CN103541439A - Method for padding of split bolt hole of concrete shear wall - Google Patents

Method for padding of split bolt hole of concrete shear wall Download PDF

Info

Publication number
CN103541439A
CN103541439A CN201310437254.5A CN201310437254A CN103541439A CN 103541439 A CN103541439 A CN 103541439A CN 201310437254 A CN201310437254 A CN 201310437254A CN 103541439 A CN103541439 A CN 103541439A
Authority
CN
China
Prior art keywords
split bolt
bolt hole
wall
section
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310437254.5A
Other languages
Chinese (zh)
Inventor
程志强
庄波
韩博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoji First Construction Work Co Ltd
Original Assignee
Baoji First Construction Work Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoji First Construction Work Co Ltd filed Critical Baoji First Construction Work Co Ltd
Priority to CN201310437254.5A priority Critical patent/CN103541439A/en
Publication of CN103541439A publication Critical patent/CN103541439A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a method for padding of a split bolt hole of a concrete shear wall. According to the method for padding of the split bolt hole of the concrete shear wall, a traditional uniform-section split bolt is replaced by a variable-section split bolt sleeve when a shear wall formwork is reinforced. The method for padding of the split bolt hole of the concrete shear wall comprises the following steps that the split bolt hole is formed in the concrete shear wall, a variable-section circular truncated cone rubber plug is placed and stuffed in the split bolt hole from the inner side of the concrete shear wall, a polyurethane foaming material which has the air hardening performance, resists seepage and preserves heat is injected into the split bolt hole, and an inner portion with the length of 15mm of the split bolt hole and an outer portion with the length of 15mm of the split bolt hole are reserved and padded with expanded mortar. According to the method for padding of the split bolt hole of the concrete shear wall, full-hole padding is guaranteed and padding is dense; the polyurethane foaming material which has the air hardening performance, resists seepage and preserves heat is used for padding, so that the padding quality is improved, and the seepage-proof and heat-preservation effect is good.

Description

The filling method in a kind of concrete shear force wall split bolt hole
Technical field
The present invention, for builing industry, is specifically related to the filling method in a kind of concrete shear force wall split bolt hole.
Background technology
The essential hole arranging when concrete shear force wall split bolt hole is concrete shear force wall formwork reinforcement, for the filling of concrete shear force wall split bolt hole, adopts the filling of expansion expansive mortar conventionally.Traditional split bolt hole, can not once clog, and filling need be clogged several times, not only will be in inboard to plug, but also to stop up in outside.Outside need to utilize outrigger while stopping up, and constructs very inconvenient, also dangerous.Traditional split bolt hole filling, adopts filling on one side, Yi Bian plug and pound, for this filling method, owing to restricted by operating personnel's accountability, probably cause two ends filling, middle empty phenomenon, can not guarantee the filling of full hole, make to clog leakiness, filling effect is lower, filling effect is undesirable, finally cause exterior wall leakage, heat insulation effect is bad, at this position, forms cold bridge.
Summary of the invention
For solving the technical problem of above-mentioned existence, the invention provides the filling method in a kind of concrete shear force wall split bolt hole, shear wall formwork adopts variable cross-section Split bolt sleeve while reinforcing, substitute traditional uniform section Split bolt sleeve, Split bolt sleeve can adopt PVC, UPVC, aluminium-plastic pipe or steel variable cross-section sleeve pipe.
The technical scheme that the present invention proposes is: the filling method in a kind of concrete shear force wall split bolt hole, and its concrete step is:
1) on concrete shear force wall, form split bolt hole: after shear force wall reinforcing steel bar colligation is good, shear wall formwork is installed, is placed variable cross-section Split bolt sleeve and split bolt bar, by split bolt compression device, template is reinforced, after formwork reinforcement is good, build shear wall concrete, after concrete setting, and not during sticking to mould, loosening split bolt, take out split bolt, stripping, just there is variable cross-section split bolt hole in concrete shear force wall;
2) place rubber stopper: adopt variable cross-section round platform post rubber stopper, from shear wall inboard, fill in split bolt hole, rubber stopper is shifted onto apart from 15 mm prescriptions of wall outer side surface layer and can be stopped, and this rubber stopper is as the external mold that injects anti-seepage heat preservation material;
3) filling split bolt hole: to the rigid anti-seepage heat preservation polyurethane foam material of injected gas in split bolt hole, injection polyurethane foam material can stop apart from shear wall inner surface 15 mm in the hole in;
4) filling both sides, split bolt hole: all reserved 15 mm places inside and outside adopting expansive mortar filling split bolt hole.
Make variable cross-section split bolt hole sleeve, Split bolt sleeve length is generally 200mm, 250mm, 300mm, 350mm, casing inner diameter: one end diameter is 30 mm, and the other end is 35mm, and steel sleeve wall thickness is 1mm, and other material wall thickness is 2.5 mm.
By the round table-like rubber stopper of variable cross-section, from the inboard plug of shear wall rubber stopper, be that one end diameter of section is 33 mm, other end diameter of section is 35 mm, and rubber stopper length is 30mm.
The invention has the beneficial effects as follows: the method is a kind of Novel seepage, is incubated efficient consent filling method, guarantee the filling of full hole, make to clog closely knit, adopt the polyurethane material of anti-seepage heat preservation to fill, improve filling quality, anti-seepage heat preservation is respond well.
Accompanying drawing explanation
Fig. 1 is concrete shear force wall split bolt pore structure figure of the present invention;
Fig. 2 is the elevation of Split bolt sleeve;
Fig. 3 is the left view of Split bolt sleeve;
Fig. 4 is the right view of Split bolt sleeve;
Fig. 5 is the elevation of the rubber stopper shown in Fig. 1;
Fig. 6 is the left view of the rubber stopper shown in Fig. 1;
Fig. 7 is the right view of the rubber stopper shown in Fig. 1.
Shown in figure: surface layer inside 1-body of wall, 2-concrete shear force wall, 3-wall outer side surface layer, filling expansive mortar in 15mm place inside 4-hole, 5-rubber stopper, expansive mortar, 7-polyurethane foam material are clogged by 15mm place outside 6-hole.
The specific embodiment
In order to make object of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
The filling method in concrete shear force wall split bolt hole, as shown in Figure 1, the steps include:
1) on concrete shear force wall, form split bolt hole: after shear force wall reinforcing steel bar colligation is good, shear wall formwork is installed, is placed variable cross-section Split bolt sleeve and split bolt bar, by split bolt compression device, template is reinforced, after formwork reinforcement is good, build shear wall concrete, after concrete setting, and not during sticking to mould, loosening split bolt, take out split bolt, stripping, just there is variable cross-section split bolt hole in concrete shear force wall 2;
2) place rubber stopper: adopt variable cross-section round platform post rubber stopper 5, from surface layer 1 inside shear wall, fill in split bolt hole, rubber stopper 5 is shifted onto apart from 15 mm prescriptions of wall outer side surface layer 3 and can be stopped, and this rubber stopper 5 is as the external mold that injects anti-seepage heat preservation materials;
3) filling split bolt hole: to the rigid anti-seepage heat preservation polyurethane foam material 7 of injected gas in split bolt hole, injection polyurethane foam material 7 can stop apart from shear wall inner surface 15 mm in the hole in;
4) filling both sides, split bolt hole: all reserved 15 mm holes inside and outside adopting expansive mortar 4,6 filling split bolt holes.
As shown in Figure 2,3, 4, make variable cross-section split bolt hole sleeve, Split bolt sleeve length is generally 200mm, 250mm, 300mm, 350mm, casing inner diameter: one end diameter is 30 mm, the other end is 35mm, and steel sleeve wall thickness is 1mm, and other material wall thickness is 2.5 mm.By the round table-like rubber stopper of variable cross-section, from the inboard plug of shear wall rubber stopper, be that one end diameter of section is 33 mm, other end diameter of section is 35 mm, and rubber stopper length is 30mm, as shown in Fig. 5,6,7.

Claims (3)

1. the filling method in concrete shear force wall split bolt hole, its concrete step is:
1) on concrete shear force wall, form split bolt hole: after shear force wall reinforcing steel bar colligation is good, shear wall formwork is installed, is placed variable cross-section Split bolt sleeve and split bolt bar, by split bolt compression device, template is reinforced, after formwork reinforcement is good, build shear wall concrete, after concrete setting, and not during sticking to mould, loosening split bolt, take out split bolt, stripping, just there is variable cross-section split bolt hole in concrete shear force wall;
2) place rubber stopper: adopt variable cross-section round platform post rubber stopper, from shear wall inboard, fill in split bolt hole, rubber stopper is shifted onto apart from shear wall external surface 15 mm prescriptions and can be stopped, and this rubber stopper is as the external mold that injects anti-seepage heat preservation material;
3) filling split bolt hole: to the polyurethane foam material of the rigid anti-seepage heat preservation of injected gas in split bolt hole, injection polyurethane foam material can stop apart from shear wall inner surface 15 mm in the hole in;
4) filling both sides, split bolt hole: all reserved 15 mm places inside and outside adopting expansive mortar filling split bolt hole.
2. the filling method in a kind of concrete shear force wall split bolt according to claim 1 hole, it is characterized in that: described variable cross-section split bolt hole sleeve, Split bolt sleeve length is generally 200mm, 250mm, 300mm, 350mm, casing inner diameter: one end diameter is 30 mm, the other end is 35mm, steel sleeve wall thickness is 1mm, and other material wall thickness is 2.5 mm.
3. the filling method in a kind of concrete shear force wall split bolt according to claim 1 hole, it is characterized in that: by the round table-like rubber stopper of variable cross-section, from the inboard plug of shear wall rubber stopper, be that one end diameter of section is 33 mm, other end diameter of section is 35 mm, and rubber stopper length is 30mm.
CN201310437254.5A 2013-09-24 2013-09-24 Method for padding of split bolt hole of concrete shear wall Pending CN103541439A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310437254.5A CN103541439A (en) 2013-09-24 2013-09-24 Method for padding of split bolt hole of concrete shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310437254.5A CN103541439A (en) 2013-09-24 2013-09-24 Method for padding of split bolt hole of concrete shear wall

Publications (1)

Publication Number Publication Date
CN103541439A true CN103541439A (en) 2014-01-29

Family

ID=49965260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310437254.5A Pending CN103541439A (en) 2013-09-24 2013-09-24 Method for padding of split bolt hole of concrete shear wall

Country Status (1)

Country Link
CN (1) CN103541439A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012960A (en) * 2017-06-02 2017-08-04 山西建筑工程有限公司 A kind of waterproof plugging device in exterior wall split bolt hole
CN108360715A (en) * 2018-04-28 2018-08-03 温州博旺联科建筑工程有限公司 A kind of wall construction method
CN108867965A (en) * 2018-07-05 2018-11-23 温州嘉成工程项目管理有限公司 A kind of construction method of the float Structure of cast-in-place concrete hollow building roof
CN109373058A (en) * 2018-11-06 2019-02-22 腾达建设集团股份有限公司 A kind of flexibility wall pipe plugging structure and its construction method
CN109797966A (en) * 2019-03-15 2019-05-24 西京学院 A kind of shear wall formwork hole plug and preparation method thereof regenerating duroplasts material
CN109838093A (en) * 2019-03-15 2019-06-04 西京学院 A kind of shear wall formwork hole plug and preparation method thereof
CN109914794A (en) * 2019-04-01 2019-06-21 西京学院 A kind of shear wall formwork hole rubber stopper rod piece and pattern hole filling method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1136464A (en) * 1997-07-18 1999-02-09 Taisei Corp Water cut off packing for alc panel through hole
CN2565881Y (en) * 2002-05-20 2003-08-13 王亚华 Outer wall bolthole sealing-up rubber stopper
CN202530581U (en) * 2012-05-04 2012-11-14 中天建设集团有限公司 Plugging structure of screw hole of outer wall
CN202559540U (en) * 2012-05-08 2012-11-28 中建六局建设发展有限公司 Waterproof plugging structure for outer wall split bolt hole
CN202730973U (en) * 2012-09-05 2013-02-13 中建七局第二建筑有限公司 Concrete outer wall bolt hole leakproof structure
CN103306383A (en) * 2013-06-30 2013-09-18 二十二冶集团第一建设有限公司 Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall
CN103334501A (en) * 2013-06-26 2013-10-02 青岛建安建设集团有限公司 Seepage prevention construction method for bolt holes in exterior walls of buildings

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1136464A (en) * 1997-07-18 1999-02-09 Taisei Corp Water cut off packing for alc panel through hole
CN2565881Y (en) * 2002-05-20 2003-08-13 王亚华 Outer wall bolthole sealing-up rubber stopper
CN202530581U (en) * 2012-05-04 2012-11-14 中天建设集团有限公司 Plugging structure of screw hole of outer wall
CN202559540U (en) * 2012-05-08 2012-11-28 中建六局建设发展有限公司 Waterproof plugging structure for outer wall split bolt hole
CN202730973U (en) * 2012-09-05 2013-02-13 中建七局第二建筑有限公司 Concrete outer wall bolt hole leakproof structure
CN103334501A (en) * 2013-06-26 2013-10-02 青岛建安建设集团有限公司 Seepage prevention construction method for bolt holes in exterior walls of buildings
CN103306383A (en) * 2013-06-30 2013-09-18 二十二冶集团第一建设有限公司 Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012960A (en) * 2017-06-02 2017-08-04 山西建筑工程有限公司 A kind of waterproof plugging device in exterior wall split bolt hole
CN108360715A (en) * 2018-04-28 2018-08-03 温州博旺联科建筑工程有限公司 A kind of wall construction method
CN108867965A (en) * 2018-07-05 2018-11-23 温州嘉成工程项目管理有限公司 A kind of construction method of the float Structure of cast-in-place concrete hollow building roof
CN109373058A (en) * 2018-11-06 2019-02-22 腾达建设集团股份有限公司 A kind of flexibility wall pipe plugging structure and its construction method
CN109797966A (en) * 2019-03-15 2019-05-24 西京学院 A kind of shear wall formwork hole plug and preparation method thereof regenerating duroplasts material
CN109838093A (en) * 2019-03-15 2019-06-04 西京学院 A kind of shear wall formwork hole plug and preparation method thereof
CN109914794A (en) * 2019-04-01 2019-06-21 西京学院 A kind of shear wall formwork hole rubber stopper rod piece and pattern hole filling method

Similar Documents

Publication Publication Date Title
CN103541439A (en) Method for padding of split bolt hole of concrete shear wall
WO2019056794A1 (en) Method for constructing cavity behind tunnel lining, and composite lining structure formed after construction
WO2012047632A3 (en) Composite construction members and method of making
JP2013116636A5 (en)
WO2011092331A3 (en) Rib for supporting and reinforcing an excavation
CN103276916B (en) A kind of building method of sealing light weight concrete construction board wall wall hole and filling plate
GB2490647B (en) Screen assembly and a method for making same
CN103408722B (en) The polyurethane sheet foam process of applying nano aerogel
CN109339440A (en) A kind of high-layer shear force wall exterior wall upstream face Screw arbor with nut at both-ends hole method for blocking
JP6168361B2 (en) Mass concrete part placement method
CN203546919U (en) Split bolt hole structure for filling concrete shear wall
US20150368902A1 (en) Method for producing a multi-layered reinforced concrete element
JP2012237162A (en) Column structure and construction method of column structure
MY189364A (en) Moulding insert and facing block with such an insert
CN104499500B (en) A kind of wind power foundation post-grouting reinforcement waterproofing system
KR101757730B1 (en) Construction exterior panel and manufacturing method of construction exterior panel using a high density polystyrene
US10519772B2 (en) Construction element for creating a tunnel, tunnel comprising such an element and methods for constructing such an element and such a tunnel
Huijben et al. Vacuumatics 3D-formwork systems: customised free-form solidification
CN103660120B (en) Prefabricated direct-buried thermal insulation pipe high density polyurethane foam strengthens mould and foaming method thereof
JP2015183398A (en) Method for preventing leakage from joint section upon injecting filler into backside of tunnel forming concrete and leakage preventing device
CN103938800A (en) Reinforced concrete column with different unbonded end lengths
CN102059739A (en) Production process of lining-type anti-corrosion reinforced concrete pipe
CN203948874U (en) A kind of hard polyurethane foams support
CN203256754U (en) Precast block for backfill
KR101026131B1 (en) method for manufacturing hollow spacer inserted in slab of building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140129

RJ01 Rejection of invention patent application after publication