CN108229929A - A kind of GIS management system and method for realizing city-building project - Google Patents
A kind of GIS management system and method for realizing city-building project Download PDFInfo
- Publication number
- CN108229929A CN108229929A CN201810126022.0A CN201810126022A CN108229929A CN 108229929 A CN108229929 A CN 108229929A CN 201810126022 A CN201810126022 A CN 201810126022A CN 108229929 A CN108229929 A CN 108229929A
- Authority
- CN
- China
- Prior art keywords
- city
- management
- gis
- building project
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/29—Geographical information databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The invention discloses a kind of GIS for realizing city-building project to manage system and method, the ground base station that is docked including image collecting device, with image collecting device and the GIS information storage server systems for establishing city-building project, ground base station includes data radio station and control computer, and step is:Utilize unmanned plane or satellite acquisition surface data;Establish city-building project GIS information systems;Establish multi-user management assistant decision support system;Real-time update figure layer;It is superimposed constructing items management OA systems;The present invention provides a kind of GIS management system and method for realizing city-building project, using efficiently convenient image collecting device take photo by plane figure implement town building project digital management, General Promotion working efficiency, formed to be related to imposing " hair ", impose after " pure land " and " project landing " integrate the system of management and control, so as to fulfill to the science decision of city-building project and the purpose efficiently managed.
Description
Technical field
The present invention relates to a kind of city-building project management, more particularly to a kind of GIS pipes for realizing city-building project
Manage system and method.
Background technology
In recent years, with city-building tempo increase, urban and rural planning, removal of relocating residents from locations to be used for construction of new buildings or factories, control squatter building and infrastructure item
Mesh workload " blowout " increases, and larger pressure and challenge are brought to governmental science decision and precision management.Main table
Now:First, information asymmetry, causes decision data untrue, and staff's plenty of time is used in and deals with assessment guide.Two
It is that acquisition of information means are backward and structure is single, becomes that government is inefficient, duplication of labour main cause.Third, information fragmentation and stagnant
Afterwards, government department is difficult to realize fine-grained management and analysis of trend.
At present, China's major part cities and towns project management system is OA systems (office automation system), and main function is
Towards the daily operation and management of tissue.The system using internet and Database Systems although effectively shorten operation flow with
Approval process, but due to cannot analyze with processing space data, be only capable of as auxiliary office use, can not realize constructing items number
Word management.
Invention content
In order to solve the existing problems, the purpose of the present invention is to provide a kind of GIS management for realizing city-building project
System and method are realized to the science decision of city-building project and the purpose efficiently managed, to solve in above-mentioned background technology
The problem of proposition.
To achieve the above object, the present invention provides following technical solution:A kind of GIS management system for realizing city-building project
System, the ground base station docked including image collecting device, with image collecting device and the GIS information for establishing city-building project
Storage server system, ground base station include data radio station and control computer, wherein,
Image collecting device is used to acquire earth's surface orthography data;
The data radio station of ground base station is used for and image collecting device wirelessly docks, and is believed to image collecting device emission control
Number and receive image collecting device acquisition image information;
Control computer electrical connection data radio station, the image data that processing data radio station receives;
GIS information storage servers system is electrically connected with control computer, and the image information deposit database of acquisition is used for
Government's many departments access.
Preferably, image collecting device can be unmanned plane or satellite, and the surface data for defending piece acquisition is three-dimensional modeling.
The present invention provides another technical solution:A kind of method of GIS management for realizing city-building project, including such as
Lower step:
The first step acquires surface data using unmanned plane or satellite, forms the data copy for the record or for reproduction of local building;
Second step establishes city-building project GIS information systems;
Third step establishes multi-user management assistant decision support system;
4th step, real-time update figure layer;
5th step, superposition constructing items management OA systems.
Preferably, the multi-user in step 3 includes relocating residents from locations to be used for construction of new buildings or factories, territory, planning, lives to build, water conservancy, traffic, municipal administration, city throw, are public
Peace and environmentally friendly ten government departments, respective government agencies establish respective database according to permission, establish business figure layer system respectively.
Preferably, respective government agencies access GIS information storage server systems, and each department stores GIS information and takes
The data for device system of being engaged in can be independently shared using being also formed integral with one another.
Preferably, the functional classification that government department establishes business figure layer system is:
(1) planning, water conservancy and three department of traffic establish design figure layer and planning figure layer, are superimposed to high definition orthography
Figure;
(2) it relocates residents from locations to be used for construction of new buildings or factories, two department of territory foundation measuring and calculating area figure layer, specially carries out precision cost accounting to relating to sign soil;
(3) department of municipal administration establishes newly-increased building figure layer, really grasps the region squatter building situation, becomes law enforcement foundation;
(4) it lives to build and establishes key project process figure layer with city Tou Liang departments, development of projects is grasped at the first time, so as to accomplish
Rational management Resources for construction;
(5) public security and environmentally friendly two departments establish emphasis supervision figure layer, strengthen management to key area.
Compared with prior art, the beneficial effects of the invention are as follows:This realization city-building project GIS management system and its
Method, using efficiently convenient image collecting device take photo by plane figure implement town building project digital management, acquisition image upload,
GIS information storage server systems establish high-volume database, with relocating residents from locations to be used for construction of new buildings or factories, territory, planning, live build, water conservancy, traffic, municipal administration, city
Ten departments' docking such as throwing, public security and environmental protection, each department establishes respective database, establishes business figure layer system, each portion respectively
Door information can be not only independently operated, and can integrate it is shared, facilitate each department according to the map data mining platform of oneself handle respectively administer
Situation, can also coordinate to carry out the work between department, General Promotion working efficiency forms " hair ", the sign to being related to imposing
The system of " pure land " and " project landing " comprehensive management and control after receipts, so as to fulfill to the science decision of city-building project and efficiently
The purpose of management.
Description of the drawings
Fig. 1 is the system schematic of the present invention;
Fig. 2 is that each department of the present invention and GIS information storage server systems share block diagram;
Fig. 3 is the flow chart of the present invention;
Fig. 4 is each department's figure layer relational graph of the present invention.
In figure:1 image collecting device, 2 ground base stations, 21 data radio stations, 22 control computers, 3GIS information storage servers
System.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work
Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, a kind of GIS management systems for realizing city-building project, including image collecting device 1 and image
The ground base station 2 of harvester docking and the GIS information storage servers system 3 for establishing city-building project, ground base station 2
Including data radio station 21 and control computer 22, wherein:
For acquiring earth's surface orthography data, image collecting device 1 can be unmanned plane or defend image collecting device 1
Star defends the surface data of piece acquisition as three-dimensional modeling, forms the data copy for the record or for reproduction of local building, containing house, farmland, pool,
The data such as the earthwork, artificial hillock, fruit-bearing forest homalographic, the scale of construction, form, as relocate residents from locations to be used for construction of new buildings or factories remove precisely calculate, control disobey law enforcement, planning and designing,
Massif is smooth and the decision-making foundations such as backfilling of earthwork measuring and calculating, water conservancy Transport Facility Construction;
The data radio station 21 of ground base station 2 is used for and image collecting device 1 wirelessly docks, and is emitted to image collecting device 1
It controls signal and receives the acquisition image information of image collecting device 1, by data radio station 21, can realize data efficient reality
When transmit;
Computer 22 is controlled to be electrically connected data radio station 21, the image data that processing data radio station 21 receives simultaneously preserves;GIS
Information storage server system 3 is electrically connected with control computer 22, being capable of the city of scientific management and comprehensive analysis with space characteristics
Project construction mass data in town accesses the image information deposit database of acquisition for government's many departments.
Fig. 2-4 are please referred to, the present invention provides another technical solution and is:A kind of GIS management for realizing city-building project
Method, include the following steps:
The first step using image collecting device or defends piece acquisition surface data, forms the data copy for the record or for reproduction of local building,
Containing data such as house, farmland, pool, the earthwork, artificial hillock, fruit-bearing forest homalographic, the scale of construction, forms, as precisely accounting, the control of removing of relocating residents from locations to be used for construction of new buildings or factories
Disobey that law enforcement, planning and designing, massif be smooth and the decision-making foundations such as backfilling of earthwork measuring and calculating, water conservancy Transport Facility Construction;
Second step establishes city-building project GIS information systems, GIS (Geo-Information system, geography letter
Breath system), it being capable of the cities and towns project construction mass data of scientific management and comprehensive analysis with space characteristics.Establish city-building
Project GIS information storage servers system 3, government's many departments are by accessing server data;
Third step, establish multi-user management assistant decision support system, to relocating residents from locations to be used for construction of new buildings or factories, territory, planning, live build, water conservancy, traffic, city
According to permission, foundation has respective database, establishes business figure layer system respectively for ten departments such as pipe, city throwing, public security and environmental protection,
Not only it can be independently operated, but also shared, General Promotion working efficiency can be integrated;It acts as:
First, planning, water conservancy and three department of traffic establish design figure layer and planning figure layer, it is superimposed to high definition orthogonal projection
It is relatively previous to be compared using professional line layout figure with design sketch as figure, more intuitively, convenient for relevant departments' practical operation, item can be saved
The time that purpose is transferred on the spot, and the funds that external mapping company provides data can be greatly reduced;
Second is that relocating residents from locations to be used for construction of new buildings or factories, two department of territory foundation measuring and calculating area figure layer, precision cost accounting specially is carried out to relating to sign soil,
Meanwhile timely update orthograph to relating to expropriation of land block, in can grasping before imposing, imposing, impose after whole work;
Third, department of municipal administration establishes newly-increased building figure layer, the region squatter building situation is really grasped, becomes law enforcement foundation;
Key project process figure layer is established with city Tou Liang departments fourth, firmly building, development of projects is grasped at the first time, so as to do
To rational management Resources for construction;
Fifth, public security and environmentally friendly two departments establish emphasis supervision figure layer, strengthen management to key area.
4th step, real-time update figure layer by image collecting device or can defend piece, in real time to above-mentioned department key area
Positive image or three-dimensional modeling figure layer are updated, it is efficient in time convenient for department's decision;
5th step, superposition constructing items management OA systems, lead permission and administrative department's responsibility, from city according to governments at all levels
It builds construction project project verification, investigation early period, practical operation, check and accept the links such as authorization superposition On-line Office Automation System, promote supervision and inspection
Efficiency promotes project construction whole process to put forward effect.
Using using unmanned plane or satellite acquisition surface data, the data copy for the record or for reproduction of local building is formed, containing house, agriculture
The data such as field, pool, the earthwork, artificial hillock, fruit-bearing forest homalographic, the scale of construction, form are wirelessly transferred, data with the data radio station 21 on ground
Input control computer 22 after conversion establishes city-building project GIS information systems, is inputted after the control processing storage of computer 22
GIS information storage servers system 3 establishes database, GIS information storage servers system 3 and relocate residents from locations to be used for construction of new buildings or factories, territory, planning, live to build,
Ten departments' docking such as water conservancy, traffic, municipal administration, city throwing, public security and environmental protection, each department establishes respective database, establishes respectively
Then business figure layer system by image collecting device or defends piece, the positive image of real-time update or three-dimensional modeling figure layer, governments at all levels
Leader is superimposed On-line Office Automation System from links such as the project verification of urban construction construction project, investigation early period, practical operation, examination authorizations.
In conclusion the GIS management system and method for this realization city-building project, are adopted using efficiently convenient image
Acquisition means figure of taking photo by plane implements town building project digital management, and acquisition image uploads, and GIS information storage servers system 3 builds
Vertical high-volume database with relocating residents from locations to be used for construction of new buildings or factories, territory, planning, lives to build, ten departments such as water conservancy, traffic, municipal administration, city are thrown, public security and environmental protection
Docking, each department establishes respective database, establishes business figure layer system respectively, and each department can not only be independently operated, information but also can
The situation shared, each department is facilitated respectively to be administered according to the map data mining platform of oneself processing is integrated, can also be coordinated between department
Carry out the work, General Promotion working efficiency, formed to be related to imposing " hair ", impose after " pure land " and " project landing "
The system of comprehensive management and control, so as to fulfill to the science decision of city-building project and the purpose efficiently managed.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto,
Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (6)
1. a kind of GIS management systems for realizing city-building project, which is characterized in that including image collecting device (1) and image
The ground base station (2) of harvester docking and the GIS information storage servers system (3) for establishing city-building project, ground
Base station (2) includes data radio station (21) and control computer (22), wherein,
Image collecting device (1) is for acquiring earth's surface orthography data;
The data radio station (21) of ground base station (2) with image collecting device (1) for wirelessly docking, to image collecting device (1)
Emissioning controling signal and the acquisition image information for receiving image collecting device (1);
Computer (22) is controlled to be electrically connected data radio station (21), the image data that processing data radio station (21) receives;
GIS information storage servers system (3) is electrically connected with control computer (22), and the image information deposit database of acquisition is used
It is accessed in government's many departments.
A kind of 2. GIS management systems for realizing city-building project as described in claim 1, which is characterized in that Image Acquisition
Device (1) can be unmanned plane or satellite, and the surface data for defending piece acquisition is three-dimensional modeling.
A kind of 3. method of GIS management for realizing city-building project, which is characterized in that include the following steps:
The first step acquires surface data using unmanned plane or satellite, forms the data copy for the record or for reproduction of local building;
Second step establishes city-building project GIS information systems;
Third step establishes multi-user management assistant decision support system;
4th step, real-time update figure layer;
5th step, superposition constructing items management OA systems.
A kind of 4. method of GIS management for realizing city-building project as claimed in claim 3, which is characterized in that step 3
In multi-user include relocating residents from locations to be used for construction of new buildings or factories, territory, planning, live to build, water conservancy, traffic, municipal administration, city are thrown, public security and environmentally friendly ten portions of government
Door, respective government agencies establish respective database according to permission, establish business figure layer system respectively.
A kind of 5. method of GIS management for realizing city-building project as claimed in claim 4, which is characterized in that each government
Department accesses GIS information storage servers system (3), and each department can to the data of GIS information storage servers system (3)
It is independent shared using can also be formed integral with one another.
A kind of 6. method of GIS management for realizing city-building project as claimed in claim 4, which is characterized in that portion of government
Door establishes the functional classification of business figure layer system:
(1) planning, water conservancy and three department of traffic establish design figure layer and planning figure layer, are superimposed to high definition orthophotoquad;
(2) it relocates residents from locations to be used for construction of new buildings or factories, two department of territory foundation measuring and calculating area figure layer, specially carries out precision cost accounting to relating to sign soil;
(3) department of municipal administration establishes newly-increased building figure layer, really grasps the region squatter building situation, becomes law enforcement foundation;
(4) it lives to build and establishes key project process figure layer with city Tou Liang departments, grasp development of projects at the first time, so as to accomplish rationally
Dispatch Resources for construction;
(5) public security and environmentally friendly two departments establish emphasis supervision figure layer, strengthen management to key area.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810126022.0A CN108229929A (en) | 2018-02-08 | 2018-02-08 | A kind of GIS management system and method for realizing city-building project |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810126022.0A CN108229929A (en) | 2018-02-08 | 2018-02-08 | A kind of GIS management system and method for realizing city-building project |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108229929A true CN108229929A (en) | 2018-06-29 |
Family
ID=62670986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810126022.0A Pending CN108229929A (en) | 2018-02-08 | 2018-02-08 | A kind of GIS management system and method for realizing city-building project |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108229929A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109191574A (en) * | 2018-09-07 | 2019-01-11 | 江苏省工程勘测研究院有限责任公司 | Earth clearance object research information management system based on unmanned plane oblique photograph |
CN109242407A (en) * | 2018-07-12 | 2019-01-18 | 上海同济城市规划设计研究院 | One kind being based on the overall planning cooperative operation system of " drawing a little " |
CN109345413A (en) * | 2018-09-06 | 2019-02-15 | 武汉光庭信息技术股份有限公司 | Architectural control device and method based on GIS map |
CN109558473A (en) * | 2018-12-06 | 2019-04-02 | 佛山科学技术学院 | A kind of road traffic facility information management system and its modeling method based on GIS |
CN110108257A (en) * | 2019-05-20 | 2019-08-09 | 苏州中飞遥感技术服务有限公司 | A kind of methods of exhibiting to be matched based on unmanned plane image and static programming figure |
CN110781171A (en) * | 2019-09-03 | 2020-02-11 | 宿州山海经测地理信息科技有限公司 | Territorial space planning data acquisition system and data acquisition method |
CN112258157A (en) * | 2020-10-22 | 2021-01-22 | 上海建科工程咨询有限公司 | Novel urbanization construction management system |
CN115906206A (en) * | 2022-10-24 | 2023-04-04 | 广州市微锋科技有限公司 | Space computing equipment based on GIS and space planning analysis method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103116825A (en) * | 2013-01-29 | 2013-05-22 | 江苏省邮电规划设计院有限责任公司 | Intelligent city management system |
CN104463472A (en) * | 2014-12-12 | 2015-03-25 | 江阴中科今朝科技有限公司 | Electronic government platform system |
CN105405079A (en) * | 2015-10-22 | 2016-03-16 | 海南图语地理信息技术有限公司 | Based-on-GIS-analysis system and method for realizing precise project land exploitation addressing |
CN105701616A (en) * | 2016-01-14 | 2016-06-22 | 天津中科智能识别产业技术研究院有限公司 | Unmanned aerial vehicle system used for night emergency commanding |
CN106123867A (en) * | 2016-06-06 | 2016-11-16 | 天津中翔腾航科技股份有限公司 | Water head site pollution source monitoring system based on unmanned plane and method |
-
2018
- 2018-02-08 CN CN201810126022.0A patent/CN108229929A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103116825A (en) * | 2013-01-29 | 2013-05-22 | 江苏省邮电规划设计院有限责任公司 | Intelligent city management system |
CN104463472A (en) * | 2014-12-12 | 2015-03-25 | 江阴中科今朝科技有限公司 | Electronic government platform system |
CN105405079A (en) * | 2015-10-22 | 2016-03-16 | 海南图语地理信息技术有限公司 | Based-on-GIS-analysis system and method for realizing precise project land exploitation addressing |
CN105701616A (en) * | 2016-01-14 | 2016-06-22 | 天津中科智能识别产业技术研究院有限公司 | Unmanned aerial vehicle system used for night emergency commanding |
CN106123867A (en) * | 2016-06-06 | 2016-11-16 | 天津中翔腾航科技股份有限公司 | Water head site pollution source monitoring system based on unmanned plane and method |
Non-Patent Citations (1)
Title |
---|
朱建广: "政务地理信息资源共享平台的建设与应用", 《中国博士学位论文全文数据库 基础科学辑》 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109242407A (en) * | 2018-07-12 | 2019-01-18 | 上海同济城市规划设计研究院 | One kind being based on the overall planning cooperative operation system of " drawing a little " |
CN109345413A (en) * | 2018-09-06 | 2019-02-15 | 武汉光庭信息技术股份有限公司 | Architectural control device and method based on GIS map |
CN109191574A (en) * | 2018-09-07 | 2019-01-11 | 江苏省工程勘测研究院有限责任公司 | Earth clearance object research information management system based on unmanned plane oblique photograph |
CN109558473A (en) * | 2018-12-06 | 2019-04-02 | 佛山科学技术学院 | A kind of road traffic facility information management system and its modeling method based on GIS |
CN110108257A (en) * | 2019-05-20 | 2019-08-09 | 苏州中飞遥感技术服务有限公司 | A kind of methods of exhibiting to be matched based on unmanned plane image and static programming figure |
CN110108257B (en) * | 2019-05-20 | 2021-05-14 | 苏州中飞遥感技术服务有限公司 | Display method based on matching of aerial images of unmanned aerial vehicle and static planning map |
CN110781171A (en) * | 2019-09-03 | 2020-02-11 | 宿州山海经测地理信息科技有限公司 | Territorial space planning data acquisition system and data acquisition method |
CN112258157A (en) * | 2020-10-22 | 2021-01-22 | 上海建科工程咨询有限公司 | Novel urbanization construction management system |
CN115906206A (en) * | 2022-10-24 | 2023-04-04 | 广州市微锋科技有限公司 | Space computing equipment based on GIS and space planning analysis method |
CN115906206B (en) * | 2022-10-24 | 2023-12-12 | 陈辉 | Space computing equipment based on GIS and space planning analysis method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108229929A (en) | A kind of GIS management system and method for realizing city-building project | |
Yeh | The development and applications of geographic information systems for urban and regional planning in the developing countries | |
CN110222373B (en) | Geotechnical engineering full life cycle oriented engineering investigation data processing method | |
CN103390037B (en) | Ten thousand people's Collaborative Plotting methods based on mobile terminal | |
CN109658510B (en) | Substation site selection method, device and server | |
CN101286210A (en) | Populace space distribution numerical simulation system | |
Wang et al. | The problem analysis and solution suggestion in the process of city information model construction | |
CN106205189B (en) | A kind of parking stall shared information service platform | |
CN107180311A (en) | Distributed photovoltaic resources integration and shared system based on SaaS | |
CN202870564U (en) | Digital mine safety production local area network system | |
Karpinskyi et al. | The system model of topographic mapping in the national spatial data infrastructure in Ukraine | |
Agus et al. | Mapping urban green open space in Bontang city using QGIS and cloud computing | |
CN105303282A (en) | Overall support system for digital ecological city | |
CN114282847A (en) | House full life cycle place name address system and construction method thereof | |
CN107680002A (en) | A kind of electric power facility information system based on GIS and BIM | |
Ponjavic et al. | Spatial data integration in heterogeneous information systems’ environment | |
Poi et al. | Rural development planning—a case study in developing geospatial data infrastructure with the help of GIS, remote sensing and GPS | |
Pan | Management-Oriented Upgrade and Construction of Urban Green Space Management System in Wuxi | |
Jichuan et al. | Research on architecture design of urban comprehensive management service platform | |
Bariar et al. | Development of GIS based spatial data infrastructure for micro-level planning | |
Liang et al. | The Design and Development of the Land Management System in Dingzhuang Town Based on Spatial Data | |
Shan et al. | Research and Development of Real Estate Information Registration Platform Based on WebGIS | |
Mundia | The Georeferenced Digital Database for Sustainable Land Use Management in Namibia | |
ZHANG | Application Analysis on Information Promotion System of Hollow Village Renovation in Hilly Area | |
Zhang et al. | Construction and Practice of Territorial Space Ecological Restoration Supervision System: A Case Study of Jiangxi Province |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |