CN106522217A - Steel conduit device and broken pile treatment construction method for cast-in-situ bored pile - Google Patents

Steel conduit device and broken pile treatment construction method for cast-in-situ bored pile Download PDF

Info

Publication number
CN106522217A
CN106522217A CN201611063648.9A CN201611063648A CN106522217A CN 106522217 A CN106522217 A CN 106522217A CN 201611063648 A CN201611063648 A CN 201611063648A CN 106522217 A CN106522217 A CN 106522217A
Authority
CN
China
Prior art keywords
concrete
steel conduit
pile
steel
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611063648.9A
Other languages
Chinese (zh)
Inventor
刘思谋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mcc Communication Construction Group Co Ltd
Original Assignee
Mcc Communication Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mcc Communication Construction Group Co Ltd filed Critical Mcc Communication Construction Group Co Ltd
Priority to CN201611063648.9A priority Critical patent/CN106522217A/en
Publication of CN106522217A publication Critical patent/CN106522217A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Abstract

The invention provides a steel conduit device and a broken pile treatment construction method for a cast-in-situ bored pile. The device comprises a steel conduit and a pipe shoe connected at the bottom of the steel conduit, wherein the pipe shoe comprises a screw thread steel sleeve, an arc-shaped valve and a sealing rubber mat; the top of the screw thread steel sleeve is in threaded connection with the bottom of the steel conduit; the bottom of the screw thread steel sleeve is hinged to the arc-shaped valve; and the arc-shaped valve is freely opened and closed under the action of internal and external pressure. Through the utilization of the steel conduit device, the pile breaking problem of the cast-in-situ bored pile or a cast-in-situ pile with expanded branches and plates due to the fact that the conduit is lifted above a concrete surface can be solved, and the problem that cement of first underwater concrete grouting is washed off by water can be effectively solved as well.

Description

Steel conduit device and process broken pile construction method for cast-in-situ bored pile
Technical field
The present invention relates to cast-in-situ bored pile and expanding branch grouting pile technical field, more specifically, are related to a kind of drilling Bored concrete pile and expanding branch grouting pile occur the steel conduit device used by broken pile during perfusion concrete and process broken pile construction Method.
Background technology
At present, cast-in-situ bored pile and expanding branch grouting pile, have been widely used in architectural engineering, science of bridge building, traffic The foundation construction such as engineering, hydraulic engineering field.With the underwater concrete pouring for adopting, generally concrete funnel is coordinated to enter water-filling using steel conduit Lower concrete construction, but in promoting catheter procedure in work progress, it is desirable to buried depth 2-6 rice of the conduit bottom in concrete, due to applying The general idea of workman person or mistake in computation, cause, when conduit is promoted, conduit bottom to be extracted concrete surface or makes conduit bottom exist In the laitance of Underwater Concrete surface layer, so that pile breaking phenomenon occurs in bored concrete pile, or make the quality of bored concrete pile undesirable.
It is therefore necessary to steel conduit used by above-mentioned cast-in-situ bored pile underwater concrete pouring is further improved, to avoid filling Note stake occurs broken pile in work progress, and the broken pile to occurring is adopted remedial measures in time, and the broken pile to being likely to occur is carried out Process, be allowed to meet the bearing capacity of design requirement and durability.
The content of the invention
In view of the above problems, it is an object of the invention to provide a kind of steel conduit device for cast-in-situ bored pile and processing disconnected Pile construction method, to solve underwater cast-in-place pile as promotion conduit is too fast or mistake in computation, conduit bottom is extracted outside concrete face Or in laitance, there is the problem of broken pile.
The present invention provides a kind of steel conduit for cast-in-situ bored pile and fills, and is connected including steel conduit and with the bottom of steel conduit Shoe;Wherein, shoe includes screw thread steel bushing and arc flap valve;Wherein, the top of screw thread steel bushing is led with steel by screw thread The bottom connection of pipe, bottom and the arc flap valve of screw thread steel bushing be hinged, arc flap valve in the presence of external and internal pressure folding oneself Such as.
Furthermore it is preferred that scheme be, also including being separately positioned on screw thread steel bushing and steel conduit junction, screw thread steel bushing With the seal gasket between the hinged place of arc flap valve and arc flap valve.
Furthermore it is preferred that scheme be that the top of steel conduit is connected with concrete funnel, and junction between is provided with Lou Bucket control valve.
Furthermore it is preferred that scheme be, arc flap valve be 5 lobes, be annularly arranged in the bottom of screw thread steel bushing.
Furthermore it is preferred that scheme be that the position at the top of steel conduit and below funnel control valve is provided with aerofluxuss Valve.
Furthermore it is preferred that scheme be that the position of drain tap is provided with air gauge.
Furthermore it is preferred that scheme be that drain tap is connected with aspirator vacuum pump by rubber tube.
The present invention also provides the construction method that a kind of cast-in-situ bored pile processes broken pile, using above-mentioned for cast-in-situ bored pile Steel conduit device is constructed, and concrete construction method includes:
S1:Shoe is installed in the bottom of steel conduit, and by the arc flap valve tight closure of shoe;
S2:The steel conduit for being provided with shoe is inserted in the concrete for having irrigated below Underwater Concrete laitance 2-3 rice;
S3:Concrete funnel is installed on the top of steel conduit, and closes funnel control valve;
S4:Concrete is filled in concrete funnel;
S5:Air in steel conduit is evacuated or is close to and is vacuum formed negative pressure;
S6:Funnel control valve is opened, the concrete in concrete funnel reaches shoe, and shoe is beaten by the impulsive force of concrete in concrete funnel Open, the concrete of steel conduit is merged with the Underwater Concrete, until whole pile body concrete pouring is finished, concrete face is higher by stake top 0.5-1 rice.
Furthermore it is preferred that scheme be in step s 5, by aspirator vacuum pump and to be arranged on the aerofluxuss on steel conduit top Air in steel conduit is completely drawn out by valve so that steel conduit is internally formed vacuum or is close to vacuum.
Steel conduit device and process broken pile knowable to technical scheme above, provided by the present invention for cast-in-situ bored pile Construction method, can solve the problem that the broken pile that cast-in-situ bored pile or expanding branch grouting pile are caused due to promoting conduit to process concrete face is asked Topic, while the device can effectively solve the problems, such as that the cement of first batch of underwater concrete pouring is washed with water, effectively reduces stake bottom Depth, improves the construction quality of cast-in-situ bored pile.In addition, the device that the present invention is provided, simple structure, low cost, and apply Work method is simple to operate, it is to avoid broken pile treatment, so as to save construction cost, accelerating construction progress.
In order to realize above-mentioned and related purpose, the one or more aspects of the present invention include the spy that will be explained in below Levy.Description below and accompanying drawing are described in detail some illustrative aspects of the present invention.However, only indicating in terms of these Being can be using some mode in the various modes of the principle of the present invention.Additionally, it is contemplated that including all these aspects with And their equivalent.
Description of the drawings
By reference to the explanation below in conjunction with accompanying drawing, and with being more fully understood to the present invention, the present invention other Purpose and result will be more apparent and should be readily appreciated that.In the accompanying drawings:
Fig. 1 is to carry out the schematic diagram that underwater concrete pouring steel conduit extracts concrete face according to the pile foundation of one embodiment of the invention;
Fig. 2 is to install steel conduit whole pulled-out holes after outward in conduit bottom according to the pile foundation of one embodiment of the present of invention The schematic diagram of Underwater Concrete is inserted into after shoe;
Fig. 3 be according to the pile foundation steel conduit bottom of one embodiment of the present of invention install shoe after carry out vacuum suction after use Funnel irrigates the schematic diagram of Underwater Concrete again;
Fig. 4 is the construction method schematic flow sheet for processing broken pile according to the cast-in-situ bored pile of the embodiment of the present invention.
Reference therein includes:Steel conduit 1, drain tap 2, funnel control valve 3, concrete funnel 4, mud 5, under water Concrete 6, laitance 7, shoe 8, aspirator vacuum pump 9, arc flap valve 10, threaded ferrule 11.
Identical label indicates similar or corresponding feature or function in all of the figs.
Specific embodiment
Further detailed description is done to the present invention with reference to meeting with specific embodiment.
In the following description, only some example embodiments of the present invention are described by way of explanation, need not Doubt, in the case that one of ordinary skill in the art will recognize without departing from the spirit and scope of the present invention, can be with Described implementation is modified with various different modes.Therefore, accompanying drawing and description are merely exemplary in itself, and It is not to limit scope of the claims.Additionally, in this manual, identical reference sign identical part.
In order to illustrate the structure of the steel conduit device provided by the present invention for cast-in-situ bored pile, Fig. 1 to Fig. 3 is respectively never Exemplary sign has been carried out to the structure of the steel conduit device for cast-in-situ bored pile with angle.Specifically, Fig. 1 shows basis The pile foundation of one embodiment of the invention carries out underwater concrete pouring steel conduit and extracts concrete face;Fig. 2 shows one of the invention Steel conduit whole pulled-out holes are inserted into Underwater Concrete after outward after shoe is installed in conduit bottom by the pile foundation of embodiment;Fig. 3 shows Pile foundation steel conduit bottom according to an embodiment of the invention is irrigated again with funnel after carrying out vacuum suction after installing shoe Underwater Concrete.
As Fig. 1 to Fig. 3 jointly shown in, provided by the present invention for the steel conduit device of cast-in-situ bored pile, including:Steel conduit 1 and the shoe 8 that is connected with the bottom of steel conduit 1;Wherein, freely, its structure composition is screw thread steel bushing 11, arc to 8 folding of shoe Shape flap valve 10 and seal gasket;Wherein, the top of screw thread steel bushing 11 is connected with the bottom of steel conduit 1 by screw thread, screw thread steel The bottom of sleeve 11 is hinged with arc flap valve 10, also, seal gasket is separately positioned on screw thread steel bushing 11 and is connected with steel conduit 1 The hinged place of place, screw thread steel bushing 11 and arc flap valve 10, and between arc flap valve 10.
Wherein, the top of steel conduit 1 is connected with concrete funnel 4, and junction between is provided with funnel control valve 3.Drain tap 2 is provided with the top of steel conduit 1 and below funnel control valve 3, and drain tap 2 will with aspirator vacuum pump Air in steel conduit 1 is extracted out so that steel conduit 1 is internally formed vacuum or is close to vacuum.Arrange in the position of drain tap 2 There is air gauge, drain tap 2 is connected with aspirator vacuum pump by rubber tube.Arc flap valve is 5 lobes, is annularly arranged in screw thread steel The bottom of sleeve.In order to ensure screw thread steel bushing and the connection of arc flap valve and opening for arc flap valve in application process of the present invention Close freely, arc flap valve will set at least to 3 lobes, and 6~8 lobes are preferable, it is also possible to make appropriate number of lobe according to actual needs Number.
Specifically, provided by the present invention for the steel conduit device of cast-in-situ bored pile, it is exactly to install in the bottom of steel conduit 1 One special device, freely, referred to as shoe 8,8 structure composition of shoe connect the screw thread steel bushing of steel conduit to the folding of this device energy 11st, arc flap valve 10, seal gasket, the bottom of screw thread steel bushing 11 and arc flap valve 10 are hinged, and in hinged place set fluid sealant Pad, is also equipped with seal gasket between arc flap valve 10, it is ensured that whole shoe 8 seals waterproof after closure.Arrive in first batch of concrete Shoe 8 up to 1 bottom of steel conduit is to open freely release concrete, and the device also ensures that the cement in first batch of concrete is flush with water Loss, can effectively reduce the laitance at a bottom, improve the construction quality of cast-in-situ bored pile.
The present invention also provides a kind of cast-in-situ bored pile and processes broken pile according to the above-mentioned steel conduit device for cast-in-situ bored pile Construction method, Fig. 4 shows that cast-in-situ bored pile according to embodiments of the present invention processes the construction method flow process of broken pile.
As shown in figure 4, the present invention also provides the construction method that a kind of cast-in-situ bored pile processes broken pile, concrete construction method bag Include:
S1:Shoe is installed in the bottom of steel conduit, and by the arc flap valve tight closure of shoe;
S2:The steel conduit for being provided with shoe is inserted in the concrete for having irrigated below Underwater Concrete laitance 2-3 rice;
S3:Concrete funnel is installed on the top of steel conduit, and closes funnel control valve;
S4:Concrete is filled in concrete funnel;
S5:Air in steel conduit is evacuated or is close to and is vacuum formed negative pressure;
S6:Funnel control valve is opened, the concrete in concrete funnel reaches shoe, and shoe is beaten by the impulsive force of concrete in concrete funnel Open, concrete and the concrete in stake of steel conduit merge, until whole pile body concrete pouring is finished, concrete face is higher by stake top 0.5-1 rice.
Wherein, in step s 5, by aspirator vacuum pump and the drain tap on steel conduit top is arranged on by steel conduit Interior air is completely drawn out so that steel conduit is internally formed vacuum or is close to vacuum.
Shown in comprehensive Fig. 1 to Fig. 4, by taking certain highway bored pile construction as an example:
The cast-in-situ bored pile is 40 meters of deep friction piles, a diameter of 1.8 meters, using concrete funnel 4 (steel) volume 3m3, adopt With the steel conduit 1 of 40 meters long a diameter of 30cm, the section length of steel conduit 1 has 2 meters, 3 meters, and with screwed connection between steel conduit 1, steel is led Need to do anti-school and hydraulic pressure test before 1 use of pipe, steel conduit 1 through test passes, carry out it is first fill Underwater Concrete C25 back covers into Work(, in 18-22cm, the bottom of steel conduit has always a demand for controlling at concrete 4-6 rice under water, as workman promotes for concrete slump control Steel conduit is slipped up, and steel conduit 1 is extracted on laitance, so as to there is fracture accident, and if in Reperfu- sion hole in upper strata concrete and hole Interlayer laitance 7 between lower floor's Underwater Concrete, so as to broken pile.For avoiding fracture accident from occurring, operator immediately will be steel conduit 1 whole Pick than air, clean steel leads the mud outside 1 pipe, and installs shoe 8 in the bottom of steel conduit 1, and threaded ferrule 11 and steel are led The bottom screwed connection of pipe 1, has therebetween seal gasket, then by 10 closing seam of arc flap valve of shoe 8, closes concrete leakage The funnel control valve 3 of bucket 4.
The drain tap 2 of 1 upper end of steel conduit is connected with pressure rubber tubing with aspirator vacuum pump 9, air bleeding valve 2 is opened, Start aspirator vacuum pump 9, check the whether gas leakage of steel conduit device.After pumping reaches negative pressure 0.1MPa, closing drain tap 2 is simultaneously quiet Put 2-3 minutes, watch air pressure meter reading, if barometer reading is not changed in, air-tightness is good after steel conduit 1 installs shoe 8, so Sling concrete funnel 4 and steel conduit device, be inserted perpendicularly in Underwater Concrete 6, when allowing shoe 8 to enter 2-3 rice in Underwater Concrete 6, concrete leaked Bucket 4 fills concrete C25, and rapid to open funnel control valve 3, the concrete in concrete funnel 4 is rapid from the presence of gravity and atmospheric pressure The shoe 8 of 1 bottom of steel conduit is reached, under the impact of huge concrete, rapidly the arc flap valve 10 of shoe 8 is opened, in steel conduit 1 Concrete and Underwater Concrete 6 it is rapid merge, then successively irrigate concrete into concrete funnel 4, then Underwater Concrete 6 backs down laitance 7 to brill The top of hole pouring pile stops perfusion concrete after 1 meter of design of pile top absolute altitude, outside steel conduit 1 is proposed Underwater Concrete 6, then should Stake concrete pouring terminates.Reach after preset strength Deng concrete strength, carry out concrete inspection and (concrete is examined generally by ultrasound examination Survey), then the stake is work type, can avoid the generation of broken pile, it is ensured that this construction quality, additionally it is possible to save construction cost (saving rework cost), accelerating construction progress.
Steel conduit device and process provided by the present invention for cast-in-situ bored pile can be seen that by above-mentioned embodiment Broken pile construction method, can solve the problem that cast-in-situ bored pile or expanding branch grouting pile are caused due to promoting conduit to process concrete face disconnected Stake problem, while the device can effectively solve the problems, such as that the cement of first batch of underwater concrete pouring is washed with water, and effectively reduces stake The depth at bottom, improves the construction quality of cast-in-situ bored pile.In addition, the device that the present invention is provided, simple structure, low cost, and And construction method is simple to operate, it is to avoid broken pile treatment, so as to save construction cost, accelerating construction progress.
Described according to the steel conduit for cast-in-situ bored pile proposed by the present invention in an illustrative manner above with reference to accompanying drawing Device and process broken pile construction method.It will be understood by those skilled in the art, however, that for being used for that the invention described above is proposed The steel conduit device of cast-in-situ bored pile and broken pile construction method is processed, can be making on the basis of without departing from present invention Various improvement.Therefore, protection scope of the present invention should be determined by the content of appending claims.

Claims (9)

1. a kind of steel conduit device for cast-in-situ bored pile, it is characterised in that including steel conduit and the bottom with the steel conduit The shoe of portion's connection;Wherein,
The shoe includes screw thread steel bushing and arc flap valve;Wherein, the top of the screw thread steel bushing by screw thread with it is described The bottom connection of steel conduit, the bottom of the screw thread steel bushing are hinged with the arc flap valve, and the arc flap valve is in interior external pressure In the presence of power, folding is freely.
2. the steel conduit device of cast-in-situ bored pile is used for as claimed in claim 1, it is characterised in that
Also include being separately positioned on the screw thread steel bushing with the steel conduit junction, the screw thread steel bushing and the arc Seal gasket between the hinged place of flap valve and the arc flap valve.
3. the steel conduit device of cast-in-situ bored pile is used for as claimed in claim 1, it is characterised in that
The arc flap valve is 5 lobes, is annularly arranged in the bottom of the screw thread steel bushing.
4. the steel conduit device of cast-in-situ bored pile is used for as claimed in claim 1, it is characterised in that
The top of the steel conduit is connected with concrete funnel, and junction between is provided with funnel control valve.
5. the steel conduit device of cast-in-situ bored pile is used for as claimed in claim 4, it is characterised in that
Position at the top of the steel conduit and below the funnel control valve is provided with drain tap.
6. the steel conduit device of cast-in-situ bored pile is used for as claimed in claim 4, it is characterised in that
The position of the drain tap is provided with air gauge.
7. the steel conduit device of cast-in-situ bored pile is used for as claimed in claim 4, it is characterised in that
The drain tap is connected with aspirator vacuum pump by rubber tube.
8. a kind of cast-in-situ bored pile processes the construction method of broken pile, using as described in any one of claim 1-7 for drilling The steel conduit device of bored concrete pile is constructed, and concrete construction method includes:
S1:Shoe is installed in the bottom of steel conduit, and by the arc flap valve tight closure of the shoe;
S2:The steel conduit for being provided with the shoe is inserted in the concrete for having irrigated below the laitance of Underwater Concrete 2-3 rice;
S3:Concrete funnel is installed on the top of the steel conduit, and closes funnel control valve;
S4:Concrete is filled in the concrete funnel;
S5:Air in the steel conduit is evacuated or is close to and is vacuum formed negative pressure;
S6:The funnel control valve is opened, the concrete in the concrete funnel reaches the shoe, the impact of concrete in the concrete funnel The shoe is opened by power, and the concrete of the steel conduit is merged with the Underwater Concrete, until whole pile body concrete pouring is finished, concrete face is high Go out stake top 0.5-1 rice.
9. cast-in-situ bored pile as claimed in claim 8 processes the construction method of broken pile, it is characterised in that
In step s 5, by aspirator vacuum pump and the drain tap on the steel conduit top is arranged on by the steel conduit Air be completely drawn out so that the steel conduit is internally formed vacuum or is close to vacuum.
CN201611063648.9A 2016-11-25 2016-11-25 Steel conduit device and broken pile treatment construction method for cast-in-situ bored pile Pending CN106522217A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611063648.9A CN106522217A (en) 2016-11-25 2016-11-25 Steel conduit device and broken pile treatment construction method for cast-in-situ bored pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611063648.9A CN106522217A (en) 2016-11-25 2016-11-25 Steel conduit device and broken pile treatment construction method for cast-in-situ bored pile

Publications (1)

Publication Number Publication Date
CN106522217A true CN106522217A (en) 2017-03-22

Family

ID=58357643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611063648.9A Pending CN106522217A (en) 2016-11-25 2016-11-25 Steel conduit device and broken pile treatment construction method for cast-in-situ bored pile

Country Status (1)

Country Link
CN (1) CN106522217A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265724A (en) * 2018-03-30 2018-07-10 中铁北京工程局集团第工程有限公司 A kind of brill stake holes concrete secondary back cover device for casting
CN110984136A (en) * 2019-11-14 2020-04-10 温州大学瓯江学院 Construction process of pressurized geopolymer cast-in-situ bored pile
CN111764393A (en) * 2020-06-30 2020-10-13 首钢水城钢铁(集团)赛德建设有限公司 Pressure measurement inspection device for guide pipe for underwater concrete pouring and pouring method
CN116289957A (en) * 2023-05-18 2023-06-23 山东东泰工程咨询有限公司 Road bridge construction pile foundation processing and forming device and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003184078A (en) * 2002-11-28 2003-07-03 Jfe Engineering Kk Cast-in-place concrete pile and its construction method
CN201649074U (en) * 2010-01-14 2010-11-24 孔超 Pile-forming device with valve pile shoe rectangular immersed tube concrete cast-in-place pile
CN102995642A (en) * 2012-12-26 2013-03-27 广西建工集团第三建筑工程有限责任公司 Underwater concrete spouting laitance prevention water-proof device
CN104452751A (en) * 2014-12-12 2015-03-25 中铁十九局集团有限公司 Secondary pouring pile forming device and pile forming method for bored piles
CN205224027U (en) * 2015-12-10 2016-05-11 河南华元基础工程有限公司 Drilling bored concrete pile pipe
CN206800384U (en) * 2016-11-25 2017-12-26 中冶交通建设集团有限公司 Steel conduit device for cast-in-situ bored pile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003184078A (en) * 2002-11-28 2003-07-03 Jfe Engineering Kk Cast-in-place concrete pile and its construction method
CN201649074U (en) * 2010-01-14 2010-11-24 孔超 Pile-forming device with valve pile shoe rectangular immersed tube concrete cast-in-place pile
CN102995642A (en) * 2012-12-26 2013-03-27 广西建工集团第三建筑工程有限责任公司 Underwater concrete spouting laitance prevention water-proof device
CN104452751A (en) * 2014-12-12 2015-03-25 中铁十九局集团有限公司 Secondary pouring pile forming device and pile forming method for bored piles
CN205224027U (en) * 2015-12-10 2016-05-11 河南华元基础工程有限公司 Drilling bored concrete pile pipe
CN206800384U (en) * 2016-11-25 2017-12-26 中冶交通建设集团有限公司 Steel conduit device for cast-in-situ bored pile

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265724A (en) * 2018-03-30 2018-07-10 中铁北京工程局集团第工程有限公司 A kind of brill stake holes concrete secondary back cover device for casting
CN108265724B (en) * 2018-03-30 2023-09-15 中铁北京工程局集团第一工程有限公司 Bored pile hole concrete secondary back cover pouring device
CN110984136A (en) * 2019-11-14 2020-04-10 温州大学瓯江学院 Construction process of pressurized geopolymer cast-in-situ bored pile
CN111764393A (en) * 2020-06-30 2020-10-13 首钢水城钢铁(集团)赛德建设有限公司 Pressure measurement inspection device for guide pipe for underwater concrete pouring and pouring method
CN116289957A (en) * 2023-05-18 2023-06-23 山东东泰工程咨询有限公司 Road bridge construction pile foundation processing and forming device and construction method

Similar Documents

Publication Publication Date Title
CN106522217A (en) Steel conduit device and broken pile treatment construction method for cast-in-situ bored pile
CN201172828Y (en) Well-covering device for dewatering well
CN108517899A (en) Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall
CN207193996U (en) A kind of precipitation pipe well well-sealing device
CN103741695A (en) Embedded grouting pipe installed on waterstop and grouting method
CN206800384U (en) Steel conduit device for cast-in-situ bored pile
CN108166517A (en) For the shut-in well method and well-sealing device of superelevation floor height hydraulic pressure dewatering well of deep well
CN103031847B (en) Reducing overlap joint combined type orifice pipe grouting method
CN109944236A (en) Root pile actively follows track delamination pour slurry system and construction method
CN101979820B (en) Process for sealing elevation drill hole water-stopping sleeves
CN206529769U (en) Cast-in-situ bored pile underwater concrete pouring steel conduit
CN212506349U (en) Water-logging well sealing device for water-lowering zone of ultra-deep foundation pit pipe well
CN106958240B (en) Air cushion type layered vacuum pipe well and soft foundation drainage method using same
CN106522218A (en) Cast-in-situ bored pile under-water concrete grouting steel conduct pipe
CN108756971A (en) A kind of hollow grouting cable anchor and its staged isolation grouting method
CN108677959A (en) A kind of grouting tube and grouting construction method suitable for mortar depositing construction under the conditions of limited space
CN210049864U (en) Packer grouting layered water stop simulation device
CN205502044U (en) Be applied to precipitation structure in grittiness water -bearing stratum under building
CN111852556A (en) Forward and reverse drainage method in downward through-layer drilling
CN110847155A (en) Waterproof seam pretreatment method in underground continuous wall construction process
CN207003415U (en) Air-cushion type batch vacuum pipe well
CN208844629U (en) Device for sounding and slip casting
CN114197508B (en) Easy-to-seal water draining device, manufacturing method and using method thereof
CN109555140A (en) Foundation pit and Tunnel Base spring pump drainage method for blocking and device
CN107504315A (en) A kind of construction method that Jiang Guandao is got over using baric systerm reparation seepage

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170322

RJ01 Rejection of invention patent application after publication