CN108301870B - A kind of underground coal mine filling bag shaped structure and its application method - Google Patents
A kind of underground coal mine filling bag shaped structure and its application method Download PDFInfo
- Publication number
- CN108301870B CN108301870B CN201711326312.1A CN201711326312A CN108301870B CN 108301870 B CN108301870 B CN 108301870B CN 201711326312 A CN201711326312 A CN 201711326312A CN 108301870 B CN108301870 B CN 108301870B
- Authority
- CN
- China
- Prior art keywords
- girder truss
- shaped structure
- rectangle
- bag shaped
- coal mine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/02—Supporting means, e.g. shuttering, for filling-up materials
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/005—Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
Abstract
A kind of underground coal mine filling bag shaped structure and its application method: including girder truss wall, fill bag shaped structure surface encapsulation layer and bottom structure, girder truss wall is formed by girder truss is framework superimposed, girder truss frame is formed by connecting by the completely the same girder truss aggregate head and the tail in four sides, every row's girder truss aggregate is connected to form by multiple girder truss cell cubes are arranged in parallel, the bottom of girder truss cell cube is rectangle, top is surrounded by four triangles, four vertexs of a triangle are overlapped as a bit, and subpoint of this on the rectangle of bottom surface is two cornerwise intersection points of rectangle, and two vertex of triangular base are successively overlapped with four vertex of rectangle, rectangle only connects a diagonal line, the rectangle diagonal line connection of adjacent truss beam element body is opposite;Girder truss wall is fixedly connected between the inner surface sealant and outer surface sealant of filling bag shaped structure surface encapsulation layer, and is mounted on bottom structure.Present invention itself has intensity and model standardizes, and can speed up the work and reduce expense.
Description
Technical field
The present invention relates to the filling forming structure that a kind of filling mining or gob side entry retaining use, especially a kind of coal mine
Retrofilling bag shaped structure and its application method.
Background technique
In mineral industry, for filler carry out gob side entry retaining, the country use at first activity steel form as
Construct thereafter as the raising of technology uses flexible filling bag instead as construct, and carries out gob side entry retaining by high-water material
Flexible filling bag is all made of in the ultrahigh water material goaf filling method of reference as filling construct.
Field engineering practice in using flexible filling bag carry out filling construct after, formed obturation can be with lane
The effect of road roof and floor pressure and expand deformation so that final filling effect is not satisfactory, and use flexible filling
Bag needs to formulate the size of filling bag, ununified standard model, so that scene is applied according to the field condition of each coal mine
Work takes a long time.
Summary of the invention
In order to overcome the shortcomings of the prior art, the present invention provides a kind of underground coal mine filling bag shaped structure and its use
Method, the filling bag shaped structure itself has intensity and model standardizes, and expense can be speeded up the work and be reduced to application method
With.
The technical solution used to solve the technical problems of the present invention is that:
A kind of underground coal mine filling bag shaped structure, including girder truss wall, filling bag shaped structure surface encapsulation layer and bottom
Portion's structure, the girder truss wall are formed by girder truss is framework superimposed, and the girder truss frame is completely the same by four sides
Girder truss aggregate head and the tail be formed by connecting, every row's girder truss aggregate is by multiple girder truss cell cubes connected shape arranged in parallel
At the bottom of the girder truss cell cube is rectangle, and top is surrounded by four triangles, and four vertexs of a triangle are overlapped
For a bit, and subpoint of this on the rectangle of bottom surface is two cornerwise intersection points of rectangle, and two of triangular base
Vertex is successively overlapped with four vertex of rectangle, and rectangle only connects a diagonal line, and the rectangle of adjacent truss beam element body is diagonal
Line connection is opposite;Girder truss wall is fixedly connected on inner surface sealant and the outer surface of filling bag shaped structure surface encapsulation layer
Between sealant, while girder truss wall is mounted on bottom structure.
A kind of application method of underground coal mine filling bag shaped structure, including following operating procedure: 1) it is needing using filling
At the down well placement of bag shaped structure, ground is flattened, then steadily places bottom structure;2) truss is coupled on bottom structure
Beam aggregate successively sets up a circle girder truss aggregate and forms girder truss frame, is superimposed multiple girder truss frames and eventually becomes one
Stifled girder truss wall;3) it when the height of girder truss wall reaches and contacts with roof, injects and fills at preset inlet
Filling chock material is completed after material solidification to be filled.
Compared with prior art, a kind of underground coal mine of the invention filling bag shaped structure and its application method, due to its filling
Bag shaped structure is formed by girder truss cell cube set, and specifically, girder truss cell cube constitutes girder truss aggregate, then by purlin
Aggregate of setting a roof beam in place forms girder truss frame, and final girder truss is framework superimposed at girder truss wall, and girder truss wall is arranged in bag
It in shape body structure surface sealant and is mounted on and just constitutes filling bag shaped structure of the invention on bottom structure, injection is filled thereto
Filling chock material, the girder truss cell cube can generate outside expansionary force in top (i.e. internal) active force by obturation,
In girder truss wall under the anchor pole of horizontal drawing or the stretching action of anchor cable, so that giving internal one outside girder truss cell cube inwardly
Reaction force effect, power between the two cancels out each other, and the final filling forming structure can effectively control obturation
The dilatancy of the lower filling forming structure generated of compression power effect.As it can be seen that the present invention is that itself has intensity and type
Number standardized convenient filling forming structure, so that for underground gob side entry retaining and the more universalness and height of filling mining technique
Using for effectization provides convenience, and can reduce expense of colliery industry when with process above.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the structural schematic diagram of girder truss cell cube in one embodiment of the invention.
Fig. 2 is the structural schematic diagram of girder truss aggregate in one embodiment of the invention.
Fig. 3 is the structural representation of girder truss wall and filling bag shaped structure surface encapsulation layer in one embodiment of the invention
Figure.
Fig. 4 is the structural schematic diagram of bottom structure in one embodiment of the invention.
Fig. 5 is the structural schematic diagram that one embodiment of the invention increases anchor pole or anchor cable structure.
In figure, 1, girder truss cell cube, 1-1, rectangle, 1-2, triangle, 2, girder truss aggregate, 3, girder truss wall,
4, bottom structure, 4-1, supporting leg, 4-2, side trench, 5, anchor pole or anchor cable, 6, filling bag shaped structure, 7, inner surface sealant, 8,
Outer surface sealant.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people
Member's every other embodiment obtained without making creative work, belongs to protection scope of the present invention.
A kind of underground coal mine of the invention fills bag shaped structure, including girder truss wall 3, filling bag shaped structure face seal
Layer and bottom structure 4, the girder truss wall 3 are formed by girder truss is framework superimposed, and the girder truss frame is by four
Completely the same 2 head and the tail of girder truss aggregate in face are formed by connecting, and every row's girder truss aggregate 2 is flat by multiple girder truss cell cubes 1
Row arrangement is connected to form, and the bottom of the girder truss cell cube 1 is rectangle 1-1, and top is surrounded by four triangle 1-2, and four
The vertex of a triangle 1-2 is overlapped as a bit, and subpoint of this on the rectangle 1-1 of bottom surface is two of rectangle 1-1 diagonal
The intersection point of line, and two vertex of the bottom triangle 1-2 are successively overlapped with four vertex of rectangle, rectangle 1-1 only connects one
The rectangle diagonal line connection of diagonal line, adjacent truss beam element body 1 is opposite;Girder truss wall 3 is fixedly connected on the bag-shaped knot of filling
Between the inner surface sealant 7 and outer surface sealant 8 of structure surface encapsulation layer, while girder truss wall 3 is mounted on bottom structure
On 4.Girder truss wall 3 of the invention in this way and filling bag shaped structure surface encapsulation layer are just gathered for an entirety, at
In order to which a kind of underground coal mine of composite board form shape fills bag shaped structure, finished product directly sets up and applies in well as standard component
Under, convenient construction.
Fig. 1 to Fig. 5 shows the structural schematic diagram of a preferred embodiment of the invention.
Referring to Fig. 1, which is a rectangle 1-1, rectangle 1-1 long 548mm, wide 216mm, and truss element
The vertex of body is in center, and apart from rectangle 1-1 high 250mm, top is surrounded by four triangle 1-2, four triangles
The vertex of 1-2 is overlapped as a bit, and subpoint of this on the rectangle 1-1 of bottom surface is two cornerwise intersection points of rectangle 1-1,
And two vertex of the bottom triangle 1-2 are successively overlapped with four vertex of rectangle 1-1, rectangle 1-1 only connects a diagonal line,
The rectangle diagonal line connection for forming the adjacent truss beam element body 1 of girder truss aggregate 2 is reversed;Truss element body can be
Steel construction, but not limited to this, it is also adapted to the material application with higher-strength.
Referring to fig. 2,1 structure of the girder truss cell cube girder truss aggregate 2 in a row as shown in figure 1 above, every row's girder truss
Aggregate 2 is connected to form by multiple girder truss cell cubes 1 are arranged in parallel, every row be directly connected to mode can using welding, because
For present material selection steel, when selecting other to meet intensity and light composite material, between girder truss cell cube 1
Connection type is gluing.The structure is more prominent in order to which initial stage image is shown, spy enumerates to be combined by 6 girder truss cell cubes 1
Made of form, and in standard form later formed by the structure composite, i.e., final template is to arrange the structures by number to fold
Add, become a face wall, be convenient for underground transportation, underground further according to actual conditions by template splicing together, thus
Achieve the purpose that finally to fill.
Referring to Fig. 3 and Fig. 4, based on the analysis of two above structure, set forms girder truss wall shown in final Fig. 3
3 effective structure figure, the girder truss wall 3 are formed by girder truss is framework superimposed, and the girder truss frame is by four sides
Completely the same 2 head and the tail of girder truss aggregate are formed by connecting, and girder truss wall 3 is fixedly connected on filling bag shaped structure face seal
Between the inner surface sealant 7 and outer surface sealant 8 of layer (as shown in Figure 3), girder truss wall 3 and filling bag shaped structure table
The connection type of face sealant can be gluing or rivet clasp, but be not excluded for actual production use during other can connection type,
Girder truss wall 3 is mounted on bottom structure 4 simultaneously.In the engineering practice in later period, and for the close of final products
Closure material, which requires, to be waterproof, smooth and has certain degree of hardness, such as duroplasts or glued board etc..
As shown in figure 4, bottom structure 4 is the fix stably structure of girder truss wall 3 in Fig. 3, the bottom structure 4 is
Standard component, specific implementation structure can be, and it is lower groove between supporting leg 4-1, top two sides are equipped with that lower part, which has supporting leg 4-1,
Side trench 4-2, girder truss wall 3 are placed in the side trench 4-2 of bottom structure 4.Girder truss wall 3 is placed in bottom structure 4
In side trench 4-2, convenience is provided for subsequent construction, changes many and diverse process of existing frame net hanging bag, and bottom structure 4 is as filling
Body bottom reveals material not.
A kind of application method of underground coal mine filling bag shaped structure, including following operating procedure:
1) firstly, the data according to live actual measurement show whether 4 size of standard bottom structure given at present is suitable,
It is practical according to scene if the size of existing standard bottom structure 4 is not able to satisfy actual conditions if suitable carry out subsequent handling
Situation changes the size of bottom structure 4 in due course;
2) at the down well placement for needing to use filling bag shaped structure that ground is smooth, then according to filling bag shaped structure
4 lower groove position of bottom structure, two corresponding excavation grooves of constructing out at smooth ground are finally steady by bottom structure 4
It is placed on the smooth ground for excavating groove;
3) girder truss wall 3 is set up after bottom structure is laid with certain length, i.e., at the side trench 4-2 of bottom structure 4
It is inserted into first part's girder truss aggregate 2, so that girder truss aggregate 2 is just inserted at side trench 4-2, then successively sets up one
Circle girder truss aggregate 2 makes it form girder truss frame, and superposition multilayer girder truss frame eventually becomes a stifled girder truss wall 3;
Referring to Fig. 5, the preferred design as the present embodiment is, can be horizontal in 6 inside of filling bag shaped structure
Draw several anchor poles or anchor cable 5.In filling 6 use process of bag shaped structure, the data and coal mine according to initial stage measurement are general
The calculation formula of anchor pole endurance, obtains the quantity of the anchor pole set up inside it or anchor cable 5, reaches and meet strength of filling mass
It is required that.On the one hand increasing the effect of anchor pole or anchor cable 5 for obturation and can fill active force between 6 the two of bag shaped structure and anti-
Active force provides active force, so that meeting all utilizations of the invention, the intensity of obturation itself on the other hand can be enhanced, make
It obtains to come that its pressure can be withstood when pressure is strong in Seam Roof And Floor, without causing obturation compression to expand deformation.
The above is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, it is all according to
According to technical spirit of the invention, any simple modification and same variation are made to above embodiments, each fall within guarantor of the invention
Within the scope of shield.
Claims (8)
1. a kind of underground coal mine fills bag shaped structure, it is characterized in that: close including girder truss wall (3), filling bag shaped structure surface
Sealing and bottom structure (4), the girder truss wall (3) are formed by girder truss is framework superimposed, the girder truss frame
It is to be formed by connecting from beginning to end by the completely the same girder truss aggregate (2) in four sides, every row's girder truss aggregate (2) is by multiple truss
Beam element body (1) is arranged in parallel to be connected to form, and the bottom of the girder truss cell cube (1) is rectangle (1-1), and top is by four
A triangle (1-2) surrounds, and the vertex of four triangles (1-2) is overlapped as a bit, and the point is on bottom surface rectangle (1-1)
Subpoint is two cornerwise intersection points of rectangle (1-1), and two vertex of the bottom triangle (1-2) and rectangle (1-1)
Four vertex are successively overlapped, and rectangle (1-1) only connects a diagonal line, and the rectangle diagonal line of adjacent truss beam element body (1) connects
It connects opposite;Girder truss wall (3) is fixedly connected on inner surface sealant (7) and the outer surface of filling bag shaped structure surface encapsulation layer
Between sealant (8), while girder truss wall (3) is mounted on bottom structure (4).
2. a kind of underground coal mine according to claim 1 fills bag shaped structure, it is characterized in that: the bottom structure (4)
For standard component, its underpart has supporting leg (4-1), is lower groove between supporting leg (4-1), and top two sides are equipped with side trench (4-2), purlin
Wall (3) of setting a roof beam in place is placed in the side trench (4-2) of bottom structure (4).
3. a kind of underground coal mine according to claim 2 fills bag shaped structure, it is characterized in that: the bottom structure (4)
A length of 3000mm, width 1000mm, side trench (4-2) width in long side are 280mm, depth 350mm.
4. a kind of underground coal mine according to claim 3 fills bag shaped structure, it is characterized in that: the girder truss cell cube
(1) rectangle (1-1) a length of 548mm, the height of width 216mm, the vertex distance rectangle (1-1) of top triangular are 250mm.
5. a kind of underground coal mine according to any one of claims 1 to 4 fills bag shaped structure, it is characterized in that: the purlin
Cell cube of setting a roof beam in place (1) is steel construction.
6. a kind of underground coal mine according to any one of claims 1 to 4 fills bag shaped structure, it is characterized in that: the filling
Bag shaped structure surface encapsulation layer selects waterproof, smooth and with certain degree of hardness material to be made.
7. a kind of application method of underground coal mine filling bag shaped structure as described in claim 1, it is characterized in that: including following behaviour
Make step:
1) it is needing at the down well placement using filling bag shaped structure, is flattening ground, then placing bottom structure (4);
2) it is coupled on bottom structure (4) girder truss aggregate (2), successively sets up circle girder truss aggregate (2) composition
Girder truss frame is superimposed multiple girder truss frames and eventually becomes a stifled girder truss wall (3);
3) when the height of girder truss wall (3) reaches and contacts with roof, filler is injected at preset inlet,
It is completed after material solidification to be filled.
8. the application method of a kind of underground coal mine filling bag shaped structure according to claim 7, it is characterized in that: described
Fill bag shaped structure (6) internal horizontal several anchor poles of drawing or anchor cable (5).
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711326312.1A CN108301870B (en) | 2017-12-13 | 2017-12-13 | A kind of underground coal mine filling bag shaped structure and its application method |
RU2018144939A RU2704408C1 (en) | 2017-12-13 | 2018-06-12 | Underground bag-like filling structure for coal mine and method of its use |
AU2018278957A AU2018278957B8 (en) | 2017-12-13 | 2018-06-12 | Coal mine underground bag-shaped filling structure and method of using same |
PCT/CN2018/090750 WO2019114224A1 (en) | 2017-12-13 | 2018-06-12 | Bag-shaped filling structure for underground coal mine and use method therefor |
ZA2018/08355A ZA201808355B (en) | 2017-12-13 | 2018-12-11 | Coal mine underground bag-shaped filling structure and method of using same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711326312.1A CN108301870B (en) | 2017-12-13 | 2017-12-13 | A kind of underground coal mine filling bag shaped structure and its application method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108301870A CN108301870A (en) | 2018-07-20 |
CN108301870B true CN108301870B (en) | 2019-06-11 |
Family
ID=62869954
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711326312.1A Active CN108301870B (en) | 2017-12-13 | 2017-12-13 | A kind of underground coal mine filling bag shaped structure and its application method |
Country Status (5)
Country | Link |
---|---|
CN (1) | CN108301870B (en) |
AU (1) | AU2018278957B8 (en) |
RU (1) | RU2704408C1 (en) |
WO (1) | WO2019114224A1 (en) |
ZA (1) | ZA201808355B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110332008A (en) * | 2019-07-31 | 2019-10-15 | 邢萌 | Based on graphite-filled underground caving place structure and its fill method |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1804567A3 (en) * | 1991-04-10 | 1993-03-23 | Apдaшeb Kohctahtиh Apkaдьebич | Movable filling stopping |
RU2160366C1 (en) * | 1999-06-03 | 2000-12-10 | Сибирский государственный индустриальный университет | Method of erection of artificial pillar |
US8444108B2 (en) * | 2008-05-12 | 2013-05-21 | Kennedy Metal Products & Buildings, Inc. | Mine seal with electrically non-conductive ties |
WO2011010300A2 (en) * | 2009-07-23 | 2011-01-27 | Biomedy Limited | A structural module for construction of buildings |
CN101705838A (en) * | 2009-11-05 | 2010-05-12 | 冀中能源邯郸矿业集团有限公司 | Separate type filling method of goaf |
CN101975085B (en) * | 2010-09-09 | 2013-07-03 | 中国矿业大学 | Gob-side entry retaining reinforcing filling body structure construction method |
CN202914107U (en) * | 2012-11-15 | 2013-05-01 | 华北科技学院 | Roadway support truss |
CN103089298B (en) * | 2013-01-23 | 2014-11-19 | 中国矿业大学 | Structure and method for building side direction multicolumn gob-side entry retaining filling wall body |
CN103603688B (en) * | 2013-09-25 | 2015-07-15 | 安徽理工大学 | Gob-side entry three-dimensional reinforcement filled wall structure and filling method thereof |
US11111787B2 (en) * | 2015-08-12 | 2021-09-07 | Moore Management Company Pty Ltd | Method and an apparatus for creating a void for underground mining |
CN105937407B (en) * | 2016-06-22 | 2017-11-10 | 西安科技大学 | A kind of construction method of gob-side entry retaining concrete filling wall annular air-pocket |
CN107013229A (en) * | 2017-05-26 | 2017-08-04 | 新疆大学 | Folding telescopic gob side entry retaining roadside packing Flexible formwork assembly and its construction method |
-
2017
- 2017-12-13 CN CN201711326312.1A patent/CN108301870B/en active Active
-
2018
- 2018-06-12 AU AU2018278957A patent/AU2018278957B8/en not_active Ceased
- 2018-06-12 RU RU2018144939A patent/RU2704408C1/en active
- 2018-06-12 WO PCT/CN2018/090750 patent/WO2019114224A1/en active Application Filing
- 2018-12-11 ZA ZA2018/08355A patent/ZA201808355B/en unknown
Also Published As
Publication number | Publication date |
---|---|
AU2018278957A1 (en) | 2019-06-27 |
WO2019114224A1 (en) | 2019-06-20 |
AU2018278957B8 (en) | 2019-09-19 |
CN108301870A (en) | 2018-07-20 |
AU2018278957B2 (en) | 2019-08-29 |
RU2704408C1 (en) | 2019-10-28 |
ZA201808355B (en) | 2020-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103255853B (en) | Tooth-groove-type connection structure of upper-layer inner wallboard of assembly-type shear wall and lower-layer inner wallboard of assembly-type shear wall | |
CN104453014B (en) | The method of attachment of 3D printing filled wall and constructional column and attachment structure | |
CN205617420U (en) | Building block formula panel reinforced earth retaining wall | |
CN104153792B (en) | A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method | |
CN207211444U (en) | A kind of mounting clip pieces coordinated with groove and tognue type Light trabses | |
CN206337641U (en) | Transverse joint connecting node between a kind of prefabricated board wall layers | |
CN107447901A (en) | Anti-seismic prefabricated floor and floor antidetonation splicing construction | |
CN203487640U (en) | Beam column connection T type node applied in top-down method | |
CN108301870B (en) | A kind of underground coal mine filling bag shaped structure and its application method | |
CN103410550B (en) | A kind of coal mine underground airbridge construction method | |
CN205714226U (en) | The Tunnel structure of steel pipe steelframe is set in a kind of | |
CN104314050A (en) | Concrete engineering deformation joint vertical water stop cavity die and construction method thereof | |
CN104314048A (en) | Manufacturing and construction method of air bag type concrete engineering deformation joint water stop type cavity die | |
CN104452826B (en) | A kind of concrete works swaging die air bag and manufacture method thereof | |
CN203296778U (en) | Rigid-flexible combination gob-side entry retaining roadway-side shoring device | |
CN103883336B (en) | A kind of adjustable gob side entry retaining body of wall of first initiatively relief pressure supporting and construction method thereof | |
CN207048187U (en) | A kind of precast concrete connecting structure | |
CN103291319B (en) | Rigid-flexible combination gob-side entry retaining method and rigid-flexible combination gob-side entry retaining device by aid of roadside supports | |
CN105840234B (en) | A kind of pile pillar filling template and its application method | |
CN104234185A (en) | Wire cage frame hollow concrete framework structure and assembling method thereof | |
CN203741782U (en) | Multi-section face plate structure of high concrete faced rockfill dam | |
CN207633583U (en) | A kind of connection structure of prefabricated post and prefabricated partition wall | |
CN203891252U (en) | High-strength earthquake-proof building masonry | |
CN206128082U (en) | Foundation fit base plate or floor slab rebar wear transform structure of shaped steel stand | |
CN204112361U (en) | A kind of barricade lath brick and barricade |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |