CN108265741A - A kind of practical approach of foundation bolt construction positioning - Google Patents

A kind of practical approach of foundation bolt construction positioning Download PDF

Info

Publication number
CN108265741A
CN108265741A CN201810076175.9A CN201810076175A CN108265741A CN 108265741 A CN108265741 A CN 108265741A CN 201810076175 A CN201810076175 A CN 201810076175A CN 108265741 A CN108265741 A CN 108265741A
Authority
CN
China
Prior art keywords
steel plate
foundation bolt
positioning device
fixing
fixing steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810076175.9A
Other languages
Chinese (zh)
Other versions
CN108265741B (en
Inventor
夏正新
杨利军
李毅
夏航宇
忻轲
黄文娟
蒋晓峰
胡智威
钱帅青
罗效戈
吴汪青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEDIN NINGBO ENGINEERING Co Ltd
Original Assignee
SEDIN NINGBO ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEDIN NINGBO ENGINEERING Co Ltd filed Critical SEDIN NINGBO ENGINEERING Co Ltd
Priority to CN201810076175.9A priority Critical patent/CN108265741B/en
Publication of CN108265741A publication Critical patent/CN108265741A/en
Application granted granted Critical
Publication of CN108265741B publication Critical patent/CN108265741B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The present invention provides a kind of practical approach of foundation bolt construction positioning, a kind of rectangle foundation bolt positioning device is obtained using this method, the positioning device includes at least four fixing steel plates, the fixing steel plate forms a rectangle, it is fixed between the fixing steel plate by fixation steel plate, at least four foundation bolts are provided on the fixing steel plate, leveling nut and fixing nut on the foundation bolt are housed, gasket is provided in the difference in height between the fixing steel plate and the fixation steel plate.The positioning device of the present invention is detachable structure, facilitates construction, repeats and utilizes, and saves steel and construction time, structure are adjusted so that the positioning of foundation bolt is more accurate.

Description

A kind of practical approach of foundation bolt construction positioning
Technical field
Invention is related to a kind of foundation bolt construction technology more particularly to a kind of practical approach of foundation bolt construction positioning.
Background technology
In the work progress of industrial building, steel-structure factory building and Equipment Foundations and tower foundation often occur.However it constructs Often occur causing foundation bolt positioning during the inaccurate either disturbing concrete of foundation bolt positioning or making bolt in the process The inconsistent frequent appearance of absolute altitude, causes steel column difficult to install or equipment is not installed, and causes quality problems and the duration of engineering Delay.
At present, there is the method for several solution foundation bolt positioning in engineering solution:
1st, the stationary positioned of steel column either rectangular apparatus foundation bolt is generally consolidated with the steel plate of prefabrication or angle steel Determine bolt, the corresponding one group of pre-embedded bolt in a basis.
2nd, the stationary positioned of the foundation bolt of tower foundation or round equipment generally uses the doughnut-shaped steel plate of prefabrication, needs The foundation bolt on the corresponding one group of pre-embedded bolt in one basis, tower foundation and round equipment basis is because device category is different, positions not With with complicated variety.
3rd, any fixed measure is not taken, causes foundation bolt positioning or foundation bolt absolute altitude wrong in work progress Position.
For the first two kind method, different pitchs of bolts all needs accordingly to make, not only takes a lot of work but also waste steel, also unfavorable In the stationary positioned of bolt absolute altitude.For the third method, steel column or equipment can be caused not to install, directly contribute engineering thing Therefore.Therefore, it is necessary to design a kind of method of foundation bolt construction positioning, take a lot of work solving current foundation bolt localization method, The problem of taking material and inaccurate positioning.
In view of drawbacks described above, creator of the present invention obtains the present invention finally by prolonged research and practice.
Patent of invention content
To solve the above problems, the technical solution that patent of the present invention uses is, a kind of foundation bolt construction positioning is provided Practical approach, obtain a kind of rectangle foundation bolt positioning device using this method, it is fixed that the positioning device includes at least four Position steel plate, the fixing steel plate form a rectangle, are fixed between the fixing steel plate by fixation steel plate, the fixing steel plate On be provided at least four foundation bolts.
Preferably, the first elongate holes that width is d1, Width Formula of Rib Knitted Fabric d1=d+ are provided on the fixing steel plate 2;The second elongate holes that width is d2, Width Formula of Rib Knitted Fabric d2=d3+2 are provided on the fixation steel plate.
Preferably, leveling nut and fixing nut are housed on the foundation bolt.
Preferably, it is provided with gasket in difference in height between the fixing steel plate and the fixation steel plate.
The practical approach of the foundation bolt construction positioning includes the following steps:
Step 1:First the pre-buried foundation bolt is positioned by design requirement plane and absolute altitude, then by the lower margin Bolt lower end passes through the reinforcing bar for setting basis the inside and the foundation bolt banding fixed;
Step 2:The leveling nut is screwed on the foundation bolt in advance, then by two parallel positioning Steel plate is placed in above the parallel fixing steel plate of other two, and the positioning is adjusted according to the position of the foundation bolt The position of steel plate;
Step 3:The absolute altitude of the leveling nut is adjusted, the fixing steel plate is made to be in final grouting layer position, this sample prescription Just the pouring of concrete and the dismounting of the rectangle foundation bolt positioning device, treat the foundation bolt plan-position and absolute altitude position After putting accurate positioning, the fixing nut is tightened respectively;
Step 4:The fixing steel plate is connected with the fixation steel plate, passes through the installation bolt and the installation nut With first on lower gasket, tighten the installation nut, the fixation steel plate and the fixing steel plate made to form the stabilization of triangle System;
Step 5:The placing concrete after having bound reinforcing bar and having propped up the basis of template, concrete casting is to designing mark Then height dismantles the rectangle foundation bolt positioning device, be recycling in other similar bases.
A kind of circle foundation bolt positioning device, the positioning device include at least 12 fixation steel plates, the fixation Steel plate forms a large circle and a small circle ring, is connected admittedly by fixing steel plate between the large circle and the small circle ring It is fixed, centre bore is provided on the fixing steel plate, foundation bolt is housed on the centre bore.
Preferably, the second elongate holes that width is d1, Width Formula of Rib Knitted Fabric d2=d3+ are provided on the fixation steel plate 2, the fixation steel plate is provided at both ends with aperture, and the diameter formula of the aperture is d4=d3+2, is set in the middle part of the fixation steel plate Centre bore is equipped with, the diameter formula of the centre bore is d5=d+2.
Preferably, the center of circle is directed toward in one end of the fixing steel plate.
Preferably, leveling nut and fixing nut are housed on the foundation bolt.
The practical approach of the foundation bolt construction positioning includes the following steps:
Step 1:First the pre-buried foundation bolt is positioned by design requirement plane and absolute altitude, then by it is described Foot bolt lower end passes through the reinforcing bar for setting basis the inside and the foundation bolt banding fixed;
Step 2:The leveling nut is screwed on the foundation bolt in advance, then presses multiple fixing steel plates Circular arrangement, wherein one end are directed toward the center of circle;
Step 3:Two parallel fixation steel plates are placed in below the fixing steel plate, then by other two A parallel fixation steel plate is placed in above the fixing steel plate, by the parallel fixation steel plate alternatively up and down into circle Arrangement adjusts the position of the fixation steel plate further according to the position of the foundation bolt;
Step 4:The absolute altitude of the leveling nut is adjusted, the fixing steel plate is made to be in final grouting layer position, is treated described Behind foundation bolt plan-position and elevation location accurate positioning, the fixing nut is tightened respectively;
Step 5:The placing concrete after having bound reinforcing bar and having propped up the basis of template, concrete casting is to designing mark Then height dismantles the round foundation bolt positioning device, is recycling in other similar bases.
Compared with the prior art the beneficial effects of the present invention are:1st, detachable structure facilitates construction, repeats and utilizes, Save steel and construction time;2nd, structure is adjusted, and more accurate positioning is provided for foundation bolt plane and absolute altitude;3rd, it positions Steel plate is in final grouting layer position, facilitates the pouring of concrete and the dismounting of rectangle foundation bolt positioning device.
Description of the drawings
Fig. 1 is the structure diagram of rectangle foundation bolt positioning device of the present invention;
Fig. 2 is the vertical view of rectangle foundation bolt positioning device of the present invention;
Fig. 3 is the structure diagram of the foundation bolt of foundation bolt positioning device of the present invention;
Fig. 4 is the structure diagram of the installation bolt of foundation bolt positioning device of the present invention;
Fig. 5 is the structure diagram of the round foundation bolt positioning device of the present invention;
Fig. 6 is the vertical view of the round foundation bolt positioning device of the present invention.
Specific embodiment
Below in conjunction with attached drawing, technical characteristic above-mentioned to patent of the present invention and other and advantage are described in more detail.
Embodiment one
The present invention provides a kind of practical approach of foundation bolt construction positioning, wherein the foundation bolt construction positioning Practical approach is based on foundation bolt construction positioning device and realizes that as shown in Figure 1, Figure 2, Figure 3 and Figure 4, the foundation bolt is applied The device of work positioning is the rectangle foundation bolt positioning device of rectangular configuration, including several fixing steel plates 1, fixation steel plate 2 With foundation bolt 3;
The fixing steel plate 1 is with certain thickness elongate steel plate, and middle is provided with width, and for d1, (unit is equal For mm) the first elongate holes, maximum 3 a diameter of d of the foundation bolt, the foundation bolt 3 be mounted on described first length On bar hole, the Width Formula of Rib Knitted Fabric of first elongate holes is d1=d+2, this can be put down using the unsolicited foundation bolt Face positions, and the fixing steel plate 1 is at least four pieces, and in the present embodiment, the fixing steel plate 1 is four pieces, parallel with respect to two pieces It is in addition parallel with respect to two pieces in lower placement upper, form a rectangle;
It is fixed between the every two pieces adjacent fixing steel plates 1 by the fixation steel plate 2, the fixation steel plate 2 has four pieces, It is certain thickness elongate steel plate, and middle is provided with the second elongate holes that width is d2, second elongate holes Upper equipped with installation bolt 4, the installation bolt 4 has several, and the fixation steel plate 2 is with the fixing steel plate 1 by the installation Bolt 4 is connected, a diameter of d3 of the installation bolt 4, and the Width Formula of Rib Knitted Fabric of second elongate holes is d2=d3+2, the peace It fills setting on bolt 4 and, there are two nut 7 is installed, the first Upper gasket and the first underlay is provided between described two installation nuts 7 Piece to place the fixation steel plate 2 and the fixing steel plate 1 between first Upper gasket and the first lower gasket, is tightened described Two installation nuts 7, make two pieces of fixing steel plates 1 and the fixation steel plate 2 form the stabilising system of a triangle;
Preferably, there are one differences in height between the fixing steel plate 1 and the fixation steel plate 2, the difference in height is interior to be set There is gasket, avoid connecting insecure;
3 middle part of foundation bolt is provided with leveling nut 5, and 3 end set of foundation bolt has fixing nut 6, institute It states and the second Upper gasket and the second lower gasket is provided between leveling nut 5 and the fixing nut 6, the foundation bolt 3 is marked The foundation bolt 3 is transferred to consistent absolute altitude by high positioning by using the leveling nut 5, by second Upper gasket and Two lower gaskets tighten the fixing nut 6, to fix the absolute altitude of the foundation bolt 3 and plan-position;
Preferably, four foundation bolts 3 are at least set on the rectangular positioning device, it is in the present embodiment, described Foundation bolt 3 is 12.
Embodiment two
A kind of practical approach of foundation bolt construction positioning as described above, the present embodiment are different from part and are, With reference to shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, the practical approach of wherein foundation bolt construction positioning includes the following steps:
Step 1:First the pre-buried foundation bolt 3 is positioned by design requirement plane and absolute altitude, then by the lower margin 3 lower end of bolt passes through the reinforcing bar for setting basis the inside and 3 banding fixed of foundation bolt;
Step 2:The leveling nut 5 is screwed on the foundation bolt 3 in advance, it is then parallel described fixed by two Position steel plate 1 is placed in above the parallel fixing steel plate 1 of other two, and institute is adjusted according to the position of the foundation bolt 3 State the position of fixing steel plate 1;
Step 3:The absolute altitude of the leveling nut 5 is adjusted, the fixing steel plate 1 is made to be in final grouting layer position, in this way Facilitate the pouring of concrete and the dismounting of the rectangle foundation bolt positioning device, treat 3 plan-position of foundation bolt and mark After high position accurate positioning, the fixing nut 6 is tightened respectively;
Step 4:The fixing steel plate 1 is connected with the fixation steel plate 2, passes through the installation bolt 4 and the installation spiral shell Lower gasket on mother 7 and first tightens the installation nut 7, the fixation steel plate 2 and the fixing steel plate 1 is made to form triangle Stabilising system;
Step 5:The placing concrete after having bound reinforcing bar and having propped up the basis of template, concrete casting is to designing mark Then height dismantles the rectangle foundation bolt positioning device, be recycling in other similar bases.
Embodiment three
A kind of practical approach of foundation bolt construction positioning as described in above-described embodiment one, the present embodiment are different from it It is in reference to shown in Fig. 3, Fig. 4, Fig. 5 and Fig. 6, the foundation bolt construction positioning device is the round lower margin of circular configuration Bolt positioning device, including several fixation steel plate 2, the fixing steel plate 1 and the foundation bolt 3:
The fixation steel plate 2 is at least 12 pieces, wherein six pieces of fixation steel plates 2 according to one piece in lastblock under Rule makes the end of the second elongate holes of the fixation steel plate 2 overlap a large circle, in addition six blocks of fixed steel Plate 2 forms a small circle ring according to above-mentioned rule, and in the present embodiment, the fixation steel plate 2 is 40 pieces, wherein 20 pieces of institutes State fixation steel plate 2 makes the end overlapping of the second elongate holes of the fixation steel plate 2 according to one piece in rule of the lastblock under A large circle is formed, in addition 20 pieces of fixation steel plates 2 form a small circle ring according to above-mentioned rule;
The fixing steel plate 1 is provided among overlapping between the fixation steel plate 2, it is in the present embodiment, described fixed Position steel plate 1 respectively has an aperture, a diameter of d4 of the aperture by setting at two close end, and formula d4=d3+2, wherein d3 are institute The diameter of installation bolt 4 is stated, the installation bolt 4 passes through two in the aperture and large circle of described 1 one end of fixing steel plate Second elongate holes of the overlapping of fixation steel plate 2 described in block, tighten fixation, and the other end of the fixing steel plate 1 equally uses institute It states on two pieces of fixation steel plates 2 that installation bolt 4 is fixed in the small circle ring, on the large circle and the small circle ring The overlapping of all fixation steel plates 2 is fixed with the fixing steel plate 1 by the installation bolt 4, the large circle and The small circle ring is relatively fixed;
In the present embodiment, the middle part of the fixing steel plate 1 is provided with centre bore d5, and formula d5=d+2, wherein d are The diameter of the foundation bolt 3, the foundation bolt 3 are mounted on the centre bore, 3 absolute altitude of foundation bolt are determined The foundation bolt 3, is transferred to consistent absolute altitude, by second Upper gasket and the second underlay by position by using the leveling nut 5 Piece tightens the fixing nut 6, to fix the absolute altitude of the foundation bolt 3 and plan-position;
Preferably, the center of circle is directed toward in described 1 one end of fixing steel plate.
Example IV
A kind of practical approach of foundation bolt construction positioning as described above, the present embodiment are different from part and are, With reference to shown in Fig. 3, Fig. 4, Fig. 5 and Fig. 6, the practical approach of wherein foundation bolt construction positioning includes the following steps:
Step 1:First the pre-buried foundation bolt 3 is positioned by design requirement plane and absolute altitude, then by it is described 3 lower end of foot bolt passes through the reinforcing bar for setting basis the inside and 3 banding fixed of foundation bolt;
Step 2:The leveling nut 5 is screwed on the foundation bolt 3 in advance, then by multiple fixing steel plates 1 By circular arrangement, the center of circle is directed toward in wherein one end;
Step 3:Two parallel fixation steel plates 2 are placed in below the fixing steel plate 1, it then will be other Two parallel fixation steel plates 2 are placed in above the fixing steel plate 1, by the parallel fixation steel plate 2 alternatively up and down Into circular arrangement, the position of the fixation steel plate 2 is adjusted further according to the position of the foundation bolt 3;
Step 4:The absolute altitude of the leveling nut 5 is adjusted, the fixing steel plate 1 is made to be in final grouting layer position, treats institute After stating 3 plan-position of foundation bolt and elevation location accurate positioning, the fixing nut 6 is tightened respectively;
Step 5:The placing concrete after having bound reinforcing bar and having propped up the basis of template, concrete casting is to designing mark Then height dismantles the round foundation bolt positioning device, is recycling in other similar bases.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art Member, under the premise of the method for the present invention is not departed from, can also make several improvement and supplement, these are improved and supplement also should be regarded as Protection scope of the present invention.

Claims (10)

1. a kind of rectangle foundation bolt positioning device, which is characterized in that the positioning device includes at least four fixing steel plates, institute It states fixing steel plate and forms a rectangle, fixed by fixation steel plate between the fixing steel plate, be provided on the fixing steel plate At least four foundation bolts.
2. rectangle foundation bolt positioning device according to claim 1, which is characterized in that be provided on the fixing steel plate First elongate holes of the width for d1, Width Formula of Rib Knitted Fabric d1=d+2;Second that width is d2 is provided on the fixation steel plate Elongate holes, Width Formula of Rib Knitted Fabric d2=d3+2.
3. rectangle foundation bolt positioning device according to claim 2, which is characterized in that equipped with tune on the foundation bolt Flush nut and fixing nut.
4. rectangle foundation bolt positioning device according to claim 3, which is characterized in that the fixing steel plate with it is described solid Determine to be provided with gasket in the difference in height between steel plate.
5. a kind of practical approach of rectangle foundation bolt positioning device realized described in claim 3, which is characterized in that describedly The practical approach of foot bolt construction positioning includes the following steps:
Step 1:First the pre-buried foundation bolt is positioned by design requirement plane and absolute altitude, then by the foundation bolt Lower end passes through the reinforcing bar for setting basis the inside and the foundation bolt banding fixed;
Step 2:The leveling nut is screwed on the foundation bolt in advance, then by two parallel fixing steel plates It is placed in above the parallel fixing steel plate of other two, the fixing steel plate is adjusted according to the position of the foundation bolt Position;
Step 3:The absolute altitude of the leveling nut is adjusted, the fixing steel plate is made to be in final grouting layer position so that it is convenient to mixed The pouring of solidifying soil and the dismounting of the rectangle foundation bolt positioning device, treat that the foundation bolt plan-position and elevation location are determined After level is true, the fixing nut is tightened respectively;
Step 4:The fixing steel plate is connected with the fixation steel plate, passes through the installation bolt and the installation nut and the Lower gasket on one tightens the installation nut, and the fixation steel plate and the fixing steel plate is made to form the stabilising system of triangle;
Step 5:The placing concrete after having bound reinforcing bar and having propped up the basis of template, concrete casting to designed elevation, so After dismantle the rectangle foundation bolt positioning device, be recycling in other similar bases.
6. a kind of circle foundation bolt positioning device, which is characterized in that the positioning device includes at least 12 fixation steel plates, The fixation steel plate forms a large circle and a small circle ring, passes through fixing steel plate between the large circle and the small circle ring Connection is fixed, and centre bore is provided on the fixing steel plate, foundation bolt is housed on the centre bore.
7. according to the round foundation bolt positioning device described in claim 6, which is characterized in that be provided with width on the fixation steel plate The second elongate holes for d1, Width Formula of Rib Knitted Fabric d2=d3+2 are spent, the fixing steel plate is provided at both ends with aperture, the aperture Diameter formula for d4=d3+2, centre bore is provided in the middle part of the fixing steel plate, the diameter formula of the centre bore is d5=d +2。
8. circle foundation bolt positioning device according to claim 7, which is characterized in that one end of the fixing steel plate refers to To the center of circle.
9. circle foundation bolt positioning device according to claim 8, which is characterized in that equipped with tune on the foundation bolt Flush nut and fixing nut.
10. a kind of practical approach for realizing the round foundation bolt positioning device described in claim 9, which is characterized in that described The practical approach of foundation bolt construction positioning includes the following steps:
Step 1:First the pre-buried foundation bolt is positioned by design requirement plane and absolute altitude, then by the lower margin spiral shell Bolt lower end passes through the reinforcing bar for setting basis the inside and the foundation bolt banding fixed;
Step 2:The leveling nut is screwed on the foundation bolt in advance, then by multiple fixing steel plates by circle Arrangement, wherein one end are directed toward the center of circle;
Step 3:Two parallel fixation steel plates are placed in below the fixing steel plate, it is then flat by other two The capable fixation steel plate is placed in above the fixing steel plate, by the parallel fixation steel plate alternatively up and down into round cloth It puts, the position of the fixation steel plate is adjusted further according to the position of the foundation bolt;
Step 4:The absolute altitude of the leveling nut is adjusted, the fixing steel plate is made to be in final grouting layer position, treats the lower margin Behind bolt plan-position and elevation location accurate positioning, the fixing nut is tightened respectively;
Step 5:The placing concrete after having bound reinforcing bar and having propped up the basis of template, concrete casting to designed elevation, so After dismantle the round foundation bolt positioning device, be recycling in other similar bases.
CN201810076175.9A 2018-01-26 2018-01-26 Practical method for foundation bolt construction positioning Active CN108265741B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810076175.9A CN108265741B (en) 2018-01-26 2018-01-26 Practical method for foundation bolt construction positioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810076175.9A CN108265741B (en) 2018-01-26 2018-01-26 Practical method for foundation bolt construction positioning

Publications (2)

Publication Number Publication Date
CN108265741A true CN108265741A (en) 2018-07-10
CN108265741B CN108265741B (en) 2020-06-16

Family

ID=62776901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810076175.9A Active CN108265741B (en) 2018-01-26 2018-01-26 Practical method for foundation bolt construction positioning

Country Status (1)

Country Link
CN (1) CN108265741B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951686A (en) * 2018-07-13 2018-12-07 济南城建集团有限公司 A kind of novel municipal traffic streetlamp foundation construction method
CN109025326A (en) * 2018-08-16 2018-12-18 武汉海王机电工程技术有限公司 A kind of assisted location method of foundation bolt
CN109025323A (en) * 2018-07-25 2018-12-18 中国十七冶集团有限公司 A kind of precast stair pre-embedded bolt accurate positioning device and its making and use method
CN109163636A (en) * 2018-10-30 2019-01-08 长安大学 A kind of positioning device for anchor bar of waterproof plate in tunnels hot melt gasket
CN109629594A (en) * 2018-12-29 2019-04-16 国家电网有限公司 Foundation bolt alignment device
CN110528568A (en) * 2019-08-30 2019-12-03 中国三冶集团有限公司 A kind of device and its application method of novel location base bolt

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101225917A (en) * 2008-02-13 2008-07-23 赵正义 Vertical locating connection construction for novel sill anchor
CN101503880A (en) * 2009-03-02 2009-08-12 赵正义 Large combined base with mast type structure
CN101748747A (en) * 2008-12-18 2010-06-23 鞍钢建设集团有限公司 Annular furnace base movable thread stand bolt positioning method
CN201770992U (en) * 2010-07-22 2011-03-23 武汉一冶钢结构有限责任公司 Foundation bolt positioning device
CN102095052A (en) * 2010-11-25 2011-06-15 华锐风电科技(集团)股份有限公司 Installing method of foundation bolt anchoring system and method for installing industrial equipment
CN102493479A (en) * 2011-12-15 2012-06-13 中国一冶集团有限公司 Construction method for circular foundation bolt hole reserved for equipment foundation
CN102561712A (en) * 2012-01-11 2012-07-11 中国建筑第二工程局有限公司 Precise positioning frame for large steel columns and equipment foundation fixing bolts and construction method of precise positioning frame
CN103184743A (en) * 2011-12-30 2013-07-03 华锐风电科技(集团)股份有限公司 Template flange
CN203080547U (en) * 2013-01-31 2013-07-24 北京燕化天钲建筑工程有限责任公司 Locating mold of adjustable pre-buried foundation bolt
CN103397701A (en) * 2013-08-13 2013-11-20 中天建设集团有限公司 Adjustable positioning structure for pre-buried bolt double-layered positioning plate and construction method
CN203729319U (en) * 2014-01-22 2014-07-23 浙江大经建设集团股份有限公司 Locating steel frame of pre-buried annularly-distributed ground bolt group
CN205530322U (en) * 2016-01-19 2016-08-31 中建八局第三建设有限公司 Fixed steel column foot pre -cast screw's construction equipment
CN106368330A (en) * 2016-08-30 2017-02-01 中铁二十局集团有限公司 Pre-burying construction mould and method of foundation bolts used for steel structure building construction
CN107119706A (en) * 2017-06-01 2017-09-01 中国十七冶集团有限公司 A kind of tower crane anchor bolt localizer and its installation method
CN206635803U (en) * 2017-04-12 2017-11-14 中建海峡建设发展有限公司 A kind of building hoist foundation structure

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101225917A (en) * 2008-02-13 2008-07-23 赵正义 Vertical locating connection construction for novel sill anchor
CN101748747A (en) * 2008-12-18 2010-06-23 鞍钢建设集团有限公司 Annular furnace base movable thread stand bolt positioning method
CN101503880A (en) * 2009-03-02 2009-08-12 赵正义 Large combined base with mast type structure
CN201770992U (en) * 2010-07-22 2011-03-23 武汉一冶钢结构有限责任公司 Foundation bolt positioning device
CN102095052A (en) * 2010-11-25 2011-06-15 华锐风电科技(集团)股份有限公司 Installing method of foundation bolt anchoring system and method for installing industrial equipment
CN102493479A (en) * 2011-12-15 2012-06-13 中国一冶集团有限公司 Construction method for circular foundation bolt hole reserved for equipment foundation
CN103184743A (en) * 2011-12-30 2013-07-03 华锐风电科技(集团)股份有限公司 Template flange
CN102561712A (en) * 2012-01-11 2012-07-11 中国建筑第二工程局有限公司 Precise positioning frame for large steel columns and equipment foundation fixing bolts and construction method of precise positioning frame
CN203080547U (en) * 2013-01-31 2013-07-24 北京燕化天钲建筑工程有限责任公司 Locating mold of adjustable pre-buried foundation bolt
CN103397701A (en) * 2013-08-13 2013-11-20 中天建设集团有限公司 Adjustable positioning structure for pre-buried bolt double-layered positioning plate and construction method
CN203729319U (en) * 2014-01-22 2014-07-23 浙江大经建设集团股份有限公司 Locating steel frame of pre-buried annularly-distributed ground bolt group
CN205530322U (en) * 2016-01-19 2016-08-31 中建八局第三建设有限公司 Fixed steel column foot pre -cast screw's construction equipment
CN106368330A (en) * 2016-08-30 2017-02-01 中铁二十局集团有限公司 Pre-burying construction mould and method of foundation bolts used for steel structure building construction
CN206635803U (en) * 2017-04-12 2017-11-14 中建海峡建设发展有限公司 A kind of building hoist foundation structure
CN107119706A (en) * 2017-06-01 2017-09-01 中国十七冶集团有限公司 A kind of tower crane anchor bolt localizer and its installation method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951686A (en) * 2018-07-13 2018-12-07 济南城建集团有限公司 A kind of novel municipal traffic streetlamp foundation construction method
CN109025323A (en) * 2018-07-25 2018-12-18 中国十七冶集团有限公司 A kind of precast stair pre-embedded bolt accurate positioning device and its making and use method
CN109025326A (en) * 2018-08-16 2018-12-18 武汉海王机电工程技术有限公司 A kind of assisted location method of foundation bolt
CN109163636A (en) * 2018-10-30 2019-01-08 长安大学 A kind of positioning device for anchor bar of waterproof plate in tunnels hot melt gasket
CN109629594A (en) * 2018-12-29 2019-04-16 国家电网有限公司 Foundation bolt alignment device
CN110528568A (en) * 2019-08-30 2019-12-03 中国三冶集团有限公司 A kind of device and its application method of novel location base bolt
CN110528568B (en) * 2019-08-30 2021-11-12 中国三冶集团有限公司 Novel foundation bolt positioning device and using method thereof

Also Published As

Publication number Publication date
CN108265741B (en) 2020-06-16

Similar Documents

Publication Publication Date Title
CN108265741A (en) A kind of practical approach of foundation bolt construction positioning
CN103397701B (en) Adjustable positioning structure for pre-buried bolt double-layered positioning plate and construction method
CN203247603U (en) High-position foundation bolt positioning device
CN107178091B (en) The pinpoint method of can-type calcine furnace steel construction pillar embedding anchor bolts
CN108222056A (en) Apparatus foundation bolt group's installation method
CN106988340A (en) The construction method that reserved steel bar in cast-in-place concrete bottom plate is accurately positioned, installed
CN203383332U (en) Adjustable positioning structure with two positioning plates for embedded bolts
CN207332350U (en) The installation constitution of shock isolating pedestal in existing building base isolation reinforcement
CN105220882A (en) A kind of cement waters smashes thickness control device and using method thereof
CN107882056A (en) A kind of foundation bolt positioning device and installation method
CN210049616U (en) Vertical pre-buried device of reservation entrance to a cave
CN106051307B (en) A kind of combined type fast-assembling support of pipelines and its installation method
JP2017061803A (en) Positioning jig for anchor bolt for column, and construction method for steel column base part
CN212983531U (en) Steady basic unit construction of water is with limit portion template reinforcing apparatus
CN107339556A (en) A kind of dismountable foundation bolt box device
JP2012067441A (en) Installation method for anchor bolt
CN205857234U (en) The tower kind equipment accurate mounting and positioning device of anchor bolt group
CN202139719U (en) Anchor bolt positioning plate for vibration isolating rubber pads
CN207144174U (en) A kind of large scale equipment essence Heibei provincial opera regulating device
JP2010281114A (en) Anchor bolt with base
CN219992739U (en) Steel column rag bolt installation fixed knot constructs
CN205296201U (en) Positioner suitable for post installation of rim of a cup basis
CN219864180U (en) Limiting sliding device for embedding building steel support
CN103953065A (en) Power equipment base fastening device and fixing method
CN203285055U (en) System used for fastening formwork at joint of new concrete and old concrete on structural side wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Xia Zhengxin

Inventor after: Luo Xiaoge

Inventor after: Wu Wangqing

Inventor after: Yang Lijun

Inventor after: Li Yi

Inventor after: Xia Hangyu

Inventor after: Xin Ke

Inventor after: Huang Wenjuan

Inventor after: Jiang Xiaofeng

Inventor after: Hu Zhiwei

Inventor after: Qian Shuaiqing

Inventor before: Xia Zhengxin

Inventor before: Luo Xiaoge

Inventor before: Wu Wangqing

Inventor before: Yang Lijun

Inventor before: Li Yi

Inventor before: Xia Hangyu

Inventor before: Xin Ke

Inventor before: Huang Wenjuan

Inventor before: Jiang Xiaofeng

Inventor before: Hu Zhiwei

Inventor before: Qian Shuaiqing