CN108222953A - The construction method that U-shaped opening shield machine passes through piping lane non-standard segment - Google Patents

The construction method that U-shaped opening shield machine passes through piping lane non-standard segment Download PDF

Info

Publication number
CN108222953A
CN108222953A CN201810019849.1A CN201810019849A CN108222953A CN 108222953 A CN108222953 A CN 108222953A CN 201810019849 A CN201810019849 A CN 201810019849A CN 108222953 A CN108222953 A CN 108222953A
Authority
CN
China
Prior art keywords
shield machine
reaction frame
slope
piping lane
standard segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810019849.1A
Other languages
Chinese (zh)
Other versions
CN108222953B (en
Inventor
黄景新
王圣涛
龚建
龚建一
陈平
安刚建
杨祖兵
余松
黄志�
安康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Fourth Engineering Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Fourth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Fourth Engineering Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201810019849.1A priority Critical patent/CN108222953B/en
Publication of CN108222953A publication Critical patent/CN108222953A/en
Application granted granted Critical
Publication of CN108222953B publication Critical patent/CN108222953B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0621Shield advancing devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to a kind of U-shaped open shield machine by the construction method of piping lane non-standard segment, include the following steps:A. slope excavation is carried out to the soil body in the range of enclosed structure in shield machine direction of advance;B. after the completion of slope is excavated, prefabricated tube coupling that shield machine pushing tow has spliced is vacated at shield machine rear and reaction frame is installed on region;C. the good reaction frame of shield machine pushing installation is pushed ahead, and region installation bracing members and firm purlin are vacated at shield machine rear;D. repeating step a, b and c pushes ahead shield machine, until shield machine passes through piping lane non-standard segment;Method using the present invention can quickly, safety, specification by non-standard segment, so as to accelerate construction progress with cost-effective input, provide reference for later piping lane shield-tunneling construction.

Description

The construction method that U-shaped opening shield machine passes through piping lane non-standard segment
Technical field
The present invention relates to building field, construction party that more particularly to a kind of U-shaped open shield machine passes through piping lane non-standard segment Method.
Background technology
Prolong section piping lane from the east of extra large Yuzhong line west to vast of heaven section, mileage pile No. K7+447.5~K10+ in Ye Hai main roads west 191.6, length 2744.1m, wherein K9+398~K9+480, K9+530~K9+635, K9+725~K9+790, K9+835~K9 + 890 totally 4 segment standard segment length 308m using U-shaped open shield-tunneling construction.
U-shaped opening shield section applies shield launching active well at K9+395~K9+426 sections, and shield machine is spelled in starting well It is promoted after the completion of dress from small mileage to big mileage, U-shaped opening shield machine, need to be by non-after segment standard section piping lane construction is completed It marks node section and enters next shield-tunneling construction section, 4 sections of shield-tunneling construction sections are respectively necessary for through node nonstandard at 50m, 90m, 45m tri- Section removes shield machine, at present, the construction that shield machine passes through non-standard segment using K9+890~K9+910 sections of foundation pits as received well Method there is no ripe construction technology at home.
Invention content
The purpose of the present invention is to provide a kind of stable structure, safe efficient, so as to accelerate construction progress with it is cost-effective The construction method that the U-shaped open shield machine of input passes through piping lane non-standard segment.
In order to achieve the above object, the technical solution adopted by the present invention is:A kind of U-shaped open shield machine is non-standard by piping lane The construction method of section, includes the following steps:
A. slope excavation is carried out to the soil body in the range of enclosed structure in shield machine direction of advance;
B. after the completion of slope is excavated, prefabricated tube coupling that shield machine pushing tow has spliced is vacated at shield machine rear and is installed on region Reaction frame;
C. the good reaction frame of shield machine pushing installation is pushed ahead, and is vacated region installation bracing members at shield machine rear and just enclosed Purlin;
D. repeating step a, b and c pushes ahead shield machine, until shield machine passes through piping lane non-standard segment.
The each slope excavation lengths of step a are not more than 5m, and the slope excavation, which is divided into level-one slope and two level slope, to carry out It excavates, level-one slope presses 1:1 slope, two level slope press 1:0.5 slope.
Reaction frame is installed to include the following steps in the step b:
A. reaction frame is processed in shield machine both sides, the reaction frame passes through slot for the bracing members being mutually parallel of six roots of sensation equal length Steel is formed by welding, wherein four bracing members same plane formed reaction frame bottom surface, in addition two be located at reaction frame bottom surface Above two sides;
B. in the bed course basis of shield machine rear area construction reaction frame, the vertical piping lane length side of length direction on bed course basis To, often save reaction frame corresponding position and at least set twice bed course basic, the length, width and height on bed course basis be respectively 8.5m-8.6m, 0.4m-0.6m and 0.18m-0.22m;
C. after the completion of bed course foundation construction, the reaction frame processed at left and right sides of shield machine is hung on the basis of bed course and adjusted To design position, then with bolt by the integral rear and leveling of reaction frame connection of the left and right sides, shield machine acts on reaction frame On promoted, region is then vacated at shield machine rear, next section reaction frame is installed, the reaction frame of section up and down passes through bolt Connection, it is described to save steel plate of jumping a queue on the outside of reaction frame turning up and down.
The good reaction frame of shield machine pushing installation, which is pushed ahead, in the step c includes the following steps:
A. the pipe bending cylinder pressurization of shield machine makes the pushing tow nylon front edge of board Contact reaction-force frame end head of shield machine;
B. the gap between pushing tow nylon front edge of board and reaction frame end is filled with steel plate;
C. the pipe bending cylinder of shield machine continues to pressurize, and pushes ahead shield machine.
Slope excavation is first carried out to the soil body in the range of enclosed structure in shield machine direction of advance using the present invention, slope is opened After the completion of digging, prefabricated tube coupling that shield machine pushing tow has spliced is vacated at shield machine rear and reaction frame is installed on region, shield machine The good reaction frame of pushing installation is pushed ahead, and region installation bracing members and firm purlin are vacated at shield machine rear, is repeated above-mentioned Step pushes ahead shield machine, until shield machine is by piping lane non-standard segment, method using the present invention can quickly, pacify Entirely, specification by non-standard segment, so as to accelerate construction progress with cost-effective input, provided for later piping lane shield-tunneling construction Reference.
Description of the drawings
Fig. 1 is soil excavation schematic diagram in front of shield machine of the present invention;
Fig. 2 is reaction frame schematic diagram of the present invention.
Specific embodiment
With reference to Fig. 1 and Fig. 2, the present invention is described in further detail.
A kind of U-shaped open shield machine is included the following steps by the construction method of piping lane non-standard segment:
A. slope excavation is carried out to the soil body in the range of enclosed structure in 10 direction of advance of shield machine;
B. after the completion of slope is excavated, prefabricated tube coupling that 10 pushing tow of shield machine has spliced is vacated at 10 rear of shield machine on region Reaction frame 20 is installed;
C. the good reaction frame 20 of 10 pushing installation of shield machine is pushed ahead, and installation bracing members in region are vacated at 10 rear of shield machine With firm purlin;
D. repeating step a, b and c pushes ahead shield machine 10, until shield machine 10 passes through piping lane non-standard segment.
The each slope excavation lengths of step a are not more than 5m, and the slope excavation is divided into level-one slope 11 and two level slope 12 It is excavated, level-one slope 11 presses 1:1 slope, two level slope 12 press 1:0.5 slope.
Reaction frame 20 is installed to include the following steps in the step b:
A. reaction frame 20 is processed in 10 both sides of shield machine, the reaction frame 20 is the bracing members being mutually parallel of six roots of sensation equal length It is formed by welding by channel steel, wherein four bracing members form the bottom surface of reaction frame 20 in same plane, in addition two are located at counter-force Above the bottom surface two sides of frame 20;
B. basic in the bed course of 10 rear area of shield machine construction reaction frame 20, the vertical piping lane of length direction on bed course basis is long Direction is spent, 20 corresponding position of reaction frame is often saved and at least sets twice bed course basic, the length, width and height on bed course basis are respectively 8.5m- 8.6m, 0.4m-0.6m and 0.18m-0.22m;
C. after the completion of bed course foundation construction, the reaction frame 20 that 10 left and right sides of shield machine processes is hung on the basis of bed course simultaneously It adjusts to design position, the reaction frame 20 of the left and right sides is then connected into integral rear and leveling with bolt, shield machine 10 acts on It is promoted on reaction frame 20, installation next section reaction frame 20 in region is then vacated at 10 rear of shield machine, it is described to save up and down Reaction frame 20 is bolted, steel plate of jumping a queue on the outside of 20 turning of the section reaction frame up and down.
The good reaction frame of shield machine pushing installation, which is pushed ahead, in the step c includes the following steps:
A. the pipe bending cylinder pressurization of shield machine 10 makes 20 end of pushing tow nylon front edge of board Contact reaction-force frame of shield machine 10;
B. with the gap between 20 end of steel plate filling pushing tow nylon front edge of board and reaction frame;
C. the pipe bending cylinder of shield machine 10 continues to pressurize, and pushes ahead shield machine 10.
Method using the present invention can quickly, safety, specification by non-standard segment, so as to accelerate construction progress and save About cost input provides reference for later piping lane shield-tunneling construction.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention It encloses and is defined, under the premise of design spirit of the present invention is not departed from, those of ordinary skill in the art are to the technical side of the present invention The various modifications and improvement that case is made should all be fallen into the protection domain that claims of the present invention determines.

Claims (4)

1. a kind of construction method that U-shaped open shield machine passes through piping lane non-standard segment, it is characterised in that:Include the following steps:
A. slope excavation is carried out to the soil body in the range of enclosed structure in shield machine direction of advance;
B. after the completion of slope is excavated, prefabricated tube coupling that shield machine pushing tow has spliced is vacated at shield machine rear and is installed on region Reaction frame;
C. the good reaction frame of shield machine pushing installation is pushed ahead, and is vacated region installation bracing members at shield machine rear and just enclosed Purlin;
D. repeating step a, b and c pushes ahead shield machine, until shield machine passes through piping lane non-standard segment.
2. a kind of U-shaped open shield machine according to claim 1 is existed by the construction method of piping lane non-standard segment, feature In:The each slope excavation lengths of step a are not more than 5m, and the slope excavation is divided into level-one slope and two level slope and is excavated, Press 1 in level-one slope:1 slope, two level slope press 1:0.5 slope.
3. a kind of U-shaped open shield machine according to claim 1 is existed by the construction method of piping lane non-standard segment, feature In:Reaction frame is installed to include the following steps in the step b:
A. reaction frame is processed in shield machine both sides, the reaction frame passes through slot for the bracing members being mutually parallel of six roots of sensation equal length Steel is formed by welding, wherein four bracing members same plane formed reaction frame bottom surface, in addition two be located at reaction frame bottom surface Above two sides;
B. in the bed course basis of shield machine rear area construction reaction frame, the vertical piping lane length side of length direction on bed course basis To, often save reaction frame corresponding position and at least set twice bed course basic, the length, width and height on bed course basis be respectively 8.5m-8.6m, 0.4m-0.6m and 0.18m-0.22m;
C. after the completion of bed course foundation construction, the reaction frame processed at left and right sides of shield machine is hung on the basis of bed course and adjusted To design position, then with bolt by the integral rear and leveling of reaction frame connection of the left and right sides, shield machine acts on reaction frame On promoted, region is then vacated at shield machine rear, next section reaction frame is installed, the reaction frame of section up and down passes through bolt Connection, it is described to save steel plate of jumping a queue on the outside of reaction frame turning up and down.
4. a kind of U-shaped open shield machine according to claim 1 is existed by the construction method of piping lane non-standard segment, feature In:The good reaction frame of shield machine pushing installation, which is pushed ahead, in the step c includes the following steps:
A. the pipe bending cylinder pressurization of shield machine makes the pushing tow nylon front edge of board Contact reaction-force frame end head of shield machine;
B. the gap between pushing tow nylon front edge of board and reaction frame end is filled with steel plate;
C. the pipe bending cylinder of shield machine continues to pressurize, and pushes ahead shield machine.
CN201810019849.1A 2018-01-09 2018-01-09 U-shaped opening shield machine passes through the construction method of piping lane non-standard segment Active CN108222953B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810019849.1A CN108222953B (en) 2018-01-09 2018-01-09 U-shaped opening shield machine passes through the construction method of piping lane non-standard segment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810019849.1A CN108222953B (en) 2018-01-09 2018-01-09 U-shaped opening shield machine passes through the construction method of piping lane non-standard segment

Publications (2)

Publication Number Publication Date
CN108222953A true CN108222953A (en) 2018-06-29
CN108222953B CN108222953B (en) 2019-07-19

Family

ID=62640572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810019849.1A Active CN108222953B (en) 2018-01-09 2018-01-09 U-shaped opening shield machine passes through the construction method of piping lane non-standard segment

Country Status (1)

Country Link
CN (1) CN108222953B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183841A (en) * 2018-10-24 2019-01-11 中铁工程机械研究设计院有限公司 Prefabricated piping lane assembling and construction method based on U-shaped shield machine
CN109236305A (en) * 2018-10-26 2019-01-18 中铁第勘察设计院集团有限公司 Shield sky is pushed away through bored tunnel and the secondary construction method and its structure originated
CN110454178A (en) * 2019-09-05 2019-11-15 中铁隧道局集团有限公司 It is originated in large-diameter shield auger with counter-force structure production method and counter-force structure
CN112343614A (en) * 2020-11-03 2021-02-09 中能(厦门)智慧科技有限公司 U-shaped shield tunneling machine-based overlapped-spliced comprehensive pipe gallery construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046933A (en) * 2012-12-08 2013-04-17 中铁十二局集团有限公司 Shield station-crossing tunneling and station parallel construction method
CN104912560A (en) * 2015-06-11 2015-09-16 北京市市政四建设工程有限责任公司 Small-radius shield curve launching construction technology on gravel clay layer
CN106150511A (en) * 2016-08-15 2016-11-23 中铁局集团有限公司 Shield driving formula sky pushes through ground fissure bored tunnel construction method
CN106761785A (en) * 2016-12-05 2017-05-31 中交第三航务工程局有限公司 A kind of subway tunnel shield originates construction technology
CN107514262A (en) * 2017-08-02 2017-12-26 中国建筑第八工程局有限公司 The construction method of shield piping lane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046933A (en) * 2012-12-08 2013-04-17 中铁十二局集团有限公司 Shield station-crossing tunneling and station parallel construction method
CN104912560A (en) * 2015-06-11 2015-09-16 北京市市政四建设工程有限责任公司 Small-radius shield curve launching construction technology on gravel clay layer
CN106150511A (en) * 2016-08-15 2016-11-23 中铁局集团有限公司 Shield driving formula sky pushes through ground fissure bored tunnel construction method
CN106761785A (en) * 2016-12-05 2017-05-31 中交第三航务工程局有限公司 A kind of subway tunnel shield originates construction technology
CN107514262A (en) * 2017-08-02 2017-12-26 中国建筑第八工程局有限公司 The construction method of shield piping lane

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183841A (en) * 2018-10-24 2019-01-11 中铁工程机械研究设计院有限公司 Prefabricated piping lane assembling and construction method based on U-shaped shield machine
CN109236305A (en) * 2018-10-26 2019-01-18 中铁第勘察设计院集团有限公司 Shield sky is pushed away through bored tunnel and the secondary construction method and its structure originated
CN110454178A (en) * 2019-09-05 2019-11-15 中铁隧道局集团有限公司 It is originated in large-diameter shield auger with counter-force structure production method and counter-force structure
CN110454178B (en) * 2019-09-05 2021-08-31 中铁隧道局集团有限公司 Method for manufacturing reaction structure for starting in large-diameter shield tunneling machine tunnel and reaction structure
CN112343614A (en) * 2020-11-03 2021-02-09 中能(厦门)智慧科技有限公司 U-shaped shield tunneling machine-based overlapped-spliced comprehensive pipe gallery construction method

Also Published As

Publication number Publication date
CN108222953B (en) 2019-07-19

Similar Documents

Publication Publication Date Title
CN108222953A (en) The construction method that U-shaped opening shield machine passes through piping lane non-standard segment
CN104099944B (en) The construction method of subway station and large span accessory structure interface
CN104196546A (en) Treatment method for fault fracture zone collapse in tunnel construction process
CN103061771B (en) Second mining mine fully mechanized coal face cuts eye driving and supporting method thereof
CN102817621B (en) Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions
DE2437012A1 (en) PROCEDURE AND EQUIPMENT FOR LAYING A PIPE STRING IN A TRENCH MADE IN OPEN SHEETING, ESPECIALLY IN WATER-BASED SOILS
JP2020023864A (en) Tunnel lining concrete placement method
CN101539021A (en) Road tunnel excavation method
CN207194917U (en) A kind of shape steel tube curtain structure for tunnel advanced support
CN106837346A (en) A kind of TBM steppings are missed the stop construction process
CN207144988U (en) Gob side entry retaining keeps off cash system
CN105697019A (en) Vertical shaft wall cast-in-place concrete joint and formwork device and construction method of vertical shaft wall cast-in-place concrete joint
CN205100527U (en) A cantilever construction platform for surmounting retaining wall
KR20100137085A (en) Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel
CN107780418A (en) The rapid constructing method cheated in Deep Foundation Pit
CN109538218A (en) The method that the filling of shield tunnel rail flowering structure tunnel bottom is constructed simultaneously with service channel
CN104675404A (en) Construction method for metro underground-excavation tunnel cross passage entering main track
CN205088634U (en) Berme ditch typical forms
CN204492851U (en) Metro built by mining method transverse passage-way temporary support component
CN104405412B (en) Metro built by mining method adit construction component
CN206860218U (en) A kind of shield machine integrally originates the interim station support frame in space
KR20140008207A (en) Precast box equipped with plate for decreasing friction and non open cut tunneling method thereof
CN218540894U (en) Simple belt type ditch for mine
CN213038224U (en) A intercept drainage renovation structure for existing line way arch road bed
CN206186053U (en) Arch prefabricated mould

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Huang Jingxin

Inventor after: Huang Zhi

Inventor after: Liang Chao

Inventor after: An Gangjian

Inventor after: Wang Shengtao

Inventor after: Yu Song

Inventor after: An Kang

Inventor after: Gong Jianyi

Inventor after: Chen Ping

Inventor after: Yang Zubing

Inventor before: Huang Jingxin

Inventor before: Wang Shengtao

Inventor before: Gong Jianyi

Inventor before: Chen Ping

Inventor before: An Gangjian

Inventor before: Yang Zubing

Inventor before: Yu Song

Inventor before: Huang Zhi

Inventor before: An Kang

CB03 Change of inventor or designer information