-03-08 龙建路桥股份有限公司 Deck installation structure
CN106495563A (en) * 2016-10-19 2017-03-15 山西省交通科学研究院 A kind of environmental protection freeze-thawing resistant type porous pavement pavement material and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030761A (en) * 2020-09-01 2020-12-04 浙江世润建创科技发展有限公司 Steel bridge full-section cleaning, paint spraying and stone scattering assembly and disassembly integrated machine and use method thereof
CN113250078A (en) * 2021-04-20 2021-08-13 东南大学 Flexible waterproof protection structure for railway steel bridge deck and construction method thereof

Also Published As

Publication number Publication date
CN108316142B (en) 2019-05-31

Similar Documents

Publication Publication Date Title
Lu et al. Alternate uses of epoxy asphalt on bridge decks and roadways
CN105884253B (en) The polymer mortar of Rapid-Repair and application
CN107299576A (en) The low noise skid resistance layer and construction method of a kind of cement pavement
CN101921566B (en) Structural adhesive for steel bonding
KR100889041B1 (en) Binder Composition, Primer Composition and Skid-proof Mixture for Road Pavement
CN103964751B (en) A kind of epoxy resin mortar bridge floor thin layer pavement material and construction method thereof
CN101235209A (en) Asphalt pavement conditioning curing agent and preparation method thereof
CN204370308U (en) The ultra-thin composite paved Rotating fields of a kind of Steel Bridge Deck polymer
CN102910862A (en) High-elasticity epoxy asphalt mortar and preparation method
CN108316142B (en) A kind of paving structure and method of Steel Bridge
CN102219441A (en) Wear-resistant, noise-reduction and heat-insulation epoxy resin emulsified asphalt mortar coating
CN109594471B (en) Paving structure of steel bridge deck and construction method thereof
KR101442156B1 (en) A Asphalt sealant composition, preparing method for thereof and repairing method of road
CN109797647A (en) A kind of composite modified asphalt bridge deck water-proof tack coat
CN102827572A (en) Rubber and plastic waterproof bonding modification asphalt mastic and preparation method of rubber and plastic waterproof bonding modification asphalt mastic
CN101798494A (en) Normal-temperature curing epoxy waterproof adhesive of bridge deck
KR102425136B1 (en) Epoxy binder composition having slip-resistance and method for repairing pavement of deteriorated concrete road using the binder composition
CN100451237C (en) Material for waterproof bridge surface system and its paving process
CN103774553A (en) Steel bridge deck paving structure and construction method thereof
JP5323980B1 (en) Waterproof structure of road bridge deck
CN109457610A (en) A kind of paving structure and construction method for Orthotropic Steel Bridge Deck reinforcement
KR102653648B1 (en) Construction method for thin layer overlaying pavement using a high functional resin composition having excellent crack resistance
CN108330765A (en) A kind of large and medium-sized bridge floor asphalt pavement structure of highway
CN210104563U (en) Pavement structure of steel bridge deck
CN106995302A (en) A kind of high-performance compound and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200622

Address after: 110000 No. 1 Herong Road, Sujiatun District, Shenyang City, Liaoning Province

Co-patentee after: Li Jifang

Patentee after: Wang Guojun

Co-patentee after: Zheng Wei

Address before: 434000 4 floor, 191 Huang Jia Tang, Sha City, Jingzhou, Hubei

Co-patentee before: Zheng Wei