CN107542017A - A kind of assembled road construction method - Google Patents

A kind of assembled road construction method Download PDF

Info

Publication number
CN107542017A
CN107542017A CN201710766898.7A CN201710766898A CN107542017A CN 107542017 A CN107542017 A CN 107542017A CN 201710766898 A CN201710766898 A CN 201710766898A CN 107542017 A CN107542017 A CN 107542017A
Authority
CN
China
Prior art keywords
paving
prefabricated
road
leveling
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710766898.7A
Other languages
Chinese (zh)
Inventor
程向辉
石磊
张思铭
梁宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Upper Sea Route Port Construction Engineering Corp Ltd
Original Assignee
Upper Sea Route Port Construction Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Upper Sea Route Port Construction Engineering Corp Ltd filed Critical Upper Sea Route Port Construction Engineering Corp Ltd
Priority to CN201710766898.7A priority Critical patent/CN107542017A/en
Publication of CN107542017A publication Critical patent/CN107542017A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Repair (AREA)

Abstract

The present invention relates to a kind of assembled road construction method, it is characterised in that comprises the following steps:Treat to pave and carry out pavement detection, walking along the street face region division of going forward side by side;It is prefabricated according to road surface region division progress paving in the prefabricated place in paving;Excavator is treated to pave and abolished, and carries out basic unit's leveling;The paving is lifted to and waits to pave by lifting machine by the hole for hoist on the prefabricated paving by region division;Assembled by seam construction in the prefabricated paving;Grouting vehicle pump carries out injecting treatment to paving bottom.The road laid by this method, because the paving of laying road is all prefabricated in special prefabricated place progress, transport job site after prefabricated to and carry out laying assembling, and assembling is rapid simple, greatly shorten the construction period, low to the Coherent traffic noise in city, quickly reparation to urban road is unimpeded to bring facility.

Description

A kind of assembled road construction method
Technical field
The present invention relates to technical field of road construction, more particularly to a kind of assembled road construction method.
Background technology
Common mode of building the road has two kinds, and one kind is casting concrete road construction, and another kind is that pitch rolls road and applied Work.Then casting concrete road construction lays coagulation firstly the need of template is set in basic unit in the region in template besieged city Soil, need using tank car then the concrete in tank car to be poured into concrete transportation to construction location in process of deployment At road to be onstructed, fully vibrated using vibrator and concrete is consolidated and struck off, finally need to cut on the road surface of hardening Flexible slit lamp sequence of operations, pitch roll road construction making base course first, and then making road structure layer, third layer are Asphalt macadam, last making stone pin surface layer.With the increasingly reduction of petroleum resources, the price of pitch gradually steps up yield and subtracted increasingly Less, the production of asphalt material and the construction of asphalt road, the situation of environmental pollution, and the paving of existing asphalt road are had unavoidably If, it has to use substantial amounts of sand material, for urban road construction, using sand material work progress not environmentally, and Sandstone material is not readily available.
In recent years, road maintenance and reconstruction and extension project were persistently strengthened the pressure of Coherent traffic noise, runway in airport, The maintenance of heavy traffic highway and urban road and reconstruction and extension project, the admissible engineering time is limited, existing conventional road Reparation, engineering time shared by reparation and reorganization and expansion is long, causes road to come into operation quickly.
The content of the invention
It is an object of the invention to provide a kind of assembled road construction method, with construction speed is fast, construction quality is high, green The advantages that environmentally friendly.
The above-mentioned technical purpose of the present invention technical scheme is that:A kind of assembled road construction method, It is characterised in that it includes following steps:
Treat to pave and carry out pavement detection, walking along the street face region division of going forward side by side;
It is prefabricated according to road surface region division progress paving in the prefabricated place in paving;
Excavator is treated to pave and abolished, and carries out basic unit's leveling;
The paving is lifted to and waits to pave by lifting machine by the hole for hoist on the prefabricated paving by region division;Institute Prefabricated paving is stated to be assembled by seam construction;
Grouting vehicle pump carries out injecting treatment to paving bottom.
Further, assembled road construction method of the present invention, it is characterised in that the pavement detection use with Lower method:
Test thickness in road surface is measured using supersonic array non-destructive detecting device, the equipment is carried out using the method for spot scan Elevation data is collected, and the scanning element spacing is incremented by using horizontal 20cm longitudinal directions 40cm;
Road pavement carries out core boring sampling, measures core sample thickness, and contrast core sample thickness is taken the mean with test thickness and is worth to Pavement Design absolute altitude.
Further, assembled road construction method of the present invention, it is characterised in that the prefabricated paving by with Lower step obtains:The prefabricated paving is prefabricated according to region division to be paved progress, and the prefabricated paving is embedded with lifting and adjusted Flat hole, jointing apparatus, transmission rod, transmission rod groove and grouting pipe;
The cement concrete to stir is poured to the prefabricated paving, control blanking height, avoids blanking from rushing Hit the position skew of institute's preburied component and passage;
Concrete is fully vibrated after pouring;
Surface groove is carried out after the prefabricated paving institute casting concrete initial set;
The prefabricated paving is placed on 5~65 DEG C of temperature after solidification completely, temperature changing speed is less than 10 DEG C/h environment Under conserved.
Further, assembled road construction method of the present invention, it is characterised in that the lifting leveling hole is set In the prefabricated paving corner, the lifting leveling sky is provided with flange nut;The jointing apparatus in the prefabricated paving is the conical surface Detachable seam component, the seam component include preburied component, connecting plate and dismountable cover plate.
Further, assembled road construction method of the present invention, it is characterised in that basic unit leveling by with Lower step is implemented:
Control excavator is purged to the road surface cubic metre of earth and stone after abolishing;
Grade stake is laid in setting position, absolute altitude is calibrated by spirit level;
The designed elevation part is higher by basic unit to clear up using electric pick;
Scraping device is set up, repair materials are partially filled with less than the designed elevation to basic unit;
Whole basic unit is struck off using scraping device, controls whole basic unit to be under the designed elevation.
Further, assembled road construction method of the present invention, it is characterised in that the prefabricated paving assembling is adopted Use following steps:In the lifting leveling hole installation hoisting ring, the hoisting ring is threadedly coupled with the flange nut, lifting machine By the hoisting ring by assembly area belonging to the prefabricated paving lifting;
The prefabricated paving is placed in smooth good basic unit by lifting machine according to design direction by chain block;
Remove the hoisting ring to load leveling leading screw in the lifting leveling hole, set up spirit level;
Electric wrench rotates the leveling leading screw, and the leveling leading screw jacks up the prefabricated paving, coordinates spirit level, first The leveling leading screw on the prefabricated paving diagonal, then leveling leading screw described in leveling the third angle are adjusted, adjustment is described prefabricated Paving is to design height;
The connecting plate of the jointing apparatus is installed in the preburied component;Now the transmission rod cooperation is attached to adjacent In transmission rod groove, if adjacent road surface needs to drill out transmission rod groove in adjacent road surface side using drilling machine without transmission rod groove;
Slip casting machine injects fast setting concrete into the transmission rod groove.
Further, assembled road construction method of the present invention, it is characterised in that to the prefabricated paving bottom Slip casting uses following methods:Slip casting machine injects slip casting by the grouting pipe, and the grouting pipe includes injected hole, guiding gutter And release aperture;The prefabricated paving includes at least two grouting pipes;The temperature of the slip casting is at least 220 DEG C;It is described Release aperture pulp or grouting pressure stop slip casting when being more than 0.5MPa.
Further, assembled road construction method of the present invention, it is characterised in that the prefabricated paving arrangement of reinforcement is Two bar-mat reinforcements, the bar-mat reinforcement are located at the top and bottom in the prefabricated paving respectively;Shake is provided with the prefabricated paving Dynamic monitoring optical cable, the vibration monitoring optical cable are fixed on the bar-mat reinforcement.
Further, assembled road construction method of the present invention, it is characterised in that the prefabricated slab bottom is set It is equipped with contact sensing element.
The present invention also provides a kind of assembled road, it is characterised in that the road occupation is any according to claim 1~9 Construction method described in claim constructs to obtain.
In summary, the invention has the advantages that, because the paving of laying road is all in special prefabricated place Carry out prefabricated, transport job site to after prefabricated and laid, and assembled simple rapid, greatly short the construction period, drop Low engineering time cost, and covering of roadway improves construction quality for standardization is prefabricated, also reduces municipal construction scene powder The generation of dirt;On the other hand, paving bottom is provided with monitoring system element, and shape is used in service life to monitor paving Condition, information interchange and collaboration for people-Che-road-environment of wisdom traffic provide data and supported, are also convenient for the dimension to the paving later stage Shield, maintenance, pavement behavior monitoring, the shunting of vehicle, for wisdom traffic, intelligent city provide data supporting.
Brief description of the drawings
Fig. 1 is the flow chart of construction method in the present embodiment;
Fig. 2 is assembled road surface cross-sectional view described in the present embodiment;
Fig. 3 is that the division schematic diagram that paves is waited described in the present embodiment;
The arrangement of reinforcement schematic diagram in prefabricated paving in the present embodiment of Fig. 4 positions
Fig. 5 is the scheme of installation of flange nut described in the present embodiment;
Fig. 6 is the prefabricated paving preburied component position view described in the present embodiment;
Fig. 7 is vibration monitoring optical cable connected mode schematic diagram in the present embodiment;
Seam construction described in Fig. 8 the present embodiment, transmission rod, power transmission groove location distribution map;
Transmission rod described in Fig. 9 the present embodiment and transmission rod groove combination schematic diagram;
Road surface structural representation after flush joint in Figure 10 the present embodiment.
Case is embodied
In order that technique effect, scheme and the advantage that the present invention is implemented are clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, clear, complete description is carried out to technical scheme, it is clear that described embodiment be the present invention one Section Example, rather than whole embodiments.
First embodiment
As shown in figure 1, the embodiment of the present invention provides a kind of assembled road construction method 100, comprise the following steps, it is special Sign is:Treat to pave including 101 and carry out pavement detection, walking along the street face region division of going forward side by side;102 carry out paving in prefabricated place It is prefabricated;103 excavators are treated to pave and abolished, and carry out basic unit's leveling;Prefabricated paving is lifted to band paving by 104 lifting machines Road surface, and prefabricated paving is assembled;105 grouting vehicle pumps carry out injecting treatment to paving bottom;It is illustrated in figure 2 this construction Assembled pavement structure schematic diagram after method construction.
Treat to pave first and carry out thickness distribution situation detection, wait to spread to collect using supersonic array non-destructive detecting device Pavement Coat Thickness with Land;In the present embodiment, supersonic array detection device uses PL200-PE equipment, and the equipment is using spot scan Method collects data;Scanning element is incremented by using horizontal 20cm longitudinal directions 40cm in the measurements.The thickness data collected is converged Always, obtained for the thickness of scanning element interval using the method for spline interpolation value;Partly region to be paved is entered Row core boring sampling, measure core sample thickness;Core sample thickness and the road surface thickness collected are contrasted, take the mean to obtain road surface Designed elevation.It will wait to pave and be divided into rational region, to facilitate the prefabricated of follow-up paving;In the present embodiment, such as Fig. 3 Shown use divides to Shanghai City Hua Jinglu and Taibei East Road intersection pavement as embodiment, is divided into two kinds of road block S1 And S2, wherein S1 are 375 × 375cm, S2 is 375 × 500cm, and finally division subregion is numbered, follow-up prefabricated paving Prefabrication and assembly construction will be carried out according to this numbering.
It is prefabricated according to the fast size progress paving of region division in the special prefabricated place in paving after region division, Two bar-mat reinforcements are included inside prefabricated paving, respectively positioned at the top and bottom in prefabricated paving, arrangement of reinforcement is as shown in figure 4, prefabricated Paving is formed using concreting;Prefabricated paving corner is provided with lifting leveling hole, and lifting leveling hole is flange nut, flange The flange of nut is located at below top rebars net, specific as shown in figure 5, the position in lifting leveling hole is according to the big of prefabricated paving It is small by Mechanics Calculation and obtain, in the present embodiment by taking 375 × 500cm plates as an example, lift by crane leveling hole position distance side 750mm away from Short side 850mm;Jointing apparatus, transmission rod, power transmission groove and grouting pipe, above position such as Fig. 6 institutes are additionally provided with prefabricated paving Show particularly have on road surface and inspection shaft hole is provided with the plate of inspection shaft.Concrete to be poured should strictly control match ratio, and make With Large-scale machine set mix, the prefabricated of paving is carried out after stirring, pouring mouth will keep certain height to that need to pour prefabricated paving, Avoid the percussion of concrete from causing pre-buried member position cheap, concrete is sufficiently shaken after the completion of pouring Smash, surface groove is carried out to prefabricated paving after the concrete initial set poured, treats to solidify completely, prefabricated paving is placed on minimum Temperature is not less than 5 DEG C, and maximum temperature is not higher than 65 DEG C, and temperature changing speed is conserved in the environment of being no more than 10 DEG C/h;More Excellently, in maintenance processes, curing membrane or geomembrane can be covered in prefabricated deck surface to ensure temperature, concrete surface phase 90% cannot be less than to humidity;More preferably, steam curing can be used to prefabricated paving.Shake is internally provided with prefabricated paving Dynamic monitoring optical cable, vibration monitoring optical cable are fixed on bar-mat reinforcement by band, and both ends optical fiber need to reserve the joint length more than 40cm Degree;More preferably, prefabricated paving edges of boards are reserved with fiber termination box, and 40cm joint can be stored in reserved fiber termination box, in this reality Apply in example, vibration monitoring optical cable is arranged in the plate in S1 regions, vibrations optical cable is using metal armouring optical cable and there is provided standby With optical cable, vibration monitoring uses DOVS measuring systems, is connected using single-ended connection, now enters the optical fiber between each plate Row series connection, then FS final spice is connected on demodulated equipment, and optical fiber connected mode direction is as shown in fig. 7, can be with by shaking optical cable Monitor the behaviour in service in paving;More preferably, pressure sensor can be set in the bottom in prefabricated paving, to monitor in paving Pressure situation in validity period, the secondary reparation to later stage paving provide data and supported;More preferably, can be by vibration monitoring light Cable is connected with each other with intelligence sensor, component intelligence paving.
It is completely solidified into after type to start to treat the road surface plate to pave in paving and carries out abolishing leveling.First using forcible entry Machine is removed to original road surface, and is transported the cubic metre of earth and stone entrucking after dismounting at building waste stacking to excavator, with excavation The bucket of machine carries out smooth to original basic unit so that basic unit is under designed elevation, and absolute altitude is laid in each zoning position Stake, and is calibrated by spirit level, and bracing wire between absolute altitude again, artificial treatment injustice basic unit is carried out in each region after calibration, right The part that basic unit is higher by designed elevation is handled using electric pick, and quick reparation material is carried out less than the part of designed elevation to basic unit Material filling, while scraping device is set up, the material for quickly repairing of filling is struck off using scraping device so that whole basic unit Under designed elevation.
The lifting transport and assembling of prefabricated board, screw on suspension ring, lifting machine is by hanging on the flange nut in lifting leveling hole Ring transports prefabricated paving entrucking to construction area to be paved in precasting yard.In assembling work region, lifting machine is according to prefabricated paving The numbering in face carries out lifting assembling, and the direction in prefabricated paving is should be noted in placement process, and prefabricated paving is controlled using chain block Face falls, until being steadily placed in the basic unit after striking off.Hoisting ring is backed out, loads leading screw, the good spirit level of frame, starts to prefabricated Paving carries out leveling, and leveling leading screw is rotated using electric wrench, and leading screw jacks up prefabricated paving, coordinates spirit level, and first adjustment is pre- Paving processed adjusts prefabricated paving to design height, treated to the leveling leading screw in the leveling leading screw on diagonal, then leveling the third angle The adjustment of one paving is completed to adjust next prefabricated paving again, makes the deviation of data that level meter is read and designed elevation in 2mm Between float.
Leveling starts to assemble paving behind prefabricated paving, and jointing apparatus and transmission rod-biography are used between prefabricated paving Power bar slot form, such a type of attachment ensure that the quick dismounting of the secondary reparation in paving.Jointing apparatus uses preburied component, connected Fishplate bar and dismountable cover plate are formed, and the jointing apparatus is arranged on the prefabricated paving surrounding of S1 regional plates, and the transmission rod passes Power groove is located at the prefabricated paving surrounding in S2 regions;Using the direction of straight-line travelling as the main direction of advance of vehicle, with advance side Parallel direction is longitudinal joint direction, is transverse joint direction with direction of advance vertical direction;Jointing apparatus sets at least two in longitudinal joint direction It is individual, in transverse joint direction at least provided with four;Transmission rod and power transmission groove set at least two in longitudinal joint direction, in transverse joint direction at least Set four;In the present embodiment, jointing apparatus sets two in longitudinal joint direction, and four are set in transverse joint direction;Relay bar and Relay groove sets two in longitudinal joint direction, four is set in transverse joint direction, specifically as shown in Figure 8.Connecting elements is placed into pre- Bury in component, and cover dismountable cover plate;Transmission rod is embedded in paving, its transmission rod groove phase with adjacent deckings after mounting Coordinate, power transmission groove offers a diameter of 50mm injected hole, after the completion of assembling, injects fast hardening concrete, power transmission from injected hole Bar and transmission rod slot structure schematic diagram are as shown in Figure 9;To the seam of two plates after jointing apparatus and power transmission groove slip casting Place carries out plate flush joint using pitch calking and elastic concrete;More preferably, in order to prevent prefabricated paving is mobile and assembling During mutually extrude, post foamed gaskets in plate side, in the present embodiment, prefabricated paving protected using 5mm foamed gaskets Surface side side, the pavement structure after joint filling are as shown in Figure 10.
After assembling, slip casting pump truck carries out injecting treatment by grouting pipe to prefabricated paving bottom;In the present embodiment In, grouting pipe includes injected hole, guiding gutter and release aperture, and every piece of prefabricated paving is provided with two grouting pipes.Slip casting pump truck The pitch that temperature is 220 DEG C is injected by injected hole, pitch is paved with prefabricated paving bottom by guiding gutter, released by release aperture Drop a hint, stop slip casting when release aperture flows out pitch or grouting pressure is more than 0.5MPa.
Carrying out assembled road construction by this method has advantages below:Urban road can be completed in a short time Plate changes the outfit, repairs and constructed, and pavement structure is totally good after reparation;On-site construction time greatly shortens short, construction by stages It is few to Coherent traffic noise, and reduce the generation of city dust;Additionally by pre-buried vibration monitoring optical cable in prefabricated paving and Contact sensing element is set in paving bottom, the behaviour in service in paving can be detected in the lifetime in paving, and Vehicle flowrate on paving can be monitored by these monitoring systems, composition can be further combined with intelligence sensor Intelligent paving, the exchange collaboration to car flow information provide data and supported.
Second embodiment
The present embodiment is related to a kind of assembled road, and this assembled road is by the construction method institute in first embodiment Obtain.
By the road obtained by the construction method of first embodiment, because paving is carried out in advance in the prefabricated special place in paving System, road is repaired and and laying when, only need to treat causeway base course abolished with smooth processing, this with it is common Road construction mode substantially reduces the road rehabilitation time compared to the time that road surface pours, flattened, being molded is saved, particularly For the maintenance of urban transportation core road, airport roadway, admissible maintenance and laying limited time, and this assembled road This is formally based on to provide possibility to road rehabilitation and laying in the short time.In addition, the stage in paving is embedded with sensing Element, data can be provided to the care and maintenance in later stage paving with the actual use situation and vehicular traffic in real-time perception paving Support.
To sum up, this specification shows that embodiment is only exemplary, and should not be construed limitation in any way originally The scope of invention.Therefore, it will be understood by those skilled in the art that not departing from complete, the appropriate scope and spirit of the present invention In the case of can carry out a variety of modifications to presently disclosed embodiments, therefore protection scope of the present invention should be with claim Limited range is defined.

Claims (10)

1. a kind of assembled road construction method, it is characterised in that comprise the following steps:
Treat to pave and carry out pavement detection, walking along the street face region division of going forward side by side;
It is prefabricated according to road surface region division progress paving in the prefabricated place in paving;
Excavator is treated to pave and abolished, and carries out basic unit's leveling;
The paving is lifted to and waits to pave by lifting machine by the hole for hoist on the prefabricated paving by region division;It is described pre- Assembled by seam construction in paving processed;
Grouting vehicle pump carries out injecting treatment to paving bottom.
2. assembled road construction method according to claim 1, it is characterised in that the pavement detection is used with lower section Method:
Test thickness in road surface is measured using supersonic array non-destructive detecting device, the equipment carries out absolute altitude using the method for spot scan Data are collected, and the scanning element spacing is incremented by using horizontal 20cm longitudinal directions 40cm;
Road pavement carries out core boring sampling, measures core sample thickness, and contrast core sample thickness is taken the mean with test thickness and is worth to road surface Designed elevation.
3. assembled pavement construction method according to claim 1, it is characterised in that the prefabricated paving passes through following step It is rapid to obtain:The prefabricated paving carried out according to region division to be paved it is prefabricated, the prefabricated paving be embedded with lifting leveling hole, Jointing apparatus, transmission rod, transmission rod groove and grouting pipe;
The cement concrete to stir is poured to the prefabricated paving, control blanking height, avoids blanking from impacting institute The position of preburied component and passage is offset;
Concrete is fully vibrated after pouring;
Surface groove is carried out after the prefabricated paving institute casting concrete initial set;
The prefabricated paving is placed on 5~65 DEG C of temperature completely after solidification, temperature changing speed is less than under 10 DEG C/h environment Row maintenance.
4. assembled road construction method according to claim 3, it is characterised in that the lifting leveling hole is arranged at institute Prefabricated paving corner is stated, the lifting leveling sky is provided with flange nut;The jointing apparatus in the prefabricated paving is that the conical surface is removable Seam component is unloaded, the seam component includes preburied component, connecting plate and dismountable cover plate.
5. assembled road construction method according to claim 1, it is characterised in that basic unit's leveling passes through following step It is rapid to implement:
Control excavator is purged to the road surface cubic metre of earth and stone after abolishing;
Grade stake is laid in setting position, absolute altitude is calibrated by spirit level;
The designed elevation part is higher by basic unit to clear up using electric pick;
Scraping device is set up, repair materials are partially filled with less than the designed elevation to basic unit;
Whole basic unit is struck off using scraping device, controls whole basic unit to be under the designed elevation.
6. assembled road construction method according to claim 1, it is characterised in that the prefabricated paving assembling use with Lower step:In the lifting leveling hole installation hoisting ring, the hoisting ring is threadedly coupled with the flange nut, and lifting machine passes through The hoisting ring is by assembly area belonging to the prefabricated paving lifting;
The prefabricated paving is placed in smooth good basic unit by lifting machine according to design direction by chain block;
Remove the hoisting ring to load leveling leading screw in the lifting leveling hole, set up spirit level;
Electric wrench rotates the leveling leading screw, and the prefabricated paving is jacked up, coordinates spirit level, first adjust by the leveling leading screw The leveling leading screw on the prefabricated paving diagonal, then leveling leading screw described in leveling the third angle, adjust the prefabricated paving To design height;
The connecting plate of the jointing apparatus is installed in the preburied component;Now the transmission rod, which coordinates, is attached to adjacent power transmission In bar groove, if adjacent road surface needs to drill out transmission rod groove in adjacent road surface side using drilling machine without transmission rod groove;
Slip casting machine injects fast setting concrete into the transmission rod groove.
7. assembled road construction method according to claim 1, it is characterised in that to the prefabricated paving bottom slip casting Using following methods:Slip casting machine injects slip casting by the grouting pipe, and the grouting pipe includes injected hole, guiding gutter and released Discharge hole;The prefabricated paving includes at least two grouting pipes;The temperature of the slip casting is at least 220 DEG C;The release Hole pulp or grouting pressure stop slip casting when being more than 0.5MPa.
8. assembled road construction method according to claim 3, it is characterised in that the prefabricated paving arrangement of reinforcement is two Bar-mat reinforcement, the bar-mat reinforcement are located at the top and bottom in the prefabricated paving respectively;Vibrations prison is provided with the prefabricated paving Light-metering cable, the vibration monitoring optical cable are fixed on the bar-mat reinforcement.
9. assembled road construction method according to claim 3, it is characterised in that the prefabricated slab bottom is provided with Contact sensing element.
10. a kind of assembled road, it is characterised in that the road occupation is applied according to claim 1~9 any claim Work method constructs to obtain.
CN201710766898.7A 2017-08-28 2017-08-28 A kind of assembled road construction method Pending CN107542017A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710766898.7A CN107542017A (en) 2017-08-28 2017-08-28 A kind of assembled road construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710766898.7A CN107542017A (en) 2017-08-28 2017-08-28 A kind of assembled road construction method

Publications (1)

Publication Number Publication Date
CN107542017A true CN107542017A (en) 2018-01-05

Family

ID=60958265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710766898.7A Pending CN107542017A (en) 2017-08-28 2017-08-28 A kind of assembled road construction method

Country Status (1)

Country Link
CN (1) CN107542017A (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108582414A (en) * 2018-04-27 2018-09-28 中铁四局集团有限公司 Construction method for prefabricating pavement precast block buckling mold
CN108625263A (en) * 2018-05-14 2018-10-09 刘刚 The pre-assembled device of pavement of road and its application method
CN108755325A (en) * 2018-05-25 2018-11-06 长安大学 A kind of cold area's assembled road and its construction method
CN108842558A (en) * 2018-07-04 2018-11-20 北京城建北方集团有限公司 Heavy concrete road surface can be had enough to meet the need
CN109797618A (en) * 2019-03-07 2019-05-24 临沂大学 A kind of intersection pavement structure quick-replaceable restorative procedure and device
CN110004791A (en) * 2019-04-19 2019-07-12 河北建设集团股份有限公司 A kind of prestressing without bondn assembled road and its construction method
CN110081960A (en) * 2019-03-26 2019-08-02 四川奇石缘科技股份有限公司 A kind of Prefabricated road vehicle dynamic weighing platform and its road construction installation method
CN110468647A (en) * 2019-05-13 2019-11-19 中国人民解放军军事科学院国防工程研究院工程防护研究所 A kind of levelling device and method based on precast concrete pavement slab
CN110644312A (en) * 2019-09-29 2020-01-03 上海隆基建设股份有限公司 Construction process of prefabricated runway panel of airport runway
CN110700061A (en) * 2019-10-22 2020-01-17 同济大学 Bottom grouting pressure maintaining device and system for assembled pavement slab
CN111041920A (en) * 2020-01-02 2020-04-21 四川恒增装配式建筑科技有限公司 Construction method for plate-type concrete prefabricated pavement
CN111041921A (en) * 2020-01-02 2020-04-21 四川恒增装配式建筑科技有限公司 Prefabricated road process construction method with load monitoring module
CN112144342A (en) * 2020-08-19 2020-12-29 中国一冶集团有限公司 Damaged pavement repairing plate structure and repairing method
CN112746543A (en) * 2020-12-21 2021-05-04 民航机场建设工程有限公司 Novel airport assembled pavement system and method
CN113026472A (en) * 2021-03-05 2021-06-25 长安大学 Intelligent cement concrete pavement structure based on piezoelectric effect and paving method thereof
CN113186769A (en) * 2021-04-22 2021-07-30 中冶南方城市建设工程技术有限公司 Assembled concrete pavement with convex falcon and construction method
CN113215914A (en) * 2021-05-31 2021-08-06 江西省宏顺建筑工程有限公司 Building pavement assembly type rapid repairing method
CN114032731A (en) * 2021-11-03 2022-02-11 中铁四局集团第一工程有限公司 Imitation reduction method for special road of automobile test yard
CN114293427A (en) * 2022-01-26 2022-04-08 中国电建集团昆明勘测设计研究院有限公司 Novel assembling type airport pavement system setting method
WO2023123687A1 (en) * 2021-12-30 2023-07-06 中国民航大学 Special device for integral plate replacement of cement concrete runway and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1145431A (en) * 1996-03-12 1997-03-19 西南工学院 Novel road and construction method thereof
CN101570949A (en) * 2009-05-04 2009-11-04 李嘉树 Method for fast paving urban road surfaces and special reinforced concrete block
CN102691255A (en) * 2012-06-16 2012-09-26 山西省交通科学研究院 Method for quickly repairing cement concrete pavement
CN104652210A (en) * 2015-03-13 2015-05-27 黄贺明 Assembled concrete traffic pavement and construction method thereof
CN104700624A (en) * 2015-03-16 2015-06-10 电子科技大学 Traffic flow online monitoring system and method based on phase-sensitive optical time domain reflectometer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1145431A (en) * 1996-03-12 1997-03-19 西南工学院 Novel road and construction method thereof
CN101570949A (en) * 2009-05-04 2009-11-04 李嘉树 Method for fast paving urban road surfaces and special reinforced concrete block
CN102691255A (en) * 2012-06-16 2012-09-26 山西省交通科学研究院 Method for quickly repairing cement concrete pavement
CN104652210A (en) * 2015-03-13 2015-05-27 黄贺明 Assembled concrete traffic pavement and construction method thereof
CN104700624A (en) * 2015-03-16 2015-06-10 电子科技大学 Traffic flow online monitoring system and method based on phase-sensitive optical time domain reflectometer

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108582414A (en) * 2018-04-27 2018-09-28 中铁四局集团有限公司 Construction method for prefabricating pavement precast block buckling mold
CN111893845A (en) * 2018-05-14 2020-11-06 杜春 Road pre-assembling device
CN108625263A (en) * 2018-05-14 2018-10-09 刘刚 The pre-assembled device of pavement of road and its application method
CN111893844A (en) * 2018-05-14 2020-11-06 杜春 Use method of road pavement preassembly device
CN108755325A (en) * 2018-05-25 2018-11-06 长安大学 A kind of cold area's assembled road and its construction method
CN108842558A (en) * 2018-07-04 2018-11-20 北京城建北方集团有限公司 Heavy concrete road surface can be had enough to meet the need
CN109797618A (en) * 2019-03-07 2019-05-24 临沂大学 A kind of intersection pavement structure quick-replaceable restorative procedure and device
CN110081960A (en) * 2019-03-26 2019-08-02 四川奇石缘科技股份有限公司 A kind of Prefabricated road vehicle dynamic weighing platform and its road construction installation method
CN110004791A (en) * 2019-04-19 2019-07-12 河北建设集团股份有限公司 A kind of prestressing without bondn assembled road and its construction method
CN110468647A (en) * 2019-05-13 2019-11-19 中国人民解放军军事科学院国防工程研究院工程防护研究所 A kind of levelling device and method based on precast concrete pavement slab
CN110644312A (en) * 2019-09-29 2020-01-03 上海隆基建设股份有限公司 Construction process of prefabricated runway panel of airport runway
CN110644312B (en) * 2019-09-29 2021-04-16 上海隆基建设股份有限公司 Construction process of prefabricated runway panel of airport runway
CN110700061A (en) * 2019-10-22 2020-01-17 同济大学 Bottom grouting pressure maintaining device and system for assembled pavement slab
CN111041920A (en) * 2020-01-02 2020-04-21 四川恒增装配式建筑科技有限公司 Construction method for plate-type concrete prefabricated pavement
CN111041921A (en) * 2020-01-02 2020-04-21 四川恒增装配式建筑科技有限公司 Prefabricated road process construction method with load monitoring module
CN112144342A (en) * 2020-08-19 2020-12-29 中国一冶集团有限公司 Damaged pavement repairing plate structure and repairing method
CN112746543A (en) * 2020-12-21 2021-05-04 民航机场建设工程有限公司 Novel airport assembled pavement system and method
CN112746543B (en) * 2020-12-21 2022-03-25 民航机场建设工程有限公司 Novel airport assembled pavement system
CN113026472A (en) * 2021-03-05 2021-06-25 长安大学 Intelligent cement concrete pavement structure based on piezoelectric effect and paving method thereof
CN113186769A (en) * 2021-04-22 2021-07-30 中冶南方城市建设工程技术有限公司 Assembled concrete pavement with convex falcon and construction method
CN113215914A (en) * 2021-05-31 2021-08-06 江西省宏顺建筑工程有限公司 Building pavement assembly type rapid repairing method
CN114032731A (en) * 2021-11-03 2022-02-11 中铁四局集团第一工程有限公司 Imitation reduction method for special road of automobile test yard
WO2023123687A1 (en) * 2021-12-30 2023-07-06 中国民航大学 Special device for integral plate replacement of cement concrete runway and construction method
CN114293427A (en) * 2022-01-26 2022-04-08 中国电建集团昆明勘测设计研究院有限公司 Novel assembling type airport pavement system setting method

Similar Documents

Publication Publication Date Title
CN107542017A (en) A kind of assembled road construction method
US9003720B2 (en) Method and apparatus for lifting and leveling a concrete panel
CN102352589B (en) Construction method for road base concrete side mold
US20150167260A1 (en) Method and apparatus for lifting and securing a concrete panel in place above a road bed
CN109610263B (en) Construction method of assembled construction access road
CN111501497B (en) Construction method for green upgrading and reconstruction of old cement concrete pavement
CN104452591B (en) A kind of construction of cast-in-situ box-beam technique that is applied to science of bridge building
CN106567410A (en) New construction method of municipal road inspection well
CN112211113A (en) Cast-in-place construction method for large-span diamond-shaped bent cap of high pier
CN111155430A (en) Road and bridge construction process
CN110682433A (en) Prefabricated stand column construction scheme
CN113152262A (en) Bridge single-column pier reinforcement construction method
CN111236089A (en) Uneven jacking system and uneven jacking construction method for existing bridge superstructure
CN108221533A (en) A kind of laying method in backroad face
CN110453592B (en) Bearing platform construction process method in prefabricated stand column range
CN110468729B (en) Construction method of frame bridge
CN113005908A (en) Installation method of overline overbridge
CN113585317B (en) Construction method for mucky soil support beam cushion layer
CN211872669U (en) Uneven jacking system of current bridge superstructure
CN113005903A (en) Grouting sleeve connection type bent cap assembling construction process
CN210712595U (en) Cement member crossing road
CN113186768A (en) Construction method for improving roadbed backfill quality after existing line demolition of frame structure
CN112761114A (en) Design and construction method for Bailey beam of aqueduct
CN112323548A (en) Tramcar municipal intersection bed board construction method
CN216712592U (en) Novel roadbed applying foamed light soil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180105

WD01 Invention patent application deemed withdrawn after publication