CN108265746A - A kind of method of back-grouting in Equipment Foundations work progress - Google Patents

A kind of method of back-grouting in Equipment Foundations work progress Download PDF

Info

Publication number
CN108265746A
CN108265746A CN201711462088.9A CN201711462088A CN108265746A CN 108265746 A CN108265746 A CN 108265746A CN 201711462088 A CN201711462088 A CN 201711462088A CN 108265746 A CN108265746 A CN 108265746A
Authority
CN
China
Prior art keywords
grouting
equipment foundations
equipment
foundations
grout groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711462088.9A
Other languages
Chinese (zh)
Inventor
卢溅平
孟瑞杰
徐尚年
崔虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Tianjin Electric Power Construction Co Ltd
Original Assignee
China Energy Engineering Group Tianjin Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Tianjin Electric Power Construction Co Ltd filed Critical China Energy Engineering Group Tianjin Electric Power Construction Co Ltd
Priority to CN201711462088.9A priority Critical patent/CN108265746A/en
Publication of CN108265746A publication Critical patent/CN108265746A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

The present invention is a kind of method of back-grouting in Equipment Foundations work progress, the specific steps are:The exterior sheathing of Equipment Foundations is installed to the top mark eminence of back-grouting;The mounting of roof plate PVC linea angulatas of exterior sheathing;The grouting height required according to construction drawing is stayed on the inside of Equipment Foundations sets groove as Equipment Foundations grout groove;Mass concrete water storing conservation is carried out using Equipment Foundations grout groove;Curing age carries out form removal, dabbing processing later;Equipment installation is corrected and is checked and accepted;After equipment installation acceptance(check), Equipment Foundations grout groove is cleared up, back-grouting is carried out and fills and leads up to designed elevation.The present invention reduces secondary grouting template installation procedures, improve appearance technique;It improves work efficiency, when foundation construction reduces process, and back-grouting directly carries out in Equipment Foundations grout groove, reduces the branch die process of back-grouting, and back-grouting operation can be carried out by being cleaned out after equipment is in place, and the time is saved for equipment installation.

Description

A kind of method of back-grouting in Equipment Foundations work progress
Technical field
The present invention relates to power construction Equipment Foundations back-grouting technical field of construction more particularly to a kind of Equipment Foundations to apply The method of back-grouting during work.
Background technology
In electric power construction projects construction, Equipment Foundations need back-grouting mostly, and Normal practice is:First Equipment Foundations are applied Work after equipment installs centering in place, then is cleaned, formwork to grout blanket bottom absolute altitude, then carries out back-grouting.It is such to do Method process is numerous and diverse, and gene basis concrete is different from back-grouting material material, concrete base layer and grout blanket color after the completion of construction It is inconsistent, and there is construction joint trace to be difficult to handle, unsightly, model sheetinstallat fixation difficulty is big, time-consuming, cost for appearance technique It is higher, it is difficult to ensure that appearance processing quality.
Invention content
Present invention seek to address that the deficiencies in the prior art, and a kind of side of back-grouting in Equipment Foundations work progress is provided Method.
The present invention to achieve the above object, using following technical scheme:
A kind of method of back-grouting in Equipment Foundations work progress, the specific steps are:
A, construction drawing is checked comprehensively before constructing, it is ensured that construction drawing does not have mistake;
When b, requiring to construct to Equipment Foundations according to construction drawing, the exterior sheathing of Equipment Foundations is installed to back-grouting Top mark eminence;
C, the mounting of roof plate PVC linea angulatas of exterior sheathing;
D, the grouting height required according to construction drawing is stayed on the inside of Equipment Foundations sets groove as Equipment Foundations grout groove, The depth of Equipment Foundations grout groove is lower 30-50mm than design height, and for dabbing, the outer wall thickness of Equipment Foundations grout groove is 100mm;
E, mass concrete water storing conservation is carried out using Equipment Foundations grout groove;
F, curing age carries out form removal, dabbing processing later;
G, equipment installation is corrected and is checked and accepted;
H, after equipment installation acceptance(check), Equipment Foundations grout groove is cleared up, back-grouting is carried out and fills and leads up to design Absolute altitude.
The exposed parts of Equipment Foundations exterior sheathing use Shimizu concrete template.
The size of PVC linea angulatas is 30mm × 30mm.
The beneficial effects of the invention are as follows:The present invention reduces secondary grouting template installation procedure, set during non-winter construction In standby foundation grouting slot can water storage huge foundation surface is conserved;It solves concrete base layer with grout blanket color to differ The problem of cause, reduces construction joint, and improves appearance technique;It improves work efficiency, when foundation construction reduces process, secondary Grouting directly carries out in Equipment Foundations grout groove, reduces the branch die process of back-grouting, is cleaned out just after equipment is in place Back-grouting operation can be carried out, the time is saved for equipment installation.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
In figure:1- Equipment Foundations grout grooves;2-PVC linea angulatas;3- Equipment Foundations;4- Shimizu concrete templates;
It is described in detail below with reference to the embodiment of the present invention with reference to attached drawing.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples:
As shown in Figure 1, in a kind of Equipment Foundations work progress back-grouting method, the specific steps are:
A, construction drawing is checked comprehensively before constructing, it is ensured that construction drawing does not have mistake;
When b, requiring to construct to Equipment Foundations 3 according to construction drawing, the exterior sheathing of Equipment Foundations 3 is installed to back-grouting Top mark eminence;
C, the mounting of roof plate PVC linea angulatas 2 of exterior sheathing;
D, it is stayed according to the grouting height of construction drawing requirement in 3 inside of Equipment Foundations and sets groove as Equipment Foundations grout groove 1, the depth of Equipment Foundations grout groove 1 is lower 30-50mm than design height, for dabbing, the outer wall thickness of Equipment Foundations grout groove 1 For 100mm;
E, mass concrete water storing conservation is carried out using Equipment Foundations grout groove 1;
F, curing age carries out form removal, dabbing processing later;
G, equipment installation is corrected and is checked and accepted;
H, after equipment installation acceptance(check), Equipment Foundations grout groove 1 is cleared up, back-grouting is carried out and fills and leads up to design Absolute altitude.
The exposed parts of 3 exterior sheathing of Equipment Foundations use Shimizu concrete template 4.
The size of PVC linea angulatas 2 is 30mm × 30mm.
The present invention reduces secondary grouting template installation procedure, can be stored in Equipment Foundations grout groove 1 during non-winter construction Water conserves 3 surface of Equipment Foundations;It solves the problems, such as that concrete base layer and grout blanket color are inconsistent, reduces construction Seam, and improve appearance technique;It improves work efficiency, Equipment Foundations 3 reduce process when constructing, and back-grouting is directly being set It is carried out in standby foundation grouting slot 1, reduces the branch die process of back-grouting, secondary filling can be carried out by being cleaned out after equipment is in place Operation is starched, the time is saved for equipment installation.
The present invention is exemplarily described above in conjunction with attached drawing, it is clear that present invention specific implementation is not by aforesaid way Limitation, as long as employ the inventive concept and technical scheme of the present invention progress various improvement or not improved direct application In other occasions, within protection scope of the present invention.

Claims (3)

1. a kind of method of back-grouting in Equipment Foundations work progress, which is characterized in that the specific steps are:
A, construction drawing is checked comprehensively before constructing, it is ensured that construction drawing does not have mistake;
When b, requiring to construct to Equipment Foundations (3) according to construction drawing, the exterior sheathing of Equipment Foundations (3) is installed to back-grouting Top mark eminence;
C, the mounting of roof plate PVC linea angulatas (2) of exterior sheathing;
D, it is stayed on the inside of Equipment Foundations (3) according to the grouting height of construction drawing requirement and sets groove as Equipment Foundations grout groove (1), the depth of Equipment Foundations grout groove (1) is lower 30-50mm than design height, for dabbing, Equipment Foundations grout groove (1) it is outer Wall thickness is 100mm;
E, mass concrete water storing conservation is carried out using Equipment Foundations grout groove (1);
F, curing age carries out form removal, dabbing processing later;
G, equipment installation is corrected and is checked and accepted;
H, after equipment installation acceptance(check), Equipment Foundations grout groove (1) is cleared up, back-grouting is carried out and fills and leads up to design mark It is high.
2. the method for back-grouting in a kind of Equipment Foundations work progress according to claim 1, which is characterized in that equipment The exposed parts of basic (3) exterior sheathing use Shimizu concrete template (4).
3. the method for back-grouting in a kind of Equipment Foundations work progress according to claim 2, which is characterized in that PVC The size of linea angulata (2) is 30mm × 30mm.
CN201711462088.9A 2017-12-28 2017-12-28 A kind of method of back-grouting in Equipment Foundations work progress Pending CN108265746A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711462088.9A CN108265746A (en) 2017-12-28 2017-12-28 A kind of method of back-grouting in Equipment Foundations work progress

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711462088.9A CN108265746A (en) 2017-12-28 2017-12-28 A kind of method of back-grouting in Equipment Foundations work progress

Publications (1)

Publication Number Publication Date
CN108265746A true CN108265746A (en) 2018-07-10

Family

ID=62772686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711462088.9A Pending CN108265746A (en) 2017-12-28 2017-12-28 A kind of method of back-grouting in Equipment Foundations work progress

Country Status (1)

Country Link
CN (1) CN108265746A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113774954A (en) * 2021-07-02 2021-12-10 中国二十冶集团有限公司 Method for moving and transforming welding machine
CN115434356A (en) * 2022-08-30 2022-12-06 中国电建集团四川工程有限公司 Construction process for secondary grouting of fan foundation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3878708A (en) * 1973-09-25 1975-04-22 Gfm Fertigungstechnik Forging press
CN101660314A (en) * 2009-09-28 2010-03-03 浙江天力建设集团有限公司 Construction method for foundation of exposed concrete equipment
CN106836808A (en) * 2017-02-21 2017-06-13 中建二局第三建筑工程有限公司 Self-compaction mass concrete construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3878708A (en) * 1973-09-25 1975-04-22 Gfm Fertigungstechnik Forging press
CN101660314A (en) * 2009-09-28 2010-03-03 浙江天力建设集团有限公司 Construction method for foundation of exposed concrete equipment
CN106836808A (en) * 2017-02-21 2017-06-13 中建二局第三建筑工程有限公司 Self-compaction mass concrete construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
许光驰: "《机电设备安装与调试》", 31 March 2012, 北京航空航天大学出版社 *
陈端铭: "设备基础灌浆面凹槽施工法", 《科技创新导报》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113774954A (en) * 2021-07-02 2021-12-10 中国二十冶集团有限公司 Method for moving and transforming welding machine
CN115434356A (en) * 2022-08-30 2022-12-06 中国电建集团四川工程有限公司 Construction process for secondary grouting of fan foundation

Similar Documents

Publication Publication Date Title
CN102121315B (en) Hole reserving construction method for tightly-fixed steel sleeve
CN103669562A (en) Cantilever bay window board concrete overall pouring structure and construction method thereof
CN103306389B (en) Dry-hang external wall insulation board and novel application thereof as dismounting-free building template
CN206396913U (en) A kind of built-in fitting positioning and mounting structure
CN108265746A (en) A kind of method of back-grouting in Equipment Foundations work progress
CN104746772A (en) Ash concrete hollow partition board anti-cracking construction method
CN103556819B (en) A kind of construction method of reserved constructional column hole on beam slab
CN104278840A (en) Decorating bare concrete construction method and split bolt hole die for same
CN103643971A (en) Method for rapid construction of tunnel inverted arch forming end mould
CN109577674A (en) A kind of metope flexure type crack repairing structure and its construction method
CN107630531B (en) Large-cantilever bare concrete stair and construction method thereof
CN103306383A (en) Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall
CN204282576U (en) A kind of lightweight external wall structure
CN104453011B (en) A kind of lightweight external wall structure and its construction method
CN203007974U (en) Tower crane foundation structure
CN212507541U (en) Roof waterproof repairing structure
CN203716410U (en) Novel roof grid seam
CN203412124U (en) Dry-hanging external wall insulation board serving as detaching-free building template
CN204298860U (en) Lid digs the inverse side wall construction joint waterproofing node that does and constructs
CN203924102U (en) Building implements foundation bolt preformed hole construction mould
CN106401176A (en) Steel-wood combination roof moldboard framework construction method
CN103628684B (en) A kind of construction method of simultaneously watering build floor and shear wall
CN201567785U (en) Ribbed beam mould plate
CN211597716U (en) A shutoff structure for prefabricated outer wall is in milk
CN204081126U (en) A kind of exterior wall tongue and groove preventing window from seeping water

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180710