CN108221718A - The bridge pier small axial dimension deviation correcting device and method for correcting error of beam body transverse direction deviation - Google Patents

The bridge pier small axial dimension deviation correcting device and method for correcting error of beam body transverse direction deviation Download PDF

Info

Publication number
CN108221718A
CN108221718A CN201810179473.0A CN201810179473A CN108221718A CN 108221718 A CN108221718 A CN 108221718A CN 201810179473 A CN201810179473 A CN 201810179473A CN 108221718 A CN108221718 A CN 108221718A
Authority
CN
China
Prior art keywords
beam body
jack
deviation
bridge pier
transverse direction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810179473.0A
Other languages
Chinese (zh)
Inventor
王勇飞
戴小冬
谭超
龙海滨
罗强
张贵明
吴有松
刘汉彪
方鸿
李锦刚
张铭
徐亮
郭鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Provincial Communications Planning Survey and Design Institute Co Ltd
Original Assignee
Hunan Provincial Communications Planning Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Provincial Communications Planning Survey and Design Institute Co Ltd filed Critical Hunan Provincial Communications Planning Survey and Design Institute Co Ltd
Priority to CN201810179473.0A priority Critical patent/CN108221718A/en
Publication of CN108221718A publication Critical patent/CN108221718A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Abstract

The invention discloses a kind of bridge pier small axial dimension deviation correcting devices of beam body transverse direction deviation, including beetle haulage system, the beetle haulage system is installed in beam body and the bent cap for supporting beam body, the beetle haulage system includes translation jack, drag-line and the anchored end mounted on beam body deviation side, the translation jack is centre-hole jack, drag-line one end connection translation jack, the other end are anchored in the non-deviation side of bent cap by anchored end.The deviation correcting device has many advantages, such as that at low cost, the lateral stressed reasonable and stroke of rectifying a deviation of bridge pier is larger.The invention also discloses a kind of method for implementing correction using the deviation correcting device, which has many advantages, such as operating process simplicity and saving of work and time.

Description

The bridge pier small axial dimension deviation correcting device and method for correcting error of beam body transverse direction deviation
Technical field
The invention belongs to bridge maintenance field of reinforcement, and in particular to a kind of bridge pier small axial dimension of beam body transverse direction deviation is entangled Deflection device and method for correcting error.
Background technology
Bridge can be divided into five kinds of beam bridge, rigid frame bridge, arch bridge, cable-stayed bridge and suspension bridge primary structures by structure type.Its Middle beam bridge because it is at low cost, the completion time of project is short, good integrity, reasonable stress, span ability are big, in Urban Bridge and highway bridge In be able to extensive use.
For beam bridge, important component of the beam body as bridge structure is the main supporting member in bridge top, is vehicle Safety, cosily traveling provides channel.Beam body is during construction, operation, since external environment, natural calamity, automobile move Power load, bearing installation injustice, the factors such as beam bottom horizontal wall inscription, may cause beam body transverse direction deviation, this bridge defect it is gradual Accumulation, can cause the safety of bridge structure certain consequence.It is small, the comfort of driving is influenced, then gives people's lives and properties greatly Bring significant damage.Therefore, it is necessary to be adopted vigorous measures in time to cope with the beam body deviation disease being likely to occur, made with restoring it Use function.
Traditional replacing and rectificating method is typically first to be jacked beam body with jack, then fall reset.Above-mentioned traditional entangles Inclined repositioning method has following three:(1)It needs to set up falsework in bridge pier side, it is time-consuming;(2)Falsework Additional bracket basis is generally required, and when bridge pier is higher, stent needs to ensure because bearing the reaction force of pushing tow beam body Securely, reliably;(3)Belong to two independent structures between falsework and bridge pier, thrusting action power will pass to lower bridge Pier may cause bridge pier to crack, and be unfavorable for bridge pier stress, bring new disease.
In addition, the Chinese patent literature that document number is CN205188840U discloses a kind of bridge lateral pushing tow correction dress It puts, using lateral pushing jack, when beam body transverse direction deviation is larger, lateral deviation is more than laterally as lateral pushing equipment The rated travel of jack in actual mechanical process, needs steel cushion block of constantly jumping a queue between beam body and lateral jack, operation It is improper to be also possible to that beam body elastic reset is caused(It is returned to original position before beam body is rectified a deviation).In addition, this deviation correcting device needs Steel hoop is installed on pier stud, therefore, the method for this lateral pushing correction has certain limitation, it is impossible to be used in has nature Lateral deviation caused by the factors such as disaster is larger, situation beyond its stroke, it is therefore desirable to which existing deviation correcting device is changed Into to expand its use scope.
Invention content
Problem to be solved by this invention is, in view of the problems of the existing technology, provides that a kind of cost is relatively low, bridge pier is horizontal To reasonable stress and the bridge pier small axial dimension deviation correcting device of the larger beam body transverse direction deviation of stroke of rectifying a deviation, it is corresponding provide it is a kind of Operating process is easy, the method for the use of saving of work and time deviation correcting device implementation correction.
In order to solve the above technical problems, technical solution proposed by the present invention is:
A kind of bridge pier small axial dimension deviation correcting device of beam body transverse direction deviation, including beetle haulage system, the beetle haulage system is installed in On the bent cap of beam body and support beam body, the beetle haulage system includes translation jack, drag-line and the anchor mounted on beam body deviation side Fixed end, the translation jack is centre-hole jack, and drag-line one end connection translation jack, the other end passes through anchored end It is anchored in the non-deviation side of bent cap.
As a further improvement of the above technical scheme:
The anchored end includes anchor plate, channel steel box, U-shaped steel hoop, anchor plate and anchor bolt, and the anchor plate is fixed on lid On the outside of the Antivibration block of the non-deviation side end of beam, the channel steel box is fixed on the outside of anchor plate, and the U-shaped steel hoop is coated on Bent cap side is simultaneously fixed in channel steel box lower part with anchor bolt, and the drag-line penetrates channel steel box, is equipped between drag-line end and channel steel box Anchor plate.
Reaction frame is equipped between the translation jack and beam body deviation side, the reaction frame is of an L-shaped structure, and is coated on partially Position curb girder body side surface and lower surface.
Further include the jack for jack up girder, it is uniformly distributed on the bent cap to have multiple pinners, pinner upper table Middle face is equipped with bearing, and the jack is installed in pinner upper surface, positioned at at least side of bearing.
The slideway being installed on bearing is further included, the gradient of the slideway is identical with bent cap.
The slideway includes channel steel, steel plate, stainless steel plate and the polyethylene F4 plates arranged from bottom to top.
The coefficient of kinetic friction between the slideway and beam body bottom surface is 0.06~0.08.
Caging system is further included, caging system includes the cross spacing block set on the inside of Antivibration block.
The caging system further includes the longitudinal spacing block between slideway and jack.
A kind of method for correcting error of bridge pier small axial dimension deviation correcting device using beam body transverse direction deviation, the beam body are installed in On bent cap by bridge pier support, the pinner on bent cap is equipped with the bearing of support beam body, and the method for correcting error step is as follows:
(a)Preparation of construction:After suspending traffic, the expansion gap device between beam body and bent cap to be rectified a deviation manually is cut, and It is whole to take out expansion gap device, jack is installed;
(b)Set up hanger in the corresponding each bent cap side of beam body to be rectified a deviation, each jack synchronization of jacking up beam body is to setting Meter height, with bridge inspection vehicle installation beetle haulage system, slideway and caging system;
(c)The slow oil return of each oil pump of each jack, falls in beam body to slideway, reseting procedure complete monitoring;
(d)The slow oil inlet of jack is translated, after passage beam body translation resets, translates the slow oil return unloading of jack;
(e)Stop jacking after jack jack up girder to the height for meeting replacing time, remove beetle haulage system, slideway and limit Position system;
(f)Former bearing is removed one by one, and new bearing is installed to former support position;
(g)The slow oil return of jack oil pump falls beam to the complete stress of bearing, removes jack;
(h)The expansion gap device between beam body and bent cap is reinstalled, is resumed traffic.
Compared with prior art, the advantage of the invention is that:
The present invention replaces push mode to translate jack with centre-hole jack, and passage counter-force is acted on bent cap, realizes bridge pier The self-balancing of stress keeps out the stent for elapsing counter-force, and will not be to lower part bridge pier without more time and energy is spent to set up Structure generates damage;Remaining beam body at deviation beam body both ends will not be caused to generate lateral displacement during correction, position of rectifying a deviation Accurately;And jack is translated in the present invention and elapses beam body along drag-line, stroke range is big, extremely serious available for deviation situation Beam body, simple to operate without steel cushion block of jumping a queue, saving of work and time.
Description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is the present invention Some embodiments, for those of ordinary skill in the art, without creative efforts, can also basis These attached drawings obtain other attached drawings.
Fig. 1 is the schematic view of the mounting position of the self-balancing deviation-rectifying system of the beam body transverse direction deviation of the present invention.
Fig. 2 is the installation site vertical view of the self-balancing deviation-rectifying system of the beam body transverse direction deviation of the present invention.
Fig. 3 be the present invention beam body transverse direction deviation self-balancing deviation-rectifying system in anchored end structure diagram.
Fig. 4 be the present invention beam body transverse direction deviation self-balancing deviation-rectifying system in anchored end structure right view.
Fig. 5 be the present invention beam body transverse direction deviation self-balancing deviation-rectifying system in reaction frame schematic view of the mounting position.
Fig. 6 be the present invention beam body transverse direction deviation self-balancing deviation-rectifying system in jack installation site signal Figure.
Fig. 7 is the cross section structure schematic diagram of the self-balancing deviation-rectifying system middle slideway of the beam body transverse direction deviation of the present invention.
Marginal data:
1st, beam body;2nd, bent cap;21st, Antivibration block;22nd, pinner;23rd, bearing;3rd, beetle haulage system;31st, jack is translated;32nd, it draws Rope;33rd, anchored end;331st, anchor plate;332nd, channel steel box;333rd, U-shaped steel hoop;334th, anchor plate;335th, anchor bolt;34th, it is anti- Power frame;4th, jack;5th, slideway;51st, channel steel;52nd, steel plate;53rd, stainless steel plate;54th, polyethylene F4 plates;6th, limiting system System;61st, cross spacing block;62nd, longitudinal spacing block;7th, bridge pier;8th, hanger.
Specific embodiment
For the ease of understanding the present invention, done more entirely below in conjunction with Figure of description and preferred embodiment to inventing herein Face meticulously describes, but protection scope of the present invention is not limited to specific examples below.
Embodiment:
As depicted in figs. 1 and 2, the bridge pier small axial dimension deviation correcting device of the beam body transverse direction deviation of the present embodiment, including passage system System 3, beetle haulage system 3 are installed in beam body 1 and the bent cap 2 for supporting beam body 1, and beetle haulage system 3 is included mounted on 1 deviation side of beam body Jack 31, drag-line 32 and anchored end 33 are translated, translation jack 31 is centre-hole jack, and centre-hole jack will elapse anti- Power is acted on bent cap, realizes the self-balancing of bridge pier stress, and passage counter-force is kept out without more time and energy is spent to set up Stent, and damage will not be generated to lower part bridge pier structure;Remaining beam at deviation beam body both ends will not be caused during correction Body generates lateral displacement, and correction position is accurate;32 one end of drag-line connection translation jack 31, the other end are anchored by anchored end 33 In the non-deviation side of bent cap 2, beam body is elapsed along drag-line 32, stroke range is unrestricted, extremely serious available for deviation situation Beam body, simple to operate without steel cushion block of jumping a queue, saving of work and time.
In the present embodiment, as shown in Figure 3 and Figure 4, anchored end 33 includes anchor plate 331, channel steel box 332, U-shaped steel hoop 333rd, anchor plate 334 and anchor bolt 335, anchor plate 331 are fixed on 21 outside of Antivibration block of 2 non-deviation side end of bent cap, slot Steel box 332 is fixed on 331 outside of anchor plate, increases entire anchored end 33 and the contact area of bent cap 2, anchoring strength adds Greatly, U-shaped steel hoop 333 is coated on 332 lower part of channel steel box and is fixed on 2 side of bent cap with anchor bolt 335, further enhances anchoring The intensity at end 33, drag-line 32 penetrate channel steel box 332, and anchor plate 334 is equipped between 32 end of drag-line and channel steel box 332, makes drag-line 32 pushing reactions transmitted act on entire 2 end of bent cap, are more uniformly stressed.
In the present embodiment, as shown in Figure 2 and Figure 5, translation jack 31 and beam body is equipped with reaction frame 34 between 1 deviation side, Reaction frame 34 is of an L-shaped structure, and is coated on 1 side of deviation curb girder body and lower surface, make 1 deviation side of beam body by jacking force evenly, Reason jacking force active area is not too small and generate the situation of partial fracture.
In the present embodiment, as shown in Figure 2 and Figure 6, the jack 4 for jack up girder 1 is further included, on bent cap 2 Even to be laid with multiple pinners 22,22 upper surface middle part of pinner is equipped with bearing 23, and jack 4 is installed in 22 upper surface of pinner, Bearing 23 on the bent cap 2 at 1 middle part of beam body is middle bearing, and support reaction is larger, and jack should be set to bearing both sides, both ends Bent cap 2 on bearing 23 for side bearing, be set to side.
In the present embodiment, as depicted in figs. 1 and 2, the slideway 5 being installed on bearing 23,5 gradient of slideway and bent cap are further included 2 is identical, so that beam body 1 is more easy to reset with passage, slideway 5 includes channel steel 51, steel plate 52, the stainless steel plate 53 arranged from bottom to top With polyethylene F4 plates 54, the coefficient of kinetic friction between 1 bottom surface of slideway 5 and beam body is 0.06~0.08.
In the present embodiment, caging system 6 is further included, as depicted in figs. 1 and 2, caging system 6 includes being set on Antivibration block 21 Inside cross spacing block 61, beam body 1 after deviation rectification is made to ensure certain gap, and ensure beam body with Antivibration block 21 Internal force unloads and beam body rebound has certain space.
In the present embodiment, caging system 6 further includes the longitudinal spacing block 62 between slideway 5 and jack 4, indulges It is located at 1 lower section limitation beam body 1 of beam body to limited block 62 and generates length travel when laterally rectifying a deviation, between exists on the two vertical direction Gap generates interference increase resistance when the fast 55 pairs of beam bodies 1 of longitudinal spacing being avoided laterally to rectify a deviation.
The method for correcting error of the bridge pier small axial dimension deviation correcting device using beam body transverse direction deviation of the present embodiment, beam body 1 fill It is located on the bent cap 2 supported by bridge pier 7, the pinner 22 on bent cap 2 is equipped with the bearing 23 of support beam body 1, method for correcting error step It is rapid as follows:
(a)Preparation of construction:After suspending traffic, the expansion gap device between beam body 1 and bent cap 2 to be rectified a deviation manually is cut, And expansion gap device is integrally taken out, jack 4 is installed;
(b)Hanger 8, each 4 synchronization of jacking up beam body 1 of jack are set up in corresponding each 2 side of bent cap of beam body 1 to be rectified a deviation To design height, with bridge inspection vehicle installation beetle haulage system 3, slideway 5 and caging system 6;
(c)The slow oil return of each oil pump of each jack 4, falls in beam body 1 to slideway 5, reseting procedure complete monitoring;
(d)31 slow oil inlet of jack is translated, after the passage translation of beam body 1 resets, translates 31 slow oil return unloading of jack;
(e)Stop jacking after 4 jack up girder 1 to the height for meeting replacing time 23 of jack, remove beetle haulage system 3, slide Road 5 and caging system 6;
(f)Former bearing 23 is removed one by one, and new bearing 23 is installed to former 23 position of bearing;
(g)The slow oil return of 4 oil pump of jack falls beam to 23 complete stress of bearing, removes jack 4;
(h)The expansion gap device between beam body 1 and bent cap 2 is reinstalled, is resumed traffic.
The above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned implementation Example.For those skilled in the art, the obtained modifications and variations under the premise of the technical concept for not departing from the present invention Also it should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of bridge pier small axial dimension deviation correcting device of beam body transverse direction deviation, including beetle haulage system(3), the beetle haulage system (3)It is installed in beam body(1)With support beam body(1)Bent cap(2)On, it is characterised in that:The beetle haulage system(3)Including being mounted on Beam body(1)The translation jack of deviation side(31), drag-line(32)And anchored end(33), the translation jack(31)For punching Jack, the drag-line(32)One end connection translation jack(31), the other end passes through anchored end(33)It is anchored in bent cap(2)'s Non- deviation side.
2. the bridge pier small axial dimension deviation correcting device of beam body transverse direction deviation according to claim 1, it is characterised in that:It is described Anchored end(33)Including anchor plate(331), channel steel box(332), U-shaped steel hoop(333), anchor plate(334)And anchor bolt (335), the anchor plate(331)It is fixed on bent cap(2)The Antivibration block of non-deviation side end(21)Outside, the channel steel box (332)It is fixed on anchor plate(331)Outside, the U-shaped steel hoop(333)It is coated on channel steel box(332)Simultaneously use anchor bolt in lower part (335)It is fixed on bent cap(2)Side, the drag-line(32)Penetrate channel steel box(332), drag-line(32)End and channel steel box(332) Between be equipped with anchor plate(334).
3. the bridge pier small axial dimension deviation correcting device of beam body transverse direction deviation according to claim 1, it is characterised in that:It is described Translate jack(31)And beam body(1)Reaction frame is equipped between deviation side(34), the reaction frame(34)It is of an L-shaped structure, coats In deviation curb girder body(1)Side and lower surface.
4. the bridge pier small axial dimension deviation correcting device of beam body transverse direction deviation according to claim 1, it is characterised in that:Also wrap It includes for jack up girder(1)Jack(4), the bent cap(2)It is above uniformly distributed to have multiple pinners(22), pinner(22) Upper surface middle part is equipped with bearing(23), the jack(4)It is installed in pinner(22)Upper surface, positioned at bearing(23)Extremely Few side.
5. the bridge pier small axial dimension deviation correcting device of beam body transverse direction deviation according to claim 4, it is characterised in that:Also wrap It includes and is installed in bearing(23)On slideway(5), the slideway(5)The gradient and bent cap(2)It is identical.
6. the bridge pier small axial dimension deviation correcting device of beam body transverse direction deviation according to claim 5, it is characterised in that:It is described Slideway(5)Including the channel steel arranged from bottom to top(51), steel plate(52), stainless steel plate(53)With polyethylene F4 plates(54).
7. the bridge pier small axial dimension deviation correcting device of beam body transverse direction deviation according to claim 5 or 6, it is characterised in that: The slideway(5)With beam body(1)The coefficient of kinetic friction between bottom surface is 0.06~0.08.
8. the bridge pier small axial dimension deviation correcting device of beam body transverse direction deviation according to claim 2, it is characterised in that:Also wrap Include caging system(6), caging system(6)Including being set on Antivibration block(21)Inside cross spacing block(61).
9. the bridge pier small axial dimension deviation correcting device of beam body transverse direction deviation according to claim 8, it is characterised in that:It is described Caging system(6)It further includes set on slideway(5)And jack(4)Between longitudinal spacing block(62).
10. a kind of method for correcting error of bridge pier small axial dimension deviation correcting device using beam body transverse direction deviation, the beam body(1)Installing By bridge pier(7)The bent cap of support(2)On, bent cap(2)On pinner(22)It is equipped with support beam body(1)Bearing(23), should Method for correcting error step is as follows:
(a)Preparation of construction:After suspending traffic, manually cut positioned at beam body to be rectified a deviation(1)And bent cap(2)Between expansion joint dress It puts, and integrally takes out expansion gap device, jack is installed(4);
(b)In beam body to be rectified a deviation(1)Corresponding each bent cap(2)Set up hanger in side(8), each jack(4)It is synchronous Jack up girder(1)To design height, beetle haulage system is installed with bridge inspection vehicle(3), slideway(5)And caging system(6);
(c)Each jack(4)The slow oil return of each oil pump, fall beam body(1)To slideway(5)On, reseting procedure whole process prison Control;
(d)Translate jack(31)Slow oil inlet elapses beam body(1)After translation resets, jack is translated(31)Slow oil return is unloaded Lotus;
(e)Jack(4)Jack up girder(1)To meeting replacing time(23)Height after stop jacking, remove passage system System(3), slideway(5)And caging system(6);
(f)By former bearing(23)It removes one by one, and by new bearing(23)It installs to former bearing(23)Position;
(g)Jack(4)The slow oil return of oil pump, falls beam to bearing(23)Complete stress removes jack(4);
(h)It reinstalls positioned at beam body(1)And bent cap(2)Between expansion gap device, resume traffic.
CN201810179473.0A 2018-03-05 2018-03-05 The bridge pier small axial dimension deviation correcting device and method for correcting error of beam body transverse direction deviation Pending CN108221718A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810179473.0A CN108221718A (en) 2018-03-05 2018-03-05 The bridge pier small axial dimension deviation correcting device and method for correcting error of beam body transverse direction deviation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810179473.0A CN108221718A (en) 2018-03-05 2018-03-05 The bridge pier small axial dimension deviation correcting device and method for correcting error of beam body transverse direction deviation

Publications (1)

Publication Number Publication Date
CN108221718A true CN108221718A (en) 2018-06-29

Family

ID=62666803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810179473.0A Pending CN108221718A (en) 2018-03-05 2018-03-05 The bridge pier small axial dimension deviation correcting device and method for correcting error of beam body transverse direction deviation

Country Status (1)

Country Link
CN (1) CN108221718A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356042A (en) * 2018-10-15 2019-02-19 浙江交工集团股份有限公司 A kind of replacing and rectificating method after pier slope
CN115492005A (en) * 2022-09-16 2022-12-20 广东长大道路养护有限公司 Bridge body sliding and resetting method

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007063797A (en) * 2005-08-30 2007-03-15 Oriental Construction Co Ltd Extruding erection method for bridge
CN102785290A (en) * 2011-05-19 2012-11-21 中铁二十三局集团轨道交通工程有限公司 Core-penetrating pull-type pedestal for pre-tensioned pre-stressing U-shaped beam and construction method thereof
CN102953348A (en) * 2012-12-12 2013-03-06 重庆桥都桥梁技术有限公司 Correcting and resetting method for pier stud of bridge
CN103821090A (en) * 2014-02-27 2014-05-28 武汉中交试验检测加固工程有限责任公司 Deviation correcting and resetting method for inclined bridge pier
CN103821092A (en) * 2014-02-27 2014-05-28 武汉中交试验检测加固工程有限责任公司 Deviation correcting and resetting method for transverse deviation of beam bodies of beam bridge
CN104963291A (en) * 2015-07-13 2015-10-07 上海天演建筑物移位工程股份有限公司 Transverse deviation correcting device and method for bridge lifting
CN105908635A (en) * 2016-06-28 2016-08-31 湖南路桥建设集团有限责任公司 Intelligent synchronous moving forward system for multiple main truss hanging baskets and construction method
CN205636520U (en) * 2016-05-05 2016-10-12 中国葛洲坝集团第二工程有限公司 Jack top pushes away and hangs basket device that moves ahead
JP2016194229A (en) * 2015-04-01 2016-11-17 大成建設株式会社 Extrusion-erection method
CN106193643A (en) * 2016-07-20 2016-12-07 东南大学 A kind of Prestressed CFRP plate stretching and anchoring device of reinforcing steel beam and combination beam
CN206173809U (en) * 2016-09-18 2017-05-17 中国铁建大桥工程局集团有限公司 A reaction frame device of rectifying for bridge incremental launching construction
CN206189270U (en) * 2016-11-22 2017-05-24 中交第二航务工程局有限公司 Integral pulling and track set stay knot structure
CN206256393U (en) * 2016-12-12 2017-06-16 中铁上海工程局集团第五工程有限公司 A kind of ejection hanging-basket walking device
CN207974028U (en) * 2018-03-05 2018-10-16 湖南省交通规划勘察设计院有限公司 The bridge pier small axial dimension deviation correcting device of beam body transverse direction deviation

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007063797A (en) * 2005-08-30 2007-03-15 Oriental Construction Co Ltd Extruding erection method for bridge
CN102785290A (en) * 2011-05-19 2012-11-21 中铁二十三局集团轨道交通工程有限公司 Core-penetrating pull-type pedestal for pre-tensioned pre-stressing U-shaped beam and construction method thereof
CN102953348A (en) * 2012-12-12 2013-03-06 重庆桥都桥梁技术有限公司 Correcting and resetting method for pier stud of bridge
CN103821090A (en) * 2014-02-27 2014-05-28 武汉中交试验检测加固工程有限责任公司 Deviation correcting and resetting method for inclined bridge pier
CN103821092A (en) * 2014-02-27 2014-05-28 武汉中交试验检测加固工程有限责任公司 Deviation correcting and resetting method for transverse deviation of beam bodies of beam bridge
JP2016194229A (en) * 2015-04-01 2016-11-17 大成建設株式会社 Extrusion-erection method
CN104963291A (en) * 2015-07-13 2015-10-07 上海天演建筑物移位工程股份有限公司 Transverse deviation correcting device and method for bridge lifting
CN205636520U (en) * 2016-05-05 2016-10-12 中国葛洲坝集团第二工程有限公司 Jack top pushes away and hangs basket device that moves ahead
CN105908635A (en) * 2016-06-28 2016-08-31 湖南路桥建设集团有限责任公司 Intelligent synchronous moving forward system for multiple main truss hanging baskets and construction method
CN106193643A (en) * 2016-07-20 2016-12-07 东南大学 A kind of Prestressed CFRP plate stretching and anchoring device of reinforcing steel beam and combination beam
CN206173809U (en) * 2016-09-18 2017-05-17 中国铁建大桥工程局集团有限公司 A reaction frame device of rectifying for bridge incremental launching construction
CN206189270U (en) * 2016-11-22 2017-05-24 中交第二航务工程局有限公司 Integral pulling and track set stay knot structure
CN206256393U (en) * 2016-12-12 2017-06-16 中铁上海工程局集团第五工程有限公司 A kind of ejection hanging-basket walking device
CN207974028U (en) * 2018-03-05 2018-10-16 湖南省交通规划勘察设计院有限公司 The bridge pier small axial dimension deviation correcting device of beam body transverse direction deviation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356042A (en) * 2018-10-15 2019-02-19 浙江交工集团股份有限公司 A kind of replacing and rectificating method after pier slope
CN115492005A (en) * 2022-09-16 2022-12-20 广东长大道路养护有限公司 Bridge body sliding and resetting method

Similar Documents

Publication Publication Date Title
CN107143145B (en) A kind of steel truss structure segmentation overhead connection and synchronous discharging method
CN107060105B (en) A kind of lifting construction method of multiple steel vestibules between high building
CN101230563B (en) Method for replacing bridge bearing without traffic interruption and special device thereof
CN102953348A (en) Correcting and resetting method for pier stud of bridge
CN108221718A (en) The bridge pier small axial dimension deviation correcting device and method for correcting error of beam body transverse direction deviation
CN207974028U (en) The bridge pier small axial dimension deviation correcting device of beam body transverse direction deviation
CN102477717A (en) Bridge pushing construction method
CN103437300A (en) Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket
CN109629461A (en) A method of it does not break off a friendship and carries out cast-in-situ box girder reset and bearing replacement
CN108179816A (en) A kind of deviation sliding and lifting device and method
CN103469725B (en) Bridge construction breaking joint dislocation expansion joint structure
EP2631424A1 (en) Support structure
CN210216183U (en) Deviation brake for continuous bridge junction pier
CN204491429U (en) Adjustable synchronization of jacking up composite steel tunnel support
KR100865752B1 (en) Shift method of bridge bearing of railroad
CN112627068B (en) Bridge support replacing auxiliary device and replacing method thereof
CN110219234A (en) Temperature self-adaptation tower Liang Shunqiao is to constant temperature reinforcing pull rod constrained procedure and system
CN215252357U (en) Longitudinal pushing and resetting device for beam body
CN211897673U (en) Road and bridge crack reinforced structure
JP2003206509A (en) Function change repair construction method for existing elastic support
CN208201670U (en) A kind of assembled T-type back liter auxiliary steel member
CN209259460U (en) Anti- staircase drop device
CN106049279A (en) Cable anchor structure in steel box girder
CN112240007A (en) Temporary support tool for replacing bridge tension and compression support and replacement construction method thereof
JP2000008323A (en) Repair construction method for existing bridge supporting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination