CN108313218A - A kind of marine mining and ore dressing platform - Google Patents

A kind of marine mining and ore dressing platform Download PDF

Info

Publication number
CN108313218A
CN108313218A CN201810243746.3A CN201810243746A CN108313218A CN 108313218 A CN108313218 A CN 108313218A CN 201810243746 A CN201810243746 A CN 201810243746A CN 108313218 A CN108313218 A CN 108313218A
Authority
CN
China
Prior art keywords
deck
tank
cabin
hold
ore dressing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810243746.3A
Other languages
Chinese (zh)
Inventor
戴雪良
章庆生
韩海林
杨辉
杭爱群
邹学义
于全虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SHIP DESIGN & RESEARCH INSTITUTE CO LTD
Original Assignee
JIANGSU SHIP DESIGN & RESEARCH INSTITUTE CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SHIP DESIGN & RESEARCH INSTITUTE CO LTD filed Critical JIANGSU SHIP DESIGN & RESEARCH INSTITUTE CO LTD
Priority to CN201810243746.3A priority Critical patent/CN108313218A/en
Publication of CN108313218A publication Critical patent/CN108313218A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B17/00Vessels parts, details, or accessories, not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B17/00Vessels parts, details, or accessories, not otherwise provided for
    • B63B2017/0072Seaway compensators

Abstract

The invention discloses a kind of marine minings and ore dressing platform, including bucket wheel dredger and ore dressing ship, the bucket wheel dredger is by the first hold, first main deck, manipulate deck, compass deck, first communication antenna, suspender, guide pile and cantilever crane composition, first main deck is mounted on the top of the first hold, deck is manipulated to be mounted on the top surface of the first main deck, compass deck is mounted on the top surface for manipulating deck, suspender, which is mounted on, to be manipulated on deck, ore dressing ship is by the second hold, second main deck, equipment deck, screening plant, second communication antenna, overhead traveling crane and side formula suspender composition.Total system comprehensive integration is transported in undersea mining ore dressing of the present invention, realize pick up the mine course of work it is efficient with it is continuous, mining dredger using the trolley guide pile system with compensation of undulation has extremely important advantage, pass through the function of compensation of undulation, impact of the wave to trolley guide pile system can be buffered, ensures that mining dredger works normally under certain stormy waves.

Description

A kind of marine mining and ore dressing platform
Technical field
The invention belongs to a kind of undersea mining technical field of beneficiation, and in particular to a kind of marine mining and ore dressing platform.
Background technology
In recent decades, with the appearance of some major progresses, the mankind also have occurred the understanding of Global Mineral aobvious It writes and changes.Ocean is similar with the potential business mineral products of ocean floor unit area with land, is imbedded in the mineral products of seawater or ocean floor 3/4ths of Global Mineral are accounted for, but are not almost developed.Coastal state can will 368 kilometers away from its coastline (200 sea In) range divide exclusive economic zone into, in these marine sites, the sovereignty of coastal state-owned exploration and development natural resources;It is managed more than various countries The other half of linchpin marine site is then managed by International Sea-Bed Authority of the United Nations (ISA), and countries in the world can pass through international Submarine Pipeline Reason office goes to exploration and development ocean.
Have at present it is many adopt scheme of concentration, mining efficiency is low and not environmentally, if the operational method of Thailand's mining dredger is around ship 360 ° of tail does not stop to rotate, and tailing directly spews out into the sea from stern.This mining methods not only hinders effective mining, also repeats Tailing is drawn, operation effect is low, can not accomplish environmentally protective mining.
Invention content
The technical problem to be solved by the present invention is to provide a kind of marine mining and choosing in view of the above shortcomings of the prior art Total system comprehensive integration is transported in mine platform, undersea mining ore dressing, realizes efficient and continuous, the use for picking up the mine course of work The mining dredger of trolley guide pile system with compensation of undulation has extremely important advantage, can by the function of compensation of undulation To buffer impact of the wave to trolley guide pile system, ensure that mining dredger works normally under certain stormy waves.
To realize the above-mentioned technical purpose, the technical solution that the present invention takes is:
A kind of marine mining and ore dressing platform, wherein:Including bucket wheel dredger and ore dressing ship, the bucket wheel dredger by First hold, the first main deck manipulate deck, compass deck, the first communication antenna, suspender, guide pile and cantilever crane composition, institute The first main deck stated is mounted on the top of the first hold, and the deck that manipulates is mounted on the top surface of the first main deck, institute The compass deck stated is mounted on the top surface for manipulating deck, and first communication antenna is fixedly mounted on the top surface of compass deck On, the suspender, which is mounted on, to be manipulated on deck, and the guide pile, which is mounted on, to be manipulated on deck, and the ore dressing ship is by second Hold, the second main deck, equipment deck, screening plant, the second communication antenna, overhead traveling crane and side formula suspender composition, described second Main deck is mounted on the top surface of the second hold, and the equipment deck is mounted on the top surface of the second main deck, the sieve Screening device and overhead traveling crane are all mounted on equipment deck, and the side formula suspender is mounted on the side of overhead traveling crane, and described second is logical Iflytech's line is mounted on the second main deck.
To optimize above-mentioned technical proposal, the concrete measure taken further includes:
The first above-mentioned hold by right ballast tank, right clothing issue room, empty cabin, the first fuel oil tank, bilge tank, lower pump cabin, Clear water cabin, preceding sea water tank, left clothing issue room, left ballast tank, the second fuel oil tank, rear sea water tank, dirty oil tank, bilge water tank and third Fuel oil tank forms, and the right ballast tank is located at the stem of the first hold, and the right clothing issue room is located at right ballast tank Left side, for the broken space in the left side of right clothing issue room, first fuel oil tank and third fuel oil tank are located at the left side in empty cabin, For the lower pump freight space between the first fuel oil tank and third fuel oil tank, the bilge tank is located at a left side for the first fuel oil tank Side, the bilge-water freight space are located at the left side of bilge water tank, the left side in the left side of third fuel oil tank, the dirty oil tank Ballast tank is located at the tail portion of the first hold, and the left clothing issue room and the second fuel oil tank are all located at the right side of left ballast tank, The preceding sea water tank and rear sea water tank are all located at the right side of left clothing issue room, and the clear water freight space is in the right side of preceding sea water tank.
The first above-mentioned main deck is by conveyance conduit, upper pump cabin, lavatory, duty room, upending frame, reamer device and stops Room composition is ceased, the conveyance conduit is mounted on the tail portion of the first main deck, and the upper pump freight space is in the right side of conveyance conduit Side, the lavatory are located at the right side in upper pump cabin, and the duty room and lobby are all located at the right side of lavatory, described Reamer device be hingedly mounted on the first main deck, the upending frame described in two be mounted on the first main deck on.
It is provided with control cabinl pulpit on above-mentioned manipulation deck.
The second above-mentioned hold is by forepeak, water intaking pond, pump room, fuel oil tank, afterpeak, cabin, empty cabin, ballast tank, light Water tank and bilge tank composition, the forepeak are located at the stem of the second hold, and the ballast tank described in two is located at forepeak Left side, water intaking pond, fresh-water tank and the bilge tank are all located between two ballast tanks, and the broken space is in a left side for ballast tank Side, the pump room are located between two empty cabins, and the fuel oil tank described in two is located at the left side in empty cabin, and the cabin is located at pump The left side in cabin, the afterpeak are located at the tail portion of the second hold.
Above-mentioned equipment deck is made of upper generating set, upper container-type switchgear house, upper duty room and upper laboratory, institute There are three upper generating set, the upper container-type switchgear houses to be located at the right side of upper generating set for the equipment deck tail distribution stated Side, the upper duty room and upper laboratory are located at the stem on equipment deck and upper duty room is located at the left side in upper laboratory.
The marine mining and ore dressing platform have the following advantages:
(1) total system comprehensive integration is transported in undersea mining ore dressing
D5014 bucket wheel dredge boats with compensation of undulation guide pile pass through slush pump, conveying after the iron ore digging of seabed Pipe, raw ore sand is delivered to ore dressing ship, realize pick up the mine course of work it is efficient with it is continuous;
(2) bucket wheel digging system is used
Bucket wheel delver is horizontal axis rotary cutting seabed ore in sand form, when bucket wheel dredge boat is using tail portion guide pile as rotating fulcrum, When fan-shaped swing is made in left and right, the excavation yield of transverse moving left and right bucket wheel delver is identical, is ensured that so defeated to ore dressing ship The raw ore uniform amount sent, continuous-stable;
(3) the trolley guide pile system with compensation of undulation:This destination item is that having the marine of stormy waves to carry out mining, So having extremely important advantage using the mining dredger of the trolley guide pile system with compensation of undulation, pass through compensation of undulation Function can buffer impact of the wave to trolley guide pile system, ensure that mining dredger works normally under certain stormy waves.
Rational mining dredger digging scheme is formulated by hydrogeology report first, seabed ore in sand form is produced, mortar is passed through Ore in sand form is served the screening that ore dressing ship carries out raw ore, level-one, secondary magnetic separation by pump and pipeline waterborne, and concentrate leaves.Dig out first When pit, by ore dressing ship tailings pump and debris tube region that Tailings transportation can be received into tailing to one, carrying out the When the mining of Two Areas, the tailing generated, can by tailings pump on ore dressing ship and debris tube by Tailings transportation to digging First pit gone out, then by sinker and tailing end mobile device, tailing is gradually divided and is sprinkled upon in first pit, is made Original landforms are restored in seabed, solve the drawbacks of tailing repeats to draw, accomplish environmentally protective mining.
The development of mining bucket wheel is to carry out the replacement research and development on the basis of original dredges the bucket wheel dredged, and bucket wheel adaptation is made to adopt The operating mode of seabed ore in sand form is dug, sealing structure, the wearability of bucket wheel shaft are more excellent.In order to allow mining dredger preferably at sea to be adopted Mine operation, the trolley guide pile system that trolley guide pile system must be used with compensation of undulation, the current country be all guide pile and Ship is to rigidly fix, and without wave compensation system, when encountering stormy waves, is easy to happen guide pile and fractures accident.Adapt to marine operating mode Ore dressing ship preparation equipment installation frame structure, develop that structure is light, the installation frame of the high preparation equipment of intensity.Due to tail Mine pump is single pump shell structure, is ruptured in order to prevent since pump case is worn, and seawater occurs into accident caused by cabin, so tailing Pump must be installed in an independent pump room, the motor of drive system, and gear-box is mounted on self-contained pump out of my cabin, develop efficiently It is reliable to cross cabin sealing structure.The steel wire rope of four positioning of anchor winches of ore dressing ship cannot use common positioning wire rope to move towards, Directly pull to seabed from deck, it is necessary to so that the steel wire rope of four positioning of anchor winches is pulled to seabed from hull bottom, to avoid steel wire rope with The phase grazing of barging fleet, causes an accident.
The advantage of the invention is that the following:Total system comprehensive integration is transported in undersea mining ore dressing, realizes selecting mine The course of work it is efficient with it is continuous, had using the mining dredger of the trolley guide pile system with compensation of undulation extremely important excellent Gesture can buffer impact of the wave to trolley guide pile system by the function of compensation of undulation, ensure mining dredger in certain wind The lower normal work of wave.
Description of the drawings
Fig. 1 is the structural schematic diagram of bucket wheel dredger of the present invention;
Fig. 2 is the first hold structure distribution schematic diagram of the invention;
Fig. 3 is the first main deck structure distribution schematic diagram of the invention;
Fig. 4 is that the present invention manipulates deck structure distribution schematic diagram;
Fig. 5 is the structural schematic diagram of ore dressing ship of the present invention;
Fig. 6 is the intermediate cutting structural schematic diagram of ore dressing ship of the present invention;
Fig. 7 is the second hold structure distribution schematic diagram of the invention;
Fig. 8 is the second main deck structure distribution schematic diagram of the invention;
Fig. 9 is present device deck structure distribution schematic diagram.
Reference numeral therein is:Bucket wheel dredger 1, the first hold 11, right ballast tank 1101, right clothing issue room 1102, Empty cabin 1103, the first fuel oil tank 1104, bilge tank 1105, lower pump cabin 1106, clear water cabin 1107, preceding sea water tank 1108, left storage Object cabin 1109, left ballast tank 1110, the second fuel oil tank 1111, rear sea water tank 1112, dirty oil tank 1113, bilge water tank 1114, Third fuel oil tank 1115, the first main deck 12, conveyance conduit 1201, upper pump cabin 1202, lavatory 1203, duty room 1204, Upending frame 1205, lobby 1207, manipulates deck 13, control cabinl pulpit 1301, the communication of compass deck 14, first at reamer device 1206 Antenna 15, suspender 16, guide pile 17, cantilever crane 18, ore dressing ship 2, the second hold 21, forepeak 2101, water intaking pond 2102, pump room 2103, fuel oil tank 2104, afterpeak 2105, cabin 2106, empty cabin 2107, ballast tank 2108, fresh-water tank 2109, bilge tank 2110, the second main deck 22, lower generating set 2201, lower container-type switchgear house 2202, lower duty room 2203, lower laboratory 2204, equipment deck 23, upper generating set 2301, upper container-type switchgear house 2302, upper duty room 2303, upper laboratory 2304, screening plant 24, the second communication antenna 25, overhead traveling crane 26, side formula suspender 27.
Specific implementation mode
The specific implementation mode of the present invention is further illustrated below in conjunction with the accompanying drawings:
A kind of marine mining and ore dressing platform, wherein:Including bucket wheel dredger 1 and ore dressing ship 2, the bucket wheel dredger 1 by the first hold 11, the first main deck 12, manipulation deck 13, compass deck 14, the first communication antenna 15, suspender 16, guide pile 17 and cantilever crane 18 form, first main deck 12 be mounted on the first hold 11 top, the manipulation deck 13 peace On the top surface of the first main deck 12, the compass deck 14 is mounted on the top surface for manipulating deck 13, and described first Communication antenna 15 is fixedly mounted on the top surface of compass deck 14, and the suspender 16, which is mounted on, to be manipulated on deck 13, described Guide pile 17 be mounted on manipulate deck 13 on, the ore dressing ship 2 by the second hold 21, the second main deck 22, equipment deck 23, Screening plant 24, the second communication antenna 25, overhead traveling crane 26 and side formula suspender 27 form, and second main deck 22 is mounted on second On the top surface of hold 21, the equipment deck 23 is mounted on the top surface of the second main deck 22,24 He of screening plant Overhead traveling crane 26 is all mounted on equipment deck 23, and the side formula suspender 27 is mounted on the side of overhead traveling crane 26, and described second is logical Iflytech's line 25 is mounted on the second main deck 22.
In embodiment, the first hold 11 is by right ballast tank 1101, right clothing issue room 1102, empty cabin 1103, the first fuel oil tank 1104, bilge tank 1105, lower pump cabin 1106, clear water cabin 1107, preceding sea water tank 1108, left clothing issue room 1109, left ballast tank 1110, the second fuel oil tank 1111, rear sea water tank 1112, dirty oil tank 1113, bilge water tank 1114 and third fuel oil tank 1115 form, The right ballast tank 1101 is located at the stem of the first hold 11, and the right clothing issue room 1102 is located at right ballast tank 1101 Left side, the empty cabin 1103 is located at the left side of right clothing issue room 1102, first fuel oil tank 1104 and third fuel oil tank 1115 are located at the left side in empty cabin 1103, the lower pump cabin 1106 be located at the first fuel oil tank 1104 and third fuel oil tank 1115 it Between, the bilge tank 1105 is located at the left side of the first fuel oil tank 1104, and the bilge water tank 1114 is located at third fuel oil tank 1115 left side, the dirty oil tank 1113 are located at the left side of bilge water tank 1114, and the left ballast tank 1110 is located at the The tail portion of one hold 11, the left clothing issue room 1109 and the second fuel oil tank 1111 are all located at the right side of left ballast tank 1110, The preceding sea water tank 1108 and rear sea water tank 1112 is all located at the right side of left clothing issue room 1109, and the clear water cabin 1107 is located at The right side of preceding sea water tank 1108.
In embodiment, the first main deck 12 is by conveyance conduit 1201, upper pump cabin 1202, lavatory 1203, duty room 1204, upending frame 1205, reamer device 1206 and lobby 1207 form, and the conveyance conduit 1201 is mounted on the first main first The tail portion of plate 12, the upper pump cabin 1202 are located at the right side of conveyance conduit 1201, and the lavatory 1203 is located at upper machine The right side of pump room 1202, the duty room 1204 and lobby 1207 are all located at the right side of lavatory 1203, the reamer Device 1206 is hingedly mounted on the first main deck 12, and the upending frame 1205 described in two is mounted on the first main deck 12.
In embodiment, manipulates and be provided with control cabinl pulpit 1301 on deck 13.
In embodiment, the second hold 21 is by forepeak 2101, water intaking pond 2102, pump room 2103, fuel oil tank 2104, afterpeak 2105, cabin 2106, empty cabin 2107, ballast tank 2108, fresh-water tank 2109 and bilge tank 2110 form, the forepeak 2101 Positioned at the stem of the second hold 21, the ballast tank 2108 described in two is located at the left side of forepeak 2101, the water intaking pond 2102, fresh-water tank 2109 and bilge tank 2110 are all located between two ballast tanks 2108, and the empty cabin 2107 is located at ballast tank 2108 left side, the pump room 2103 are located between two empty cabins 2107, and the fuel oil tank 2104 described in two is located at empty cabin 2107 left side, the cabin 2106 are located at the left side of pump room 2103, and the afterpeak 2105 is located at the second hold 21 Tail portion.
In embodiment, the second main deck 22 is by lower generating set 2201, lower container-type switchgear house 2202, lower duty room 2203 and lower laboratory 2204 composition, 22 tail distribution of the second main deck it is described there are three lower generating set 2201 Lower container-type switchgear house 2202 is located at the right side of lower generating set 2201, the lower duty room 2203 and lower laboratory 2204 It is located at the left side in lower laboratory 2204 positioned at the stem and lower duty room 2203 of the second main deck 22.
In embodiment, equipment deck 23 is by upper generating set 2301, upper container-type switchgear house 2302, upper duty room 2303 It is formed with upper laboratory 2304, there are three upper generating set 2301, the upper packagings for 23 tail distribution of equipment deck Box switchgear house 2302 is located at the right side of upper generating set 2301, and the upper duty room 2303 and upper laboratory 2304, which are located at, to be set The stem and upper duty room 2303 on standby deck 23 are located at the left side in upper laboratory 2304.
The above is only the preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-described embodiment, All technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art For those of ordinary skill, several improvements and modifications without departing from the principles of the present invention should be regarded as the protection of the present invention Range.

Claims (7)

1. a kind of marine mining and ore dressing platform, it is characterised in that:Including bucket wheel dredger (1) and ore dressing ship (2), the bucket Dredger (1) is taken turns by the first hold (11), the first main deck (12), manipulation deck (13), compass deck (14), the first communication day Line (15), suspender (16), guide pile (17) and cantilever crane (18) composition, first main deck (12) are mounted on the first hold (11) top, the manipulation deck (13) are mounted on the top surface of the first main deck (12), the compass deck (14) On the top surface for manipulating deck (13), first communication antenna (15) is fixedly mounted on the top surface of compass deck (14) On, the suspender (16), which is mounted on, to be manipulated on deck (13), and the guide pile (17), which is mounted on, to be manipulated on deck (13), institute The ore dressing ship (2) stated is by the second hold (21), the second main deck (22), equipment deck (23), screening plant (24), the second communication Antenna (25), overhead traveling crane (26) and side formula suspender (27) composition, second main deck (22) are mounted on the second hold (21) On top surface, the equipment deck (23) is mounted on the top surface of the second main deck (22), the screening plant (24) and day Vehicle (26) is all mounted on equipment deck (23), and the side formula suspender (27) is mounted on the side of overhead traveling crane (26), described Second communication antenna (25) is mounted on the second main deck (22).
2. a kind of marine mining according to claim 1 and ore dressing platform, it is characterised in that:First hold (11) By right ballast tank (1101), right clothing issue room (1102), empty cabin (1103), the first fuel oil tank (1104), bilge tank (1105), under Pump cabin (1106), clear water cabin (1107), preceding sea water tank (1108), left clothing issue room (1109), left ballast tank (1110), second Fuel oil tank (1111), rear sea water tank (1112), dirty oil tank (1113), bilge water tank (1114) and third fuel oil tank (1115) group At the right ballast tank (1101) is located at the stem of the first hold (11), and the right clothing issue room (1102) is located at right pressure The left side of water tank (1101) is carried, the empty cabin (1103) is located at the left side of right clothing issue room (1102), first fuel oil tank (1104) and third fuel oil tank (1115) is positioned at the left side of empty cabin (1103), and the lower pump cabin (1106) is located at the first fuel oil Between cabin (1104) and third fuel oil tank (1115), the bilge tank (1105) is located at the left side of the first fuel oil tank (1104), The bilge water tank (1114) is located at the left side of third fuel oil tank (1115), and the dirty oil tank (1113) is located at bilge water tank (1114) left side, the left ballast tank (1110) are located at the tail portion of the first hold (11), the left clothing issue room (1109) and the second fuel oil tank (1111) is all located at the right sides of left ballast tank (1110), the preceding sea water tank (1108) and after Sea water tank (1112) is all located at the right side of left clothing issue room (1109), and the clear water cabin (1107) is located at preceding sea water tank (1108) Right side.
3. a kind of marine mining according to claim 1 and ore dressing platform, it is characterised in that:First main deck (12) by conveyance conduit (1201), upper pump cabin (1202), lavatory (1203), duty room (1204), upending frame (1205), hinge Knife system (1206) and lobby (1207) composition, the conveyance conduit (1201) are mounted on the tail of the first main deck (12) Portion, the upper pump cabin (1202) are located at the right side of conveyance conduit (1201), and the lavatory (1203) are located at upper pump The right side in cabin (1202), the duty room (1204) and lobby (1207) are all located at the right side of lavatory (1203), described Reamer device (1206) be hingedly mounted on the first main deck (12), the upending frame (1205) described in two be mounted on first master On deck (12).
4. a kind of marine mining according to claim 1 and ore dressing platform, it is characterised in that:The manipulation deck (13) On be provided with control cabinl pulpit (1301).
5. a kind of marine mining according to claim 1 and ore dressing platform, it is characterised in that:Second hold (21) By forepeak (2101), water intaking pond (2102), pump room (2103), fuel oil tank (2104), afterpeak (2105), cabin (2106), Empty cabin (2107), ballast tank (2108), fresh-water tank (2109) and bilge tank (2110) composition, the forepeak (2101) are located at The stem of second hold (21), the ballast tank (2108) described in two are located at the left side of forepeak (2101), the water intaking pond (2102), fresh-water tank (2109) and bilge tank (2110) are all located between two ballast tanks (2108), the empty cabin (2107) Left side positioned at ballast tank (2108), the pump room (2103) are located between two empty cabins (2107), the fuel oil described in two Cabin (2104) is located at the left side of empty cabin (2107), and the cabin (2106) is located at the left side of pump room (2103), stern point Cabin (2105) is located at the tail portion of the second hold (21).
6. a kind of marine mining according to claim 1 and ore dressing platform, it is characterised in that:Second main deck (22) by lower generating set (2201), lower container-type switchgear house (2202), lower duty room (2203) and lower laboratory (2204) Composition, there are three lower generating set (2201), the lower container-type distribution for described the second main deck (22) tail distribution Room (2202) is located at the right side of lower generating set (2201), and the lower duty room (2203) and lower laboratory (2204) are located at the The stem and lower duty room (2203) of two main decks (22) are located at the left side in lower laboratory (2204).
7. a kind of marine mining according to claim 1 and ore dressing platform, it is characterised in that:The equipment deck (23) It is made of upper generating set (2301), upper container-type switchgear house (2302), upper duty room (2303) and upper laboratory (2304), There are three upper generating set (2301), the upper container-type switchgear houses (2302) for described equipment deck (23) tail distribution Right side positioned at upper generating set (2301), the upper duty room (2303) and upper laboratory (2304) are located at equipment deck (23) stem and upper duty room (2303) is located at the left side in upper laboratory (2304).
CN201810243746.3A 2018-03-23 2018-03-23 A kind of marine mining and ore dressing platform Pending CN108313218A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810243746.3A CN108313218A (en) 2018-03-23 2018-03-23 A kind of marine mining and ore dressing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810243746.3A CN108313218A (en) 2018-03-23 2018-03-23 A kind of marine mining and ore dressing platform

Publications (1)

Publication Number Publication Date
CN108313218A true CN108313218A (en) 2018-07-24

Family

ID=62898288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810243746.3A Pending CN108313218A (en) 2018-03-23 2018-03-23 A kind of marine mining and ore dressing platform

Country Status (1)

Country Link
CN (1) CN108313218A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113114A (en) * 2018-08-08 2019-01-01 江苏省船舶设计研究所有限公司 Suction is twisted to dig sand ore dressing integrated ship
CN110656669A (en) * 2019-08-20 2020-01-07 上海航盛船舶设计有限公司 Small-size pump suction type dredge of inland river
WO2020061764A1 (en) * 2018-09-25 2020-04-02 符瑶 Excavation device for dredger

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101130995A (en) * 2007-09-21 2008-02-27 熊梓光 Excavator and sand dredger
CN102874384A (en) * 2012-09-06 2013-01-16 武汉二航路桥特种工程有限责任公司 Simple dredger for gravels in flowing water and method for dredging gravels
CN202828022U (en) * 2012-08-01 2013-03-27 山东省航宇船舶修造有限公司 Combined dredging ship
CN203546782U (en) * 2013-09-18 2014-04-16 福建省马尾造船股份有限公司 Cutter-suction device
US20140231326A1 (en) * 2013-02-06 2014-08-21 Island and Prairie Suction Tech Inc. Apparatus for Vacuuming Pollution from a Body of Water
CN204527556U (en) * 2014-12-26 2015-08-05 上海航盛船舶设计有限公司 A kind of ocean mining ship ore-sorting system supportive device
CN104923397A (en) * 2014-03-20 2015-09-23 北京中凯宏德科技有限公司 Ore mining and dressing integrated ship
CN106956752A (en) * 2017-02-22 2017-07-18 哈尔滨工程大学 A kind of nimble type deep sea mining vessel type
CN107089305A (en) * 2017-05-10 2017-08-25 中港疏浚有限公司 A kind of jack up ore dressing platform
CN107284611A (en) * 2017-07-07 2017-10-24 山东浩海疏浚装备有限公司 Tin ore collection screening packaging multifunctional ship
CN208602652U (en) * 2018-03-23 2019-03-15 江苏省船舶设计研究所有限公司 A kind of marine mining and ore dressing platform

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101130995A (en) * 2007-09-21 2008-02-27 熊梓光 Excavator and sand dredger
CN202828022U (en) * 2012-08-01 2013-03-27 山东省航宇船舶修造有限公司 Combined dredging ship
CN102874384A (en) * 2012-09-06 2013-01-16 武汉二航路桥特种工程有限责任公司 Simple dredger for gravels in flowing water and method for dredging gravels
US20140231326A1 (en) * 2013-02-06 2014-08-21 Island and Prairie Suction Tech Inc. Apparatus for Vacuuming Pollution from a Body of Water
CN203546782U (en) * 2013-09-18 2014-04-16 福建省马尾造船股份有限公司 Cutter-suction device
CN104923397A (en) * 2014-03-20 2015-09-23 北京中凯宏德科技有限公司 Ore mining and dressing integrated ship
CN204527556U (en) * 2014-12-26 2015-08-05 上海航盛船舶设计有限公司 A kind of ocean mining ship ore-sorting system supportive device
CN106956752A (en) * 2017-02-22 2017-07-18 哈尔滨工程大学 A kind of nimble type deep sea mining vessel type
CN107089305A (en) * 2017-05-10 2017-08-25 中港疏浚有限公司 A kind of jack up ore dressing platform
CN107284611A (en) * 2017-07-07 2017-10-24 山东浩海疏浚装备有限公司 Tin ore collection screening packaging multifunctional ship
CN208602652U (en) * 2018-03-23 2019-03-15 江苏省船舶设计研究所有限公司 A kind of marine mining and ore dressing platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113114A (en) * 2018-08-08 2019-01-01 江苏省船舶设计研究所有限公司 Suction is twisted to dig sand ore dressing integrated ship
WO2020061764A1 (en) * 2018-09-25 2020-04-02 符瑶 Excavation device for dredger
CN110656669A (en) * 2019-08-20 2020-01-07 上海航盛船舶设计有限公司 Small-size pump suction type dredge of inland river

Similar Documents

Publication Publication Date Title
CN103247977B (en) Multiphase submarine cable transverse arrangement of turbo circulation laying and construction method
CN108313218A (en) A kind of marine mining and ore dressing platform
CN101906971B (en) New method for mining submarine cobalt crusts
CN201291991Y (en) Sullage digging pumping vessel for ocean intertidal zone
CN102261086B (en) Non-mudhold double-body drag suction dredger and construction method thereof
CN106088200A (en) A kind of modularity environmental dredging ship
CN203594452U (en) Mining device for oceanic mineral resources
CN203417748U (en) Separation ship for beach placer
CN208602652U (en) A kind of marine mining and ore dressing platform
CN109944287B (en) Dredging operation system under wharf
CN102758462A (en) Stem punching device for self-propelled trailing suction hopper dredgers and construction method thereof
CN104278657A (en) Dredging method
CN108532546A (en) A kind of method that gavan', navigation channel backward are excavated
WO2019061672A1 (en) Ore mining and dressing integrated ship
CN202787354U (en) Self-propelled trailing suction dredger bow thrust device
KR20170043487A (en) Marine steel works with metal smelting furnaces and construction machinery
CN210134470U (en) Dredging operation system under wharf
CN209053145U (en) Suction is twisted to dig sand ore dressing integrated ship
CN203546782U (en) Cutter-suction device
CN206157803U (en) Formula grab dredger is dug to automatic side of bridge type
CN108528646A (en) A kind of shield pick ice working ship
CN208248444U (en) A kind of shield pick ice working ship
CN103074879A (en) Artificial island manufacture method
CN104058071B (en) A kind of semi-submersible dredget
CN218667551U (en) Outboard supporting type riprap diversion structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination