CN108263446B - Track traffic train route management method - Google Patents

Track traffic train route management method Download PDF

Info

Publication number
CN108263446B
CN108263446B CN201611264609.5A CN201611264609A CN108263446B CN 108263446 B CN108263446 B CN 108263446B CN 201611264609 A CN201611264609 A CN 201611264609A CN 108263446 B CN108263446 B CN 108263446B
Authority
CN
China
Prior art keywords
train
section
turnout
planned
driven
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611264609.5A
Other languages
Chinese (zh)
Other versions
CN108263446A (en
Inventor
江海
褚志广
凡威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Splendor Science and Technology Co Ltd
Original Assignee
Henan Splendor Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Splendor Science and Technology Co Ltd filed Critical Henan Splendor Science and Technology Co Ltd
Priority to CN201611264609.5A priority Critical patent/CN108263446B/en
Publication of CN108263446A publication Critical patent/CN108263446A/en
Application granted granted Critical
Publication of CN108263446B publication Critical patent/CN108263446B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/08Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in one direction only
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/08Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in one direction only
    • B61L23/14Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in one direction only automatically operated
    • B61L23/16Track circuits specially adapted for section blocking

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention provides a rail transit train route management method, in a turnout route, according to the setting of a running plan, managing two sections behind the turnout according to the plan, always opening a train planned to be driven into a first train, closing other trains, installing a signal machine in a second section behind the turnout, when the train planned to be driven into the first train enters the second section behind the turnout, acquiring an arrival signal by the signal machine, resetting data by a central control center, calculating the train planned to be driven into the first train after the resetting, opening the train and closing a subsequent train; in the single-track route, when a front train enters a certain section, the section is controlled to close a subsequent train, a signal machine is installed at the exit of the section, when the head of the front train exits the current section, the section is controlled to open the next train, and the subsequent train is continuously closed. The rail transit train route management method has the advantages of scientific design, collision prevention and station entering efficiency improvement.

Description

Track traffic train route management method
Technical Field
The invention relates to a train running method, in particular to a track traffic train route management method.
Background
The existing train route method provides that when a train exists in a section, other trains cannot enter the section, the section is not arranged according to a route plan, the method is designed according to the situation that the former low-speed train is slow in starting and slow in running, so that the train number caused by the train at a later point cannot arrive on time, the running speed of the train is the shortest plate of the train operation efficiency, the train is accelerated more and more quickly along with the improvement of the track technology, the plan execution rate is greatly improved, and the arrival accuracy is also greatly improved.
In order to solve the above problems, people are always seeking an ideal technical solution.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, and provides a rail transit train route management method which is scientific in design, prevents collision and improves the station entering efficiency.
In order to achieve the purpose, the invention adopts the technical scheme that: a rail transit train route management method, the train route includes the route of the fork and single track route, in the route of the fork, presume according to the plan of going, manage two sections behind the fork according to the plan, open the first train of planned train that is planned to drive into always, close to other trains, mount the signal machine in the second section behind the fork, when the first train of planned train that is planned to drive into enters the second section behind the fork at present, the signal machine obtains the arrival signal, the central control center resets the data, and calculate the first train of planned train that is planned to drive into after resetting, open it, close to the subsequent train; in the single-track route, when a front train enters a certain section, the section is controlled to close a subsequent train, a signal machine is installed at the exit of the section, when the head of the front train exits the current section, the section is controlled to open the next train, and the subsequent train is continuously closed.
Basically, the signal machines are installed in all train sections and are communicated with each other through the control center.
Compared with the prior art, the invention has outstanding substantive characteristics and remarkable progress, and particularly, the invention divides the train entering management into a single-track entering station and a turnout entering station, in the turnout, in order to prevent the collision of high-speed trains, two sections behind the turnout are sequenced according to the scheduled arrival time, the train which arrives at the first can always enter, the subsequent trains can not enter, the real-time sequencing means is not carried out any more, each train needs to run according to the plan, even if the speed deviation exists, the rule can not be destroyed, and the problem that the speed of the turnout train overtakes the planned train number to cause the rush to the section to influence the whole driving plan is avoided. The signal machine is installed in the second section after the single-line station entering and the single-line turnout, when the train head drives over the signal machine, data are reset, the follow-up train numbers are reordered, and the station entering and passing efficiency is greatly improved.
Detailed Description
The technical solution of the present invention is further described in detail by the following embodiments.
A method for managing the route of track traffic train includes such steps as providing a branch route and a single-track route, according to the traveling plan setting, the two sections behind the turnout are managed according to the plan and are always opened for the train planned to be driven into the first train, for other trains, the existing train has higher form speed, stable average speed and difficult occurrence of error points, the arrangement according to the plan is more scientific, the time is more abundant, the planning of the access plan is easier, installing a signal machine in a second section behind the turnout, when the train planned to be driven into the current first train enters the second section behind the turnout, the signal machine obtains an arrival signal, the central control center resets data, calculates a train planned to be driven into the first train after the data are reset, the train closing device is opened, and is closed for subsequent trains, so that the closing time of a section for the following trains is shortened, and the running efficiency of the trains is further improved; in the single-line access, when a front train enters a certain section, the section is controlled to close a subsequent train, a signal machine is installed at the exit of the section, when the head of the front train exits the current section, the section is controlled to open the next train and continue to close the subsequent train, the principle is communicated, the closing time of the section to the next train is shortened, and the efficiency is further improved. And signal machines are installed in each train section and are communicated with each other through data of the control center. So as to master the section of each train and control the train running information.
Finally, it should be noted that the above examples are only used to illustrate the technical solutions of the present invention and not to limit the same; although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art will understand that: modifications to the specific embodiments of the invention or equivalent substitutions for parts of the technical features may be made; without departing from the spirit of the present invention, it is intended to cover all aspects of the invention as defined by the appended claims.

Claims (2)

1. A rail transit train route management method is characterized by comprising the following steps: the train access comprises a turnout access and a single-track access, wherein in the turnout access, the two sections behind the turnout are managed according to a plan according to the setting of a running plan, a first train planned to be driven in is always opened, other trains are closed, a signal machine is installed in a second section behind the turnout, when the current train planned to be driven in the first train enters the second section behind the turnout, the signal machine acquires an arrival signal, a central control center resets data, calculates the train planned to be driven in the first train after the resetting, opens the train and closes the subsequent train; in the single-line access, when a front train enters a certain section, the section is controlled to close a subsequent train, a signal machine is installed at the exit of the section, and when the head of the front train exits the current section, the central control center resets data, controls the section to open the next train and continues to close the subsequent train.
2. The rail transit train route management method according to claim 1, characterized in that: and signal machines are installed in each train section and are communicated with each other through data of the control center.
CN201611264609.5A 2016-12-30 2016-12-30 Track traffic train route management method Active CN108263446B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611264609.5A CN108263446B (en) 2016-12-30 2016-12-30 Track traffic train route management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611264609.5A CN108263446B (en) 2016-12-30 2016-12-30 Track traffic train route management method

Publications (2)

Publication Number Publication Date
CN108263446A CN108263446A (en) 2018-07-10
CN108263446B true CN108263446B (en) 2020-07-24

Family

ID=62753860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611264609.5A Active CN108263446B (en) 2016-12-30 2016-12-30 Track traffic train route management method

Country Status (1)

Country Link
CN (1) CN108263446B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110884534A (en) * 2018-09-10 2020-03-17 安徽华斯源新能源科技有限公司 Rail transit train operation management method
CN112590870B (en) * 2020-12-11 2022-12-16 交控科技股份有限公司 Departure method and device based on virtual annunciator, electronic equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101513891A (en) * 2008-12-29 2009-08-26 卡斯柯信号有限公司 Method for automatic route processing in train running control
CN101898569A (en) * 2010-07-16 2010-12-01 北京全路通信信号研究设计院 Method and system for controlling train route
CN101898568A (en) * 2010-07-16 2010-12-01 北京全路通信信号研究设计院 Minizone train route transaction method and system
CN102616251A (en) * 2011-01-27 2012-08-01 铁道部运输局 Automatic access management method and control device for high-speed train
CN104354720A (en) * 2014-10-22 2015-02-18 北京交控科技有限公司 Main line bifurcation region interlocking protection method and system of tramcar
CN105383526A (en) * 2015-12-15 2016-03-09 北京交控科技股份有限公司 Train conflict inspection and resolution method and automatic train monitoring system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2703730B2 (en) * 1994-10-06 1998-01-26 東海旅客鉄道株式会社 Route setting method for rail transportation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101513891A (en) * 2008-12-29 2009-08-26 卡斯柯信号有限公司 Method for automatic route processing in train running control
CN101898569A (en) * 2010-07-16 2010-12-01 北京全路通信信号研究设计院 Method and system for controlling train route
CN101898568A (en) * 2010-07-16 2010-12-01 北京全路通信信号研究设计院 Minizone train route transaction method and system
CN102616251A (en) * 2011-01-27 2012-08-01 铁道部运输局 Automatic access management method and control device for high-speed train
CN104354720A (en) * 2014-10-22 2015-02-18 北京交控科技有限公司 Main line bifurcation region interlocking protection method and system of tramcar
CN105383526A (en) * 2015-12-15 2016-03-09 北京交控科技股份有限公司 Train conflict inspection and resolution method and automatic train monitoring system

Also Published As

Publication number Publication date
CN108263446A (en) 2018-07-10

Similar Documents

Publication Publication Date Title
JP5213841B2 (en) Train schedule adjustment method and apparatus
US8682511B2 (en) Method for platooning of vehicles in an automated vehicle system
CN108263446B (en) Track traffic train route management method
JP2021165139A (en) Operation control system
CN106428031A (en) Unmanned high-speed rail passenger transport system and intelligent scheduling method thereof
JP2014220859A (en) Automatic train operation system, train operation support system, and train operation management system
Wang et al. Real-time scheduling for single lines in urban rail transit systems
CN108146470A (en) A kind of double Y crossing priority control methods of tramcar
Schittenhelm Planning with timetable supplements in railway timetables
CN113135207A (en) Intelligent control system of tramcar and intersection operation control method thereof
CN108010347B (en) Method and device for controlling passing of level crossing under semi-special right of railway vehicle
Montrone et al. Energy consumption minimization problem in a railway network
Wang et al. Optimal trajectory planning for trains under a moving block signaling system
CN110884534A (en) Rail transit train operation management method
CN109552362A (en) Rail transit train route management method
CN104590320A (en) Method and system capable of ensuring accurate running of subway train according to schedule
Rao et al. Potential railway benefits according to enhanced cooperation between traffic management and automatic train operation
Kecman et al. Adaptive, data-driven, online prediction of train event times
Kokurin et al. Technological foundations of traffic controller data support automation
CN104132660A (en) Tourism distribution area orienting method based on unmanned aerial vehicle
Mattalia The effects on operation and capacity on railways deriving from the switching to continous signals and tracing systems (ERTMS)
Liu et al. A Bi-level Real-time Rescheduling Approach for Train Operation in High-speed Railways
EP4056450A1 (en) Method and system for managing guided vehicle traffic within a railway network
Morast et al. Operational effects of driverless trains on secondary lines
Wang et al. Study on train headway in different turning-back mode of urban mass transit station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant