CN108278086A - A kind of positioning drilling platform for urban track traffic - Google Patents
A kind of positioning drilling platform for urban track traffic Download PDFInfo
- Publication number
- CN108278086A CN108278086A CN201810095201.2A CN201810095201A CN108278086A CN 108278086 A CN108278086 A CN 108278086A CN 201810095201 A CN201810095201 A CN 201810095201A CN 108278086 A CN108278086 A CN 108278086A
- Authority
- CN
- China
- Prior art keywords
- slide unit
- straight line
- line slide
- montant
- track traffic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/003—Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/04—Supports for the drilling machine, e.g. derricks or masts specially adapted for directional drilling, e.g. slant hole rigs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/01—Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
- E21B21/015—Means engaging the bore entrance, e.g. hoods for collecting dust
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterized by means for land transport with their own drive, e.g. skid mounting or wheel mounting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
Abstract
A kind of positioning drilling platform for urban track traffic,Including straight line slide unit and pedestal,The straight line slide unit is laid in the underface of bore position along boring direction,The bottom of the pedestal is fixed on fine tuning slide unit,The fine tuning slide unit is mounted on straight line slide unit and can be moved along straight line slide unit,The positioning device that fine tuning slide unit can be located on straight line slide unit any position is additionally provided on the straight line slide unit,There are one the vertical supports vertically laid for installation on one end of the pedestal,Two montants to match with the height at the top of position to be drilled are fixed in the vertical supports,The lower part of two montants is provided with the height adjustment mechanism adjusting for adjusting montant height in the position for being conveniently operated personnel's adjusting,It is connected and is limited by pitch control unit between two montants,The configuration of the present invention is simple,It is easy to operate,It is small to punch error,Drilling precision is high,It is efficient,High-precision efficiency operation can be achieved.
Description
Technical field
The present invention relates to four electrical domain of urban track traffic, especially a kind of positioning drilling for urban track traffic is flat
Platform.
Background technology
In the work progress of urban track traffic, for crane span structure, air hose, fire-fighting and supplying drainage at the top of the station hall layer of station
The fixation in road needs, to drilling at the top of the station hall layer of station, then to fix by fixing bracket, fixing bracket is usually equidistant double
Hole fixing bracket, it is therefore desirable to bore distance double holes, the drilling construction method that industry generally uses at present is manually to set up scaffold
After platform, manpower is climbed to punch position and is punched, in practice of construction, since the height in city rail traffic station room is general
It it is 3 meters to 9 meters, artificial construction risk of climbing is high, and since pipeline is generally straight line moving, wiring path is long, therefore
On the one hand positional punch position is wanted to reduce error when drilling, on the other hand due to the closing of construction environment, ash when control is punched
No matter dirt is also particularly important to workers ' health or construction safety, and by setting up the form of construction work of scaffold, it sets up to city
The height of city's rail traffic station, needs the time spent long, low construction efficiency, it is often more important that, scaffold is set up arbitrarily
Property is big, can not ensure that drilling operation is accurate by the way that punch position is positioned manually, and worker can only one, hole hole beat, this
Sample is easier to cause cumulative errors beating equidistant diplopore so that bigger error, therefore this mode neither can guarantee constructor
Body and labor safety, and reduce working efficiency, improve construction cost.
Invention content
The present invention in view of the above shortcomings of the prior art with problem and a kind of simple in structure, easy to operate, punching is provided and is missed
The positioning drilling platform for urban track traffic that difference is small, drilling precision is high, efficient, environmentally friendly.
Above-mentioned purpose that the invention is realized by the following technical scheme:
A kind of positioning drilling platform for urban track traffic, including straight line slide unit and pedestal, straight line slide unit edge
Boring direction is laid in the underface of bore position, and the bottom of the pedestal is fixed on fine tuning slide unit, the fine tuning slide unit peace
It can be moved along straight line slide unit on straight line slide unit, straight line slide unit can be located in by fine tuning slide unit by being additionally provided on the straight line slide unit
Positioning device on any position, installation is described there are one the vertical supports vertically laid on one end of the pedestal
Two montants to match with the height at the top of position to be drilled are fixed in vertical supports, the lower part of two montants is being conveniently operated
The position that personnel are adjusted is provided with the height adjustment mechanism adjusting for adjusting montant height, passes through spacing control between two montants
Device connection limit processed, the side of the montant are connected by steel anchor rod and the other end of rock-bolt length regulating device and pedestal
It connects, the impact drill fixed frame of fixed impact drill, the impact drill fixed frame and/or spacing is equipped at the top of the every montant
Vertically disposed laser calibrator is installed on the middle part of control device, the vertical supports laser calibrator transmitting terminal just
Lower section is fixed with horizon equipment, emits position of the laser beam on horizon equipment by laser calibrator, to ensure impact drill
Verticality can also be finely tuned perpendicular if finding that the position of impact drill is inaccurate by horizon equipment by rock-bolt length regulating device
The verticality of bar ensures the accurate of impact drill position in this way, to improve the precision of drilling, in drilling, by montant
Height adjustment mechanism can adjust the height of montant, to pass through the depth of height adjustment mechanism control drilling.
The dust collecting hood for collecting impact drill punching dust, the dust collecting hood are additionally provided on the impact drill fixed frame
It is connect with the suction ventilator being mounted on the base by aspiration channel, the air outlet of the suction ventilator is equipped with dust collecting installation, leads to
Dust collecting hood is crossed, while punching, dust is collected by suction ventilator, prevents airborne dust, to reduce working environment
Pollution, reduce influence of the environment to worker's body.
The suction ventilator is mounted on the base by damping device, reduces influence of the suction ventilator vibrations to punching in this way.
The montant includes upper boom, middle bar and lower beam, and the lower beam is connected with middle bar by height adjustment mechanism, it is described on
Bar and middle bar are to be threadedly coupled, and are connected and are limited by pitch control unit between two upper booms between two lower beams, used
Above structure, montant is assembly, so as to adjust length, and convenience in transport and assembling as needed.
The vertical supports are trapezoid support, and the cross tube of the vertical supports is equipped with corresponding with montant size, position
Two slot holes, the sheer poles of the vertical supports is equipped with the locating slot of positioning montant, and the lower beam is inserted into the slot hole
And it is positioned by locating slot.
The pitch control unit uses horizontal leading screw fixator, and the both sides movable end of the horizontal leading screw fixator is same
Step movement.
The rock-bolt length regulating device uses flower basket bolt, and one end of the flower basket bolt is fixed on the base, another
End is connect with steel anchor rod.
The vertical supports between two montants on be additionally provided with determine two montant spacing horizontal ruler, it is described
Horizon equipment is mounted on the horizontal ruler.
Using the above structure, the invention has the advantages that:.
1, the pedestal of the present apparatus is mounted on by finely tuning slide unit on straight line slide unit, in this way in adjacent holes away from large-scale walking
When, it is moved by straight line slide unit, small range is located through fine tuning slide unit, reaches once set up in this way, the production of mass operation
Purpose;
2, the montant of the present apparatus uses " triangle stability " principle, and entire platform is determined into an adjustable type right angle
Triangle body, it is ensured that platform structure complete stability;
3, using horizontal direction horizon equipment and vertical direction laser beam composition high-precision right angle, pass through the small of hard anchor pole
Quickly adjustment, realizes high-precision efficiency operational method.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is straight line slide unit of the present invention, finely tunes the structural schematic diagram of slide unit and pedestal.
Specific implementation mode
Below in conjunction with the accompanying drawings, a kind of specific reality of the positioning drilling platform for urban track traffic is further described
Apply mode.
As shown in Figure 1, 2, a kind of positioning drilling platform for urban track traffic, including straight line slide unit 2 and pedestal 1,
The straight line slide unit 2 is laid in the underface of bore position along boring direction, and the bottom of the pedestal 1 is fixed on fine tuning slide unit
On, the fine tuning slide unit is mounted on straight line slide unit 2 and can be moved along straight line slide unit, and being additionally provided on the straight line slide unit 2 can will be micro-
Slide unit is adjusted to be located in the positioning device on straight line slide unit any position, the positioning device includes adjusting slide unit hold-down support and micro-
Adjust slide unit bearing, when operation, required according to design size, slide after fixed slide unit bearing quickly slides to target location, by with
Laser calibrating equipment coordinates, final to finely tune slide unit bearing, reaches precise positioning, and there are one edges for installation on one end of the pedestal 1
The vertical supports 9 that vertical direction is laid are fixed with two in the vertical supports 9 and match with the height at the top of position to be drilled
Montant 3, the lower part of two montants 3 are provided with the height adjustment mechanism for adjusting montant height in the position for being conveniently operated personnel's adjusting
34 are adjusted, and the montant includes upper boom 31, middle bar 32 and lower beam 33, and the lower beam 33 and middle bar 32 pass through height adjustment mechanism 34
Connection, the upper boom 31 and middle bar 32 are to be threadedly coupled, and pass through spacing control between two upper booms 32 between two lower beams 33
The connection of device 10 processed limits, and in this example, the height adjustment mechanism 34 can be lead screw regulating mechanism, the work of lead screw regulating mechanism
Moved end is connect by spring with upper boom 31, to which spring can play the role of buffering, in addition, the height tune of lead screw regulating mechanism
Section is manually implemented by rotating handle, while saving cost in this way, is conveniently operated, after punch position confirmation, the height
Regulating device plays upper boom 31 using spring supporting, and rotating handle makes montant that impact drill be driven to rise punching when punching, has punched
At rear slow release rotating handle, limitation punching depth can also be achieved the purpose that by spring, led between two montants 3
The connection limit of pitch control unit 10 is crossed, the pitch control unit 10 uses horizontal leading screw fixator, the horizontal leading screw solid
The both sides movable end for determining device is to move synchronously, and ensures the centering adjusted in this way, the side of the montant 3 passes through 4 He of steel anchor rod
Rock-bolt length regulating device 5 is connect with the other end of pedestal 1, and the rock-bolt length regulating device 5 uses flower basket bolt, the flower
One end of basket bolt is fixed on the base, and the other end is connect with steel anchor rod, and the top of the every montant 3 is equipped with fixed punch
The impact drill fixed frame 35 of brill is hit, the middle part of the pitch control unit 10 is equipped with vertically disposed laser calibrator 36, institute
The vertical supports 9 upper horizontal ruler for being equipped with determining two montant spacing, vertical supports 9 between two montants are stated to exist
Horizon equipment 91 is fixed with immediately below 36 transmitting terminal of laser calibrator, the horizon equipment 91 is mounted on the horizontal ruler.
The dust collecting hood 6 for collecting impact drill punching dust is additionally provided on the impact drill fixed frame 35, the dust is received
Collection cover 6 is connect by aspiration channel 7 with the suction ventilator 8 being mounted on the base, and the air outlet of the suction ventilator is equipped with dust collection
Device.
The vertical supports 9 are trapezoid support, and the cross tube of the vertical supports 9 is equipped with and montant size, position pair
Two slot holes answered, the sheer pole of the vertical supports are equipped with the locating slot of positioning montant, and the lower beam is inserted into the slot hole
It is interior and positioned by locating slot.
Specific implementation mode is as follows:
1. according to design requirement, location survey axis adjusts straight line slide unit length and width;
2. according to subway concourse layer height assembling drilling platform, steel anchor rod, impact drill and dust collector;
3. reference laser calibrator, central scale and straight line slide unit tense steel anchor rod;
4. rotating 2 steering wheels simultaneously to top bore position;
5. startup power supply;
6. punching;
7. alternately installing the 2nd group of straight line slide unit;
8. drilling platform is pushed to carry out next group of punching.
The present invention is not limited to above-mentioned preferred forms, anyone can obtain other various shapes under the inspiration of the present invention
The product of formula, however, make any variation in its shape or structure, it is every that there is same as the present application or similar technical side
Case is within the scope of the present invention.
Claims (8)
1. a kind of positioning drilling platform for urban track traffic, it is characterised in that:Including straight line slide unit (2) and pedestal (1),
The straight line slide unit (2) is laid in the underface of bore position along boring direction, and the bottom of the pedestal (1) is fixed on fine tuning and slides
On platform (11), the fine tuning slide unit (11) is mounted on straight line slide unit (2) and can be moved along straight line slide unit, the straight line slide unit (2)
On be additionally provided with and can will finely tune slide unit and be located in positioning device on straight line slide unit any position, pacify on one end of the pedestal (1)
Dress there are one the vertical supports (9) vertically laid, be fixed on the vertical supports (9) two at the top of position to be drilled
The montant (3) that matches of height, the lower part of two montants (3) is provided with adjusting montant in the position for being conveniently operated personnel's adjusting
The height adjustment mechanism (34) of height is connected between two montants (3) by pitch control unit (10) and is limited, described perpendicular
The side of bar (3) is fixed on the other end of pedestal (1) by steel anchor rod (4) and rock-bolt length regulating device (5), described in every
The impact drill fixed frame (35) of fixed impact drill, the impact drill fixed frame (35) and/or spacing are equipped at the top of montant (3)
Vertically disposed laser calibrator (36) is installed, the vertical supports (9) are in laser calibration on the middle part of control device (10)
It is fixed with horizon equipment (91) immediately below device (36) transmitting terminal.
2. the positioning drilling platform according to claim 1 for urban track traffic, it is characterised in that:The impact drill
The dust collecting hood (6) for collecting impact drill punching dust is additionally provided on fixed frame (35), the dust collecting hood (6) passes through air draught
Pipe (7) is connect with the suction ventilator (8) being mounted on the base, and the air outlet of the suction ventilator is equipped with dust collecting installation.
3. the positioning drilling platform according to claim 2 for urban track traffic, it is characterised in that:The suction ventilator
(8) it is mounted on pedestal (1) by damping device.
4. the positioning drilling platform for urban track traffic according to one of claims 1 to 3, it is characterised in that:Institute
It includes upper boom (31), middle bar (32) and lower beam (33) to state montant, and the lower beam (33) and middle bar (32) pass through height adjustment mechanism
(34) it connects, the upper boom (31) and middle bar (32) are to be threadedly coupled, between two lower beams (33) between two upper booms (32)
It is connected and is limited by pitch control unit (10).
5. the positioning drilling platform according to claim 4 for urban track traffic, it is characterised in that:The vertical branch
Frame (9) is trapezoid support, and the cross tubes of the vertical supports (9) is equipped with two slot hole corresponding with montant size, position, described
The sheer pole of vertical supports is equipped with the locating slot of positioning montant, and the lower beam is inserted into the slot hole and passes through locating slot
Positioning.
6. the positioning drilling platform according to claim 1 for urban track traffic, it is characterised in that:The spacing control
It is to move synchronously that device processed, which uses horizontal leading screw fixator, the both sides movable end of the horizontal leading screw fixator,.
7. the positioning drilling platform according to claim 1 for urban track traffic, it is characterised in that:The anchor pole is long
Spending regulating device uses flower basket bolt, one end of the flower basket bolt to be fixed on the base, and the other end is connect with steel anchor rod.
8. the positioning drilling platform according to claim 1 for urban track traffic, it is characterised in that:The vertical branch
Frame between two montants (3) on be additionally provided with the horizontal ruler for determining two montant (3) spacing, the horizon equipment (91) peace
On the horizontal ruler.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810095201.2A CN108278086B (en) | 2018-01-31 | 2018-01-31 | A kind of positioning drilling platform for urban track traffic |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810095201.2A CN108278086B (en) | 2018-01-31 | 2018-01-31 | A kind of positioning drilling platform for urban track traffic |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108278086A true CN108278086A (en) | 2018-07-13 |
CN108278086B CN108278086B (en) | 2019-05-03 |
Family
ID=62807073
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810095201.2A Active CN108278086B (en) | 2018-01-31 | 2018-01-31 | A kind of positioning drilling platform for urban track traffic |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108278086B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109057731A (en) * | 2018-09-06 | 2018-12-21 | 中国石油化工股份有限公司 | A kind of pumping unit hanging point and workover derrick pulley center and well head centering laser tester |
CN110485921A (en) * | 2019-08-21 | 2019-11-22 | 康宏伟 | A kind of NPR anchor cable construction drilling directing controller |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200964790Y (en) * | 2006-10-24 | 2007-10-24 | 赵亮 | Hydraulic minisize drilling machine |
CN202117571U (en) * | 2011-05-27 | 2012-01-18 | 中铁十三局集团电务工程有限公司 | Movable type tunnel top drilling machine |
CN202325233U (en) * | 2011-10-25 | 2012-07-11 | 西安建筑科技大学 | Crawler-type hydraulic anchor rod drill carriage |
CN102913121A (en) * | 2012-10-22 | 2013-02-06 | 石午江 | Flexible swing pipe vibrator boring machine |
US20150143759A1 (en) * | 2013-11-25 | 2015-05-28 | Unit Corporation | Box-on-box self-stacking substructure for a drill rig |
CN204899789U (en) * | 2015-08-18 | 2015-12-23 | 中铁一局集团电务工程有限公司 | Rigid suspension contact net platform of perpendicularly upwards driling |
CN105781457A (en) * | 2016-04-05 | 2016-07-20 | 辽宁工程技术大学 | Mining pollution discharge dust-control drilling device |
CN105970960A (en) * | 2016-06-30 | 2016-09-28 | 广东力源液压机械有限公司 | Walking pile driver |
CN106089042A (en) * | 2016-07-12 | 2016-11-09 | 宿迁淮海科技服务有限公司 | A kind of from mobile diagonal orientation base plate armature boring chassis |
CN106089044A (en) * | 2016-07-12 | 2016-11-09 | 宿迁淮海科技服务有限公司 | A kind of from mobile four stud location base plate armature boring chassis |
CN106194022A (en) * | 2016-09-26 | 2016-12-07 | 辽宁工程技术大学 | A kind of Portable drilling device for fully-mechanized mining working passing fault and using method |
CN205936398U (en) * | 2016-08-23 | 2017-02-08 | 卢泽生 | Public road bridge roof beam construction drilling platform |
CN107269227A (en) * | 2017-08-11 | 2017-10-20 | 楼炜 | A kind of architectural engineering multifunctional hole-drilling machine |
CN206785312U (en) * | 2017-06-17 | 2017-12-22 | 中建二局第三建筑工程有限公司 | Reinforcing steel implant drilling machine |
CN108278129A (en) * | 2018-02-07 | 2018-07-13 | 周宗亚 | A kind of mining energy conservation and environmental protection ancillary equipment |
CN207892537U (en) * | 2018-01-31 | 2018-09-21 | 通号(长沙)轨道交通控制技术有限公司 | A kind of positioning drilling platform for urban track traffic |
-
2018
- 2018-01-31 CN CN201810095201.2A patent/CN108278086B/en active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200964790Y (en) * | 2006-10-24 | 2007-10-24 | 赵亮 | Hydraulic minisize drilling machine |
CN202117571U (en) * | 2011-05-27 | 2012-01-18 | 中铁十三局集团电务工程有限公司 | Movable type tunnel top drilling machine |
CN202325233U (en) * | 2011-10-25 | 2012-07-11 | 西安建筑科技大学 | Crawler-type hydraulic anchor rod drill carriage |
CN102913121A (en) * | 2012-10-22 | 2013-02-06 | 石午江 | Flexible swing pipe vibrator boring machine |
US20150143759A1 (en) * | 2013-11-25 | 2015-05-28 | Unit Corporation | Box-on-box self-stacking substructure for a drill rig |
CN204899789U (en) * | 2015-08-18 | 2015-12-23 | 中铁一局集团电务工程有限公司 | Rigid suspension contact net platform of perpendicularly upwards driling |
CN105781457A (en) * | 2016-04-05 | 2016-07-20 | 辽宁工程技术大学 | Mining pollution discharge dust-control drilling device |
CN105970960A (en) * | 2016-06-30 | 2016-09-28 | 广东力源液压机械有限公司 | Walking pile driver |
CN106089042A (en) * | 2016-07-12 | 2016-11-09 | 宿迁淮海科技服务有限公司 | A kind of from mobile diagonal orientation base plate armature boring chassis |
CN106089044A (en) * | 2016-07-12 | 2016-11-09 | 宿迁淮海科技服务有限公司 | A kind of from mobile four stud location base plate armature boring chassis |
CN205936398U (en) * | 2016-08-23 | 2017-02-08 | 卢泽生 | Public road bridge roof beam construction drilling platform |
CN106194022A (en) * | 2016-09-26 | 2016-12-07 | 辽宁工程技术大学 | A kind of Portable drilling device for fully-mechanized mining working passing fault and using method |
CN206785312U (en) * | 2017-06-17 | 2017-12-22 | 中建二局第三建筑工程有限公司 | Reinforcing steel implant drilling machine |
CN107269227A (en) * | 2017-08-11 | 2017-10-20 | 楼炜 | A kind of architectural engineering multifunctional hole-drilling machine |
CN207892537U (en) * | 2018-01-31 | 2018-09-21 | 通号(长沙)轨道交通控制技术有限公司 | A kind of positioning drilling platform for urban track traffic |
CN108278129A (en) * | 2018-02-07 | 2018-07-13 | 周宗亚 | A kind of mining energy conservation and environmental protection ancillary equipment |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109057731A (en) * | 2018-09-06 | 2018-12-21 | 中国石油化工股份有限公司 | A kind of pumping unit hanging point and workover derrick pulley center and well head centering laser tester |
CN110485921A (en) * | 2019-08-21 | 2019-11-22 | 康宏伟 | A kind of NPR anchor cable construction drilling directing controller |
Also Published As
Publication number | Publication date |
---|---|
CN108278086B (en) | 2019-05-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103521807B (en) | A kind of liftable laser positioning high spatial suspension rod punching erecting device and method of operating | |
CN101495396B (en) | Method for installing elevator guide rail and system therefor | |
CN108278086B (en) | A kind of positioning drilling platform for urban track traffic | |
CN110487258B (en) | Prism support device and using method thereof | |
CN206740090U (en) | One kind is applied to linear pattern canal axes positioning measuring device | |
CN203696028U (en) | Liftable laser-positioning high-space suspender punching device | |
CN207892537U (en) | A kind of positioning drilling platform for urban track traffic | |
CN206034213U (en) | Railway track skew measuring device | |
CN203869661U (en) | Hanging pillar central position locating device used for overhead contact line equipment construction in tunnel | |
KR200458683Y1 (en) | Pointing device using laser beam | |
CN103983256B (en) | A kind of contact network in tunnel casts anchor construction survey method | |
CN209907531U (en) | A support for rainwater pipeline construction | |
CN111232808A (en) | Transverse installation method of prefabricated modular elevator | |
CN201081703Y (en) | Aircraft body level measuring point tester | |
CN110480848A (en) | A kind of wall transverse direction boring method and wall drilling machine for house repairing | |
CN109538891A (en) | A kind of measuring instrument automatic adjusting support of civil engineering | |
CN211060834U (en) | Template concatenation displacement monitoring devices | |
CN208984063U (en) | A kind of engineering construction setting-out Sopwith staff device | |
CN209477611U (en) | A kind of pipeline welding platform | |
CN209196460U (en) | The scale bipod in adjustable feet orientation | |
CN103499716B (en) | Low-voltage lighting ammeter box installs orientation tool | |
CN220708377U (en) | Inclined plane measurement auxiliary device | |
RU219211U1 (en) | DEVICE FOR LEVELING THE PLASTER LAYER | |
CN217330932U (en) | Positioning device for opening circular pipeline | |
CN219368744U (en) | Laser target position adjusting device for measuring verticality |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: 410000 R&D Building of No. 2199 Yuelu West Avenue (Changsha) Industrial Park, Changsha High-tech Development Zone, Changsha City, Hunan Province Patentee after: General (Changsha) Rail Traffic Control Technology Co. Ltd. Address before: 410205 Hunan province Changsha City Lugu high tech Development Zone, Road No. 658 Hunan Lugu harbor 3003-C012. Patentee before: General (Changsha) Rail Traffic Control Technology Co. Ltd. |
|
CP02 | Change in the address of a patent holder |