- CN206397111U CN206397111U CN201720038500.3U CN201720038500U CN206397111U CN 206397111 U CN206397111 U CN 206397111U CN 201720038500 U CN201720038500 U CN 201720038500U CN 206397111 U CN206397111 U CN 206397111U
- Authority
- CN
- China
- Prior art keywords
- bar
- locking
- transverse
- fix bar
- inserting column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
Novel building engineering scaffold device, including firm banking, lower fix bar, lock contiguous block, upper fix bar, transverse reinforced bar, lock stud, the firm banking top has lower fix bar slot, the lower fix bar of connection inside the lower fix bar slot, the lower fix bar top is by locking the upper fix bar of contiguous block connection, the locking contiguous block both sides have transverse bar inserting column, the transverse reinforced bar two ends have transverse bar inserting column fixing groove, the transverse bar inserting column fixing groove connects transverse bar inserting column, the transverse bar inserting column both sides have locking screw channel, the transverse bar inserting column section is square, the transverse reinforced bar both sides have spanner handle hole, the spanner handle hole connection locking control flume, connection locking stud inside the locking control flume, the locking stud and locking control flume intermeshing.
Description
Technical field
The utility model is related to scaffold field, more particularly to a kind of novel building engineering scaffold device.
Background technology
Existing scaffold carries out binding fixation frequently with iron wire, and iron wire is naked to be exposed on the external, easy using iron wire for a long time
It is broken by weathering corrosion, use is very dangerous, while installation is very inconvenient, is not easy to dismounting.
Utility model content
The utility model for deficiencies of the prior art there is provided a kind of firm stable, it is rational in infrastructure, be easy to tear open
The novel building engineering scaffold device unloaded.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of novel building engineering scaffold device, including firm banking, lower fix bar, locking contiguous block, upper fixation
Bar, transverse reinforced bar, locking stud, the firm banking top has inside lower fix bar slot, the lower fix bar slot
The lower fix bar of connection, the lower fix bar top is by locking the upper fix bar of contiguous block connection, the locking contiguous block both sides tool
There is transverse bar inserting column, the transverse reinforced bar two ends have transverse bar inserting column fixing groove, the transverse bar inserting column fixing groove connection
Transverse bar inserting column, the transverse bar inserting column both sides have locking screw channel, and the transverse bar inserting column section is square, the transverse direction
Bracing piece both sides have to be connected inside spanner handle hole, the spanner handle hole connection locking control flume, the locking control flume
Stud, the locking stud and locking control flume intermeshing are locked, the locking stud has spanner control flume, the spanner
It is square to control slot cross-section, the locking stud insertion locking screw channel.
The locking contiguous block bottom has lower inserting groove, and the lower fix bar top has grafting gland, described to insert
Connecing gland top has standing screw, and the standing screw passes through lower inserting groove, the lower inserting groove of grafting gland insertion
In.
The locking contiguous block top has in lower inserting groove, the fixed lower inserting groove of bar insertion, fixed
There is fix bar to connect screw channel for bar bottom, and the fix bar connection screw channel is intermeshed with standing screw.
Beneficial effect:
During using installing, spanner is inserted spanner by transverse bar inserting column insertion transverse reinforced bar two ends through spanner handle hole
In control flume, rotating spanner, locking stud is in rotary moving in locking control flume, is finally inserted in locking screw channel, realizes laterally
Bar inserting column is fixed with transverse reinforced bar and locked, and locks stud inside transverse reinforced bar, will not occur weathering corrosion phenomenon,
Structure is more reasonable, and use is safer, and laterally fixed, structure is realized in the presence of transverse reinforced bar, between scaffold
Stable and firm, this novel building engineering scaffold device convenient disassembly is rational in infrastructure, is easy to group to turn, safe and reliable.Solid
The lower upper fix bar of intermeshing effect of the fixed pole connection screw channel with locking stud is directly fixedly connected with the realization of lower fix bar, simultaneously
Under upper fix bar is connected with lower fix bar, lock contiguous block in the presence of, reinforced, structure is more stablized, jail
Gu it is stable.
Brief description of the drawings
Fig. 1 is novel building engineering scaffold device structural representation described in the utility model.
Fig. 2 is Fig. 1 described in the utility model part section structural representation.
Embodiment
The utility model is described in further detail below according to drawings and examples:
A kind of novel building engineering scaffold device, including firm banking 1, lower fix bar 3, locking contiguous block 10, on
Fix bar 14, transverse reinforced bar 17, locking stud 7, the top of firm banking 1 has lower fix bar slot 2, the lower fixation
The lower fix bar 3 of the inside of bar slot 2 connection, the lower top of fix bar 3 is described by locking the upper fix bar 14 of the connection of contiguous block 10
Locking contiguous block 10 both sides have transverse bar inserting column, and the two ends of transverse reinforced bar 17 have transverse bar inserting column fixing groove 16, institute
The connection transverse bar inserting column of transverse bar inserting column fixing groove 16 is stated, the transverse bar inserting column both sides have locking screw channel 18, the transverse direction
Bar inserting column section is square, and the both sides of transverse reinforced bar 17 have spanner handle hole 6, the connection of spanner handle hole 6 lock
Tight control flume 5, the inside connection locking stud 7 of locking control flume 5, the locking stud 7 is mutually nibbled with locking control flume 5
Close, the locking stud 7 has spanner control flume 4, the section of spanner control flume 4 is square, the locking stud 7 is inserted
Screw channel 18 is locked, during using installing, transverse bar inserting column insertion transverse reinforced bar 17 two ends plug in spanner through spanner handle hole 6
Enter in spanner control flume 4, rotating spanner, locking stud 7 is in rotary moving in locking control flume 5, be finally inserted locking screw channel 18
In, realize that transverse bar inserting column is fixed with transverse reinforced bar 17 and lock, and stud 7 is locked inside transverse reinforced bar 17, will not
Generation weathering corrosion phenomenon, structure is more reasonable, and use is safer, and in the presence of transverse reinforced bar 17, scaffold it
Between realize laterally fixed, firmly, this novel building engineering scaffold device convenient disassembly is rational in infrastructure, just for Stability Analysis of Structures
Yu Zuzhuan is safe and reliable.
Locking contiguous block 10 bottom has lower inserting groove 11, and the lower top of fix bar 3 has grafting gland 8,
The top of grafting gland 8 has standing screw 9, and the standing screw 9 passes through lower inserting groove 11, the grafting gland 8
In the lower inserting groove 11 of insertion.
Locking contiguous block 10 top has in lower inserting groove 12, the fixed lower inserting groove 12 of the insertion of bar 14, institute
Stating the bottom of fix bar 14, there is fix bar to connect screw channel 13, and the fix bar connection screw channel 13 is intermeshed with standing screw 9,
Fix bar 14 is realized directly solid with lower fix bar 3 in the case where fix bar connects intermeshing effect of the screw channel 13 with locking stud 7
Fixed connection, at the same under upper fix bar 14 is connected with lower fix bar 3, lock contiguous block 10 in the presence of, reinforced,
Structure is more stablized, firm stable.
Claims (3)
1. a kind of novel building engineering scaffold device, it is characterized in that:Including firm banking, lower fix bar, locking contiguous block,
Upper fix bar, transverse reinforced bar, locking stud, the firm banking top have lower fix bar slot, and the lower fix bar is inserted
The lower fix bar of connection inside groove, the lower fix bar top is by locking the upper fix bar of contiguous block connection, the locking contiguous block
Both sides have transverse bar inserting column, and the transverse reinforced bar two ends have transverse bar inserting column fixing groove, and the transverse bar inserting column is fixed
Groove connects transverse bar inserting column, and the transverse bar inserting column both sides have locking screw channel, and the transverse bar inserting column section is square, institute
Stating transverse reinforced bar both sides has in spanner handle hole, the spanner handle hole connection locking control flume, the locking control flume
Portion's connection locking stud, the locking stud and locking control flume intermeshing, the locking stud have spanner control flume, institute
Stating spanner controls slot cross-section to be square, the locking stud insertion locking screw channel.
2. novel building engineering scaffold device according to claim 1, it is characterized in that:The locking contiguous block bottom
With lower inserting groove, the lower fix bar top has grafting gland, and the grafting gland top has standing screw, institute
Standing screw is stated through lower inserting groove, under the grafting gland insertion in inserting groove.
3. novel building engineering scaffold device according to claim 2, it is characterized in that:The locking contiguous block top
With lower inserting groove, under fixed bar insertion in inserting groove, there is fix bar to connect screw channel, institute for fixed bar bottom
Fix bar connection screw channel is stated to be intermeshed with standing screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720038500.3U CN206397111U (en) | 2017-01-13 | 2017-01-13 | Novel building engineering scaffold device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720038500.3U CN206397111U (en) | 2017-01-13 | 2017-01-13 | Novel building engineering scaffold device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206397111U true CN206397111U (en) | 2017-08-11 |
Family
ID=59514261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720038500.3U Expired - Fee Related CN206397111U (en) | 2017-01-13 | 2017-01-13 | Novel building engineering scaffold device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206397111U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108252501A (en) * | 2018-03-13 | 2018-07-06 | 佛山市亚科恒远科技有限公司 | A kind of combined scaffold of architectural engineering |
CN110528868A (en) * | 2019-08-28 | 2019-12-03 | 章庆宁 | A kind of scaffold of architectural engineering |
CN114108998A (en) * | 2021-11-05 | 2022-03-01 | 上海绿地建设(集团)有限公司 | Construction frame |
-
2017
- 2017-01-13 CN CN201720038500.3U patent/CN206397111U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108252501A (en) * | 2018-03-13 | 2018-07-06 | 佛山市亚科恒远科技有限公司 | A kind of combined scaffold of architectural engineering |
CN110528868A (en) * | 2019-08-28 | 2019-12-03 | 章庆宁 | A kind of scaffold of architectural engineering |
CN114108998A (en) * | 2021-11-05 | 2022-03-01 | 上海绿地建设(集团)有限公司 | Construction frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206397111U (en) | Novel building engineering scaffold device | |
CN103119230B (en) | Combined pre-embedded anchoring slot system | |
CN206016247U (en) | A kind of wall form support system | |
CN209585627U (en) | A kind of concreting reinforcing piece of construction template | |
CN210713362U (en) | Steel pipe bundle combined structure composed of mixed section steel | |
CN112942827A (en) | Stupefied connection structure of steel formwork frame back of body for building | |
CN208329622U (en) | A kind of dedicated split bolt of building engineering construction | |
CN201843221U (en) | Connecting joint of H-shaped steel beam and post of corrugated web | |
CN215802452U (en) | Prefabricated corner outer wall of prefabricated building | |
CN212359099U (en) | Shear wall template fixing device is built in room | |
CN204008770U (en) | A kind of electricity meter | |
CN210239212U (en) | Ancient building reinforcing apparatus | |
CN203296268U (en) | Cross-shaped lap joint buckle | |
CN203924501U (en) | Steel bar skeleton positioning | |
CN103981886A (en) | Detachable self-stabilization tenon buckle foundation | |
CN201687210U (en) | External corner tensioner | |
CN202914109U (en) | Integral type lining system of light-section cable tunnel | |
CN207348219U (en) | A kind of prefabricated assembled concrete frame | |
CN208009469U (en) | A kind of lateral wall is without perforation Encased truss | |
CN207794323U (en) | A kind of assembled architecture beam column | |
CN204645586U (en) | Civil engineering scaffold U-shaped wall attaching parts | |
CN201152014Y (en) | Scaffolding connector | |
CN204941225U (en) | Stile's connector in a kind of alumium alloy door and window use | |
CN213741982U (en) | Steel construction stair | |
CN215519221U (en) | Connecting device for building external hanging and building main body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170811 Termination date: 20200113 |