CN103306383A - Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall - Google Patents

Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall Download PDF

Info

Publication number
CN103306383A
CN103306383A CN2013102673872A CN201310267387A CN103306383A CN 103306383 A CN103306383 A CN 103306383A CN 2013102673872 A CN2013102673872 A CN 2013102673872A CN 201310267387 A CN201310267387 A CN 201310267387A CN 103306383 A CN103306383 A CN 103306383A
Authority
CN
China
Prior art keywords
bolt hole
wall
pto
reinforced concrete
concrete shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102673872A
Other languages
Chinese (zh)
Inventor
郭耀东
赵春梅
王国志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
Original Assignee
1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP filed Critical 1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
Priority to CN2013102673872A priority Critical patent/CN103306383A/en
Publication of CN103306383A publication Critical patent/CN103306383A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

An infiltration prevention method for a bolt hole in the outer wall of a reinforced concrete shear wall comprises the following steps: A, cleaning the surface of the bolt hole in the outer wall: taking out sundry in the bolt hole, removing ash residues in the hole and using water to fully wet the wall of the hole with water; B, using rigid cement mortar to fill and compact the bolt hole; C, cleaning and smoothening 30 mm around the bolt hole in the outer wall surface; D, horizontally and vertically brushing cold base oil to the bolt hole and the periphery of the bolt hole; E, cooling down the cold base oil for 3-5 minutes, and pasting PTO self-adhesive water-proof coiled materials; F, using a rubber mallet to uniformly hammer the PTO self-adhesive water-proof coiled material to enable the PTO self-adhesive water-proof coiled materials to be bonded firmly with the outer wall surface. The infiltration prevention method for the bolt hole in the outer wall of the reinforced concrete shear wall solves the problem that the indoor wall is contaminated by infiltration of the bolt hole in the outer wall, saves higher maintenance cost, reduces claim for compensation of a proprietor due to infiltration and improves the whole construction quality of projects.

Description

Reinforced concrete shear wall exterior wall bolt hole percolation-proof method
Technical field
The present invention relates to a kind of construction techniques, specifically, relate to a kind of reinforced concrete shear wall exterior wall bolt hole percolation-proof method.
Background technology
In the situation that existing job practices and technological means have inevitably stayed the through-wall bolt hole during construction shear wall.Therefore invented this technical patent for the shutoff at this position with the processing means that increase waterproofing course, avoided the pollution that interior decoration caused because of the infiltration of exterior wall bolt hole and reprocessed.
The method of processing at present shear wall exterior wall bolt hole in the industry is:
Adopt cement mortar to tamp in the both sides of bolt hole simultaneously, it is floating flat with structure metope one that bolt hole tamps the surface.After reaching intensity, mortar carries out metope (plaster, putty, coating, insulation) interior and exterior finishes etc. lower to operation.
There are the following problems for prior art:
(1) shutoff is closely knit fully.The original structure concrete shear force wall is generally C30~C40 concrete, and rear plugging material generally is cement mortar.There is the time interval of strength difference and construction in bi-material, each own contraction separately in the process that mortar strength and structural concrete strength increase simultaneously in the hole, its shrinkage stress opposite direction.At it separately in the process of gain in strength, the former bolt hole wall position Lock-in of joining at bi-material the slit.
(2) slit inevitably occurs after the bolt hole shutoff, but original construction technology has been ignored the processing to this position, has caused the hidden danger of infiltration.Simultaneously, the construction object of bolt hole plugging construction content is relatively discrete and quantity is very big, and mortar quality checking means are deficient and be difficult to accomplish absolutely check in the shutoff metapore.The shutoff quality of any one bolt hole slightly has deficiency, must seep water from this position in the future.
Summary of the invention
For above-mentioned deficiency of the prior art, the invention provides a kind of reinforced concrete shear wall exterior wall bolt hole percolation-proof method that prevents that the infiltration of exterior wall bolt hole from causing indoor wall to pollute.
The technical solution used in the present invention is:
A kind of reinforced concrete shear wall exterior wall bolt hole percolation-proof method, operating procedure is as follows:
The surface of A, External Wall bolt hole is cleared up: take out foreign material in the bolt hole, lime-ash in the cleaning hole, the abundant moistening hole wall of water;
B, real with filling up plug in the bolt hole with the hydraulic cement mortar;
Clear up smooth around C, the wall face bolt hole in the scope of 30mm;
Anyhow brush oil of the cold end around D, bolt hole and the bolt hole;
After hanging 3~5 minutes after E, the oil brushing of the cold end, paste the PTO adhesive waterproof coil;
F, the even hammering PTO of rubber hammer adhesive waterproof coil make PTO adhesive waterproof coil and wall face bonding firmly.
During described filling hydraulic cement mortar, carried out simultaneously by wall face and interior metope both sides.
Described PTO adhesive waterproof coil is cut into square according to the bolt hole size; PTO adhesive waterproof coil edge is greater than bolt hole edge 15mm.
The bolt hole surface of described filling hydraulic cement mortar is floating with trowel, and the bolt hole surface is bright and clean smooth all around with the bolt hole wall face.
The beneficial effect of the relative prior art of the present invention:
Reinforced concrete shear wall exterior wall bolt hole percolation-proof method of the present invention, having solved the indoor wall that in the past caused because of the infiltration of exterior wall bolt hole pollutes, saved higher maintenance cost, reduced because infiltration to owner's claim, has improved the integral construction quality of engineering.
Description of drawings
Fig. 1 is exterior wall through-wall bolt hole shutoff pre-structure schematic diagram;
Fig. 2 is structural representation after the hole shutoff of exterior wall through-wall bolt;
Fig. 3 is the A partial structurtes schematic diagram of Fig. 2;
Fig. 4 is that the B of Fig. 2 is to structural representation.
Critical piece symbol description in the accompanying drawing:
Among the figure:
1, wall face 2, interior metope
3, bolt hole 4, hydraulic cement mortar
5, cold end oil 6, PTO adhesive waterproof coil
7, exterior wall.
The specific embodiment
The present invention will be described in detail referring to drawings and Examples:
A kind of reinforced concrete shear wall exterior wall bolt hole percolation-proof method, operating procedure is as follows:
The surface of A, External Wall bolt hole 3 is cleared up: take out bolt hole 3 interior foreign material, lime-ash in the cleaning hole, the abundant moistening hole wall of water;
B, real with filling up plug in the bolt hole 3 with the hydraulic cement mortar; Mortar strength is unsuitable excessive, and proportioning is (mass ratio) cement: medium sand: water=1:6:1, cement mortar moisture control be (can agglomeratingly throw away can scatter on the ground is advisable to be held in the hand) between 12%~13%;
Clear up smooth around C, wall face 1 bolt hole 3 in the scope of 30mm;
Anyhow brush oil of the cold end 5 around D, bolt hole 3 and the bolt hole;
After hanging 3~5 minutes after E, 5 brushings of oil of the cold end, paste PTO adhesive waterproof coil 6;
F, the even hammering PTO of rubber hammer adhesive waterproof coil 6 make that PTO adhesive waterproof coil 6 and wall face 1 are bonding firmly can to carry out the follow-up work such as external wall insulation stickup.
During described filling hydraulic cement mortar 4, carried out simultaneously by wall face 1 and interior metope 2 both sides.
Described PTO adhesive waterproof coil 6 is cut into square according to the bolt hole size; PTO adhesive waterproof coil 6 edges are greater than bolt hole 3 edge 15mm.
Bolt hole 3 surfaces of described filling hydraulic cement mortar 4 are floating with trowel, and bolt hole 3 surfaces are bright and clean smooth all around with bolt hole wall face 1.
During reinforced concrete shear wall exterior wall bolt hole percolation-proof method construction of the present invention, the each household cost drops into increases by 25~75 yuan.But eliminated a hidden danger of quality, the expense of reprocessing of saving simultaneously and the economic results in society of increase are huge.

Claims (4)

1. a reinforced concrete shear wall exterior wall bolt hole percolation-proof method is characterized in that, operating procedure is as follows:
The surface of A, External Wall bolt hole is cleared up: take out foreign material in the bolt hole, lime-ash in the cleaning hole, the abundant moistening hole wall of water;
B, real with filling up plug in the bolt hole with the hydraulic cement mortar;
Clear up smooth around C, the wall face bolt hole in the scope of 30mm;
Anyhow brush oil of the cold end around D, bolt hole and the bolt hole;
After hanging 3~5 minutes after E, the oil brushing of the cold end, paste the PTO adhesive waterproof coil;
F, the even hammering PTO of rubber hammer adhesive waterproof coil make PTO adhesive waterproof coil and wall face bonding firmly.
2. described reinforced concrete shear wall exterior wall bolt hole percolation-proof method according to claim 1 is characterized in that: during described filling hydraulic cement mortar, carried out simultaneously by wall face and interior metope both sides.
3. described reinforced concrete shear wall exterior wall bolt hole percolation-proof method according to claim 1, it is characterized in that: described PTO adhesive waterproof coil is cut into square according to the bolt hole size; PTO adhesive waterproof coil edge is greater than bolt hole edge 15mm.
4. described reinforced concrete shear wall exterior wall bolt hole percolation-proof method according to claim 1, it is characterized in that: the bolt hole surface of described filling hydraulic cement mortar is floating with trowel, and is bright and clean smooth around bolt hole surface and the bolt hole wall face.
CN2013102673872A 2013-06-30 2013-06-30 Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall Pending CN103306383A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102673872A CN103306383A (en) 2013-06-30 2013-06-30 Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102673872A CN103306383A (en) 2013-06-30 2013-06-30 Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall

Publications (1)

Publication Number Publication Date
CN103306383A true CN103306383A (en) 2013-09-18

Family

ID=49132067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102673872A Pending CN103306383A (en) 2013-06-30 2013-06-30 Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall

Country Status (1)

Country Link
CN (1) CN103306383A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541439A (en) * 2013-09-24 2014-01-29 宝鸡市第一建筑工程有限责任公司 Method for padding of split bolt hole of concrete shear wall
CN103572843A (en) * 2013-11-22 2014-02-12 中冶东方工程技术有限公司 Water seepage treatment device and manufacturing method thereof
CN104612289A (en) * 2015-02-13 2015-05-13 中冶建工集团有限公司 Method for constructing external walls
CN112502299A (en) * 2020-12-07 2021-03-16 中建八局第四建设有限公司 Novel three-color polyurethane plugging process for split bolt holes of outer wall
CN112761681A (en) * 2021-02-04 2021-05-07 西南交通大学 Bolt hole waterproof structure of high-head shield tunnel segment
CN113175109A (en) * 2021-04-27 2021-07-27 上海宝冶集团有限公司 Plugging method of through-wall hole
CN113802698A (en) * 2021-08-20 2021-12-17 上海宝冶集团有限公司 Construction method for plugging split bolt holes of shear wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4771584A (en) * 1987-04-02 1988-09-20 F. Bon Jasperson Concrete block wall construction method
CN101131007A (en) * 2006-08-23 2008-02-27 天津市森宇建筑技术法律咨询有限公司 Preventing method for exterior wall leakage of face tile
CN100396859C (en) * 2007-07-19 2008-06-25 河北建设集团有限公司 Pouring concrete separating crack structure and construction method thereof
CN101914927A (en) * 2010-06-22 2010-12-15 中国建筑第二工程局有限公司 Waterproof system for basement bottom board and wall surface and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4771584A (en) * 1987-04-02 1988-09-20 F. Bon Jasperson Concrete block wall construction method
CN101131007A (en) * 2006-08-23 2008-02-27 天津市森宇建筑技术法律咨询有限公司 Preventing method for exterior wall leakage of face tile
CN100396859C (en) * 2007-07-19 2008-06-25 河北建设集团有限公司 Pouring concrete separating crack structure and construction method thereof
CN101914927A (en) * 2010-06-22 2010-12-15 中国建筑第二工程局有限公司 Waterproof system for basement bottom board and wall surface and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
付立坡: "浅谈外墙螺栓孔砂浆封堵填塞施工", 《科技与企业》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541439A (en) * 2013-09-24 2014-01-29 宝鸡市第一建筑工程有限责任公司 Method for padding of split bolt hole of concrete shear wall
CN103572843A (en) * 2013-11-22 2014-02-12 中冶东方工程技术有限公司 Water seepage treatment device and manufacturing method thereof
CN104612289A (en) * 2015-02-13 2015-05-13 中冶建工集团有限公司 Method for constructing external walls
CN112502299A (en) * 2020-12-07 2021-03-16 中建八局第四建设有限公司 Novel three-color polyurethane plugging process for split bolt holes of outer wall
CN112761681A (en) * 2021-02-04 2021-05-07 西南交通大学 Bolt hole waterproof structure of high-head shield tunnel segment
CN112761681B (en) * 2021-02-04 2022-04-22 西南交通大学 Bolt hole waterproof structure of high-head shield tunnel segment
CN113175109A (en) * 2021-04-27 2021-07-27 上海宝冶集团有限公司 Plugging method of through-wall hole
CN113802698A (en) * 2021-08-20 2021-12-17 上海宝冶集团有限公司 Construction method for plugging split bolt holes of shear wall

Similar Documents

Publication Publication Date Title
CN103306383A (en) Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall
CN103343655B (en) Wall window construction method
CN104746772B (en) Ash concrete hollow partition board anti-cracking construction method
CN104612261A (en) Method for external insulation construction of polystyrene board thin plastered surface in cold and windy area
CN104018598A (en) Outer wall structure and construction and installation method
CN103266767A (en) Construction method for preventing and treating cracks between concrete structure and filler wall
CN204326567U (en) A kind of reinforced concrete wall runs through large fracture preparing structure
CN106088537B (en) A kind of window auxiliary frame pre-embedded construction method
CN107338967A (en) A kind of new technology and new material of aging blocks outdoor tile facing renewal and reform
CN102852290A (en) Roof parapet flashing place structure and construction method thereof
CN104530871A (en) Ceramic tile interfacial agent and using method thereof
CN110821198A (en) High-rise building external wall thermal insulation mortar falling prevention method
CN102486048A (en) Construction method for exterior heat preserving wall surface of exterior wall of high-rise building
CN204676714U (en) Water-stopping steel strip and construction joint structure
CN105625650A (en) Construction method for roofing parapet wall flashing protective layer
CN105888084A (en) Whole outer wall internal thermal insulation system construction method by using enhanced composite thermal insulation material
CN103882997B (en) The processing method of metal or frosting structure
CN207499702U (en) A kind of door-window opening waterproofing node structure
CN110005174A (en) Improve the construction method of Machine-blasting mortar plastering quality
KR101376090B1 (en) Repair method for concrete structure and automatic machine for the repair method
CN101446138A (en) Reconstructed project wall external decoration material anti-seepage construction method
CN108149881A (en) The back side anchoring bond system and installation method of a kind of thin-coat plaster heat insulating decorative board
CN204266404U (en) A kind of outer-wall crack-resisting anti-leakage structure
KR20140109022A (en) Functionality special mortar composition use Method of water proofing
CN109537926B (en) Waterproof and leaking stoppage construction method for building area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130918