CN108265746A - A kind of method of back-grouting in Equipment Foundations work progress - Google Patents
A kind of method of back-grouting in Equipment Foundations work progress Download PDFInfo
- Publication number
- CN108265746A CN108265746A CN201711462088.9A CN201711462088A CN108265746A CN 108265746 A CN108265746 A CN 108265746A CN 201711462088 A CN201711462088 A CN 201711462088A CN 108265746 A CN108265746 A CN 108265746A
- Authority
- CN
- China
- Prior art keywords
- grouting
- equipment foundations
- equipment
- foundations
- grout groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Abstract
The present invention is a kind of method of back-grouting in Equipment Foundations work progress, the specific steps are:The exterior sheathing of Equipment Foundations is installed to the top mark eminence of back-grouting;The mounting of roof plate PVC linea angulatas of exterior sheathing;The grouting height required according to construction drawing is stayed on the inside of Equipment Foundations sets groove as Equipment Foundations grout groove;Mass concrete water storing conservation is carried out using Equipment Foundations grout groove;Curing age carries out form removal, dabbing processing later;Equipment installation is corrected and is checked and accepted;After equipment installation acceptance(check), Equipment Foundations grout groove is cleared up, back-grouting is carried out and fills and leads up to designed elevation.The present invention reduces secondary grouting template installation procedures, improve appearance technique;It improves work efficiency, when foundation construction reduces process, and back-grouting directly carries out in Equipment Foundations grout groove, reduces the branch die process of back-grouting, and back-grouting operation can be carried out by being cleaned out after equipment is in place, and the time is saved for equipment installation.
Description
Technical field
The present invention relates to power construction Equipment Foundations back-grouting technical field of construction more particularly to a kind of Equipment Foundations to apply
The method of back-grouting during work.
Background technology
In electric power construction projects construction, Equipment Foundations need back-grouting mostly, and Normal practice is:First Equipment Foundations are applied
Work after equipment installs centering in place, then is cleaned, formwork to grout blanket bottom absolute altitude, then carries out back-grouting.It is such to do
Method process is numerous and diverse, and gene basis concrete is different from back-grouting material material, concrete base layer and grout blanket color after the completion of construction
It is inconsistent, and there is construction joint trace to be difficult to handle, unsightly, model sheetinstallat fixation difficulty is big, time-consuming, cost for appearance technique
It is higher, it is difficult to ensure that appearance processing quality.
Invention content
Present invention seek to address that the deficiencies in the prior art, and a kind of side of back-grouting in Equipment Foundations work progress is provided
Method.
The present invention to achieve the above object, using following technical scheme:
A kind of method of back-grouting in Equipment Foundations work progress, the specific steps are:
A, construction drawing is checked comprehensively before constructing, it is ensured that construction drawing does not have mistake;
When b, requiring to construct to Equipment Foundations according to construction drawing, the exterior sheathing of Equipment Foundations is installed to back-grouting
Top mark eminence;
C, the mounting of roof plate PVC linea angulatas of exterior sheathing;
D, the grouting height required according to construction drawing is stayed on the inside of Equipment Foundations sets groove as Equipment Foundations grout groove,
The depth of Equipment Foundations grout groove is lower 30-50mm than design height, and for dabbing, the outer wall thickness of Equipment Foundations grout groove is
100mm;
E, mass concrete water storing conservation is carried out using Equipment Foundations grout groove;
F, curing age carries out form removal, dabbing processing later;
G, equipment installation is corrected and is checked and accepted;
H, after equipment installation acceptance(check), Equipment Foundations grout groove is cleared up, back-grouting is carried out and fills and leads up to design
Absolute altitude.
The exposed parts of Equipment Foundations exterior sheathing use Shimizu concrete template.
The size of PVC linea angulatas is 30mm × 30mm.
The beneficial effects of the invention are as follows:The present invention reduces secondary grouting template installation procedure, set during non-winter construction
In standby foundation grouting slot can water storage huge foundation surface is conserved;It solves concrete base layer with grout blanket color to differ
The problem of cause, reduces construction joint, and improves appearance technique;It improves work efficiency, when foundation construction reduces process, secondary
Grouting directly carries out in Equipment Foundations grout groove, reduces the branch die process of back-grouting, is cleaned out just after equipment is in place
Back-grouting operation can be carried out, the time is saved for equipment installation.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
In figure:1- Equipment Foundations grout grooves;2-PVC linea angulatas;3- Equipment Foundations;4- Shimizu concrete templates;
It is described in detail below with reference to the embodiment of the present invention with reference to attached drawing.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples:
As shown in Figure 1, in a kind of Equipment Foundations work progress back-grouting method, the specific steps are:
A, construction drawing is checked comprehensively before constructing, it is ensured that construction drawing does not have mistake;
When b, requiring to construct to Equipment Foundations 3 according to construction drawing, the exterior sheathing of Equipment Foundations 3 is installed to back-grouting
Top mark eminence;
C, the mounting of roof plate PVC linea angulatas 2 of exterior sheathing;
D, it is stayed according to the grouting height of construction drawing requirement in 3 inside of Equipment Foundations and sets groove as Equipment Foundations grout groove
1, the depth of Equipment Foundations grout groove 1 is lower 30-50mm than design height, for dabbing, the outer wall thickness of Equipment Foundations grout groove 1
For 100mm;
E, mass concrete water storing conservation is carried out using Equipment Foundations grout groove 1;
F, curing age carries out form removal, dabbing processing later;
G, equipment installation is corrected and is checked and accepted;
H, after equipment installation acceptance(check), Equipment Foundations grout groove 1 is cleared up, back-grouting is carried out and fills and leads up to design
Absolute altitude.
The exposed parts of 3 exterior sheathing of Equipment Foundations use Shimizu concrete template 4.
The size of PVC linea angulatas 2 is 30mm × 30mm.
The present invention reduces secondary grouting template installation procedure, can be stored in Equipment Foundations grout groove 1 during non-winter construction
Water conserves 3 surface of Equipment Foundations;It solves the problems, such as that concrete base layer and grout blanket color are inconsistent, reduces construction
Seam, and improve appearance technique;It improves work efficiency, Equipment Foundations 3 reduce process when constructing, and back-grouting is directly being set
It is carried out in standby foundation grouting slot 1, reduces the branch die process of back-grouting, secondary filling can be carried out by being cleaned out after equipment is in place
Operation is starched, the time is saved for equipment installation.
The present invention is exemplarily described above in conjunction with attached drawing, it is clear that present invention specific implementation is not by aforesaid way
Limitation, as long as employ the inventive concept and technical scheme of the present invention progress various improvement or not improved direct application
In other occasions, within protection scope of the present invention.
Claims (3)
1. a kind of method of back-grouting in Equipment Foundations work progress, which is characterized in that the specific steps are:
A, construction drawing is checked comprehensively before constructing, it is ensured that construction drawing does not have mistake;
When b, requiring to construct to Equipment Foundations (3) according to construction drawing, the exterior sheathing of Equipment Foundations (3) is installed to back-grouting
Top mark eminence;
C, the mounting of roof plate PVC linea angulatas (2) of exterior sheathing;
D, it is stayed on the inside of Equipment Foundations (3) according to the grouting height of construction drawing requirement and sets groove as Equipment Foundations grout groove
(1), the depth of Equipment Foundations grout groove (1) is lower 30-50mm than design height, for dabbing, Equipment Foundations grout groove (1) it is outer
Wall thickness is 100mm;
E, mass concrete water storing conservation is carried out using Equipment Foundations grout groove (1);
F, curing age carries out form removal, dabbing processing later;
G, equipment installation is corrected and is checked and accepted;
H, after equipment installation acceptance(check), Equipment Foundations grout groove (1) is cleared up, back-grouting is carried out and fills and leads up to design mark
It is high.
2. the method for back-grouting in a kind of Equipment Foundations work progress according to claim 1, which is characterized in that equipment
The exposed parts of basic (3) exterior sheathing use Shimizu concrete template (4).
3. the method for back-grouting in a kind of Equipment Foundations work progress according to claim 2, which is characterized in that PVC
The size of linea angulata (2) is 30mm × 30mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711462088.9A CN108265746A (en) | 2017-12-28 | 2017-12-28 | A kind of method of back-grouting in Equipment Foundations work progress |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711462088.9A CN108265746A (en) | 2017-12-28 | 2017-12-28 | A kind of method of back-grouting in Equipment Foundations work progress |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108265746A true CN108265746A (en) | 2018-07-10 |
Family
ID=62772686
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711462088.9A Pending CN108265746A (en) | 2017-12-28 | 2017-12-28 | A kind of method of back-grouting in Equipment Foundations work progress |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108265746A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113774954A (en) * | 2021-07-02 | 2021-12-10 | 中国二十冶集团有限公司 | Method for moving and transforming welding machine |
CN115434356A (en) * | 2022-08-30 | 2022-12-06 | 中国电建集团四川工程有限公司 | Construction process for secondary grouting of fan foundation |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3878708A (en) * | 1973-09-25 | 1975-04-22 | Gfm Fertigungstechnik | Forging press |
CN101660314A (en) * | 2009-09-28 | 2010-03-03 | 浙江天力建设集团有限公司 | Construction method for foundation of exposed concrete equipment |
CN106836808A (en) * | 2017-02-21 | 2017-06-13 | 中建二局第三建筑工程有限公司 | Self-compaction mass concrete construction method |
-
2017
- 2017-12-28 CN CN201711462088.9A patent/CN108265746A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3878708A (en) * | 1973-09-25 | 1975-04-22 | Gfm Fertigungstechnik | Forging press |
CN101660314A (en) * | 2009-09-28 | 2010-03-03 | 浙江天力建设集团有限公司 | Construction method for foundation of exposed concrete equipment |
CN106836808A (en) * | 2017-02-21 | 2017-06-13 | 中建二局第三建筑工程有限公司 | Self-compaction mass concrete construction method |
Non-Patent Citations (2)
Title |
---|
许光驰: "《机电设备安装与调试》", 31 March 2012, 北京航空航天大学出版社 * |
陈端铭: "设备基础灌浆面凹槽施工法", 《科技创新导报》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113774954A (en) * | 2021-07-02 | 2021-12-10 | 中国二十冶集团有限公司 | Method for moving and transforming welding machine |
CN115434356A (en) * | 2022-08-30 | 2022-12-06 | 中国电建集团四川工程有限公司 | Construction process for secondary grouting of fan foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102121315B (en) | Hole reserving construction method for tightly-fixed steel sleeve | |
CN103669562A (en) | Cantilever bay window board concrete overall pouring structure and construction method thereof | |
CN103306389B (en) | Dry-hang external wall insulation board and novel application thereof as dismounting-free building template | |
CN206396913U (en) | A kind of built-in fitting positioning and mounting structure | |
CN108265746A (en) | A kind of method of back-grouting in Equipment Foundations work progress | |
CN104746772A (en) | Ash concrete hollow partition board anti-cracking construction method | |
CN103556819B (en) | A kind of construction method of reserved constructional column hole on beam slab | |
CN104278840A (en) | Decorating bare concrete construction method and split bolt hole die for same | |
CN103643971A (en) | Method for rapid construction of tunnel inverted arch forming end mould | |
CN109577674A (en) | A kind of metope flexure type crack repairing structure and its construction method | |
CN107630531B (en) | Large-cantilever bare concrete stair and construction method thereof | |
CN103306383A (en) | Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall | |
CN204282576U (en) | A kind of lightweight external wall structure | |
CN104453011B (en) | A kind of lightweight external wall structure and its construction method | |
CN203007974U (en) | Tower crane foundation structure | |
CN212507541U (en) | Roof waterproof repairing structure | |
CN203716410U (en) | Novel roof grid seam | |
CN203412124U (en) | Dry-hanging external wall insulation board serving as detaching-free building template | |
CN204298860U (en) | Lid digs the inverse side wall construction joint waterproofing node that does and constructs | |
CN203924102U (en) | Building implements foundation bolt preformed hole construction mould | |
CN106401176A (en) | Steel-wood combination roof moldboard framework construction method | |
CN103628684B (en) | A kind of construction method of simultaneously watering build floor and shear wall | |
CN201567785U (en) | Ribbed beam mould plate | |
CN211597716U (en) | A shutoff structure for prefabricated outer wall is in milk | |
CN204081126U (en) | A kind of exterior wall tongue and groove preventing window from seeping water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180710 |