CN104153792B - A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method - Google Patents

A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method Download PDF

Info

Publication number
CN104153792B
CN104153792B CN201410356142.1A CN201410356142A CN104153792B CN 104153792 B CN104153792 B CN 104153792B CN 201410356142 A CN201410356142 A CN 201410356142A CN 104153792 B CN104153792 B CN 104153792B
Authority
CN
China
Prior art keywords
energy
absorbing
support system
steel pipe
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410356142.1A
Other languages
Chinese (zh)
Other versions
CN104153792A (en
Inventor
李术才
徐飞
王渭明
张乾青
李利平
张骞
王庆瀚
刘洪亮
王健华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201410356142.1A priority Critical patent/CN104153792B/en
Publication of CN104153792A publication Critical patent/CN104153792A/en
Application granted granted Critical
Publication of CN104153792B publication Critical patent/CN104153792B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of energy-absorbing being applicable to weak broken wall rock and allow pressure tunnel support system and method, comprising some, structures consistent with tunnel cross-section shape is the grid steel frame of enclosed construction, steel pipe is installed in barrier steelframe, energy absorption device is pressed to be connected by allowing of a kind of sealing between steel pipe with barrier steelframe, grid steel frame, steel pipe and the sectional shelf-unit allowing pressure energy absorption device form, its interval in tunnel moderate distance is arranged, and is connected between the sectional shelf-unit be connected by longitudinal beam; Be provided with preformed hole every a certain distance symmetry on longitudinal beam, the anchor pole of Shi Hanzhang or anchor cable and joist anchor in rock stratum by preformed hole, form three-dimensional integer support to country rock.Solve such tunnel surrounding long-term by DYNAMIC LOADING OF DRIVING TRAIN ON BRIDGES, seismic load and faulting load action under country rock large deformation cause the problem of support system unstable failure.

Description

A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method
Technical field
The present invention relates to a kind of energy-absorbing and allow pressure novel tunnel supporting and protection structure and implementation method thereof, particularly relate to a kind of the tunnel support structure system and the implementation method thereof that are applicable to bear for a long time weak broken wall rock under DYNAMIC LOADING OF DRIVING TRAIN ON BRIDGES, seismic load and faulting load action.
Background technology
For keeping the sound development at full speed of China's economy, realizing the conversion of economic structure system smoothly, getting through blood vessel---speedway, railway, the subway of the economic lifeline connecting each department, extremely urgent.Get rich and first repair the roads, country increases the construction to each department traffic route.Be no matter be strengthen the dynamics to development of the West Regions in recent years, or alleviate urban traffic pressure and the city underground built just like a raging fire, as many Underground Transportation Engineering all will support issues to country rock after tunnel excavation; Especially western China is many mountainous terrain, the gushing water of easily sending out often needing to excavate overlength is dashed forward the Karst Tunnel of mud, such tunnel surrounding weak broken, geological conditions extreme difference, under long-term dynamic loading, country rock easily has the large deformation of the obvious rheological equationm of state, how under long-term train dynamic pressure or seismic loading, effective surrounding rock supporting is implemented to such tunnel, also face many challenges newly.At present for the tunnel of self stability extreme difference, its supporting and protection structure is more common is that i iron bow member, grid steel frame, the U-shaped support that can contract etc. coordinate Bolt net and jet technology to carry out combined supporting.
Present economic situation and tunnel development trend require that supporting should ensure that tunnel safety accomplishes economical rationality again, and surrouding rock stress concentration phenomenon be alleviated or be avoided to simple concrete spraying support can, but effectively can not stop tunnel deformation; Although shaped steel arch has the distortion that good support rigidity suppresses tunnel surrounding, because its coefficient of expansion is different from concrete, easily produce the crack of hoop, and be difficult to support behind concrete filling closely knit, have a strong impact on supporting effect.
Summary of the invention
In order to solve such tunnel surrounding long-term by DYNAMIC LOADING OF DRIVING TRAIN ON BRIDGES, seismic load and faulting load action under country rock large deformation cause the problem of support system unstable failure, the present invention proposes and be a kind ofly applicable to for a long time by the weak broken wall rock tunnel under DYNAMIC LOADING OF DRIVING TRAIN ON BRIDGES, seismic load and faulting load action, what have that energy-absorbing allows pressure feature forms supporting and protection structure by Core Walls Structure and steel grating; Specifically describe the implementation method of this kind of structure simultaneously,
For achieving the above object, the present invention adopts technical scheme as follows:
A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system, comprising some, structures consistent with tunnel cross-section shape is the grid steel frame of enclosed construction, steel pipe is installed in described grid steel frame, described steel pipe presses energy absorption device to be connected with between grid steel frame by allowing of a kind of sealing, described grid steel frame, steel pipe and the sectional shelf-unit allowing pressure energy absorption device form, its interval in tunnel moderate distance is arranged, and is connected between adjacent sectional shelf-unit by longitudinal beam; Be provided with preformed hole every a certain distance symmetry on longitudinal beam, the anchor pole of Shi Hanzhang or anchor cable and joist anchor in rock stratum by preformed hole, form three-dimensional integer support to country rock.
Anchor pole (rope) is by longitudinal beam and the acting in conjunction of limited concrete bow member, it has with country rock contact area large to form a three-dimensional support system, bond effect is good, can common eigenvector jointly stressed, there will not be shrinkage crack, because the advantage of cavitation not easily appears thereafter greatly in its bow member gap; Under extreme difference wall rock condition, consider the shortcoming of grid steel frame support rigidity deficiency, install steel pipe therein, by preformed hole to concrete perfusion inside steel pipe, improve its entire compression and bending resistance.
The described energy-absorbing ring allowing pressure energy absorption device be made up of high strength steel flat spring, has the characteristic allowing and press energy-absorbing.
Described high strength steel disc is the silicon-manganese spring steel sheet that yield strength is greater than 1000Mpa.
Described steel pipe is provided with preformed hole, by preformed hole to concrete perfusion inside steel pipe, improves its entire compression and bending resistance.
Be connected with bolt by grid junction plate between grid steel frame described in every section, and be provided with the rubber pad of different-thickness and intensity between the grid junction plate be connected.
Steel sleeve by being furnished with the rubber pad of different-thickness and intensity between steel pipe described in every section connects.
On steel pipe described in every section, two ends are provided with an exhaust opening, and lower end is provided with grout hole, and described exhaust opening and grout hole are all furnished with and the seal cover coordinated separately.
The longitudinal beam that each Pin sectional shelf-unit is formed by i iron or U-type groove steel, grid steel frame connects; Described i iron or adopt outer joint form between U-type groove steel and grid steel frame, by U-shaped clamp or weld together.
The energy-absorbing being applicable to weak broken wall rock allows the implementation method of pressure tunnel support system, comprises the following steps:
1) integrating tunnel sequence of excavation, first locally installs the sectional shelf-unit of the steel grating+concrete steel pipe assembled along excavation face, be fixed on country rock by the prestressed anchor (rope) being furnished with joist;
2) then immediately newly excavate part, by sleeve pipe and high-strength bolt link remainder sectional shelf-unit, and prestressed anchor pole (rope) and joist are fixed on country rock, ensure that every section of sectional shelf-unit is on same section loop wire simultaneously;
3), after treating a Pin support installing, segmentation is to steel pipe concrete perfusion, and grout hole is in bottom, and exhaust opening, on top, is sealed grout hole and exhaust opening by seal cover after this section of perfusion terminates, until all steel pipe grouting is complete;
4) by coupling beam, every Pin sectional shelf-unit is connected, simultaneously at coupling beam hole to be provided injection prestressed anchor (rope) and joist, form three-dimensional high strength support system.
The present invention has the following advantages compared with current conventional tunnel support support and method thereof:
1) by assembled grating steelframe and core concrete steel pipe, overcome and utilize merely grid steel frame to carry out supporting, support rigidity is lower, in the shortcoming of the unfavorable adjoining rock stability of long-term large deformation and Deformation control;
2) by installing sealing energy-absorbing by pressure device between steel grating and concrete steel pipe, the buffer memory to the impact energy of the long-term train load in country rock inside or seismic load and absorption is achieved; Also realize dynamically allowing pressure to long-term Rheological Deformation simultaneously;
3) by installing the speciality rubber pad of suitable intensity, thickness in every section of steel grating junction and concrete steel pipe junction, bump and seismic load is alleviated to the flash disruption of supporting and protection structure;
4) utilize longitudinal coupling beam that each Pin support is coupled together, form the support system of stereoscopic three-dimensional, be conducive to the bulk strength playing support system;
5) by Shi Hanzhang anchor pole (rope) and joist, support system and country rock are encrypted and presses together, form support circle together with country rock, suppress the plastic flow of country rock relax zone to worsen, the three-dimensional stress constraint achieving country rock maximizes and recovers.
Accompanying drawing explanation
Fig. 1 is that the main body of apparatus of the present invention embodiment one faces structural representation-1;
Fig. 2 is that the main body of apparatus of the present invention embodiment one faces structural representation-2;
Fig. 3 is that the grid of the corresponding diagram 1 of apparatus of the present invention connects and sleeve pipe detail drawing;
Fig. 4 a is that the energy-absorbing of the corresponding diagram 1 of apparatus of the present invention is by pressure device overall diagram;
Fig. 4 b is that the energy-absorbing of the corresponding diagram 1 of apparatus of the present invention is by pressure device sectional view;
Fig. 5 is the grid drawing of the corresponding diagram 1 of apparatus of the present invention;
Fig. 6 is the a-a sectional drawing of the corresponding diagram 5 of apparatus of the present invention;
Fig. 7 is the grid expanded view of the corresponding diagram 5 of apparatus of the present invention;
Fig. 8 is the three dimensions schematic diagram of the support system of apparatus of the present invention;
In figure: 1-grid steel frame, 2-concrete steel pipe, 3-sleeve pipe, 4-longitudinal beam, 5-rubber pad a, 6-high-strength bolt, 7-grid junction plate, 8-energy-absorbing by pressure ring, 9-grout hole, 10-exhaust opening, 11-rubber pad b, 12-prestressed anchor (rope).
Detailed description of the invention
Describe the present invention below in conjunction with accompanying drawing and embodiment one.
Apparatus of the present invention mainly comprise grid steel frame 1, concrete steel pipe 2, sleeve pipe 3, longitudinal coupling beam 4, rubber pad a5, high-strength bolt 6, grid junction plate 7, energy-absorbing is by pressure ring 8, grout hole 9, exhaust opening 10, rubber pad b11, prestressed anchor (rope) 12 and joist; Grid steel frame 1 is consistent with tunnel cross-section shape, structure is enclosed construction, grid steel frame 1 in be installed on concrete steel pipe 2, be connected by pressure ring 8 by a kind of energy-absorbing of sealing between concrete steel pipe 2 with grid steel frame 1, the sectional shelf-unit that grid steel frame 1, concrete steel pipe 2 and energy-absorbing form by pressure ring 8, its interval in tunnel moderate distance is arranged, and is connected between adjacent sectional shelf-unit by longitudinal beam; Be provided with preformed hole every a certain distance symmetry on longitudinal beam, the anchor pole of Shi Hanzhang or anchor cable and joist anchor in rock stratum by preformed hole, form three-dimensional integer support to country rock.
Steel grating and concrete surface long-pending large, bond effect is good, can common eigenvector jointly stressed, there will not be shrinkage crack, because its bow member gap not easily occurs cavitation thereafter greatly; But supporting steel grating rigidity is general less, and cannot adapt to heavily stressed surrounding rock tunnel, the design carrys out the deficiency of its long-term support rigidity supplementary by embedding slip casting round steel pipe therein; Sealing is installed in the two contact position simultaneously and allows pressure device,
Grid steel frame+concrete steel pipe sectional shelf-unit keeps at a certain distance away layout, connected by longitudinal beam between adjacent stent, on longitudinal beam, symmetry leaves anchor pole (rope) hole at spacing intervals, Shi Hanzhang anchor pole (rope) and joist anchor in rock stratum by preformed hole, form three-dimensional integer support to country rock.
Prestressed anchor (rope) 12 is by longitudinal beam and the acting in conjunction of limited concrete bow member, it has with country rock contact area large to form a three-dimensional support system, bond effect is good, can common eigenvector jointly stressed, there will not be shrinkage crack, because the advantage of cavitation not easily appears thereafter greatly in its bow member gap; Under extreme difference wall rock condition, consider the shortcoming of grid steel frame support rigidity deficiency, install steel pipe therein, by preformed hole to concrete perfusion inside steel pipe, improve its entire compression and bending resistance.
The parts connected between grid steel frame and concrete steel pipe are a kind of sealed device, and the energy-absorbing ring that energy-absorbing is made up of high strength steel flat spring by pressure ring 8 has the characteristic allowing and press energy-absorbing.High strength steel disc is the silicon-manganese spring steel sheet that yield strength is greater than 1000Mpa.
By the excavating sequences sectional in tunnel, be connected with high-strength bolt 6 by grid junction plate 7 between every section of grid steel frame 1, and be provided with the rubber pad a5 of different-thickness and intensity (depending on country rock by compressive strain requirement) between the grid junction plate be connected.
Concrete steel pipe 2 is provided with preformed hole, by preformed hole to concrete perfusion inside steel pipe, improves its entire compression and bending resistance.
Connected by the steel sleeve 3 of the rubber pad b11 being furnished with different-thickness and intensity (depending on country rock by compressive strain requirement) between every section concrete steel pipe 2.
On steel pipe described in every section, two ends are provided with an exhaust opening 10, and lower end is provided with grout hole 9, and exhaust opening 10 and grout hole 9 are all furnished with and the seal cover coordinated separately, conveniently carry out work post-grouting reinforcing.
Each Pin sectional shelf-unit connects into entirety by longitudinal beam 4, and supporting structure system and country rock are pressed together by Shi Hanzhang anchor pole (rope) and joist 12 by sectional shelf-unit and longitudinal beam 4, form the three-dimensional support system of three dimensions with country rock.The longitudinal beam formed by i iron or U-type groove steel, grid steel frame connects; Described i iron or adopt outer joint form between U-type groove steel and grid steel frame, by U-shaped clamp or weld together.Each Pin supporting and protection structure is made up of four parts, is connected between every part by high-strength rubber pad, thus the long-term energy-absorbing yield supporting by broken weak tunnel under DYNAMIC LOADING OF DRIVING TRAIN ON BRIDGES or seismic loading realized.
The energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and implementation method thereof, sets forth further by reference to the accompanying drawings to its method of operating:
1) integrating tunnel sequence of excavation, first installs the sectional shelf-unit of the steel grating+concrete steel pipe assembled along first step excavation face part, be fixed on country rock by prestressed anchor (rope) and joist 12 simultaneously;
2) then immediately bottom excavated section, all the other section of sectional shelf-unit is assembled by sleeve pipe 3 and high-strength bolt 6, grid junction plate 7, and injection prestressed anchor (rope) 12 is fixed on country rock, ensure that every section of sectional shelf-unit is on same section loop wire simultaneously;
3), after treating a Pin support installing, segmentation is to steel pipe concrete perfusion, and grout hole 9 is in bottom, and exhaust opening 10, on top, is sealed grout hole and exhaust opening by supporting seal cover after this section of perfusion terminates, until all steel pipe grouting is complete;
4) by longitudinal coupling beam 4, every Pin sectional shelf-unit is realized longitudinally connecting, simultaneously at coupling beam hole to be provided injection prestressed anchor (rope) and joist 12, form three-dimensional high strength support system.
In the present invention, prestressed anchor (rope) is at weak surrounding rock smashed to pieces, or crevice water enriches stratum and also can replace with grouted anchor bar or grouting cable anchor etc. in interval, improves the mechanical property of country rock with the mechanics parameter changing country rock.
The present invention only sets forth for example one tunnel support, but is applicable to the supporting in subway, mine working, karst chamber, secretly hole and some special underground constructions too.
As known by the technical knowledge, the present invention can be realized by other the embodiment not departing from its Spirit Essence or essential feature.Therefore, with regard to each side, all just illustrating, is not only.Within the scope of the present invention all or be all included in the invention being equal to the change in scope of the present invention.

Claims (8)

1. the energy-absorbing being applicable to weak broken wall rock allows the implementation method of pressure tunnel support system, the described energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system, comprise some consistent with tunnel cross-section shape, structure is the grid steel frame of enclosed construction, steel pipe is installed in described grid steel frame, described steel pipe presses energy absorption device to be connected with between grid steel frame by allowing of a kind of sealing, described grid steel frame, steel pipe and the sectional shelf-unit allowing pressure energy absorption device form, its interval in tunnel moderate distance is arranged, connected by longitudinal beam between adjacent sectional shelf-unit, be provided with preformed hole every a certain distance symmetry on longitudinal beam, the anchor pole of Shi Hanzhang or anchor cable and joist anchor in rock stratum by preformed hole, form three-dimensional integer support, it is characterized in that comprising the following steps to country rock:
1) integrating tunnel sequence of excavation, first locally installs the sectional shelf-unit of the steel grating+concrete steel pipe assembled, is fixed on country rock by the prestressed anchor or anchor cable being furnished with joist along excavation face;
2) then immediately newly excavate part, by sleeve pipe and high-strength bolt link remainder sectional shelf-unit, and prestressed anchor pole or anchor cable and joist are fixed on country rock, ensure that every section of sectional shelf-unit is on same section loop wire simultaneously;
3), after treating a Pin support installing, segmentation is to steel pipe concrete perfusion, and grout hole is in bottom, and exhaust opening, on top, is sealed grout hole and exhaust opening by seal cover after this section of perfusion terminates, until all steel pipe grouting is complete;
4) by coupling beam, every Pin sectional shelf-unit is connected, simultaneously at coupling beam hole to be provided injection prestressed anchor or anchor cable and joist, form three-dimensional high strength support system.
2. the energy-absorbing being applicable to weak broken wall rock as claimed in claim 1 allows the implementation method of pressure tunnel support system, it is characterized in that: the described energy-absorbing ring allowing pressure energy absorption device be made up of high strength steel flat spring, has to allow the characteristic of pressure energy-absorbing.
3. the energy-absorbing being applicable to weak broken wall rock as claimed in claim 2 allows the implementation method of pressure tunnel support system, it is characterized in that: described high strength steel disc is the silicon-manganese spring steel sheet that yield strength is greater than 1000Mpa.
4. the energy-absorbing being applicable to weak broken wall rock as claimed in claim 1 allows the implementation method of pressure tunnel support system, it is characterized in that: described steel pipe is provided with preformed hole, by preformed hole to concrete perfusion inside steel pipe, improve its entire compression and bending resistance.
5. the energy-absorbing being applicable to weak broken wall rock as claimed in claim 1 allows the implementation method of pressure tunnel support system, it is characterized in that: be connected with bolt by grid junction plate between the grid steel frame described in every section, and be provided with the rubber pad of different-thickness and intensity between the grid junction plate be connected.
6. the energy-absorbing being applicable to weak broken wall rock as claimed in claim 1 allows the implementation method of pressure tunnel support system, it is characterized in that: the steel sleeve by being furnished with the rubber pad of different-thickness and intensity between the steel pipe described in every section connects.
7. the energy-absorbing being applicable to weak broken wall rock as claimed in claim 6 allows the implementation method of pressure tunnel support system, it is characterized in that: on the steel pipe described in every section, two ends are provided with an exhaust opening, lower end is provided with grout hole, and described exhaust opening and grout hole are all furnished with and the seal cover coordinated separately.
8. the energy-absorbing being applicable to weak broken wall rock as claimed in claim 1 allows the implementation method of pressure tunnel support system, it is characterized in that: the longitudinal beam connection that each Pin sectional shelf-unit is formed by i iron or U-type groove steel, grid steel frame; Described i iron or adopt outer joint form between U-type groove steel and grid steel frame, by U-shaped clamp or weld together.
CN201410356142.1A 2014-07-24 2014-07-24 A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method Expired - Fee Related CN104153792B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410356142.1A CN104153792B (en) 2014-07-24 2014-07-24 A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410356142.1A CN104153792B (en) 2014-07-24 2014-07-24 A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method

Publications (2)

Publication Number Publication Date
CN104153792A CN104153792A (en) 2014-11-19
CN104153792B true CN104153792B (en) 2016-04-06

Family

ID=51879403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410356142.1A Expired - Fee Related CN104153792B (en) 2014-07-24 2014-07-24 A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method

Country Status (1)

Country Link
CN (1) CN104153792B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104675412A (en) * 2015-02-12 2015-06-03 湖南省煤炭地质勘查院 Closed integral bearing supporting structure for coal-mine coal-pillar bottom plate crushed surrounding rock roadway
CN105545322B (en) * 2016-02-26 2018-11-27 山东大学 For controlling the safeguard structure and support system and method that tunnel wall rock deformation destroys
CN106194209B (en) * 2016-07-07 2020-02-14 中国石油天然气集团公司 Concrete-filled steel tube support and construction method thereof
CN106321123B (en) * 2016-09-14 2018-06-19 安徽理工大学 A kind of self-adjustable mining bracket of support stiffness
CN108756948B (en) * 2018-06-15 2023-06-20 中铁工程设计咨询集团有限公司 Self-bearing supporting structure for large-span tunnel prestress anchor net supporting rock shell
CN109386297B (en) * 2018-10-15 2020-04-24 兰州理工大学 Hydraulic tunnel grading yielding support structure and construction method
CN111577339B (en) * 2020-04-21 2021-09-28 中国建筑股份有限公司 High-ground-stress soft rock tunnel supporting structure system and construction method thereof
CN111648794B (en) * 2020-06-02 2021-11-12 山东高速科技发展集团有限公司 Support framework for tunnel portal section in cold region and installation method
CN112523776B (en) * 2020-11-23 2022-03-08 安徽理工大学 Thin bedrock supporting construction
CN113982630B (en) * 2021-10-29 2024-04-05 成都未来智隧科技有限公司 Tunnel supporting structure
CN114320414A (en) * 2021-12-29 2022-04-12 山东科技大学 Multistage energy-absorbing tunnel supporting structure and construction method thereof

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2454913C3 (en) * 1974-11-20 1978-06-08 Hochtief Ag Fuer Hoch- Und Tiefbauten Vormals Gebr. Helfmann, 4300 Essen Method and arrangement for driving a tunnel
CN201486570U (en) * 2009-07-10 2010-05-26 中铁二院工程集团有限责任公司 Overlarge cross section old loess tunnel primary support structure of high-speed railway
CN102226407A (en) * 2011-05-23 2011-10-26 中铁二院工程集团有限责任公司 Four-line large-span tunnel cable-arch combined primary support structure
CN102562097A (en) * 2012-01-30 2012-07-11 山东大学 Three-dimensional asymmetrical supporting system
CN102852533A (en) * 2012-10-18 2013-01-02 山东大学 High-strength three-dimensional support system of yielding type restriction concrete lagging jack
CN102877862A (en) * 2012-10-18 2013-01-16 山东大学 Confined concrete quantitative yielding lagging jack based on mine U-shaped steel
CN102979543B (en) * 2012-12-25 2014-07-23 成都理工大学 Support method for brittle failure of surrounding rocks of hard rock double-track tunnel by river in area of high stress
CN204082170U (en) * 2014-07-24 2015-01-07 山东大学 A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system

Also Published As

Publication number Publication date
CN104153792A (en) 2014-11-19

Similar Documents

Publication Publication Date Title
CN104153792B (en) A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method
CN204082170U (en) A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system
CN104120647B (en) It is suitable for section assembling concrete frame bridge pier system and the construction method of rapid construction
CN103161480B (en) Initiatively support the method for roadside packing gob side entry retaining
CN106351670B (en) A kind of closed pre support tunnel structure
CN206800412U (en) The foundation pit enclosure structure that a kind of steel-pipe pile is combined with Larsen steel sheet pile fore shaft
KR101028535B1 (en) Construction method of double tunnel
CN106087629B (en) Without the prefabricated baffle foam concrete light road bank structure of conical slope and construction method
CN103993607B (en) Steel floral tube controls slip casting antiskid composite construction and rapid constructing method thereof
CN205013013U (en) Secretly dig station supporting construction suitable for last soft hard formation down
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN203488189U (en) Tunnel structure for emptying renovation
CN104047613A (en) Method for anchoring coal mine tunnel bottom plate
CN208966352U (en) A kind of supporting construction in weak rocks matter region tunnel
CN103362513A (en) Transformation and construction method for existing cavity in underground excavation region
CN105240024A (en) Parallel shield tunneling method for extended construction of subway station
CN106759376A (en) Anchored Sheet Pile Wall for Excavation system and its construction method for closing on existing underground structure
CN103953363A (en) Method for connecting shield tunnel pipe sheet and transverse passage structure
CN102817621B (en) Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions
CN104612696A (en) Construction method for underground excavated large-section subway station to pass through viaduct in fine sand layer based on pioneer heading-column method
CN102425155B (en) Method for reinforcing overlying shallow rockmass in mined-out area
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
CN202227287U (en) High speed railway bridge protection shed tunnel structure
CN107938707A (en) Prefabricated assembled underground subway station top board structure
CN103147772B (en) Method for supporting steel strip connecting bridge of arch-shaped soft rock roadway with large section

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Shucai

Inventor after: Xu Fei

Inventor after: Wang Weiming

Inventor after: Zhang Qianqing

Inventor after: Li Liping

Inventor after: Zhang Jian

Inventor after: Wang Qinghan

Inventor after: Liu Hongliang

Inventor after: Wang Jianhua

Inventor before: Li Shucai

Inventor before: Xu Fei

Inventor before: Zhang Qianqing

Inventor before: Li Liping

Inventor before: Zhang Jian

Inventor before: Wang Qinghan

Inventor before: Liu Hongliang

Inventor before: Wang Jianhua

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI SHUCAI XU FEI ZHANG QIANQING LI LIPING ZHANG JIAN WANG QINGHAN LIU HONGLIANG WANG JIANHUA TO: LI SHUCAI XU FEI WANG WEIMING ZHANG QIANQING LI LIPING ZHANG JIAN WANG QINGHAN LIU HONGLIANG WANG JIANHUA

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406