CN100451237C - Material for waterproof bridge surface system and its paving process - Google Patents

Material for waterproof bridge surface system and its paving process Download PDF

Info

Publication number
CN100451237C
CN100451237C CNB2006100540819A CN200610054081A CN100451237C CN 100451237 C CN100451237 C CN 100451237C CN B2006100540819 A CNB2006100540819 A CN B2006100540819A CN 200610054081 A CN200610054081 A CN 200610054081A CN 100451237 C CN100451237 C CN 100451237C
Authority
CN
China
Prior art keywords
asphalt
rubber
solvent
waterproof system
sand gel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006100540819A
Other languages
Chinese (zh)
Other versions
CN101021058A (en
Inventor
胥志宏
牟建波
李玉龙
陈仕周
陈辉强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhixiang Road Construction Technology Engineering Co Ltd Chongqing
Original Assignee
Zhixiang Road Construction Technology Engineering Co Ltd Chongqing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhixiang Road Construction Technology Engineering Co Ltd Chongqing filed Critical Zhixiang Road Construction Technology Engineering Co Ltd Chongqing
Priority to CNB2006100540819A priority Critical patent/CN100451237C/en
Publication of CN101021058A publication Critical patent/CN101021058A/en
Application granted granted Critical
Publication of CN100451237C publication Critical patent/CN100451237C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The present invention is material for waterproof bridge surface system and its paving process. The material for waterproof bridge surface system includes: lower closing layer material comprising component A of bisphenol A epoxy resin and toughening agent, component B of modified epoxy curing agent and crushed stone in certain weight proportion; solvent type asphalt rubber comprising AH-70# asphalt, solvent, styrene-butadiene block copolymer, petroleum resin and neoprene; and rubber asphalt sand glue comprising AH-70# asphalt, rosin, styrene-butadiene block copolymer, asphalt modifier, rock asphalt and stone powder. The waterproof bridge surface system has excellent waterproof effect, excellent protection on the bridge structure and other advantages.

Description

The material and the pavement construction method of deck paving waterproof system
One, technical field
The present invention relates to a kind of novel deck paving waterproof system, and material, preparation and the pavement construction method of waterproof system are provided.
Two, background technology
Domestic present most of engineering is not only considered waterproof effect by the wearing layer design to bridge deck pavement, causing water to infiltrate mating formation to form power betwixt between layer and the bridge deck washes away, or at cold district generation freeze-thaw damage, the layer that causes mating formation breaks away from bridge deck, early damage appears in deck paving, has not only had a strong impact on the result of use of high-grade highway, causes a hidden trouble to traffic safety, influence the current environment of highway, increase the maintenance cost; On the other hand, water infiltrates in bridge deck and the bridge construction, causes the too early corrosion of reinforcing bar of structure inner panel, girder construction, concrete surface charing and corrosion, the concrete supporting capacity descends, and causes the bearing capacity of whole bridge construction to descend, and bridge durability will be affected.Foreign experience is told us, as if effective protection of ignoring bridge construction, in the use of the later stage of bridge, will pay heavy maintenance cost in bridge construction.
China is in high-grade highway construction, most bridge floors are mated formation and are all failed to take into full account the requirement of bridge functional performance aspect, at present, some bridges that the high-grade highway construction initial stage builds up, its driving functions of mating formation reduces, and because the situation that the seepage of water causes bridge construction to damage is more and more; Some bridges that built up afterwards; though considered the waterproof of deck paving; but the waterproof adhesive property is relatively poor; be difficult to the effect that reaches desirable during construction; and the durability of waterproofing course is relatively poor, simultaneously the protection of bridge construction is paid attention to inadequately, and what have is open to traffic soon that deck paving just begins to occur various diseases; disease repeats again after disposing, and the frequency of maintenance of bridge floor is higher.The neoprene that discloses a kind of usefulness 3~6mm among the Chinese patent CN200420007829.6 is as waterproofing course, and the steel bridge face waterproof paving structure of the thick modified asphalt SMA of the 25~35mm that mats formation; Chinese patent application number is to disclose the employing polyurethane resin in 200410027199 to paste plate object as waterproofing course; A kind of bridge deck water-proof of being made up of poly-imido fat waterproofing materials and bituminous concrete is disclosed among the JP2003160937; Disclose among the JP2002122981 a kind of by the polyurethane waterproofing material, the bridge deck water-proof that thermoplastic bonding material and cast asphalt concrete are formed.Only adopting reaction resin in these inventions is not enough as waterproof, the adhesive property of this one deck and bituminous concrete is relatively poor, deformation performance is relatively poor, and the reaction resin material after the construction is the spreading small crushed stone not, the surface smoother, this will cause pavement layer shear to cut poor-performing, in use occur disease phenomenons such as delamination passing easily.
Three, summary of the invention
Thinking of the present invention is reaction resin bottom impermeable layer, solvent-borne type asphalt rubber and rubber asphalt sand gel to be formed jointly the waterproof system of deck paving.The reaction resin bottom impermeable layer has stronger waterproof sealing process, can guarantee the bonding of interlayer of mating formation for the layer of mating formation provides coarse interface simultaneously, prevents the interlayer passing.The solvent-borne type asphalt rubber has higher adhesive property, can bonding preferably reaction resin bottom impermeable layer and rubber asphalt sand gel, and can not produce simultaneously and pollute environment, and easy construction.Rubber asphalt sand gel has higher water shutoff and deformation performance, can absorb the part distortion of bridge deck, reduces the destruction that produces because of the bridge deck stress raisers, has bonding preferably and cutting performance simultaneously.
The purpose of this invention is to provide a kind of deck paving waterproof system, comprise the composition and the preparation method of this system with premium properties.
The present invention is achieved in that this system is made up of reaction resin bottom impermeable layer, solvent-borne type asphalt rubber and rubber asphalt sand gel, and the composition mass component of reaction resin bottom impermeable layer is:
A component: 80~98 parts of bisphenol A epoxide resins
0~20 part of flexibilizer
B component: amine epoxy curing agent modified
A, B constituent mass ratio are 1: 1~5: 1
Small crushed stone and A constituent mass component ratio are 40: 1~1: 1
The composition mass component of solvent-borne type asphalt rubber is:
AH-70 #20~60 parts of pitches
30~75 parts of non-toluene solvents
5~25 parts of styrene butadiene block copolymers
0~25 part of Petropols
0~15 part of neoprene
The composition mass component of rubber asphalt sand gel is:
AH-70 #5~28 parts of pitches
0~10 part of rosin
0~10 part of styrene butadiene block copolymer
0~12 part of asphalt modifier
0~15 part of natural kir
50~88 parts of stone flours.
Amine epoxy curing agent modified operable time at normal temperatures of the present invention is longer, can continue at normal temperatures after the construction to solidify.
Flexibilizer of the present invention is the linear polymer that contains hydroxyl, carboxyl.
Small crushed stone of the present invention is 0.3~2.36m hard rubble.Require clean, the cleaning of small crushed stone.
Solvent of the present invention is a non-toluene solvent, has stronger dissolubility, belongs to alkanes.
Styrene butadiene block copolymer of the present invention is to be that catalyzer carries out a kind of thermoplastic elastomer SBS that anionic polymerisation makes with the lithium alkylide.
Petropols C 5 petroleum resin of the present invention or C 9 petroleum resin.
Rosin of the present invention is a kind of natural organic matter, mainly is made up of various resin acids, is soluble in multiple organic solvent, has distinctive chemism.
Asphalt modifier UB of the present invention is a kind of new type polyolefin class asphalt modifier.Its fusing point is about 115 ℃.
Natural kir of the present invention is a kind of natural Powdered natural kir of solid carbon hydrogen compound resinoid type hard.
The limestone stone flour that stone flour of the present invention adopts for the plain asphalt concrete.But stone flour needs drying.
The pavement construction method of the material of deck paving waterproof system of the present invention, it is made up of following step:
Step 1: the preparation of solvent-borne type asphalt rubber, styrene butadiene block copolymer, Petropols, neoprene are put into the closed container that has mixing plant by mass ratio, pour the non-toluene solvent of definite quality then into, it is melted rise 30~90 minutes, and fully stir, again with AH-70 #Pitch adds in batches, stirs it is mixed, and promptly gets the solvent-borne type asphalt rubber;
Step 2: after the A in the reaction resin bottom impermeable layer, B component mixed at normal temperatures by mass ratio and stirring with the electric hand mixing plant, with cylinder with its roller coating on the bridge deck of dry cleansing, and spreading small crushed stone immediately;
Step 3: after question response resin bottom impermeable layer solidifies substantially, with cylinder roller coating solvent-borne type asphalt rubber;
Step 4: after the construction of solvent-borne type asphalt rubber finished 4~10 hours, the rubber asphalt sand gel of can constructing;
Step 5: the preparation of rubber asphalt sand gel, before this with AH-70 #Pitch is warming up to 160~180 ℃, then be injected into asphalt modification equipment and be warmed up to 170~190 ℃ with bitumenpump, again with rosin, styrene butadiene block copolymer, asphalt modifier UB put into wherein melt rose 15~50 minutes after, grind 5~15 times with the colloid mill in the asphalt modification equipment, and natural kir put into carry out mixing and stirring, promptly get the rubber asphalt binder, squeeze in the special-purpose stirring intensification equipment producing good rubber asphalt binder, and measure, then add the stone flour of definite quality in batches, and stir and to be warmed up to 180~240 ℃, promptly obtain rubber asphalt sand gel;
Step 6: rubber asphalt sand gel is transported to the job site of finishing reaction resin bottom impermeable layer and the construction of solvent-borne type asphalt rubber, the rubber asphalt sand gel gradation is poured on the scope of operation, and carry out floating with floating instrument immediately, promptly finish the construction of rubber asphalt sand gel, also finish whole bridge deck water-proof system pavement construction simultaneously.
Deck paving waterproof body cording of the present invention has performances such as good waterproof, bonding, anti-shearing, resistance to deformation.Compare with existing bridge surface waterproof layer (coating waterproofing, waterproof coiled material, polyurethane waterproofing etc.), has good water proofing property, easy construction, with the asphalt concrete pavement on upper strata can better be whole in conjunction with forming, have higher adhesive strength and shear strength, because rubber asphalt sand gel has good deformation property, therefore can absorb the part distortion of bridge deck.
Four, the specific embodiment
Below by specific embodiment the present invention is specifically described.
Embodiment
The reaction resin bottom impermeable layer
(1) takes by weighing raw material by following proportioning
A component: 86 parts of bisphenol A epoxide resins
14 parts of flexibilizer
B component: amine epoxy curing agent modified 25 parts
270 parts of small crushed stones.
(2) preparation technology
Bisphenol A epoxide resin, flexibilizer and amine epoxy curing agent modified joining are mixed about 15 minutes in the container, and use the cylinder roller coating on bridge deck in mixture, immediately the spreading small crushed stone.Promptly get the reaction resin bottom impermeable layer.
The solvent-borne type asphalt rubber
(1) takes by weighing raw material by following proportioning
AH-70 #40 parts of pitches
42 parts of non-toluene solvents
13 parts of styrene butadiene block copolymers
3 parts of C5 Petropols
2 parts of neoprenes
(2) preparation technology
Styrene butadiene block copolymer, C5 Petropols, neoprene melted in non-toluene solvent rise 30~90 minutes, and fully stir, again with AH-70 #Pitch adds in batches, stirs it is mixed, and promptly gets the solvent-borne type asphalt rubber.And with the solvent-borne type asphalt rubber with the cylinder roller coating on the reaction resin bottom impermeable layer of basic curing.
Rubber asphalt sand gel
(1) takes by weighing raw material by following proportioning
AH-70 #20 parts of pitches
0.8 part of rosin
2.6 parts of styrene butadiene block copolymers
0.4 part of asphalt modifier UB
0.2 part of natural kir
76 parts of stone flours
(2) preparation technology
Before this with AH-70 #Pitch is warming up to 160~180 ℃, then be injected into asphalt modification equipment and be warmed up to 170~190 ℃ with bitumenpump, again with rosin, styrene butadiene block copolymer, asphalt modifier UB put into wherein melt rose 15~50 minutes after, grind 5~15 times with the colloid mill in the asphalt modification equipment, and natural kir put into carry out mixing and stirring, promptly get the rubber asphalt binder, squeeze in the special-purpose stirring intensification equipment producing good rubber asphalt binder, and measure, then add the stone flour of definite quality in batches, and stir and to be warmed up to 180~240 ℃, promptly obtain rubber asphalt sand gel.
(3) construction technology
Rubber asphalt sand gel is transported to the job site of finishing the construction of reaction resin bottom impermeable layer and solvent-borne type asphalt rubber, the rubber asphalt sand gel gradation is poured on the scope of operation, and carry out floatingly immediately with floating instrument, promptly finish the construction of rubber asphalt sand gel.
Result's test
The deck paving waterproof system performance that the foregoing description is prepared sees Table 1.
The table Bridge 1 face waterproof system performance of mating formation
Figure C20061005408100091
Remarks: adhesive strength adopts the method for drawing to test; Shear strength adopts presses the method for cutting to test; Infiltration coefficient adopts the constant 500mbar of being of seepage pressure and continues to carry out in 15 minutes the test of infiltration coefficient; In the low temperature bend test, with rubber asphalt sand gel test specimen cutting growth (250 ± 2) mm, wide (30 ± 2) mm, high (35 ± 2) mm prism girder, stride the footpath and be (200 ± 0.5) mm, span centre loads, and loading speed is under the 50mm/min condition, flexural-tensile strain and bending stifiness modulus when testing-10 ℃.

Claims (9)

1. the material of a deck paving waterproof system is made up of reaction resin bottom impermeable layer, solvent-borne type asphalt rubber and rubber asphalt sand gel, it is characterized in that the composition mass component of reaction resin bottom impermeable layer is:
A component: 80~98 parts of bisphenol A epoxide resins
0~20 part of flexibilizer
B component: amine epoxy curing agent modified
A, B constituent mass ratio are 1: 1~5: 1
Small crushed stone and A constituent mass component ratio are 40: 1~1: 1
The composition mass component of solvent-borne type asphalt rubber is:
AH-70 #20~60 parts of pitches
30~75 parts of non-toluene solvents
5~25 parts of styrene butadiene block copolymers
0~25 part of Petropols
0~15 part of neoprene
The composition mass component of rubber asphalt sand gel is:
AH-70 #5~28 parts of pitches
0~10 part of rosin
0~10 part of styrene butadiene block copolymer
0~12 part of asphalt modifier
0~15 part of natural kir
50~88 parts of stone flours.
2. according to the material of the described a kind of deck paving waterproof system of claim 1, it is characterized in that: described flexibilizer is the linear polymer that contains hydroxyl, carboxyl.
3. according to the material of the described a kind of deck paving waterproof system of claim 1, it is characterized in that: described small crushed stone is 0.3~2.36mm hard rubble.
4. according to the material of the described a kind of deck paving waterproof system of claim 1, it is characterized in that: described styrene butadiene block copolymer is to be that catalyzer carries out a kind of thermoplastic elastomer SBS that anionic polymerisation makes with the lithium alkylide.
5. according to the material of the described a kind of deck paving waterproof system of claim 1, it is characterized in that: described Petropols are carbon 5 or carbon 9 Petropols.
6. according to the material of the described a kind of deck paving waterproof system of claim 1, it is characterized in that: rosin is to refine through distillation with natural pine resin to form.
7. according to the material of the described a kind of deck paving waterproof system of claim 1, it is characterized in that: described asphalt modifier is a kind of polyolefin asphalt modifier UB.
8. according to the material of the described a kind of deck paving waterproof system of claim 1, it is characterized in that: the limestone stone flour that described stone flour adopts for the plain asphalt concrete.
9. the pavement construction method of the material of a deck paving waterproof system as claimed in claim 1 is characterized in that it is made up of following step:
Step 1: the preparation of solvent-borne type asphalt rubber, by mass ratio styrene butadiene block copolymer, Petropols, neoprene are put into the closed container that has mixing plant, pour the non-toluene solvent of definite quality then into, it is melted rise 30~90 minutes, and fully stir, again with AH-70 #Pitch adds in batches, stirs it is mixed, and promptly gets the solvent-borne type asphalt rubber;
Step 2: after the A in the reaction resin bottom impermeable layer, B component mixed at normal temperatures by mass ratio and stirring with the electric hand mixing plant, with cylinder with its roller coating on the bridge deck of dry cleansing, and spreading small crushed stone immediately;
Step 3: after question response resin bottom impermeable layer solidifies substantially, with cylinder roller coating solvent-borne type asphalt rubber;
Step 4: after the construction of solvent-borne type asphalt rubber finished 4~10 hours, the rubber asphalt sand gel of can constructing;
Step 5: the preparation of rubber asphalt sand gel, before this with AH-70 #Pitch is warming up to 160~180 ℃, then be injected into asphalt modification equipment and be warmed up to 170~190 ℃ with bitumenpump, again with rosin, styrene butadiene block copolymer, asphalt modifier UB put into wherein melt rose 15~50 minutes after, grind 5~15 times with the colloid mill in the asphalt modification equipment, and natural kir put into carry out mixing and stirring, promptly get the rubber asphalt binder, squeeze in the special-purpose stirring intensification equipment producing good rubber asphalt binder, and measure, then add the stone flour of definite quality in batches, and stir and to be warmed up to 180~240 ℃, promptly obtain rubber asphalt sand gel;
Step 6: rubber asphalt sand gel is transported to the job site of finishing reaction resin bottom impermeable layer and the construction of solvent-borne type asphalt rubber, the rubber asphalt sand gel gradation is poured on the scope of operation, and carry out floating with floating instrument immediately, promptly finish the construction of rubber asphalt sand gel, also finish the pavement construction of whole bridge deck water-proof system simultaneously.
CNB2006100540819A 2006-02-16 2006-02-16 Material for waterproof bridge surface system and its paving process Expired - Fee Related CN100451237C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100540819A CN100451237C (en) 2006-02-16 2006-02-16 Material for waterproof bridge surface system and its paving process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100540819A CN100451237C (en) 2006-02-16 2006-02-16 Material for waterproof bridge surface system and its paving process

Publications (2)

Publication Number Publication Date
CN101021058A CN101021058A (en) 2007-08-22
CN100451237C true CN100451237C (en) 2009-01-14

Family

ID=38708929

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100540819A Expired - Fee Related CN100451237C (en) 2006-02-16 2006-02-16 Material for waterproof bridge surface system and its paving process

Country Status (1)

Country Link
CN (1) CN100451237C (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101250857B (en) * 2008-03-20 2010-11-03 山东省交通科学研究所 Method for continuous processing T beam bridge floor
CN102516717B (en) * 2011-12-22 2014-07-09 云南云岭高速公路养护绿化工程有限公司 Thermoplastic elastomer toughened epoxy resin, its preparation and its application
CN103804836A (en) * 2012-11-12 2014-05-21 洛阳骏腾能源科技有限公司 Elasticity-proof, leakage-proof and prick-resistant macromolecular material for automobile tyres
CN103194946B (en) * 2013-04-22 2015-07-08 山东省交通科学研究所 Cement concrete bridge deck pavement structure capable of being applied to extreme operating environments
CN103205227B (en) * 2013-04-28 2015-04-29 重庆市智翔铺道技术工程有限公司 Cementing compound for pavement layers
CN103225264B (en) * 2013-05-23 2016-01-13 交通运输部公路科学研究所 A kind of composite rubber asphalt concrete steel bridge surface pavement structure
CN106478042B (en) * 2015-08-27 2018-07-06 科中大集团有限公司 Discharge inorganic waterproof material of anion and its preparation method and application

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4755409A (en) * 1986-01-24 1988-07-05 Hyload Corporation Waterproofing laminate
RU2142969C1 (en) * 1997-08-08 1999-12-20 Акционерное общество "Беларусьрезинотехника" Method of preparing bitumen-polymer-based compositions for waterproofing materials
CN1239730A (en) * 1998-06-20 1999-12-29 韩本工业株式会社 Double waterproof materials of asphalt mastic spread film and sheet on concrete structure and its working method
RU2237076C1 (en) * 2003-04-23 2004-09-27 ОАО "Тольяттиазот" Waterproofing mastic
CN1613939A (en) * 2004-09-16 2005-05-11 王耀波 Waterproof sealing compound for asphalt road surface, production and applied constructing process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4755409A (en) * 1986-01-24 1988-07-05 Hyload Corporation Waterproofing laminate
RU2142969C1 (en) * 1997-08-08 1999-12-20 Акционерное общество "Беларусьрезинотехника" Method of preparing bitumen-polymer-based compositions for waterproofing materials
CN1239730A (en) * 1998-06-20 1999-12-29 韩本工业株式会社 Double waterproof materials of asphalt mastic spread film and sheet on concrete structure and its working method
RU2237076C1 (en) * 2003-04-23 2004-09-27 ОАО "Тольяттиазот" Waterproofing mastic
CN1613939A (en) * 2004-09-16 2005-05-11 王耀波 Waterproof sealing compound for asphalt road surface, production and applied constructing process

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
上海卢浦大桥钢桥面铺装防水体系的研究. 陈仕周等.东南大学学报(自然科学版),第34卷第3期. 2004
上海卢浦大桥钢桥面铺装防水体系的研究. 陈仕周等.东南大学学报(自然科学版),第34卷第3期. 2004 *
钢桥面SMA铺装技术的研究与发展. 陈仕周等.公路交通科技,第21卷第10期. 2004
钢桥面SMA铺装技术的研究与发展. 陈仕周等.公路交通科技,第21卷第10期. 2004 *
钢桥面铺装技术的研究与发展. 张力等.公路,第1期. 2001
钢桥面铺装技术的研究与发展. 张力等.公路,第1期. 2001 *

Also Published As

Publication number Publication date
CN101021058A (en) 2007-08-22

Similar Documents

Publication Publication Date Title
CN100451237C (en) Material for waterproof bridge surface system and its paving process
CN103866667B (en) Semi-flexible heavy-load pavement paving structure
CN100577736C (en) Asphalt pavement conditioning curing agent and preparation method thereof
CN101200873A (en) Method for paving resin filling type asphalt concrete steel box-beam bridge deck combined structure
CN101343162B (en) High-ductility polymer-rubber powder-honey-combed cement concrete road covering material and construction process thereof
CN103482904B (en) A kind of modified epoxy mortar resistant abrasion patching material
CN100572668C (en) A kind of half-flexible water drainage skid-free noise-reducing road surface pavement structure
CN102296514B (en) Anti-skating wearing layer of epoxy asphalt pavement and preparation method thereof
CN103952958A (en) Method for rut maintaining and paving of municipal road
CN109594471B (en) Paving structure of steel bridge deck and construction method thereof
CN103114526A (en) Steel bridge deck pavement cold mixing maintenance material and manufacturing method thereof
CN105541182A (en) Ultra-viscous fiber resin asphalt wearing layer mixture and preparation method thereof
CN109455998A (en) A kind of manufacture craft of steel pipe fiber seif-citing rate regenerated aggregate concrete column
CN104652212A (en) Improved construction method of old cement concrete pavement
CN111118999A (en) Road structure of urban intersection, bus station and bus lane
CN109797620A (en) A kind of Heavy Traffic globality Rut resistance road paving structure based on composite material
CN103194946B (en) Cement concrete bridge deck pavement structure capable of being applied to extreme operating environments
US20060127572A1 (en) Method for producing a bituminous mix, in particular by cold process, and bituminous mix obtained by said method
CN212000441U (en) Novel road surface structure of urban heavy-load traffic
CN111304994B (en) Semi-flexible functional combined structure recovery layer applied to asphalt pavement maintenance
RU2433096C2 (en) Mixture of substances used particularly as additive for concrete mixture
CN210104563U (en) Pavement structure of steel bridge deck
CN107059615A (en) Permanent seal cooling Bridge Surface Paving by Cement structure
CN202323706U (en) Repair structure for epoxy asphalt pavement pit slot
CN203238541U (en) Cement concrete bridge deck pavement structure capable of being applied to extreme operating environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090114

Termination date: 20220216