CN108265724B - Bored pile hole concrete secondary back cover pouring device - Google Patents

Bored pile hole concrete secondary back cover pouring device Download PDF

Info

Publication number
CN108265724B
CN108265724B CN201810291978.6A CN201810291978A CN108265724B CN 108265724 B CN108265724 B CN 108265724B CN 201810291978 A CN201810291978 A CN 201810291978A CN 108265724 B CN108265724 B CN 108265724B
Authority
CN
China
Prior art keywords
conical
connecting sleeve
concrete
leaf
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810291978.6A
Other languages
Chinese (zh)
Other versions
CN108265724A (en
Inventor
欧才军
王维涛
郑蕾
程峰
朱乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Beijing Engineering Group Co Ltd
First Engineering Co Ltd of China Railway Beijing Engineering Group Co Ltd
Original Assignee
China Railway Beijing Engineering Group Co Ltd
First Engineering Co Ltd of China Railway Beijing Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Beijing Engineering Group Co Ltd, First Engineering Co Ltd of China Railway Beijing Engineering Group Co Ltd filed Critical China Railway Beijing Engineering Group Co Ltd
Priority to CN201810291978.6A priority Critical patent/CN108265724B/en
Publication of CN108265724A publication Critical patent/CN108265724A/en
Application granted granted Critical
Publication of CN108265724B publication Critical patent/CN108265724B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

The invention provides a secondary bottom sealing pouring device for bored concrete of a pile hole, which comprises the following components: a connecting sleeve, at least two conical leaves; the cone-shaped blades are spliced into a complete cone, and the bottom surface contour of the cone is consistent with and butted with the contour of the connecting sleeve; each conical leaf is in pivot connection with one end of the connecting sleeve and can be freely opened and closed, the contact area between the front end of the guide pipe and mud and slurry in the hole is effectively reduced by arranging the connecting sleeve and the conical leaf, the surface mud and slurry are prevented from entering the guide pipe in the process of quickly inserting the concrete, the interlayer in the concrete of the pile body can be effectively prevented from being formed to break piles, when the concrete is poured, the conical leaf is opened under the action of the dead weight of the concrete so as to realize pouring, the success rate of pile pouring or pile splicing by a secondary guide pipe insertion method is effectively improved, the pile breaking rate is reduced, the construction cost is saved, and the construction efficiency is improved.

Description

Bored pile hole concrete secondary back cover pouring device
Technical Field
The invention relates to the technical field of concrete pouring, in particular to a secondary bottom sealing pouring device for pile hole drilling concrete.
Background
The current common method for filling underwater concrete of the bored pile generally adopts a conduit method, and the principle is that a concrete mixture enters the lower part of the initial poured concrete through a conduit in sealed connection under the action of a certain drop pressure, and the initial poured concrete and slurry above the initial poured concrete are jacked up and gradually ascended to form a continuous compact concrete pile body. Therefore, the embedded depth of the lowest section of conduit is required to be always kept 2-6m below the concrete pouring surface in the pouring process of the concrete so as to ensure that the concrete can be poured continuously. However, in construction, the phenomenon that the pipe is accidentally pulled out of the concrete surface or the pouring is interrupted due to the blocking of the pipe by the concrete is unavoidable.
Disclosure of Invention
The invention aims to provide a secondary bottom sealing pouring device for bored concrete in a pile hole, which solves the problem that a guide pipe is accidentally pulled out of a concrete surface or the pouring is interrupted due to the blocking of a concrete pipe by arranging a conical blade.
In order to solve the above problems, the present invention provides a secondary bottom sealing pouring device for bored concrete pile, comprising: a connecting sleeve, at least two conical leaves; the cone-shaped blades are spliced into a complete cone, and the bottom surface contour of the cone is consistent with and butted with the contour of the connecting sleeve; each conical leaf is pivotally connected with one end of the connecting sleeve and can be freely opened and closed.
Further, the bored concrete secondary back cover pouring device further comprises: a locking ring and a locking rib; one end of the locking rib is fixedly arranged on the inner side of the conical leaf, the other end of the locking rib is bent towards the radial direction of the connecting sleeve, and the bending ends of all the locking ribs are sleeved in the locking ring.
Further, the bored concrete secondary back cover pouring device further comprises: a collar; the lantern ring is fixedly arranged on the connecting sleeve and/or the outer wall of the conical blade.
Further, the bored concrete secondary back cover pouring device further comprises: a limiting block; one end of the limiting block is fixedly arranged on the connecting side of the connecting sleeve and the conical leaf, the other side of the limiting block extends to the conical leaf part, and each conical leaf is correspondingly provided with a limiting block.
Further, the conical leaves in the bored concrete secondary bottom sealing pouring device are three.
Further, in the bored concrete secondary back cover pouring device, the conical leaves are connected with the connecting sleeve through hinges.
Through setting up connecting sleeve and toper leaf, effectively reduce the area of contact of pipe front end and downthehole mud and magma, in the quick insert concrete in-process, avoid top layer mud and magma to get into in the pipe, can effectively avoid appearing the intermediate layer in the pile body concrete and form broken pile, when beginning to pour into the concrete, thereby realize pouring by punching the toper leaf under the dead weight effect of concrete. The success rate of filling piles or pile extension by the secondary pipe insertion method is effectively improved, the pile breaking rate is reduced, the construction cost is saved, and the construction efficiency is improved.
Drawings
FIG. 1 is a schematic diagram of a prior art scheme;
FIG. 2 is a front view of an embodiment in accordance with the present invention;
FIG. 3 is a cross-sectional view of FIG. 2;
FIG. 4 is a bottom view of an embodiment according to the present invention;
fig. 5 is a top view of an embodiment according to the present invention.
Reference numerals:
1: a connecting sleeve; 2: a conical leaf; 3: a hinge; 4: a locking rib; 5: a locking ring; 6: a collar; 7: and a limiting block.
Detailed Description
The objects, technical solutions and advantages of the present invention will become more apparent by the following detailed description of the present invention with reference to the accompanying drawings. It should be understood that the description is only illustrative and is not intended to limit the scope of the invention. In addition, in the following description, descriptions of well-known structures and techniques are omitted so as not to unnecessarily obscure the present invention.
Referring to fig. 1, in the prior art, the concrete surface is accurately measured, then the conduit is hung on the concrete surface by 0.5-0.7 m (according to the diameter of the conduit), a precast concrete ball plug is tied on a double-strand 7-wire, and the precast concrete ball plug is placed on the water surface in the conduit (without gaps). Concrete is poured into the hopper for 0.1m 3 Slowly placing the precast concrete ball plug at the bottom end of the guide pipe, and fixing the iron wire on the hopper. The guide pipe is inserted under the concrete surface by 1.0m, the concrete is poured into the hopper, then the iron wire is cut off, and the concrete is continuously poured to the designed elevation.
The embodiments of the present invention will be described in detail below with reference to the attached drawings.
Referring to fig. 2-5, the bored concrete secondary back cover pouring device in this embodiment includes a connecting sleeve 1 and three conical leaves 2, and the number of the conical leaves 2 may be designed according to actual needs, and at least two conical leaves may be used. Three toper leaves 2 in this embodiment can splice into a complete cone, the bottom surface profile of cone is unanimous and dock with connecting sleeve 1 profile, every toper leaf 2 and connecting sleeve 1's one end is through pivot connection, in this embodiment it is hinge 3 connection to adopt, hinge 3's stiff end is fixed to be set up on connecting sleeve 1, and be located the hookup location of toper leaf 2 and connecting sleeve 1, hinge 3's rotating end is the U-shaped simultaneously, the rotating end is fixed to be set up in the lateral surface of toper leaf 2, and pass the stiff end, thereby make toper leaf 2 can freely rotate around the stiff end. Meanwhile, in order to avoid overlarge opening and closing angles of the conical leaves 2 when concrete is poured for the second time, the resistance is overlarge when the pouring tube is retracted, the limiting blocks 7 are further arranged on the outer wall of the connecting sleeve, the number of the limiting blocks 7 is consistent with that of the conical leaves 2, one side of each conical leaf 2 can be fixedly arranged on the outer wall of the connecting sleeve, and the other side of each limiting block 7 extends to the part of the conical leaf 2, so that the limiting block 7 prevents the conical leaf 2 from being opened and closed further due to the effect of the limiting block 7 when the conical leaf 2 is pushed away by concrete mixture, the limiting effect is achieved, and the conical leaves 2 can be effectively prevented from being broken. In order to prevent the pouring pipe from being opened in advance when the pouring pipe is inserted into concrete for secondary pouring, a locking rib 4 can be arranged on the inner side of each conical blade 2, one end of each locking rib 4 is fixedly arranged on the inner side of each conical blade 2, the other end of each locking rib is bent towards the radial direction of the connecting sleeve 1, in the embodiment, the bending angle is 159.44 degrees, then the locking rib 4 of each conical blade 2 is converged towards the center of the connecting sleeve 1 in the embodiment, then three locking ribs 4 are sleeved on each locking ring 5, and therefore, as the locking rib 4 is blocked by the locking ring 5, the conical blade 2 cannot be turned outwards, the sleeve ring 6 can be penetrated by steel wires, the locking ring 5 can be removed by pulling the steel wires when pouring is needed, and the conical blade 2 can be opened and closed. Simultaneously in order to prevent that toper leaf 2 and connecting sleeve 1 from droing, can be provided with lantern ring 6 at the fixed surface of toper leaf 2 and connecting sleeve 1, pass lantern ring 6 through the steel wire, when taking place to drop, can take out toper leaf 2 or connecting sleeve 1 from the pouring hole through pulling the steel wire, simultaneously, if take place toper leaf 2 can not normally open and shut and lead to the unable normal pouring of concrete, thereby can assist to open toper leaf 2 through pulling wire rope, of course lantern ring 6 can only set up on connecting sleeve 1 or toper leaf 2, also can all set up.
When secondary bottom sealing pouring is needed, the three conical leaves 2 are folded, the locking ring 5 is sleeved on the three locking ribs 4 and clamped, the two holes of the locking ring 5 are penetrated by thin steel wires, the length of the thin steel wires is not less than the height from the concrete surface in the holes to the hole opening, and the margin length of 3 meters is reserved. And (3) extracting the guide pipe from the pouring hole, replacing the blocked pipe joint, installing the secondary bottom sealing pouring device at the lowest end of the bottom joint of the guide pipe, pouring fresh concrete into the pipe, filling the concrete into the secondary bottom sealing pouring device, hanging the guide pipe of the bottom joint by a crane, lengthening the guide pipe at the orifice, continuing hanging the guide pipe until the bottom joint of the guide pipe is inserted into a range of 2m below the concrete surface, fixing the guide pipe, and installing a funnel at the top. The locking ring 5 is taken out of the guide pipe through the steel wire rope, then concrete is poured into the funnel, the conical blades 2 are opened under the impact of the concrete, the concrete can flow out of the bottom of the guide pipe, and the concrete is continuously poured until the design elevation is reached.
The conical design can effectively reduce the contact area of the front end of the guide pipe with mud and slurry in the hole, and can prevent the mud and slurry on the surface layer from entering the guide pipe in the process of quickly inserting the concrete, thereby effectively preventing the pile body from forming a broken pile due to the interlayer in the concrete. The success rate of secondary conduit insertion method filling pile or pile extension is improved, the pile breaking rate is reduced, the construction cost is saved, and the construction efficiency is improved.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explanation of the principles of the present invention and are in no way limiting of the invention. Accordingly, any modification, equivalent replacement, improvement, etc. made without departing from the spirit and scope of the present invention should be included in the scope of the present invention. Furthermore, the appended claims are intended to cover all such changes and modifications that fall within the scope and boundary of the appended claims, or equivalents of such scope and boundary.

Claims (4)

1. The utility model provides a bore stake hole concrete secondary back cover pouring device which characterized in that includes:
a connecting sleeve, at least two conical leaves;
the conical leaves are spliced into a complete cone, and the bottom surface outline of the cone is consistent with the outline of the connecting sleeve and is in butt joint;
each conical leaf is pivotally connected with one end of the connecting sleeve and can be freely opened and closed;
further comprises: a locking ring and a locking rib;
one end of the locking rib is fixedly arranged on the inner side of the conical leaf, the other end of the locking rib is bent towards the radial direction of the connecting sleeve, and the bent ends of all the locking ribs are sleeved in the locking ring;
further comprises: a collar;
the lantern ring is fixedly arranged on the connecting sleeve and/or the outer wall of the conical blade.
2. The bored concrete secondary back cover filling apparatus as set forth in claim 1, further comprising:
a limiting block;
one end of the limiting block is fixedly arranged on the connecting side of the connecting sleeve and the conical leaf, the other side of the limiting block extends to the conical leaf part, and each conical leaf is correspondingly provided with one limiting block.
3. The bored concrete secondary backing filling apparatus of claim 1, wherein:
the conical leaves have three pieces.
4. The bored concrete secondary backing filling apparatus according to claim 3, wherein:
the conical leaves are connected with the connecting sleeve through hinges.
CN201810291978.6A 2018-03-30 2018-03-30 Bored pile hole concrete secondary back cover pouring device Active CN108265724B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810291978.6A CN108265724B (en) 2018-03-30 2018-03-30 Bored pile hole concrete secondary back cover pouring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810291978.6A CN108265724B (en) 2018-03-30 2018-03-30 Bored pile hole concrete secondary back cover pouring device

Publications (2)

Publication Number Publication Date
CN108265724A CN108265724A (en) 2018-07-10
CN108265724B true CN108265724B (en) 2023-09-15

Family

ID=62778187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810291978.6A Active CN108265724B (en) 2018-03-30 2018-03-30 Bored pile hole concrete secondary back cover pouring device

Country Status (1)

Country Link
CN (1) CN108265724B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112576210B (en) * 2020-12-15 2022-11-04 中铁北京工程局集团有限公司 Clear hole device of drilling bored concrete pile

Citations (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR379242A (en) * 1907-06-26 1907-10-29 William John Stewart Trepan for the establishment of concrete columns and other similar works
FR981617A (en) * 1949-01-04 1951-05-29 Removable pile shoe for foundation on piles
CH389515A (en) * 1960-02-02 1965-03-15 Ignaz Dipl Ing Zeissl Device for sealing ramming pipes at the lower end of the pipe
CH569850A5 (en) * 1973-08-15 1975-11-28 Zschokke Conrad Ag Bush for introducing materials, e.g. underwater concrete, into bores - has suspension rod with control to release casing lock
GB1465866A (en) * 1974-07-24 1977-03-02 Mannesmann Roehrenwerke Ag Pile
US4199279A (en) * 1977-03-25 1980-04-22 The Shimizu Construction Co., Ltd. Method and apparatus for placing concrete under water
US4214843A (en) * 1979-01-03 1980-07-29 Brown & Root, Inc. Subsea grout distributor
SU815135A1 (en) * 1976-04-27 1981-03-23 Sajko Viktoriya A Device for securing support members with enlarged portion with concrete
JPH01158110A (en) * 1987-12-15 1989-06-21 Kiyoshi Kitagawa Opening and closing device for tremie tube
CN1057082A (en) * 1990-06-04 1991-12-18 俞晓 The dry type steel basket soil basketing method and the device thereof of castinplace pile
JPH06322764A (en) * 1993-05-17 1994-11-22 Ishikawajima Harima Heavy Ind Co Ltd Underwater concrete construction method and device thereof
CN2213752Y (en) * 1994-06-16 1995-11-29 张喜龙 Clack type loose-leaf pile boots
JPH09273151A (en) * 1996-04-08 1997-10-21 Serasutaa Fukui:Kk Construction method of field formation pile and pipe body for field formation pile construction
JP2001098549A (en) * 1999-09-29 2001-04-10 Takenaka Komuten Co Ltd Slime removing method and removing device to diametrically expanded part of axially intermediate part of cast-in-place concrete pile
DE10351956B3 (en) * 2003-11-07 2005-07-14 Josef Möbius Bau-Aktiengesellschaft Device for extracting earth material from pipe driven into soil has flaps held by cable extending from one end of gripper pipe to other connected to actuator so this lowers cable and flaps drop to outlet position under pressure of soil
CN1995553A (en) * 2006-12-21 2007-07-11 万军 Pile forming method for filling pile of compact-making hole and its drill rod
CN101363222A (en) * 2008-09-18 2009-02-11 湖南路桥建设集团公司 Pile extension under water
CN201649074U (en) * 2010-01-14 2010-11-24 孔超 Pile-forming device with valve pile shoe rectangular immersed tube concrete cast-in-place pile
KR20110094407A (en) * 2010-02-16 2011-08-24 강명석 Pile having lid for opening and shutting
CN201981535U (en) * 2011-03-18 2011-09-21 翟宇思 Construction device of ramming compaction pile ramming expanded pile
CN202220340U (en) * 2011-08-24 2012-05-16 中交二航局第三工程有限公司 Underwater concreting conduit
CN203174597U (en) * 2013-01-15 2013-09-04 五冶集团上海有限公司 Flap type pile point of tube-sinking cast-in-situ pile
CN203200752U (en) * 2013-04-15 2013-09-18 马鞍山十七冶工程科技有限责任公司 Broken pile treatment device of cast-in-situ bored pile
CN203213105U (en) * 2013-04-16 2013-09-25 马鞍山十七冶工程科技有限责任公司 Broken-pile processor for cast-in-situ bored pile
CN104196015A (en) * 2014-09-28 2014-12-10 江西中恒岩土工程技术有限公司 Construction method for empty hole through long spiral drilled press-grouting pile
CN204491598U (en) * 2015-02-25 2015-07-22 洛阳理工学院 A kind of steel pipe pile combined type pile top
CN204676541U (en) * 2015-04-07 2015-09-30 河海大学 A kind of cast-in-situ major diameter pipe pile flap valve shoe assisting in opening device
CN204898663U (en) * 2015-06-17 2015-12-23 浙江水利水电学院 Cutting edge type flap valve stake point with lateral extension function
CN105649076A (en) * 2014-11-11 2016-06-08 五冶集团上海有限公司 Outer pile inner hole soil retaining flapper-type pile tip used for prestressed concrete pipe (PHC) pile sleeving construction
CN105887812A (en) * 2016-04-29 2016-08-24 朱龙 Single-pile-casing construction method for static pressure sinking pipe carrier cast-in-place pile
CN106522217A (en) * 2016-11-25 2017-03-22 中冶交通建设集团有限公司 Steel conduit device and broken pile treatment construction method for cast-in-situ bored pile
CN206034425U (en) * 2016-08-23 2017-03-22 中铁十一局集团第四工程有限公司 Pile foundation concrete quadratic placement pipe installation
CN206404192U (en) * 2016-10-26 2017-08-15 北京安龙科技集团有限公司 Police umbrella window breaker
CN206529769U (en) * 2016-11-25 2017-09-29 中冶交通建设集团有限公司 Cast-in-situ bored pile underwater concrete pouring steel conduit
CN206635765U (en) * 2017-03-23 2017-11-14 孙康 A kind of conduit tip
CN107476302A (en) * 2017-10-13 2017-12-15 朱龙 A kind of flapper-type pile top
CN208105274U (en) * 2018-03-30 2018-11-16 中铁北京工程局集团第一工程有限公司 A kind of brill stake holes concrete secondary back cover device for casting

Patent Citations (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR379242A (en) * 1907-06-26 1907-10-29 William John Stewart Trepan for the establishment of concrete columns and other similar works
FR981617A (en) * 1949-01-04 1951-05-29 Removable pile shoe for foundation on piles
CH389515A (en) * 1960-02-02 1965-03-15 Ignaz Dipl Ing Zeissl Device for sealing ramming pipes at the lower end of the pipe
CH569850A5 (en) * 1973-08-15 1975-11-28 Zschokke Conrad Ag Bush for introducing materials, e.g. underwater concrete, into bores - has suspension rod with control to release casing lock
GB1465866A (en) * 1974-07-24 1977-03-02 Mannesmann Roehrenwerke Ag Pile
SU815135A1 (en) * 1976-04-27 1981-03-23 Sajko Viktoriya A Device for securing support members with enlarged portion with concrete
US4199279A (en) * 1977-03-25 1980-04-22 The Shimizu Construction Co., Ltd. Method and apparatus for placing concrete under water
US4214843A (en) * 1979-01-03 1980-07-29 Brown & Root, Inc. Subsea grout distributor
JPH01158110A (en) * 1987-12-15 1989-06-21 Kiyoshi Kitagawa Opening and closing device for tremie tube
CN1057082A (en) * 1990-06-04 1991-12-18 俞晓 The dry type steel basket soil basketing method and the device thereof of castinplace pile
JPH06322764A (en) * 1993-05-17 1994-11-22 Ishikawajima Harima Heavy Ind Co Ltd Underwater concrete construction method and device thereof
CN2213752Y (en) * 1994-06-16 1995-11-29 张喜龙 Clack type loose-leaf pile boots
JPH09273151A (en) * 1996-04-08 1997-10-21 Serasutaa Fukui:Kk Construction method of field formation pile and pipe body for field formation pile construction
JP2001098549A (en) * 1999-09-29 2001-04-10 Takenaka Komuten Co Ltd Slime removing method and removing device to diametrically expanded part of axially intermediate part of cast-in-place concrete pile
DE10351956B3 (en) * 2003-11-07 2005-07-14 Josef Möbius Bau-Aktiengesellschaft Device for extracting earth material from pipe driven into soil has flaps held by cable extending from one end of gripper pipe to other connected to actuator so this lowers cable and flaps drop to outlet position under pressure of soil
CN1995553A (en) * 2006-12-21 2007-07-11 万军 Pile forming method for filling pile of compact-making hole and its drill rod
CN101363222A (en) * 2008-09-18 2009-02-11 湖南路桥建设集团公司 Pile extension under water
CN201649074U (en) * 2010-01-14 2010-11-24 孔超 Pile-forming device with valve pile shoe rectangular immersed tube concrete cast-in-place pile
KR20110094407A (en) * 2010-02-16 2011-08-24 강명석 Pile having lid for opening and shutting
CN201981535U (en) * 2011-03-18 2011-09-21 翟宇思 Construction device of ramming compaction pile ramming expanded pile
CN202220340U (en) * 2011-08-24 2012-05-16 中交二航局第三工程有限公司 Underwater concreting conduit
CN203174597U (en) * 2013-01-15 2013-09-04 五冶集团上海有限公司 Flap type pile point of tube-sinking cast-in-situ pile
CN203200752U (en) * 2013-04-15 2013-09-18 马鞍山十七冶工程科技有限责任公司 Broken pile treatment device of cast-in-situ bored pile
CN203213105U (en) * 2013-04-16 2013-09-25 马鞍山十七冶工程科技有限责任公司 Broken-pile processor for cast-in-situ bored pile
CN104196015A (en) * 2014-09-28 2014-12-10 江西中恒岩土工程技术有限公司 Construction method for empty hole through long spiral drilled press-grouting pile
CN105649076A (en) * 2014-11-11 2016-06-08 五冶集团上海有限公司 Outer pile inner hole soil retaining flapper-type pile tip used for prestressed concrete pipe (PHC) pile sleeving construction
CN204491598U (en) * 2015-02-25 2015-07-22 洛阳理工学院 A kind of steel pipe pile combined type pile top
CN204676541U (en) * 2015-04-07 2015-09-30 河海大学 A kind of cast-in-situ major diameter pipe pile flap valve shoe assisting in opening device
CN204898663U (en) * 2015-06-17 2015-12-23 浙江水利水电学院 Cutting edge type flap valve stake point with lateral extension function
CN105887812A (en) * 2016-04-29 2016-08-24 朱龙 Single-pile-casing construction method for static pressure sinking pipe carrier cast-in-place pile
CN206034425U (en) * 2016-08-23 2017-03-22 中铁十一局集团第四工程有限公司 Pile foundation concrete quadratic placement pipe installation
CN206404192U (en) * 2016-10-26 2017-08-15 北京安龙科技集团有限公司 Police umbrella window breaker
CN106522217A (en) * 2016-11-25 2017-03-22 中冶交通建设集团有限公司 Steel conduit device and broken pile treatment construction method for cast-in-situ bored pile
CN206529769U (en) * 2016-11-25 2017-09-29 中冶交通建设集团有限公司 Cast-in-situ bored pile underwater concrete pouring steel conduit
CN206635765U (en) * 2017-03-23 2017-11-14 孙康 A kind of conduit tip
CN107476302A (en) * 2017-10-13 2017-12-15 朱龙 A kind of flapper-type pile top
CN208105274U (en) * 2018-03-30 2018-11-16 中铁北京工程局集团第一工程有限公司 A kind of brill stake holes concrete secondary back cover device for casting

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
铁路路基边坡降雨冲刷行为与规律的研究;安友理;;建材与装饰(18);全文 *

Also Published As

Publication number Publication date
CN108265724A (en) 2018-07-10

Similar Documents

Publication Publication Date Title
CN109235436B (en) Device for pile head construction and construction method thereof
CN108265724B (en) Bored pile hole concrete secondary back cover pouring device
CN105604057B (en) One kind expands unfolding wing type anchor rod device
CN108661050A (en) Modified Prefabricated hollow pipe tree root pilework, forming method and cement slurry
CN107237339A (en) A kind of concrete cut increases leakage preventing structure and its construction method
CN206173957U (en) Pore -forming is with protecting a section of thick bamboo
CN104452751A (en) Secondary pouring pile forming device and pile forming method for bored piles
CN208816080U (en) A kind of same diameter casing antipriming of bored grouting
CN210066783U (en) Mountain vertical high slope prestressed anchorage cable supporting device
CN209277837U (en) A kind of flexible cable inclinometer detector fishing device based on low-resistance
CN107794925A (en) The grouting behind shaft or drift lining cast-in-situ concrete thin-wall and construction method of a kind of reserved grouting pipeline
CN114197508B (en) Easy-to-seal water draining device, manufacturing method and using method thereof
JP6411099B2 (en) Ground injection method
CN215565852U (en) Tray for reverse sealing drilling
CN110004925B (en) Broken bored pile processing device and construction method
CN109403328B (en) Perforated pipe grouting assembly and construction method
CN109555140A (en) Foundation pit and Tunnel Base spring pump drainage method for blocking and device
CN208105274U (en) A kind of brill stake holes concrete secondary back cover device for casting
CN207193995U (en) A kind of dewatering well that can be separated with well casing looks for middle environmental protecting device
CN113833014A (en) Retaining wall and construction method thereof
CN205016933U (en) Poling ware that leads to stifled pre -buried carbon element bellows
CN109372460A (en) Flexible cable inclinometer detector fishing device and its Refloatation method based on low-resistance
CN205224039U (en) Can dismantle and hang muscle
CN110965566A (en) A clay agitator for cofferdam is transferred
CN109162275A (en) The strong guy anchor of road holding

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant