CN104153792B - A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method - Google Patents
A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method Download PDFInfo
- Publication number
- CN104153792B CN104153792B CN201410356142.1A CN201410356142A CN104153792B CN 104153792 B CN104153792 B CN 104153792B CN 201410356142 A CN201410356142 A CN 201410356142A CN 104153792 B CN104153792 B CN 104153792B
- Authority
- CN
- China
- Prior art keywords
- energy
- absorbing
- support system
- steel pipe
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410356142.1A CN104153792B (en) | 2014-07-24 | 2014-07-24 | A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410356142.1A CN104153792B (en) | 2014-07-24 | 2014-07-24 | A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104153792A CN104153792A (en) | 2014-11-19 |
CN104153792B true CN104153792B (en) | 2016-04-06 |
Family
ID=51879403
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410356142.1A Expired - Fee Related CN104153792B (en) | 2014-07-24 | 2014-07-24 | A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104153792B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104675412A (en) * | 2015-02-12 | 2015-06-03 | 湖南省煤炭地质勘查院 | Closed integral bearing supporting structure for coal-mine coal-pillar bottom plate crushed surrounding rock roadway |
CN105545322B (en) * | 2016-02-26 | 2018-11-27 | 山东大学 | For controlling the safeguard structure and support system and method that tunnel wall rock deformation destroys |
CN106194209B (en) * | 2016-07-07 | 2020-02-14 | 中国石油天然气集团公司 | Concrete-filled steel tube support and construction method thereof |
CN106321123B (en) * | 2016-09-14 | 2018-06-19 | 安徽理工大学 | A kind of self-adjustable mining bracket of support stiffness |
CN108756948B (en) * | 2018-06-15 | 2023-06-20 | 中铁工程设计咨询集团有限公司 | Self-bearing supporting structure for large-span tunnel prestress anchor net supporting rock shell |
CN109386297B (en) * | 2018-10-15 | 2020-04-24 | 兰州理工大学 | Hydraulic tunnel grading yielding support structure and construction method |
CN111577339B (en) * | 2020-04-21 | 2021-09-28 | 中国建筑股份有限公司 | High-ground-stress soft rock tunnel supporting structure system and construction method thereof |
CN111648794B (en) * | 2020-06-02 | 2021-11-12 | 山东高速科技发展集团有限公司 | Support framework for tunnel portal section in cold region and installation method |
CN112523776B (en) * | 2020-11-23 | 2022-03-08 | 安徽理工大学 | Thin bedrock supporting construction |
CN113982630B (en) * | 2021-10-29 | 2024-04-05 | 成都未来智隧科技有限公司 | Tunnel supporting structure |
CN114320414A (en) * | 2021-12-29 | 2022-04-12 | 山东科技大学 | Multistage energy-absorbing tunnel supporting structure and construction method thereof |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2454913C3 (en) * | 1974-11-20 | 1978-06-08 | Hochtief Ag Fuer Hoch- Und Tiefbauten Vormals Gebr. Helfmann, 4300 Essen | Method and arrangement for driving a tunnel |
CN201486570U (en) * | 2009-07-10 | 2010-05-26 | 中铁二院工程集团有限责任公司 | Overlarge cross section old loess tunnel primary support structure of high-speed railway |
CN102226407A (en) * | 2011-05-23 | 2011-10-26 | 中铁二院工程集团有限责任公司 | Four-line large-span tunnel cable-arch combined primary support structure |
CN102562097A (en) * | 2012-01-30 | 2012-07-11 | 山东大学 | Three-dimensional asymmetrical supporting system |
CN102852533A (en) * | 2012-10-18 | 2013-01-02 | 山东大学 | High-strength three-dimensional support system of yielding type restriction concrete lagging jack |
CN102877862A (en) * | 2012-10-18 | 2013-01-16 | 山东大学 | Confined concrete quantitative yielding lagging jack based on mine U-shaped steel |
CN102979543B (en) * | 2012-12-25 | 2014-07-23 | 成都理工大学 | Support method for brittle failure of surrounding rocks of hard rock double-track tunnel by river in area of high stress |
CN204082170U (en) * | 2014-07-24 | 2015-01-07 | 山东大学 | A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system |
-
2014
- 2014-07-24 CN CN201410356142.1A patent/CN104153792B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104153792A (en) | 2014-11-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104153792B (en) | A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method | |
CN204082170U (en) | A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system | |
CN104120647B (en) | It is suitable for section assembling concrete frame bridge pier system and the construction method of rapid construction | |
CN103161480B (en) | Initiatively support the method for roadside packing gob side entry retaining | |
CN106351670B (en) | A kind of closed pre support tunnel structure | |
CN206800412U (en) | The foundation pit enclosure structure that a kind of steel-pipe pile is combined with Larsen steel sheet pile fore shaft | |
KR101028535B1 (en) | Construction method of double tunnel | |
CN106087629B (en) | Without the prefabricated baffle foam concrete light road bank structure of conical slope and construction method | |
CN103993607B (en) | Steel floral tube controls slip casting antiskid composite construction and rapid constructing method thereof | |
CN205013013U (en) | Secretly dig station supporting construction suitable for last soft hard formation down | |
CN103628885A (en) | Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel | |
CN203488189U (en) | Tunnel structure for emptying renovation | |
CN104047613A (en) | Method for anchoring coal mine tunnel bottom plate | |
CN208966352U (en) | A kind of supporting construction in weak rocks matter region tunnel | |
CN103362513A (en) | Transformation and construction method for existing cavity in underground excavation region | |
CN105240024A (en) | Parallel shield tunneling method for extended construction of subway station | |
CN106759376A (en) | Anchored Sheet Pile Wall for Excavation system and its construction method for closing on existing underground structure | |
CN103953363A (en) | Method for connecting shield tunnel pipe sheet and transverse passage structure | |
CN102817621B (en) | Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions | |
CN104612696A (en) | Construction method for underground excavated large-section subway station to pass through viaduct in fine sand layer based on pioneer heading-column method | |
CN102425155B (en) | Method for reinforcing overlying shallow rockmass in mined-out area | |
CN109457709A (en) | A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable | |
CN202227287U (en) | High speed railway bridge protection shed tunnel structure | |
CN107938707A (en) | Prefabricated assembled underground subway station top board structure | |
CN103147772B (en) | Method for supporting steel strip connecting bridge of arch-shaped soft rock roadway with large section |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Shucai Inventor after: Xu Fei Inventor after: Wang Weiming Inventor after: Zhang Qianqing Inventor after: Li Liping Inventor after: Zhang Jian Inventor after: Wang Qinghan Inventor after: Liu Hongliang Inventor after: Wang Jianhua Inventor before: Li Shucai Inventor before: Xu Fei Inventor before: Zhang Qianqing Inventor before: Li Liping Inventor before: Zhang Jian Inventor before: Wang Qinghan Inventor before: Liu Hongliang Inventor before: Wang Jianhua |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LI SHUCAI XU FEI ZHANG QIANQING LI LIPING ZHANG JIAN WANG QINGHAN LIU HONGLIANG WANG JIANHUA TO: LI SHUCAI XU FEI WANG WEIMING ZHANG QIANQING LI LIPING ZHANG JIAN WANG QINGHAN LIU HONGLIANG WANG JIANHUA |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160406 Termination date: 20210724 |