- Prior art keywords
- side frame
- architectural engineering
- scaffold
- bottom bar
- stent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/14—Comprising essentially pre-assembled two-dimensional frame-like elements, e.g. of rods in L- or H-shape, with or without bracing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
The invention discloses a kind of combined scaffolds of architectural engineering, including the first side frame and the second side frame, the top both sides of second side frame are mounted on engaging stent, card slot is provided at the top of the engaging stent, the bottom of the engaging stent is respectively connected with reinforcement support column, the reinforcement support column is mounted on the second side frame, several equally distributed jacks are offered on second side frame, the jack is internally connected with ladder bars, symmetrical fixed bayonet is offered on the inner wall of second side frame, the inside of the fixed bayonet is equipped with fixed link.The beneficial effects of the invention are as follows:Stent is engaged by design, flexible, convenient in carrying is dismounted between single assembly for scaffold, can be required according to Specific construction, it forms different groups of frame sizes and avoids the inconvenience that bolt operation is brought, without scattered fastener easy to be lost, component loss is reduced to minimum degree, load-carrying properties are good, securely and reliably.
Description
Technical field
The invention belongs to construction engineering technical fields, and in particular to a kind of combined scaffold of architectural engineering.
Background technology
Scaffold is to ensure each work progress is smoothed out and is set up workbench.Position by setting up is divided into outer
Scaffold, internal scaffolding;It can be divided into timber scaffolding, bamboo scaffolding, steel pipe scaffold by material difference;It is divided by structural form vertical
Rod-type scaffold, door-type scaffold, swinging scaffold, suspended scaffold, chooses formula scaffold, climbs formula foot hand bridge scaffold
Frame.The scaffold of different purposes is selected in different types of engineering construction.Bridge support frame is in the majority using bowl buckle scaffold, also has
Use door-type scaffold.As China largely modernizes the appearance of heavy construction system, fastener type steel pipe scaffold cannot
The needs of construction development are adapted to, Devoting Major Efforts To Developing and popularization and application new type scaffold are the task of top priority.It was verified that using new
Not only construction safety is reliable for type scaffold, and assembling and dissembling speed is fast, and scaffold steel using amount can reduce 33%, and assembly and disassembly work efficiency improves two
Times or more, construction cost can be decreased obviously, and construction site is civilized, clean and tidy.
Existing technology has the following problems:1st, the universal scaffold safety assurance of current application is poor, and construction efficiency is low,
The needs of capital construction projects development are not adapted to, and fastener is easily lost, quality of quality of connection fastener itself and operation
Influence it is notable;2nd, the rod piece at node is connected to be eccentric, and load and internal force are transmitted by skid resistance, thus its bearing capacity drops
It is low.
Invention content
To solve the problems mentioned above in the background art.The present invention provides a kind of combined foot hands of architectural engineering
Frame has the characteristics that install convenient.
To achieve the above object, the present invention provides following technical solution:A kind of combined scaffold of architectural engineering, including
First side frame and the second side frame, the top both sides of second side frame are mounted on engaging stent, the top of the engaging stent
Card slot is provided with, the bottom of the engaging stent is respectively connected with reinforcement support column, and the reinforcement support column is mounted on the second side frame
On, offering several equally distributed jacks on second side frame, the jack is internally connected with ladder bars, and described
Symmetrical fixed bayonet is offered on the inner wall of two side frames, the inside of the fixed bayonet is equipped with fixed link, and two described solid
Pedal is connected between fixed pole, the both ends of the fixed link offer connecting hole, set on the both sides outer wall of second side frame
Scissors strut is equipped with, the both ends of the scissors strut are mounted in ladder bars, and the bottom of second side frame is equipped with the second bottom bar,
The both ends of second bottom bar are mounted on pedestal, are provided with tenon at the top of second side frame, second side frame it is upper
Side is provided with the first side frame, and first side frame is identical with the second side cage structure, and the bottom of first side frame is equipped with first
Bottom bar, the both ends of first bottom bar are fixed on inside card slot, and first side frame is mounted on the by the first bottom bar and card slot
On two side frames.
Preferably, the connection mode of first bottom bar and card slot is is connected together.
Preferably, it is provided with anti-skid chequer at the top of the pedal.
Preferably, it is connected with reinforcing bolt on the scissors strut.
Preferably, the engaging stent is an integral structure with strengthening support column.
Preferably, the connection mode of the scissors strut and ladder bars is socket.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, the present invention engages stent by design, and flexible, convenient in carrying is dismounted between single assembly for scaffold, can be according to tool
Body construction requirement forms different groups of frame sizes and avoids the inconvenience that bolt operation is brought, without scattered fastener easy to be lost, structure
Part loss is reduced to minimum degree, and load-carrying properties are good, securely and reliably.
2nd, the present invention effectively prevent scaffold linear deformation, enhances foot hand by the external installation scissors strut in side frame
The overall stiffness of frame, rational in infrastructure, stress performance is good, makes full use of steel strength, and bearing capacity is high.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the front view of the present invention;
Fig. 3 is the structure diagram of the present invention;
In figure:1st, fixed bayonet;2nd, tenon;3rd, engage stent;4th, ladder bars;5th, the first side frame;6th, the first bottom bar;7th, strengthen
Support column;8th, the second side frame;9th, the second bottom bar;10th, jack;11st, card slot;12nd, fixed link;13rd, scissors strut;14th, pedestal;
15th, pedal;16th, connecting hole.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work
Embodiment shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the present invention provides following technical scheme:The combined scaffold of a kind of architectural engineering, including
One side frame 5 and the second side frame 8, the top both sides of the second side frame 8 are mounted on engaging stent 3, and the top of engaging stent 3 is provided with
Card slot 11, the bottom of engaging stent 3, which is respectively connected with, strengthens support column 7, strengthens support column 7 and is mounted on the second side frame 8, engaging branch
Frame 3 is an integral structure with strengthening support column 7, several equally distributed jacks 10, jack 10 are offered on the second side frame 8
Be internally connected with ladder bars 4, symmetrical fixed bayonet 1, the inside installation of fixed bayonet 1 are offered on the inner wall of the second side frame 8
There is fixed link 12, be connected with pedal 15 between two fixed links 12, the top of pedal 15 is provided with anti-skid chequer, and the two of fixed link 12
End offers connecting hole 16, and scissors strut 13 is provided on the both sides outer wall of the second side frame 8, is connected with and adds on scissors strut 13
Fixing bolt, the both ends of scissors strut 13 are mounted in ladder bars 4, and the connection mode of scissors strut 13 and ladder bars 4 is to be socketed, the second side
The bottom of frame 8 is equipped with the second bottom bar 9, and the both ends of the second bottom bar 9 are mounted on pedestal 14, and the top of the second side frame 8 is provided with
Tenon 2, the top of the second side frame 8 are provided with the first side frame 5, and the first side frame 5 is identical with 8 structure of the second side frame, the first side frame 5
Bottom is equipped with the first bottom bar 6, and the both ends of the first bottom bar 6 are fixed on inside card slot 11, the connection side of the first bottom bar 6 and card slot 11
To be connected together, the first side frame 5 is mounted on by the first bottom bar 6 and card slot 11 on the second side frame 8 formula.
The operation principle and process for using of the present invention:The present invention pacifies 8 bottom end of the second side frame of bottom in installation
The second bottom bar 9 is loaded onto, upper bed-plate 14 is installed at the both ends of the second bottom bar 9, fixes in bayonet 1 and installs on the side frame top of top layer
Upper fixed link 12, and ladder bars 4 are installed in the inside of jack 10 successively, it is assembled into helper, 4 both ends of ladder bars of side frame the top
Across connecting hole 16, also so as to fix pedal 15, scissors strut 13 is installed in the both sides of side frame, the second side frame 8 is used as foot
First side frame 5 on upper strata is directed at the top that tenon 2 is connected to the second side frame 8 by hand cradle base foundation, while the first bottom bar 6
Both ends are each attached to inside the card slot 11 on engaging stent 3, are required overlap-add operation according to Specific construction, are completed multi-layer constructed.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of combined scaffold of architectural engineering, including the first side frame (5) and the second side frame (8), it is characterised in that:It is described
The top both sides of second side frame (8) are mounted on engaging stent (3), and card slot (11) is provided at the top of the engaging stent (3),
The bottom of the engaging stent (3), which is respectively connected with, strengthens support column (7), and the reinforcement support column (7) is mounted on the second side frame (8)
On, several equally distributed jacks (10) are offered on second side frame (8), jack (10) are internally connected with
Ladder bars (4) offer symmetrical fixed bayonet (1), the inside of the fixed bayonet (1) on the inner wall of second side frame (8)
Fixed link (12) is installed, pedal (15) is connected between two fixed links (12), the both ends of the fixed link (12) are equal
Connecting hole (16) is offered, scissors strut (13), the scissors strut are provided on the both sides outer wall of second side frame (8)
(13) both ends are mounted in ladder bars (4), and the bottom of second side frame (8) is equipped with the second bottom bar (9), second bottom bar
(9) both ends are mounted on pedestal (14), and tenon (2), second side frame (8) are provided at the top of second side frame (8)
Top be provided with the first side frame (5), first side frame (5) is identical with the second side frame (8) structure, first side frame (5)
Bottom the first bottom bar (6) is installed, it is internal that the both ends of first bottom bar (6) are fixed on card slot (11), first side frame
(5) by the first bottom bar (6) and card slot (11) on the second side frame (8).
2. a kind of combined scaffold of architectural engineering according to claim 1, it is characterised in that:First bottom bar
(6) with the connection mode of card slot (11) to be connected together.
3. a kind of combined scaffold of architectural engineering according to claim 1, it is characterised in that:The pedal (15)
Top is provided with anti-skid chequer.
4. a kind of combined scaffold of architectural engineering according to claim 1, it is characterised in that:The scissors strut
(13) reinforcing bolt is connected on.
5. a kind of combined scaffold of architectural engineering according to claim 1, it is characterised in that:The engaging stent
(3) it is an integral structure with strengthening support column (7).
6. a kind of combined scaffold of architectural engineering according to claim 1, it is characterised in that:The scissors strut
(13) it is socket with the connection mode of ladder bars (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810204845.0A CN108252501A (en) | 2018-03-13 | 2018-03-13 | A kind of combined scaffold of architectural engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810204845.0A CN108252501A (en) | 2018-03-13 | 2018-03-13 | A kind of combined scaffold of architectural engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108252501A true CN108252501A (en) | 2018-07-06 |
Family
ID=62746842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810204845.0A Withdrawn CN108252501A (en) | 2018-03-13 | 2018-03-13 | A kind of combined scaffold of architectural engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108252501A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110778268A (en) * | 2019-10-29 | 2020-02-11 | 新昌县凌智机械有限公司 | A equipment mounting bracket for mine engineering construction |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002066765A2 (en) * | 2001-02-22 | 2002-08-29 | Wilhelm Layher Vermögensverwaltungs-Gmbh | Connection device for scaffolding |
CN205330126U (en) * | 2015-12-03 | 2016-06-22 | 无锡市晨源建筑器材有限公司 | High scaffold of security for building |
CN206397111U (en) * | 2017-01-13 | 2017-08-11 | 黄伟明 | Novel building engineering scaffold device |
-
2018
- 2018-03-13 CN CN201810204845.0A patent/CN108252501A/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002066765A2 (en) * | 2001-02-22 | 2002-08-29 | Wilhelm Layher Vermögensverwaltungs-Gmbh | Connection device for scaffolding |
CN205330126U (en) * | 2015-12-03 | 2016-06-22 | 无锡市晨源建筑器材有限公司 | High scaffold of security for building |
CN206397111U (en) * | 2017-01-13 | 2017-08-11 | 黄伟明 | Novel building engineering scaffold device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110778268A (en) * | 2019-10-29 | 2020-02-11 | 新昌县凌智机械有限公司 | A equipment mounting bracket for mine engineering construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101503908B (en) | Construction method for spacing suspension cable structural template support platform | |
CN102877638A (en) | Operating platform and operating method for constructing suspension steel structure system | |
CN108252501A (en) | A kind of combined scaffold of architectural engineering | |
CN201661066U (en) | Scaffold connecting mechanism | |
CN201712776U (en) | Support for building scaffold boards | |
CN219528334U (en) | Scaffold for building construction | |
CN203846791U (en) | Beam-column joint reinforcing pipa bracket system used for archaistic buildings or historic building restoration | |
CN215671992U (en) | Construction cat ladder | |
CN215168009U (en) | Novel combined building curtain wall template for building | |
CN201873949U (en) | Bride prestress stretch-draw trolley | |
CN209369330U (en) | A kind of rail brackets of jumping formwork | |
CN2519833Y (en) | Fastener for scaffold | |
CN217680342U (en) | Scaffold for house construction | |
CN204212069U (en) | Hanging basket for building construction | |
CN109898816A (en) | A kind of housing construction scaffold | |
CN217998865U (en) | Wall scaffold board installation device is leaned on to activity assembled scaffold frame | |
CN220747577U (en) | Reinforced steel structure platform | |
CN212689545U (en) | Corner pole setting device for lifting aluminum alloy climbing frame | |
CN215671235U (en) | High-strength assembly type steel structure support | |
CN218205592U (en) | Scaffold frame that construction was used | |
CN213868823U (en) | Convenient stable gate-type scaffold | |
CN218912152U (en) | Disc buckle type scaffold structure | |
CN216471922U (en) | Transition joint structure | |
CN204326122U (en) | Foundation pile pressure-resistant static load test girder connector | |
CN210140988U (en) | Hydraulic climbing formwork bearing triangular frame lengthening device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180706 |