CN108206484A - A kind of follow-on power cable installation equipment - Google Patents

A kind of follow-on power cable installation equipment Download PDF

Info

Publication number
CN108206484A
CN108206484A CN201711130702.1A CN201711130702A CN108206484A CN 108206484 A CN108206484 A CN 108206484A CN 201711130702 A CN201711130702 A CN 201711130702A CN 108206484 A CN108206484 A CN 108206484A
Authority
CN
China
Prior art keywords
chamber
face
sliding seat
slides
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711130702.1A
Other languages
Chinese (zh)
Other versions
CN108206484B (en
Inventor
余强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Pengyu Hydraulic Technology Co.,Ltd.
Original Assignee
Guangzhou King Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou King Intelligent Technology Co Ltd filed Critical Guangzhou King Intelligent Technology Co Ltd
Priority to CN201711130702.1A priority Critical patent/CN108206484B/en
Publication of CN108206484A publication Critical patent/CN108206484A/en
Application granted granted Critical
Publication of CN108206484B publication Critical patent/CN108206484B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/08Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00Rotary drilling
    • E21B3/02Surface drives for rotary drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterized by means for land transport with their own drive, e.g. skid mounting or wheel mounting

Abstract

The invention discloses a kind of follow-on power cable installation equipment, slide the mounting frame on the trolley rack including trolley rack and up and down, the regulation and control slot of opening to the right is provided in the trolley rack, cooperation is slided in the regulation and control slot, and skid is installed, the cooperation of spiral shell shape is equipped with the spiral shell shape column for setting of extending up and down in the skid, the spiral shell shape column bottom extension section is rotatably assorted with the regulation and control slot bottom end wall and connect, the spiral shell shape column top extension Duan Yuzhu drives row machine and is connected, the main drive row machine outer surface is mounted in the regulation and control slot upper inside walls and secure fit connects, the sliding seat right part end face is fixedly mounted with the mounting frame, the receiving chamber for setting of extending upwards is equipped in the mounting frame bottom end face, the receiving intracavitary, which slides, is connected with sliding seat;The configuration of the present invention is simple, it is easy to operate, it improves the planing stability up and down of sliding seat and improves the safety for digging drilling and working efficiency.

Description

A kind of follow-on power cable installation equipment
Technical field
The present invention relates to road cable mounting technique field, specifically a kind of follow-on power cable installation equipment.
Background technology
During work about electric power, it usually needs cable be laid in ground, is needed on the ground before cable laying Cut a groove that can accommodate cable, the prior art to dig the equipment of hook groove its structure too complex, and Service efficiency is low.
Invention content
The technical problems to be solved by the invention are to provide a kind of follow-on power cable installation equipment, can solve The problems in above-mentioned present technology.
The present invention is achieved through the following technical solutions:The power cable installation of a modification of the present invention type is set It is standby, the mounting frame on the trolley rack is slided including trolley rack and up and down, opening is provided in the trolley rack Regulation and control slot to the right slides cooperation in the regulation and control slot and is equipped with skid, in the skid cooperation of spiral shell shape be equipped with up and down Extend the spiral shell shape column set, and the spiral shell shape column bottom extension section is rotatably assorted with the regulation and control slot bottom end wall and connect, the spiral shell shape Extension Duan Yuzhu in column top drives row machine and is connected, the main drive row machine outer surface be mounted in the regulation and control slot upper inside walls and Secure fit connects, and the sliding seat right part end face is fixedly mounted with the mounting frame, in the mounting frame bottom end face Receiving chamber equipped with upward setting of extending, the receiving intracavitary, which slides, is connected with sliding seat, at left and right sides of the receiving chamber It is communicated respectively in inner wall equipped with the first spring return device and the second spring return device, the first spring return device top The mounting frame inner wall in sliding the pressurizing unit of mating connection, institute with the first spring return device extruding It states first for extending at sliding seat inside top position equipped with left and right and setting and slides chamber, described first, which slides intracavitary, slides cooperation company The first sliding block is connected to, the first sliding block left side end is installed with the locking lever for setting of extending to the left, the locking lever Left side extension end is through outer end face on the left of the sliding seat and slides mating connection, spiral shell in the first sliding block right end face Shape is connected with the first spiral shell shape bar of setting of extending to the right, and row machine is driven in extension end with first on the right side of the first spiral shell shape bar It is connected, drift slot is equipped in the first sliding block bottom end face, described first slides in the sliding seat on the downside of chamber Chamber is slided equipped with second, the described second interior be equipped with of the sliding seat for sliding on the downside of chamber is worn up to chamber, and described second slides intracavitary cunning Row is connected with connection sliding block, and the connection sliding block top end surface is installed with the body of rod for setting of extending upwards, the bar Extension end slides chamber and described second through described first and slides the sliding seat inner wall between chamber and slide at the top of body It is connected, extension end, which is installed with to put in the drift slot and squeeze, at the top of the body of rod slides the oblique of mating connection Portion, the connection sliding block left bottom end face and described second slide and are equipped with the first spring element, institute on the left of chamber between inner bottom wall The installing plate that connection sliding block bottom right side end face is installed with setting of extending downwards is stated, the installing plate bottom extension section runs through institute State second slide chamber and it is described wear up to the sliding seat inner wall between chamber and slide mating connection, the installing plate bottom end The second drive row machine is installed in face, the second drive row motor spindle end, which is connected with, puts in first taper worn up to intracavitary It takes turns, the cutting structure being equipped with up to intracavitary to be connected with first taper cone pulley is worn described on the left of first taper cone pulley Part is additionally provided with illumination apparatus in the mounting frame.
Preferably technical solution, the first drive row machine outer surface are installed on described first and slide on the right side of chamber in inner wall And it is fixedly connected.
Preferably technical solution, the first spring return device, which includes communicating, to be arranged in the receiving chamber left side The first guide groove in wall and the first guide pad for being connected and being arranged in first guide groove is slided, described first leads Into first guide groove of block bottom, extrusion fit is connected with the second spring element, is set in the first guide pad right end face There is the locking hole for setting of extending to the left;The second spring return device, which includes communicating, is arranged on inner wall on the right side of the receiving chamber Interior the second guide groove and slide that mating connection is arranged in second guide groove and left side end and the sliding seat are right Second guide pad of side end face secure fit connection, in second guide groove of the second guide pad bottom extrusion fit connect Third spring element is connected to, interior be equipped with of inner wall is locked to be squeezed with the second guide pad bottom end face on the right side of second guide groove Surely the locking component being connected.
Preferably technical solution, the pressurizing unit include communicating being arranged in the first guide groove inner roof wall Cavity and clearance fit connection are arranged on the extruding eccentric wheel in the cavity, and being installed with left and right on the extruding eccentric wheel prolongs The steering shaft of setting is opened up, extension end is connected with third drive row machine on the left of the steering shaft, and the third drives row machine appearance Face is installed in the cavity inner left wall and is fixedly connected, extension end and inner wall on the right side of the cavity on the right side of the steering shaft Be rotatably assorted connection.
Preferably technical solution, the component of digging are arranged on the cutting brill worn up to intracavitary including extension up and down Hole head and circumferentially fixed the second taper cone pulley being arranged on the cutting drill head outer surface, the cutting drill head top are prolonged Exhibition end with it is described wear to be rotatably assorted up to intracavitary roof connect, the cutting drill head bottom extension section runs through the sliding seat Bottom end face and the connection that is rotatably assorted, the cutting drill head bottom extension end are grown outside the bottom end face of the sliding seat.
Preferably technical solution, the illumination apparatus include being fixed at the both sides of the mounting frame bottom end Lamp holder at position, is equipped with energy-saving lamp in the lamp holder inside, the bottom surface of the energy-saving lamp under the mounting frame Bottom surface is concordant.
The beneficial effects of the invention are as follows:The configuration of the present invention is simple, it is easy to operate, divided in inner wall at left and right sides of chamber by receiving It does not communicate and sets the first spring return device and the second spring return device, the mounting frame inner wall at the top of the first spring return device In vivo to slide the pressurizing unit of mating connection with the extruding of the first spring return device, sliding seat inside top sets a left side at position Right first set of extending slides chamber, and first, which slides intracavitary, slides first sliding block that is connected, the first sliding block left side end The locking lever of fixed setting of extending to the left, locking lever left side extension end is through outer end face on the left of sliding seat and slides cooperation company It connects, the mating connection of the first sliding block right end face inner spiral is extended the first spiral shell shape bar of setting to the right, on the right side of the first spiral shell shape bar Extension end drives row machine with first and is connected, and sets drift slot in the first sliding block bottom end face, first slides the cunning on the downside of chamber Second is set in row seat and slides chamber, second slides to set in the sliding seat on the downside of chamber and wear up to chamber, and second, which slides intracavitary, slides mating connection Sliding block is connected, the body of rod of the fixed upward setting of extending of connection sliding block top end surface, body of rod top extension end runs through first It slides chamber and second to slide the sliding seat inner wall between chamber and slide mating connection, extension end is fixed at the top of the body of rod puts in tiltedly In shape slot and the oblique portion for sliding mating connection is squeezed, inner bottom wall on the left of chamber is slided in connection sliding block left bottom end face with second Between set the first spring element, the installing plate of the fixed downward setting of extending in connection sliding block bottom right side end face, installing plate bottom is prolonged Exhibition section slides chamber through second and wears up to the sliding seat inner wall between chamber and slide mating connection, solid in installing plate bottom end face If second drives row machine, the second drive row motor spindle end connection puts in the first taper cone pulley worn up to intracavitary, on the left of the first taper cone pulley Wear up to intracavitary and set cutting component to be connected with the first taper cone pulley, can realize automatically control the first spring return device with The guiding of second spring return device and sliding seat slides cooperation, improves the planing stability up and down of sliding seat, meanwhile, pass through lock Gu the locking and unlock of component and the second guide pad are connected, trolley rack is made to improve sliding seat in mobile transportational process Stability, can realize automatically control dig boring work transmission and driving work, improve dig drilling safety and Working efficiency.
Description of the drawings
For ease of explanation, the present invention is described in detail by following specific embodiment and attached drawing.
Fig. 1 is that the power cable of a modification of the present invention type installs device external overall structure diagram;
Fig. 2 is that the power cable of a modification of the present invention type installs overall structure diagram inside equipment;
Fig. 3 is overall structure diagram inside the sliding seat of the present invention.
Specific embodiment
As shown in Figure 1, Figure 2 and Figure 3, a modification of the present invention type power cable installation equipment, including trolley rack 7 with And the mounting frame 6 on the trolley rack 7 is slided up and down, the regulation and control slot of opening to the right is provided in the trolley rack 7 71, cooperation being slided in the regulation and control slot 71, skid 72 being installed, the cooperation of spiral shell shape is equipped in the skid 72 extends up and down The spiral shell shape column 73 of setting, the 73 bottom extension section of spiral shell shape column are rotatably assorted with regulation and control 71 base end wall of slot and connect, the spiral shell 73 top extension Duan Yuzhu of shape column drives row machine 74 and is connected, and main 74 outer surface of drive row machine is mounted on the regulation and control slot 71 In the inner wall of side and secure fit connects, and the 72 right part end face of sliding seat is fixedly mounted with the mounting frame 6, the installing frame The receiving chamber 64 for setting of extending upwards is equipped in 6 bottom end face of body, is slided in the receiving chamber 64 and is connected with sliding seat 5, It is communicated respectively equipped with the first spring return device and the second spring return device in receiving 64 left and right sides inner wall of chamber, it is described It is slided in 6 inner wall of the mounting frame at the top of first spring return device to be squeezed with the first spring return device The pressurizing unit of mating connection is equipped with left and right at the 5 inside top position of sliding seat and extends and the first of setting slides chamber 51, institute It states first and slides to slide in chamber 51 and be connected with the first sliding block 510, the 510 left side end of the first sliding block is fixed oriented Extend the locking lever 514 of setting in left side, the 514 left side extension end of locking lever through the 5 left side outer end face of sliding seat and Mating connection is slided, the 510 right end face inner spiral of the first sliding block is connected with the first spiral shell of setting of extending to the right Shape bar 512, the 512 right side extension end of the first spiral shell shape bar are connected with the first drive row machine 513, first sliding block It is equipped with drift slot 511 in 510 bottom end faces, described first slides in the sliding seat 5 of 51 downside of chamber and slide chamber equipped with second 52, described second slides to be equipped in the sliding seat 5 of the downside of chamber 52 and wears up to chamber 53, and described second slides cooperation is slided in chamber 52 Connection sliding block 520 is connected with, connection 520 top end surface of sliding block is installed with the body of rod 521 for setting of extending upwards, described Chamber 51 and described second is slided through described first and is slided in the sliding seat 5 between chamber 52 in 521 top extension end of the body of rod Wall body and mating connection is slided, the 521 top extension end of the body of rod is installed with to put in the drift slot 511 and squeeze and slide Bottom in 52 left side of chamber is slided in the oblique portion 5210 being connected, the connection 520 left bottom end face of sliding block with described second The first spring element 522 is equipped between wall, 520 bottom right side end face of the connection sliding block is installed with the installation for setting of extending downwards Plate 523, the 523 bottom extension section of installing plate slide chamber 52 through described second and described wear up to sliding described between chamber 53 Seat and slides mating connection at 5 inner walls, is installed with the second drive row machine 5230 in 523 bottom end face of installing plate, and described second 5230 bottom end of drive row machine, which is connected with, puts in described wear up to the first taper cone pulley 5231 in chamber 53, first taper cone pulley 5231 The described of left side is worn up to the interior cutting component being equipped with to be connected with first taper cone pulley 5231 of chamber 53, the installing frame Illumination apparatus is additionally provided in body 6.
Valuably, 513 outer surface of the first drive row machine is installed on described first and slides in 51 right side inner wall of chamber and fix Connection.
Valuably, the first spring return device includes communicating first be arranged in receiving 64 inner left wall of chamber It guide groove 62 and slides to be connected and is arranged on the first guide pad 620 in first guide groove 62, described first is oriented to Extrusion fit is connected with the second spring element 621 in first guide groove 62 of 620 bottom of block, and first guide pad 620 is right The locking hole 6201 for setting of extending to the left is equipped in side end face;The second spring return device include communicating be arranged on it is described It the second guide groove 61 in receiving 64 right side inner wall of chamber and slides mating connection and is arranged in second guide groove 61 and left The second guide pad 610 that side end is connect with the 5 right end face secure fit of sliding seat, 610 bottom of the second guide pad Second guide groove 61 in extrusion fit be connected with third spring element 611, set in the 61 right side inner wall of the second guide groove There is the locking component 65 to be connect with 610 bottom end face of the second guide pad extruding lock fit, so as to fulfill automatic control The guiding for making the first spring return device and the second spring return device and sliding seat 5 slides cooperation, improves the upper and lower of sliding seat 5 Planing stability, meanwhile, it is connected by the locking and unlock of locking component 65 and second guide pad 610, makes to push away Vehicle frame 7 improves the stability of sliding seat 5 in mobile transportational process.
Valuably, the pressurizing unit include communicating the cavity 63 that is arranged in 62 inner roof wall of the first guide groove and Clearance fit connection is arranged on the extruding eccentric wheel 632 in the cavity 63, and being installed with left and right on the extruding eccentric wheel 632 prolongs The steering shaft 631 of setting is opened up, the 631 left side extension end of steering shaft drives row machine 633 with third and is connected, and the third is driven 633 outer surface of row machine is installed in 63 inner left wall of cavity and is fixedly connected, the 631 right side extension end of steering shaft with The 63 right side inner wall of cavity is rotatably assorted connection, and the first bullet is driven so as to fulfill by the extruding eccentric wheel 632 in pressurizing unit The first guide pad 620 in power recovery device is realized slides work above and below reciprocal.
Valuably, the cutting component include extension up and down be arranged on it is described wear up to the cutting drill head 531 in chamber 53 with And circumferentially fixed the second taper cone pulley 532 being arranged on 531 outer surface of the cutting drill head, the cutting drill head 531 are pushed up Portion extension end with it is described wear to be rotatably assorted up to 53 inner roof wall of chamber connect, the cutting drill head 531 bottom extension section runs through institute It states the bottom end face of sliding seat 5 and the connection that is rotatably assorted, 531 bottom extension end of the cutting drill head grows the sliding seat Outside 5 bottom end face, so as to fulfill the transmission for digging boring work and driving work is automatically controlled, the peace for digging drilling is improved Full property and working efficiency.
Valuably, the illumination apparatus includes being fixed at the lamp at two side positions of 6 bottom end of mounting frame Seat 66 is equipped with energy-saving lamp 67, the bottom surface of the energy-saving lamp 67 and the bottom of the mounting frame 6 in 66 inside of lamp holder Face is concordant, by the setting of illumination apparatus so as to which the present apparatus be facilitated to be used in the case of dark, increases working efficiency.
During original state, third drives row machine 633 and controls steering shaft 631 that extruding eccentric wheel 632 is driven to rotate, and makes extruding eccentric Protrusion on wheel 632 is utmostly far from the first guide groove 62, at this point, the first guide pad 620 is by the second spring element 621 Extruding force is slided to the top position in the first guide groove 62, meanwhile, the second guide pad 610 is squeezed by third spring element 611 Pressure makes the second guide pad 610 slide to the top position in the second guide groove 61, meanwhile, it is driven by the second guide pad 610 Sliding seat 5 is slided to the top position in receiving chamber 64, at this point, sliding seat 5 is made to drive the cutting drilling below top end surface First 531 are fully located in receiving chamber 64, meanwhile, the first sliding block 510 is made to be located at first and slides right-most position in chamber 51, this When, the locking lever 514 at left side end is driven to be fully located at the inner left wall body of sliding seat 5 by the first sliding block 510 and make locking 514 left side end of bar is in relative status with locking hole 6201, meanwhile, connection sliding block 520 is squeezed by the first spring element 522 Power makes connection sliding block 520 slide to second and slides top position in chamber 52, at this point, driving top by connection sliding block 520 The oblique portion 5210 at the 521 top end of the body of rod 521 and the body of rod in portion, which utmostly slips into drift slot 511 and squeezes to slide, matches Connection is closed, meanwhile, the installing plate 523 of bottom right side is driven utmostly to put in second by connection sliding block 520 and slided in chamber 52, At this point, first taper cone pulley 5231 at bottom end is driven utmostly to keep away from chisel drill head 531 by installing plate 523.
When needing to dig boring work, the first spiral shell shape bar 512 is driven to rotate by the first drive row machine 513 first, by the One spiral shell shape bar 512 drives the first sliding block 510 gradually to slide the left direction in chamber 51 along first and slides, at this point, being slided by first Row block 510 drives the locking lever 514 on the end of left side gradually to put in locking hole 6201, meanwhile, by 510 bottom of the first sliding block Drift slot 511 in end face squeezes with oblique portion 5210 and slides mating connection, at this point, by oblique portion 5210 drive the body of rod 521 with And the connection sliding block 520 at 521 bottom end of the body of rod gradually overcomes 522 extruding force of the first spring element, and gradually slided along second Bottom direction in chamber 52 slides, meanwhile, 523 bottom end of installing plate is driven gradually to put in by connection sliding block 520 and worn up to chamber In 53, at this point, the first taper cone pulley 5231 on 523 bottom end of installing plate is made to move closer to the second taper cone pulley 532, until first Sliding block 510 slide to first slide the left-most position in chamber 51 when, at this point, by the first sliding block 510 drive left side end Locking lever 514 utmostly put in locking hole 6201, meanwhile, make 510 bottom end face of the first sliding block and oblique portion 5210 Top end squeezes and slides mating connection, is slided at this point, oblique portion 5210 is made to skid off first by the extruding completely of the first sliding block 510 In chamber 51, meanwhile, the connection sliding block 520 for driving 521 bottom end of the body of rod 521 and the body of rod by oblique portion 5210 overcomes first 522 extruding force of spring element utmostly slides to second and slides bottom position in chamber 52, at this point, by 520 band of connection sliding block The 523 bottom end of installing plate of dynamic bottom right side, which is utmostly put in, wears up in chamber 53, and make on 523 bottom end of installing plate 532 at a fully engaged connection of first taper cone pulley 5231 and the second taper cone pulley, then by controlling 65 and second guide pad of locking component 610 completely disengage, at this point, the second drive row of control machine 5230 drives the first taper cone pulley 5231 to rotate, and then by the first taper cone pulley Cutting drill head 531 on 5231 the second taper cone pulleies 532 of drive and the second taper cone pulley 532 rotates, meanwhile, row machine is driven by third Extruding eccentric wheel 632 in 633 drive steering shafts 631 and steering shaft 631 rotates, by the protrusion on extruding eccentric wheel 632 Mating connection back and forth continuously is slided with the extruding of the first guide pad 620, and then is driven and slided by the locking lever 514 in locking hole 6201 Row seat 5 is realized continuously back and forth slides work up and down.
The beneficial effects of the invention are as follows:The configuration of the present invention is simple, it is easy to operate, divided in inner wall at left and right sides of chamber by receiving It does not communicate and sets the first spring return device and the second spring return device, the mounting frame inner wall at the top of the first spring return device In vivo to slide the pressurizing unit of mating connection with the extruding of the first spring return device, sliding seat inside top sets a left side at position Right first set of extending slides chamber, and first, which slides intracavitary, slides first sliding block that is connected, the first sliding block left side end The locking lever of fixed setting of extending to the left, locking lever left side extension end is through outer end face on the left of sliding seat and slides cooperation company It connects, the mating connection of the first sliding block right end face inner spiral is extended the first spiral shell shape bar of setting to the right, on the right side of the first spiral shell shape bar Extension end drives row machine with first and is connected, and sets drift slot in the first sliding block bottom end face, first slides the cunning on the downside of chamber Second is set in row seat and slides chamber, second slides to set in the sliding seat on the downside of chamber and wear up to chamber, and second, which slides intracavitary, slides mating connection Sliding block is connected, the body of rod of the fixed upward setting of extending of connection sliding block top end surface, body of rod top extension end runs through first It slides chamber and second to slide the sliding seat inner wall between chamber and slide mating connection, extension end is fixed at the top of the body of rod puts in tiltedly In shape slot and the oblique portion for sliding mating connection is squeezed, inner bottom wall on the left of chamber is slided in connection sliding block left bottom end face with second Between set the first spring element, the installing plate of the fixed downward setting of extending in connection sliding block bottom right side end face, installing plate bottom is prolonged Exhibition section slides chamber through second and wears up to the sliding seat inner wall between chamber and slide mating connection, solid in installing plate bottom end face If second drives row machine, the second drive row motor spindle end connection puts in the first taper cone pulley worn up to intracavitary, on the left of the first taper cone pulley Wear up to intracavitary and set cutting component to be connected with the first taper cone pulley, can realize automatically control the first spring return device with The guiding of second spring return device and sliding seat slides cooperation, improves the planing stability up and down of sliding seat, meanwhile, pass through lock Gu the locking and unlock of component and the second guide pad are connected, trolley rack is made to improve sliding seat in mobile transportational process Stability, can realize automatically control dig boring work transmission and driving work, improve dig drilling safety and Working efficiency.
The above description is merely a specific embodiment, but protection scope of the present invention is not limited thereto, any The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, it is of the invention Protection domain should be determined by the scope of protection defined in the claims.

Claims (6)

1. a kind of follow-on power cable installation equipment, slide on the trolley rack including trolley rack and up and down Mounting frame, it is characterised in that:The regulation and control slot of opening to the right is provided in the trolley rack, cooperation peace is slided in the regulation and control slot Equipped with skid, spiral shell shape coordinates the spiral shell shape column for being equipped with setting of extending up and down in the skid, and the spiral shell shape column bottom is extended Section is rotatably assorted with the regulation and control slot bottom end wall and connect, and the spiral shell shape column top extension Duan Yuzhu drives row machine and is connected, described Main drive row machine outer surface is mounted in the regulation and control slot upper inside walls and secure fit connects, the sliding seat right part end face and institute Mounting frame fixed installation is stated, the receiving chamber for setting of extending upwards, the receiving chamber are equipped in the mounting frame bottom end face Inside slide and be connected with sliding seat, communicate respectively in inner wall at left and right sides of the receiving chamber equipped with the first spring return device and Second spring return device, to described first in the mounting frame inner wall at the top of the first spring return device Spring return device squeezes the pressurizing unit for sliding mating connection, and left and right extension is equipped at the sliding seat inside top position and is set First put slides chamber, and described first, which slides intracavitary, slides and be connected with the first sliding block, end on the left of first sliding block Tail is installed with the locking lever for setting of extending to the left, and extension end is through outer end face on the left of the sliding seat on the left of the locking lever And mating connection is slided, the first sliding block right end face inner spiral is connected with the first spiral shell shape of setting of extending to the right Bar, the first spiral shell shape bar right side extension end drive row machine with first and are connected, set in the first sliding block bottom end face There is a drift slot, described first slides in the sliding seat on the downside of chamber and slide chamber equipped with second, and described second slides on the downside of chamber It is equipped in the sliding seat and wears up to chamber, described second, which slides intracavitary, slides and be connected with connection sliding block, and the connection is slided Block top end surface is installed with the body of rod for setting of extending upwards, and chamber and institute are slided in extension end through described first at the top of the body of rod It states second to slide the sliding seat inner wall between chamber and slide mating connection, extension end, which is installed with, at the top of the body of rod stretches In into the drift slot and the oblique portion for sliding mating connection is squeezed, it is described to connect sliding block left bottom end face and described second It slides and is equipped with the first spring element on the left of chamber between inner bottom wall, the connection sliding block bottom right side end face, which is installed with to extend downwards, to be set The installing plate put, the installing plate bottom extension section slide chamber through described second and described wear up to the sliding seat between chamber Inner wall and mating connection is slided, the second drive row machine is installed in the installing plate bottom end face, described second drives row motor spindle End, which is connected with, puts in first taper cone pulley worn up to intracavitary, and described wear up to intracavitary on the left of first taper cone pulley is equipped with use With the cutting component being connected with first taper cone pulley, illumination apparatus is additionally provided in the mounting frame.
2. a kind of follow-on power cable installation equipment according to claim 1, it is characterised in that:Described first drives row Machine outer surface is installed on described first and slides in the inner wall of chamber right side and be fixedly connected.
3. a kind of follow-on power cable installation equipment according to claim 1, it is characterised in that:First elastic force Recovery device includes communicating the first guide groove being arranged in the receiving chamber inner left wall and sliding mating connection being arranged on The first guide pad in first guide groove, extrusion fit connection in first guide groove of the first guide pad bottom There is the second spring element, the locking hole for setting of extending to the left is equipped in the first guide pad right end face;Second elastic force Recovery device includes communicating the second guide groove being arranged on the right side of the receiving chamber in inner wall and sliding mating connection being arranged on The second guide pad that in second guide groove and left side end is connect with the sliding seat right end face secure fit, described the Extrusion fit is connected with third spring element, the second guide groove right side inner wall in second guide groove of two guide pad bottoms The interior locking component being equipped with to be connect with the second guide pad bottom end face extruding lock fit.
4. a kind of follow-on power cable installation equipment according to claim 3, it is characterised in that:The pressurizing unit It is arranged in the cavity including communicating the cavity being arranged in the first guide groove inner roof wall and clearance fit connection Eccentric wheel is squeezed, described squeeze is installed with the steering shaft that left and right extension is set on eccentric wheel, extension end on the left of the steering shaft Row machine to be driven with third to be connected, the third drives row machine outer surface and is installed in the cavity inner left wall and is fixedly connected, Extension end is rotatably assorted with inner wall on the right side of the cavity and connect on the right side of the steering shaft.
5. a kind of follow-on power cable installation equipment according to claim 1, it is characterised in that:The cutting component Including extend up and down be arranged on it is described wear up to intracavitary cutting drill head and circumferentially fixed be arranged on outside the cutting drill head The second taper cone pulley on surface, it is described cutting drill head at the top of extension end with it is described wear to be rotatably assorted up to intracavitary roof connect, The bottom end face that drill head bottom extension section is dug through the sliding seat and the connection that is rotatably assorted, the cutting drill head Bottom extension end is grown outside the bottom end face of the sliding seat.
6. a kind of follow-on power cable installation equipment according to claim 1, it is characterised in that:The illumination apparatus Including the lamp holder being fixed at two side positions of the mounting frame bottom end, it is equipped in the lamp holder inside energy saving Lamp, the bottom surface of the energy-saving lamp are concordant with the bottom surface of the mounting frame.
CN201711130702.1A 2017-11-15 2017-11-15 A kind of power cable installation equipment Active CN108206484B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711130702.1A CN108206484B (en) 2017-11-15 2017-11-15 A kind of power cable installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711130702.1A CN108206484B (en) 2017-11-15 2017-11-15 A kind of power cable installation equipment

Publications (2)

Publication Number Publication Date
CN108206484A true CN108206484A (en) 2018-06-26
CN108206484B CN108206484B (en) 2019-10-25

Family

ID=62604486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711130702.1A Active CN108206484B (en) 2017-11-15 2017-11-15 A kind of power cable installation equipment

Country Status (1)

Country Link
CN (1) CN108206484B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1357075A (en) * 1999-07-02 2002-07-03 桑德威克塔姆罗克有限公司 Rock drill and mounting frame
EP2133507B1 (en) * 2008-06-13 2011-03-09 BAUER Maschinen GmbH Drilling device and drilling method
CN103924977A (en) * 2014-02-27 2014-07-16 中铁工程装备集团有限公司 Center-pillared full-face shaft drilling machine
CN105386723A (en) * 2015-12-18 2016-03-09 黄朝阳 Long spiral mast rotatable drilling machine
CN107100544A (en) * 2017-06-23 2017-08-29 湖南文理学院 A kind of moveable efficiently rock drilling device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1357075A (en) * 1999-07-02 2002-07-03 桑德威克塔姆罗克有限公司 Rock drill and mounting frame
EP2133507B1 (en) * 2008-06-13 2011-03-09 BAUER Maschinen GmbH Drilling device and drilling method
CN103924977A (en) * 2014-02-27 2014-07-16 中铁工程装备集团有限公司 Center-pillared full-face shaft drilling machine
CN105386723A (en) * 2015-12-18 2016-03-09 黄朝阳 Long spiral mast rotatable drilling machine
CN107100544A (en) * 2017-06-23 2017-08-29 湖南文理学院 A kind of moveable efficiently rock drilling device

Also Published As

Publication number Publication date
CN108206484B (en) 2019-10-25

Similar Documents

Publication Publication Date Title
CN107724959B (en) A kind of novel power cable installation equipment
CN107662004A (en) A kind of decorative panel for building installation perforating device
US10301795B1 (en) Power cable installation device
CN107681560A (en) A kind of power cable laying equipment
CN107662003A (en) A kind of decorative panel for building Special punching device
CN107009426A (en) A kind of decorative panel for building installs special perforating device
CN107816318A (en) A kind of winning equipment
CN211370300U (en) Adjustable drill bit for coal mine exploration
CN108500312A (en) The manufacturing technologies equipment such as a kind of cemented carbide material and high-end hard alloy cutter
CN108206484B (en) A kind of power cable installation equipment
CN107769098A (en) A kind of power cable installs equipment
CN216841455U (en) Be applied to wear-resisting baffle of machine of digging soon
CN108233274A (en) A kind of follow-on power cable laying equipment
CN210798958U (en) Digging and drilling machine
CN107863725A (en) A kind of new power cable laying equipment
CN108788232A (en) A kind of genetic engineering device
CN108565780A (en) A kind of pre-buried equipment of cable of novel power construction
CN108306221A (en) A kind of pre-buried equipment of the cable of power construction
CN108972741A (en) A kind of process equipment of cross section hard wooden floor block
CN107695857A (en) A kind of safe material finish equipment
CN108221616A (en) A kind of follow-on road upkeep constructing device
CN108838434A (en) A kind of Preparation equipment of genetic engineering equipment
CN107806017B (en) A kind of bridge construction equipment
CN107687318B (en) A kind of efficient road construction drilling machine
CN108233270A (en) A kind of follow-on power construction cable installation apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190924

Address after: 221400, Jiangsu, Xuzhou, Xinyi Tong Zhen Ditch Street

Applicant after: Xinyi construction and Development Co., Ltd.

Address before: 510030 No. 2, 2108, Fuqian Road, Yuexiu District, Guangzhou City, Guangdong Province

Applicant before: Guangzhou Pindi Intelligent Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200609

Address after: 221400 No.66, industrial concentration zone, Hegou Town, Xinyi City, Xuzhou City, Jiangsu Province

Patentee after: Xuzhou Pengyu Hydraulic Technology Co.,Ltd.

Address before: 221400, Jiangsu, Xuzhou, Xinyi Tong Zhen Ditch Street

Patentee before: XINYI HEGOU INDUSTRIAL CONCENTRATION DISTRICT CONSTRUCTION DEVELOPMENT Co.,Ltd.