CN108240106A - Wall connecting piece structure with detachable embedded part - Google Patents

Wall connecting piece structure with detachable embedded part Download PDF

Info

Publication number
CN108240106A
CN108240106A CN201810045345.7A CN201810045345A CN108240106A CN 108240106 A CN108240106 A CN 108240106A CN 201810045345 A CN201810045345 A CN 201810045345A CN 108240106 A CN108240106 A CN 108240106A
Authority
CN
China
Prior art keywords
connecting piece
pipe
built
wall
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810045345.7A
Other languages
Chinese (zh)
Inventor
唐平
叶忠勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
China 19th Metallurgical Corp Chengdu Construction Co ltd
Original Assignee
China 19th Metallurgical Group Co ltd
China 19th Metallurgical Corp Chengdu Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Group Co ltd, China 19th Metallurgical Corp Chengdu Construction Co ltd filed Critical China 19th Metallurgical Group Co ltd
Priority to CN201810045345.7A priority Critical patent/CN108240106A/en
Publication of CN108240106A publication Critical patent/CN108240106A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to the field of building construction equipment, in particular to a detachable embedded part wall connecting piece structure which can effectively recover steel pipes and reduce construction cost. When the scaffold is actually used, the embedded pipe structure of the wall connecting piece is firstly fixedly arranged in concrete, then worker construction is normally carried out, the scaffold is dismantled after the construction is finished, the steel pipe of the embedded wall connecting piece is directly pulled out manually, the embedded pipe structure is left in the concrete, and the steel pipe of the wall connecting piece can be reused, so that the purposes of saving construction materials and greatly saving construction cost are achieved.

Description

The wall-connecting piece structure of dismountable pre-buried part
Technical field
The present invention relates to construction equipment field, especially a kind of wall-connecting piece structure of dismountable pre-buried part.
Background technology
In construction, mostly using in structural beams or slab direct embedded steel tube as scaffold wall connecting piece, the portion Divide the wall-connecting piece being embedded in concrete that cannot be pulled out when removing, permanent can only be embedded in concrete, and removing It needs to be cut off with electric welding machine during wall-connecting piece.There are the following defects for the above method:First, pre-buried part cannot pull out after steel pipe is pre-buried It removes, waste of materials;2nd, the method for cutting off can only be taken after steel pipe is pre-buried, occupies the construction time, lost labor and machinery, increase are applied Work cost.
Invention content
The technical problems to be solved by the invention, which are to provide one kind, can effectively recycle steel pipe, and reduce construction cost The wall-connecting piece structure of dismountable pre-buried part.
The technical solution adopted by the present invention to solve the technical problems is:The wall-connecting piece structure of dismountable pre-buried part, institute Wall-connecting piece is stated to be made of steel pipe and built-in pipe structure, wherein the built-in pipe structure is detachably socketed in the outside wall surface of steel pipe, The built-in pipe structure is fixedly installed in concrete.
Further, transparent adhesive tape fixed structure is provided between the steel pipe and built-in pipe structure.
Further, the built-in pipe structure is pvc pipe.
Further, it is coaxially arranged between the steel pipe and built-in pipe structure.
Further, the length of the steel pipe is longer than the length of built-in pipe structure.
The beneficial effects of the invention are as follows:In actual use, the built-in pipe structure of wall-connecting piece is fixedly installed on first mixed In solidifying soil, worker's construction is then normally carried out, and scaffold is removed after completing to construct, and directly extracted using manually pre-buried Built-in pipe structure is stayed in concrete content by the steel pipe of wall-connecting piece, and the steel pipe of wall-connecting piece can use again, so as to fulfill saving Construction material, has greatly saved the purpose of construction cost, and present invention embedded steel tube suitable for various structural beams or slab is made Among the occasion of scaffold wall connecting piece.
Description of the drawings
Fig. 1 is the structure diagram of wall-connecting piece of the present invention.
Fig. 2 is the structure diagram of the present invention in actual use.
In figure label for:Steel pipe 1, built-in pipe structure 2, transparent adhesive tape fixed structure 3, scaffold 4, concrete 5.
Specific embodiment
The present invention is further described below in conjunction with the accompanying drawings.
The wall-connecting piece structure of dismountable pre-buried part as shown in Figure 1 and Figure 2, the wall-connecting piece is by steel pipe 1 and built-in pipe knot Structure 2 is formed, wherein the built-in pipe structure 2 is detachably socketed in the outside wall surface of steel pipe 1, the fixation of built-in pipe structure 2 is set It is placed in concrete 5.
In actual use, built-in pipe structure 2 is fixedly installed in concrete 5 first, so as to form fixed pedestal, Then, scaffold and the wall-connecting piece in built-in pipe structure 2 are attached by steel pipe 1, so as to build firm 4 knot of scaffold Structure.Use terminate that scaffold 4 is needed to remove when, only need the extraction out of built-in pipe structure 2 simply by steel pipe 1, ten That divides is convenient, the purpose also effectively realize and save construction material, saved construction cost.It, can for the ease of practical operation The length of the steel pipe 1 is allowed to be longer than the length of built-in pipe structure 2 with selection.
Since meeting is there are smaller gap between steel pipe 1 and built-in pipe structure 2, in order to realize that wall-connecting piece is integrally-built Stability can select to set transparent adhesive tape fixed structure 3 between the steel pipe 1 and built-in pipe structure 2.As depicted in figs. 1 and 2 , transparent adhesive tape fixed structure 3 can provide stable structural strengthening when needing to consolidate between steel pipe 1 and built-in pipe structure 2, At the end of use, only it need to exert oneself to extract steel pipe 1 from built-in pipe structure 2.In order to realize the stabilization of structure, institute can be selected It is coaxially arranged to state between steel pipe 1 and built-in pipe structure 2.
Generally, for the reduction of maximum cost of implementation, preferably described built-in pipe structure 2 is pvc pipe.
It is of the invention effectively to solve scaffold wall connecting piece in construction and be embedded in part in concrete and remove, after Phase must use machinery to cut off, material cannot be reused to cause waste of material, increase construction time and construction machinery Problem, so as to up to construction efficiency is improved, achieve the effect that cost efficiency.

Claims (5)

1. the wall-connecting piece structure of dismountable pre-buried part, it is characterised in that:The wall-connecting piece is by steel pipe (1) and built-in pipe structure (2) it forms, wherein the built-in pipe structure (2) is detachably socketed in the outside wall surface of steel pipe (1), the built-in pipe structure (2) It is fixedly installed in concrete (5).
2. the wall-connecting piece structure of dismountable pre-buried part as described in claim 1, it is characterised in that:The steel pipe (1) and pre- Transparent adhesive tape fixed structure (3) is provided between pipe laying structure (2).
3. the wall-connecting piece structure of dismountable pre-buried part as claimed in claim 1 or 2, it is characterised in that:The built-in pipe knot Structure (2) is pvc pipe.
4. the wall-connecting piece structure of dismountable pre-buried part as described in claim 1, it is characterised in that:The steel pipe (1) and pre- Pipe laying structure is coaxially arranged between (2).
5. the wall-connecting piece structure of dismountable pre-buried part as described in claim 1, it is characterised in that:The length of the steel pipe (1) Degree is longer than the length of built-in pipe structure (2).
CN201810045345.7A 2018-01-17 2018-01-17 Wall connecting piece structure with detachable embedded part Pending CN108240106A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810045345.7A CN108240106A (en) 2018-01-17 2018-01-17 Wall connecting piece structure with detachable embedded part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810045345.7A CN108240106A (en) 2018-01-17 2018-01-17 Wall connecting piece structure with detachable embedded part

Publications (1)

Publication Number Publication Date
CN108240106A true CN108240106A (en) 2018-07-03

Family

ID=62699549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810045345.7A Pending CN108240106A (en) 2018-01-17 2018-01-17 Wall connecting piece structure with detachable embedded part

Country Status (1)

Country Link
CN (1) CN108240106A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184179A (en) * 2018-11-12 2019-01-11 中冶建工集团有限公司 Company's wall construction of wall-connecting piece and the wall-connecting piece
CN110397263A (en) * 2019-07-31 2019-11-01 中国建筑第四工程局有限公司 A kind of detachable outrigger wall-connecting piece
CN115288418A (en) * 2022-08-15 2022-11-04 中国建筑第八工程局有限公司 External scaffold wall connecting device using opposite-pull screw holes of template and construction method thereof
CN117266537A (en) * 2023-09-19 2023-12-22 中国十七冶集团有限公司 Quick-detachable fastener type steel pipe scaffold wall connecting piece and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE1014289A7 (en) * 2001-07-09 2003-08-05 Pirard Mathieu System guard rail removable work masonry in elevation.
CN202577934U (en) * 2012-05-03 2012-12-05 武汉常阳新力建设工程有限公司 Screw thread wall-connection member of scaffold and building
CN103485527A (en) * 2013-09-06 2014-01-01 成都建工工程总承包有限责任公司 Wall connector and use method thereof
CN203878968U (en) * 2014-04-02 2014-10-15 中国建筑第八工程局有限公司 Connecting structure between scaffold and main body structure
CN204081446U (en) * 2014-08-22 2015-01-07 湖南省第三工程有限公司 Scaffold rigid connecting wall rod member
CN104295082A (en) * 2013-07-19 2015-01-21 中建四局第一建筑工程有限公司 Method for recycling anchor ring of steel beam of overhanging frame and anchor ring component used by method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE1014289A7 (en) * 2001-07-09 2003-08-05 Pirard Mathieu System guard rail removable work masonry in elevation.
CN202577934U (en) * 2012-05-03 2012-12-05 武汉常阳新力建设工程有限公司 Screw thread wall-connection member of scaffold and building
CN104295082A (en) * 2013-07-19 2015-01-21 中建四局第一建筑工程有限公司 Method for recycling anchor ring of steel beam of overhanging frame and anchor ring component used by method
CN103485527A (en) * 2013-09-06 2014-01-01 成都建工工程总承包有限责任公司 Wall connector and use method thereof
CN203878968U (en) * 2014-04-02 2014-10-15 中国建筑第八工程局有限公司 Connecting structure between scaffold and main body structure
CN204081446U (en) * 2014-08-22 2015-01-07 湖南省第三工程有限公司 Scaffold rigid connecting wall rod member

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184179A (en) * 2018-11-12 2019-01-11 中冶建工集团有限公司 Company's wall construction of wall-connecting piece and the wall-connecting piece
CN110397263A (en) * 2019-07-31 2019-11-01 中国建筑第四工程局有限公司 A kind of detachable outrigger wall-connecting piece
CN115288418A (en) * 2022-08-15 2022-11-04 中国建筑第八工程局有限公司 External scaffold wall connecting device using opposite-pull screw holes of template and construction method thereof
CN115288418B (en) * 2022-08-15 2024-03-12 中国建筑第八工程局有限公司 External scaffold wall connecting device utilizing opposite-pull screw holes of template and construction method thereof
CN117266537A (en) * 2023-09-19 2023-12-22 中国十七冶集团有限公司 Quick-detachable fastener type steel pipe scaffold wall connecting piece and construction method thereof

Similar Documents

Publication Publication Date Title
CN108240106A (en) Wall connecting piece structure with detachable embedded part
CN201738575U (en) Beam-slab supporting system with post-cast strip
CN101871262A (en) Method for constructing beam plate supporting system having post-cast strip
CN205935621U (en) Simple and easy outer scaffold frame and shear force wall connecting device
CN204299162U (en) To encorbelment steel I-beam anchor structure
CN108131012A (en) A kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method
CN104295003A (en) Structural column construction method
CN106223611A (en) Standpipe hole presetting mold and construction method thereof
CN105952154B (en) A kind of concrete-pouring template stent
CN103556819A (en) Construction method for reserving constructional column holes in beam plate
CN207393216U (en) A kind of fixed structure of tunnel double-lining back-grouting pipe
CN213898233U (en) Underground construction reinforced structure
CN105604339B (en) Secondary structure constructs column reinforcing method
CN102926544A (en) Method for constructing wall pulling steel bars in frame column and structure thereof
CN208792746U (en) A kind of expansion joint regularization same tool steel plate template
CN203285056U (en) Stair formwork supporting base
CN208267393U (en) Electrical wire tube one-time reserved pre-buried finished product protection device
CN104912209A (en) Plugging device for pipeline reserved hole of cast-in-situ slab and machining and plugging construction method
CN206903186U (en) Adjustable detachable wall-connecting device of scaffold
CN206408924U (en) Reusable cantilever frame embedded ring
CN204590621U (en) A kind of Novel water stop screw
CN103104099A (en) Method for constructing wall pulling steel bars in frame column and structure thereof
CN201627203U (en) Revolvable ground anchor device for single-side support form
CN206829619U (en) A kind of recoverable top plate hole to be provided sleeve pipe
CN211646391U (en) Auxiliary device for breaking pile head of concrete cast-in-place pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180703