CN108222010A - A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method - Google Patents
A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method Download PDFInfo
- Publication number
- CN108222010A CN108222010A CN201810227347.8A CN201810227347A CN108222010A CN 108222010 A CN108222010 A CN 108222010A CN 201810227347 A CN201810227347 A CN 201810227347A CN 108222010 A CN108222010 A CN 108222010A
- Authority
- CN
- China
- Prior art keywords
- trestle
- foundation pit
- shaped steel
- secondary beam
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The deep foundation pit supporting structure being related to the invention discloses a kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method in civil engineering, including reinforced concrete girder, shaped steel secondary beam and top detachable steel plate pavement structure, the shaped steel secondary beam is ridden upon on reinforced concrete girder, and shaped steel secondary beam top is laid with detachable steel plate circuit face and forms a kind of force structure.The present invention passes through in reinforced concrete girder top pre-embedded bolt, it connect to form trestle work structure with shaped steel secondary beam, the combination trestle work structure can serve as supporting trestle, the horizontally-supported force structure of foundation pit can be used as again, meet requirement of the design to supporting construction moment of flexure and shearing, it overcomes the shortcomings that existing armored concrete trestle consumable material is huge and disposable.Steel concrete combined type foundation pit trestle work structure rigidity is big compared with shaped steel trestle, and may act as foundation pit horizontal support structure, and have the advantages that environmentally protective, reusable while saves engineering cost.
Description
Technical field
The present invention relates to foundation pit trestle technical field in deep-foundation pit engineering, specially a kind of recyclable steel concrete combination of assembled
Formula foundation pit trestle work structure and construction method.
Background technology
With Urban Underground Space Excavation, base pit engineering is towards bigger more Shenzhen Development Bank in city, and Foundation Pit Construction field
The narrow neighboring buildings in ground are intensive, more demanding to construction site utilization rate in foundation pit, for such situation, generally pass through in engineering
Construction bridge is set to utilize place inside foundation pit.Common construction bridge is divided into two kinds, when armored concrete trestle, second is that
Steel trestle.
In armored concrete trestle system, trestle beam slab and support system integral cast-in-situ are non-dismountable, disposable,
It is huge that workload is removed simultaneously, causes largely to waste.
In steel trestle system, trestle beam and top trestle plate are laid using steel construction, although it is detachable due to
Material stiffness is small compared with armored concrete, and bearing capacity is limited, therefore suffers from conditionality in actually using, and can not meet complexity
Under the conditions of large-area construction needs.
Before making the present invention, Chinese patent(Application number:CN 107246014A)Disclose " detachable foundation pit trestle body
System and its construction method ", it is characterized in that trestle beam collectively constitutes trestle region with being layed in the steel plate roadbed box on trestle beam top.
It realizes the detachable use of trestle, but has the disadvantages that:(1)It is layed between subgrade case on concrete trestle beam, due to road
Base case size is limited, and trestle beam span and spacing need to strictly meet subgrade case and be laid with requirement so that trestle beam span is smaller, economical
Property is poor;(2)Subgrade case is only fixed by upper reinforcement and side grooves, can not be formed and is reliably connected with trestle beam, stack in construction
Axle load is carried often as dynamic load, only connect the globality for being difficult to ensure that subgrade case with upper reinforcement by groove;(3)Due to trestle
Beam span is limited by subgrade case size, and lower part trestle stand column pile radical is often more, it is difficult to it avoids conflicting with agent structure beam column,
Influence main structure construction.
Chinese patent(Application number:CN 106968256A)Disclose " foundation pit assembled steel trestle construction method ", feature
To use Bailey bracket unit as trestle component, lower part setting steel lattice column, but there are following defects for this method:(1)Bei Lei
Frame element stiffness is smaller, and cannot need to be higher than foundation pit with the horizontally-supported unification of foundation pit, trestle beam absolute altitude and support absolute altitude, foundation pit support
By must fall under trestle beam;(2)Trestle span is limited by Bailey bracket unit, has fixed modulus, it is difficult to meet large span
It is required that;(3)Trestle rigidity is smaller, and Foundation Pit is big.
Therefore, can form one kind there is an urgent need to one kind can have enough rigidity and again conveniently detachable and repeatable make
With the foundation pit trestle work structure with cost and duration advantage.The recyclable steel concrete combined type foundation pit trestle work structure of assembled is this
Under the conditions of come into being, become and solve the problems, such as this means.
Invention content
It is an object of the present invention to provide a kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction methods, are passing
It unites on the basis of armored concrete trestle and steel trestle, improves trestle work structure system, while improve raw steel reinforced concrete stack
Bridge is disposable can not dismantle with steel trestle rigidity it is weak the problem of.The present invention passes through pre- on reinforced concrete girder top
Bolt is buried, connect to form trestle work structure with shaped steel secondary beam, which can serve as supporting trestle and as foundation pit
Horizontal inner support force structure meets requirement of the design to supporting construction moment of flexure and shearing, it overcomes existing armored concrete
The shortcomings that trestle consumable material is huge and disposable.Steel reinforced concrete combined type trestle work structure rigidity is big compared with shaped steel trestle,
And foundation pit horizontal support structure is may act as, and engineering cost and work are saved while have many advantages, such as environmentally protective reusable
Phase.
The object of the present invention is achieved like this:
A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled includes the reinforced concrete of inner support horizontal with foundation pit one
Native trestle girder 1, the shaped steel secondary beam 2 for being placed in 1 top of armored concrete trestle girder and it is layed in the removable of 2 top of shaped steel secondary beam
Unload steel plate road surface 3;
The edge of the armored concrete trestle girder 1 is both provided with concrete flanging 10, positioned at armored concrete trestle master
Pre-buried high-strength bolt 9 in beam 1 is connect with top shaped steel secondary beam 2;
It is mixed by being located at the pre-buried high-strength bolt 9 in armored concrete trestle girder 1 with reinforcing bar the bottom of the shaped steel secondary beam 2
Solidifying soil trestle girder 1 connects, and the end of shaped steel secondary beam 2 terminates in 10 position of concrete flanging;
The detachable steel plate circuit face 3 on 2 top of shaped steel secondary beam is layed in lower part shaped steel secondary beam 2 by being welded to connect, detachable steel
It is connected between plate circuit face 3 by distributing bar 11;
1 lower section of the armored concrete trestle girder is provided with a plurality of trestle column arranged side by side and stand column pile 6, trestle column and
By the column channel steel bridging 5 of right-angled intersection between stand column pile 6, trestle column and 6 top of stand column pile by steel bracket 4 with
Armored concrete trestle girder 1 connects;
A kind of construction method of the recyclable steel concrete combined type foundation pit trestle work structure of assembled, includes the following steps:
Step1. construction foundation pit fender post, is excavated to hat bottom elevation, Guan Liang of constructing and stack bridge main beam part and with foundation pit water
Flat support uniformly pours, wherein 1 outside setting concrete flanging 10 of armored concrete trestle girder, and pre-buried high-strength bolt 9;
Step2. after the completion for the treatment of that armored concrete trestle girder 1 conserves, shaped steel is laid on 1 top of armored concrete trestle girder
Beam 2, shaped steel secondary beam 2 are fixedly connected with armored concrete trestle girder 1 using pre-buried high-strength bolt 9 and nut 12, connecting portion
Using felt or plank buffering isolation;
Step3. steel plate road surface 3 is laid on above-mentioned shaped steel secondary beam 2, the top on steel plate road surface 3 is by using welding structure reinforcing bar
11 fix, and lower part is welded to connect with shaped steel secondary beam 2, and is adopted between the steel plate road surface 3 and shaped steel secondary beam 2 and concrete flanging
It is filled with C15 plain concretes 10;
Step4. the hierarchical block excavation pit soil body is to bottom is cheated, and pours basement bottom board and bottom plate support replacement of constructing, and successively upwards
Construction building agent structure;
Step5. main structure construction to be built removes foundation pit trestle top shaped steel secondary beam and steel plate road surface to ± 0.000.
Positive beneficial effect:The advantages of existing reinforced concrete support construction rigidity is big, and foundation pit deformation is small, and with steel knot
Structure trestle is easy for construction, detachable the advantages of recycling, and has the advantages that save engineering cost while green is reusable
With.
Description of the drawings
The structure diagram of Fig. 1 present invention;
Fig. 2 shaped steel secondary beams connect top view with girder;
Fig. 3 is that shaped steel secondary beam connect floor map with girder;
Fig. 4 is that trestle girder reserves high-strength bolt anchoring piece;
Fig. 5 is trestle beam flange schematic diagram;
Fig. 6 is trestle work structure overall schematic;
It is in figure:1. reinforced concrete girder;2. shaped steel secondary beam;3. steel plate road surface;4. steel bracket;5. column channel steel scissors
Support;6. trestle column and stand column pile;7. support pile;8. trestle beam flange;9. high-strength bolt;10.C15 plain concretes;11. construction
Reinforcing bar;12.M24 nuts.
Specific embodiment
As shown in figures 1 to 6, the recyclable steel concrete combined type foundation pit trestle work structure of a kind of assembled, including with being propped up in foundation pit level
The armored concrete trestle girder 1 of one is supportted, the shaped steel secondary beam 2 on 1 top of armored concrete trestle girder is placed in and is layed in type
The detachable steel plate circuit face 3 on 2 top of steel secondary beam;
The edge of the armored concrete trestle girder 1 is both provided with concrete flanging 10, positioned at armored concrete trestle master
Pre-buried high-strength bolt 9 in beam 1 is connect with top shaped steel secondary beam 2;
It is mixed by being located at the pre-buried high-strength bolt 9 in armored concrete trestle girder 1 with reinforcing bar the bottom of the shaped steel secondary beam 2
Solidifying soil trestle girder 1 connects, and the end of shaped steel secondary beam 2 terminates in 10 position of concrete flanging;
The detachable steel plate circuit face 3 on 2 top of shaped steel secondary beam is layed in lower part shaped steel secondary beam 2 by being welded to connect, detachable steel
It is connected between plate circuit face 3 by distributing bar 11;
1 lower section of the armored concrete trestle girder is provided with a plurality of trestle column arranged side by side and stand column pile 6, trestle column and
By the column channel steel bridging 5 of right-angled intersection between stand column pile 6, trestle column and 6 top of stand column pile by steel bracket 4 with
Armored concrete trestle girder 1 connects;
A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled, including reinforced concrete girder 1, shaped steel secondary beam 2, steel plate
Road surface 3, wherein three main composition structures, the horizontally-supported part of reinforced concrete girder 1 and foundation pit, armored concrete
The span of girder 1 and section consider that the factors such as axial force of the supports and trestle load are designed according to horizontally-supported spacing, trestle beam
Top mark height is flushed with foundation pit Guan Liang absolute altitude, and rule of thumb girder span can be 4 ~ 9m.Shaped steel secondary beam 2 uses H400 × 400 × 13
× 21 shaped steel, shaped steel length can carry out factory process according to trestle beam span, and shaped steel end and centre are reserved with High-strength bolt hole
Position.Steel plate road surface 3 is factory process, and common-size is 6 × 1m, 6 × 2m etc..Shaped steel secondary beam can be used with reinforced concrete girder
10.9 grades of M24x8.0 high-strength bolts connections.
High-strength bolt connector 4 is embedded in the reinforced concrete girder 1, pre-plugged is in beam before structure pours
Interior, the shaped steel secondary beam 2 is reserved with corresponding bolt hole, and wherein high-strength bolt is connected to above reinforced concrete girder, institute
Using being welded to connect between the steel steel plate road surface 3 stated and shaped steel secondary beam 2, top welds to form entirety by 20 distributing bars,
Shaped steel secondary beam 2 transports the section steel beam processed to project construction scene according to requiring that different length can be processed into.Trestle master
It is designed on the outside of beam and foundation pit Guan Liang using flange, flange height 500mm, width 200mm, flange upper surface and steel plate road surface
Upper surface is neat, and reinforcing bar anchors into trestle beam and Guan Liang at flange position.It is used between steel plate road surface and shaped steel secondary beam and girder flange
C15 plain concretes are filled.
This patent additionally provides a kind of construction method of the recyclable steel concrete combined type foundation pit trestle work structure of assembled, please refers to
Attached drawing 1-6, then construction method is further described, Specific construction step is as follows:
Step1. base pit engineering is understood, and carry out site inspection before constructing, rationally determining foundation pit construction horizontal layout, with
Just it determines trestle size, imports and exports position, with reference to the horizontally-supported arrangement of foundation pit, choose optimal location.
Step2. construction foundation pit fender post and stand column pile are excavated to hat bottom elevation, Guan Liang of constructing and stack bridge main beam portion
Point and uniformly to pour foundation pit horizontally-supported, wherein 1 outside setting flange of Guan Liang and reinforced concrete girder.
Step3. after the completion for the treatment of the maintenance of trestle girder, shaped steel secondary beam 2, shaped steel are laid on 1 top of reinforced concrete girder
Beam 2 connect 9 with trestle girder 1 using pre-buried high-strength bolt, and felt can be used in connecting portion or plank buffering isolation is applied with reducing
Working hour noise.
Step4. steel plate road surface 3 is laid on shaped steel secondary beam 2, steel plate road surface top is connected by using welded reinforcement, under
Portion is connect, and mixed between the steel plate road surface and shaped steel secondary beam and girder flange using C15 elements using welding with shaped steel secondary beam
Solidifying soil filling.
Step5. the hierarchical block excavation pit soil body is to bottom is cheated, and pours basement bottom board and bottom plate support replacement of constructing, and successively
Upward construction building agent structure.
Step6. it treats that whole major structure of construction are constructed to ± 0.000, removes foundation pit trestle top shaped steel secondary beam and steel plate
Road surface, which is realized, to be recycled.
Basic principle, main feature and advantages of the present invention described above and that describe the present invention, only of the invention
Preferred embodiment is not intended to limit the invention, any modification for being made all within the spirits and principles of the present invention, etc.
With replace and improve etc., should be included in the present invention claims protection domain within.
Claims (6)
1. a kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled, it is characterised in that:It is main include in foundation pit level
The armored concrete trestle girder 1 of one is supported, the shaped steel secondary beam 2 on 1 top of armored concrete trestle girder is placed in and is layed in
The detachable steel plate circuit face 3 on 2 top of shaped steel secondary beam.
2. the recyclable steel concrete combined type foundation pit trestle work structure of assembled according to claim 1, which is characterized in that described
The edge of armored concrete trestle girder 1 is both provided with concrete flanging 10, pre-buried in armored concrete trestle girder 1
High-strength bolt 9 is connect with top shaped steel secondary beam 2.
3. the recyclable steel concrete combined type foundation pit trestle work structure of assembled according to claim 1, which is characterized in that described
The bottom of shaped steel secondary beam 2 passes through the pre-buried high-strength bolt 9 being located in armored concrete trestle girder 1 and armored concrete trestle master
Beam 1 connects, and the end of shaped steel secondary beam 2 terminates in 10 position of concrete flanging.
4. the recyclable steel concrete combined type foundation pit trestle work structure of assembled according to claim 1, it is characterised in that:It is layed in
The detachable steel plate circuit face 3 on 2 top of shaped steel secondary beam with lower part shaped steel secondary beam 2 by being welded to connect, between detachable steel plate circuit face 3
It is connected by distributing bar 11.
5. the recyclable steel concrete combined type foundation pit trestle work structure of assembled according to claim 1, it is characterised in that:Described
The lower section of armored concrete trestle girder 1 is provided with a plurality of trestle column arranged side by side and stand column pile 6, trestle column and stand column pile 6 it
Between steel bracket 4 and reinforced concrete passed through by the column channel steel bridging 5 of right-angled intersection, trestle column and 6 top of stand column pile
Native trestle girder 1 connects.
6. a kind of construction method of the recyclable steel concrete combined type foundation pit trestle work structure of assembled according to claim 1,
It is characterized in that, includes the following steps:
Step1. construction foundation pit fender post, is excavated to hat bottom elevation, Guan Liang of constructing and stack bridge main beam part and with foundation pit water
Flat support uniformly pours, wherein 1 outside setting concrete flanging 10 of armored concrete trestle girder, and pre-buried high-strength bolt 9;
Step2. after the completion for the treatment of that armored concrete trestle girder 1 conserves, shaped steel is laid on 1 top of armored concrete trestle girder
Beam 2, shaped steel secondary beam 2 are fixedly connected with armored concrete trestle girder 1 using pre-buried high-strength bolt 9 and nut 12, connecting portion
Using felt or plank buffering isolation;
Step3. steel plate road surface 3 is laid on above-mentioned shaped steel secondary beam 2, the top on steel plate road surface 3 is by using welding structure reinforcing bar
11 fix, and lower part is welded to connect with shaped steel secondary beam 2, and is adopted between the steel plate road surface 3 and shaped steel secondary beam 2 and concrete flanging
It is filled with C15 plain concretes 10;
Step4. the hierarchical block excavation pit soil body is to bottom is cheated, and pours basement bottom board and bottom plate support replacement of constructing, and successively upwards
Construction building agent structure;
Step5. main structure construction to be built removes foundation pit trestle top shaped steel secondary beam and steel plate road surface to ± 0.000.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810227347.8A CN108222010A (en) | 2018-03-20 | 2018-03-20 | A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810227347.8A CN108222010A (en) | 2018-03-20 | 2018-03-20 | A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108222010A true CN108222010A (en) | 2018-06-29 |
Family
ID=62659673
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810227347.8A Pending CN108222010A (en) | 2018-03-20 | 2018-03-20 | A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108222010A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440784A (en) * | 2018-12-25 | 2019-03-08 | 上海建工七建集团有限公司 | Regularization prefabricated assembling type reinforced concrete supports cover board and construction method |
CN110656581A (en) * | 2019-09-19 | 2020-01-07 | 广州机施建设集团有限公司 | Temporary bridge construction process |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005060952A (en) * | 2003-08-08 | 2005-03-10 | Yokogawa Bridge Corp | Large span steel grating structure and its construction method |
US20130047351A1 (en) * | 2011-08-31 | 2013-02-28 | Marc Breault | Pipeline crossing bridge |
CN203383221U (en) * | 2013-07-29 | 2014-01-08 | 上海强劲地基工程股份有限公司 | Foundation pit support structure formed by armoured concrete and steel structure |
CN104060547A (en) * | 2014-07-10 | 2014-09-24 | 中交二航局第四工程有限公司 | Temporary steel trestle constructing method and trestle |
CN204608794U (en) * | 2015-01-22 | 2015-09-02 | 中天建设集团有限公司 | A kind of transhipment mound platform for deep-foundation pit excavation |
CN204753354U (en) * | 2015-06-11 | 2015-11-11 | 辽宁紫竹桩基础工程股份有限公司 | Cover worker's board landing stage |
CN105401583A (en) * | 2015-12-25 | 2016-03-16 | 中铁十四局集团有限公司 | Steel structure soil delivery platform for wide and deep step foundation pit |
CN205975551U (en) * | 2016-08-16 | 2017-02-22 | 郑州水务建筑工程股份有限公司 | A construction platform for construction of aquatic steel sheet pile |
CN107246014A (en) * | 2017-06-30 | 2017-10-13 | 上海建工集团股份有限公司 | Detachable foundation pit trestle system and its construction method |
CN206828906U (en) * | 2017-05-27 | 2018-01-02 | 中铁第四勘察设计院集团有限公司 | A kind of temporary pavement bedding structure for Metro Deep Excavation |
CN208121776U (en) * | 2018-03-20 | 2018-11-20 | 南京市测绘勘察研究院股份有限公司 | A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled |
-
2018
- 2018-03-20 CN CN201810227347.8A patent/CN108222010A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005060952A (en) * | 2003-08-08 | 2005-03-10 | Yokogawa Bridge Corp | Large span steel grating structure and its construction method |
US20130047351A1 (en) * | 2011-08-31 | 2013-02-28 | Marc Breault | Pipeline crossing bridge |
CN203383221U (en) * | 2013-07-29 | 2014-01-08 | 上海强劲地基工程股份有限公司 | Foundation pit support structure formed by armoured concrete and steel structure |
CN104060547A (en) * | 2014-07-10 | 2014-09-24 | 中交二航局第四工程有限公司 | Temporary steel trestle constructing method and trestle |
CN204608794U (en) * | 2015-01-22 | 2015-09-02 | 中天建设集团有限公司 | A kind of transhipment mound platform for deep-foundation pit excavation |
CN204753354U (en) * | 2015-06-11 | 2015-11-11 | 辽宁紫竹桩基础工程股份有限公司 | Cover worker's board landing stage |
CN105401583A (en) * | 2015-12-25 | 2016-03-16 | 中铁十四局集团有限公司 | Steel structure soil delivery platform for wide and deep step foundation pit |
CN205975551U (en) * | 2016-08-16 | 2017-02-22 | 郑州水务建筑工程股份有限公司 | A construction platform for construction of aquatic steel sheet pile |
CN206828906U (en) * | 2017-05-27 | 2018-01-02 | 中铁第四勘察设计院集团有限公司 | A kind of temporary pavement bedding structure for Metro Deep Excavation |
CN107246014A (en) * | 2017-06-30 | 2017-10-13 | 上海建工集团股份有限公司 | Detachable foundation pit trestle system and its construction method |
CN208121776U (en) * | 2018-03-20 | 2018-11-20 | 南京市测绘勘察研究院股份有限公司 | A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled |
Non-Patent Citations (4)
Title |
---|
夏翔;刘芳玲;叶海龙;: "钢栈桥在超深超大基坑土方工程中的应用", 施工技术 * |
张中善;程威风;: "贝雷梁式钢栈桥在深基坑土方开挖中的应用", 工程质量 * |
胡发秋: "漳州后石电厂输煤栈桥结构设计特点", 福建建筑 * |
赵升峰;黄广龙;章新;马世强;熊彬涛;: "深基坑工程中大型混凝土栈桥设计与施工分析", 施工技术 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440784A (en) * | 2018-12-25 | 2019-03-08 | 上海建工七建集团有限公司 | Regularization prefabricated assembling type reinforced concrete supports cover board and construction method |
CN110656581A (en) * | 2019-09-19 | 2020-01-07 | 广州机施建设集团有限公司 | Temporary bridge construction process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109235499B (en) | Open-cut underground building structure assembly type construction method | |
CN103334439B (en) | Long-span reinforced concrete inner support structure of rectangular deep foundation pit and construction method of structure | |
CN107542017A (en) | A kind of assembled road construction method | |
CN106968256A (en) | Foundation ditch assembled steel trestle construction method | |
CN102839601A (en) | Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure | |
CN205421616U (en) | Assemble integral shear force wall with steel pipe concrete edge member | |
CN109914472B (en) | Soft soil area assembled comprehensive pipe gallery and construction method thereof | |
CN102392536A (en) | Construction method for long-span hanging vestibule type template support system | |
CN202787055U (en) | Pier fixed connection structure of steel structure overhead bridge | |
CN110847915A (en) | Construction process for jumping-cutting demolishing and subsection back-jacking of double-side-wall temporary support of shallow-buried fine sand layer | |
CN208121776U (en) | A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled | |
CN104405165B (en) | The assembled mixing station storage bin partition wall of a kind of repeatable utilization and construction method thereof | |
CN108222010A (en) | A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method | |
JP2007126925A (en) | Bridge construction method | |
KR20040004819A (en) | Method for changing steel bridge of supporting rail into concreat bridge | |
CN103790176A (en) | Embedded short strut structure and construction method thereof | |
CN105951983A (en) | Building frame structure and construction method thereof | |
CN102808375B (en) | Hinge structure of steel pier column of portal frame platform bridge and bearing platform and construction method thereof | |
CN103967332A (en) | Construction method of building site barrier | |
CN207934054U (en) | A kind of prefabricated assembled raft foundation | |
CN104074370B (en) | A kind of building with brick-concrete structure entirety cross the river shift method and special support changing device thereof | |
CN216515083U (en) | High bridge cushion cap structure of filling | |
CN108978713A (en) | A kind of prefabrication elevator shaft foundation pit and its installation method | |
CN208792366U (en) | A kind of prefabrication elevator shaft foundation pit | |
CN208858150U (en) | A kind of close rib building roof mold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |