CN107816318A - A kind of winning equipment - Google Patents
A kind of winning equipment Download PDFInfo
- Publication number
- CN107816318A CN107816318A CN201710951791.XA CN201710951791A CN107816318A CN 107816318 A CN107816318 A CN 107816318A CN 201710951791 A CN201710951791 A CN 201710951791A CN 107816318 A CN107816318 A CN 107816318A
- Authority
- CN
- China
- Prior art keywords
- cavity volume
- stretches
- end pin
- sliding
- setting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterized by means for land transport with their own drive, e.g. skid mounting or wheel mounting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B3/00—Rotary drilling
- E21B3/02—Surface drives for rotary drilling
Abstract
The invention discloses a kind of winning equipment, debugging machine including pedestal and at the top of pedestal, left and right is correspondingly provided with the first cavity volume and the second cavity volume in pedestal, the first engine is fixedly installed in pedestal between first cavity volume and the second cavity volume, power is connected with respectively both sides to the left and right and stretched the first Coupling Shaft of setting at left and right sides of first engine, the section that stretched on the left of first Coupling Shaft probes into the first cavity volume and stretch end pin and the switching cooperation of the first cavity volume inner left wall, the section that stretched on the right side of first Coupling Shaft probes into the second cavity volume and the end pin that stretches is fixedly installed first bevel gear, the first Coupling Shaft outer surface in first cavity volume is fixedly installed second bevel gear, the sliding groove for the setting that stretches upwards is provided with debugging machine bottom surface, slipped in sliding groove and be combined with trolley shoe;The present invention is simple in construction, easy to operate, can realize the automatic drilling work of massif, and can carry out automatic positoning according to the height of massif.
Description
Technical field
The present invention relates to mining technique field, specifically a kind of winning equipment.
Background technology
Usually need to drill to massif during mining, traditional bore mode is artificial hand-held drilling machine
Being drilled, this mode wastes time and energy, and because massif has certain gradient, therefore artificial drilling is very easy to bore
Askew, precision is low.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of winning equipment, and it can solve the problem that above-mentioned show in the art
Problem.
The present invention is achieved through the following technical solutions:A kind of winning equipment of the present invention, including pedestal and peace
Debugging machine at the top of the pedestal, the interior left and right of the pedestal are correspondingly provided with the first cavity volume and the second cavity volume, and described first holds
The first engine is fixedly installed in the pedestal between chamber and second cavity volume, is moved at left and right sides of first engine
Power cooperation is connected with respectively both sides to the left and right and stretched the first Coupling Shaft of setting, and the section that stretched on the left of first Coupling Shaft probes into institute
State in the first cavity volume and the end pin that stretches coordinates with the first cavity volume inner left wall switching, stretch section on the right side of first Coupling Shaft
Probe into second cavity volume and the end pin that stretches is fixedly installed first bevel gear, first switching in first cavity volume
Axle outer surface is fixedly installed second bevel gear, and the sliding groove for the setting that stretches upwards, the cunning are provided with the debugging machine bottom surface
Slipped in access slot and be combined with trolley shoe, the internal helical line that is mutually correspondingly provided with is connected and stretched up and down at left and right sides of the trolley shoe
Extended the first screw rod and the second screw rod put, first screw rod are located at the sliding groove relative above first cavity volume
Interior, second screw rod is located in the sliding groove relative above second cavity volume, first screw rod and described second
The screw tip end pin that stretches coordinates with the sliding groove inner roof wall switching, and the first screw rod bottom stretches described in section break-through the
The base top surface above one cavity volume and switching coordinates, the first screw rod bottom end pin that stretches are probeed into first cavity volume
And end pin is fixedly installed the third hand tap gear to the connection that coincide with the second bevel gear right hand top, second screw rod
Bottom stretches described in section break-through on the second cavity volume the base top surface of top and switching coordinates, and the second screw rod bottom stretches
End pin is probeed into second cavity volume and end pin is fixedly installed to coincide what is connected with the first bevel gear right hand top
4th bevel gear, the trolley shoe is interior to be provided with drilling power device, and the debugging machine right flank is fixedly installed splashproof stone cover.
Preferably technical scheme, the drilling power device include being arranged on sliding chamber in the trolley shoe and
Lead to the guide groove of setting and the setting that stretches to the right with inwall on the right side of the sliding chamber, stretch end pin break-through institute on the right side of the guide groove
Trolley shoe right flank is stated, the sliding intracavitary is provided with the second Coupling Shaft of the setting that stretches up and down, and the second Coupling Shaft bottom is stretched
To prolong end pin with the sliding intracavitary bottom wall switching to coordinate, end pin and the second engine are connected at the top of second Coupling Shaft,
The second engine outer surface is arranged in the sliding intracavitary roof and secure fit connects, the sliding intracavitary it is described
It is fixedly installed eccentric wheel on second Coupling Shaft outer surface, the sliding intracavitary on the right side of the eccentric wheel is sliding to be combined with derivation
Block, slip in the guide groove and be combined with left and right and stretch the drilling power bar of setting, stretch end pin spy on the left of the drilling power bar
Enter the sliding intracavitary and be connected with the derivation block right flank secure fit, the drilling power bar derived on the right side of block
Outer surface is provided with spring element, and the end pin that stretched on the right side of the drilling power bar is stretched out outside the trolley shoe right flank, stretches out the cunning
The alleviation groove set in the drilling power bar outside block right flank provided with upper and lower break-through is connect, slips and is combined with the alleviation groove
Electric drill bit device.
Preferably technical scheme, the electric drill bit device include sliding be equipped with the alleviation groove and up and down
Stretched the pole of setting, and hole slot is provided with inside the pole, and the guide block for being combined with or so the setting that stretches, institute are slipped in the hole slot
The end pin that stretches at left and right sides of guide block is stated to be fixedly connected with inwall at left and right sides of the alleviation groove respectively, it is described on the downside of the guide block
It is provided with hole slot and alleviates spring element, the pole bottom end pin switching that stretches has electric drill head, the electric drill head right hand top and institute
Switching has punching press rackwork between stating pole outer right wall.
The beneficial effects of the invention are as follows:
1. stretched the first Coupling Shaft of setting by the both sides to the left and right that are connected respectively of power at left and right sides of the first engine, the
The section that stretched on the left of one Coupling Shaft probes into the first cavity volume and stretch end pin and the switching cooperation of the first cavity volume inner left wall, the first switching
The section that stretched on the right side of axle probes into the second cavity volume and the end pin fixed setting first bevel gear that stretches, the first Coupling Shaft in the first cavity volume
Second bevel gear is fixedly installed in outer surface, and the sliding groove for the setting that stretches upwards is set in debugging machine bottom surface, slips sliding in groove coordinate
Trolley shoe, internal the first screw rod and second for mutually accordingly setting the mating connection of helical line and the upper and lower setting that stretches in the trolley shoe left and right sides
Screw rod, the first screw rod are located in sliding groove relative above the first cavity volume, and the second screw rod is located at cunning relative above the second cavity volume
In access slot, the first screw rod and the second screw tip stretch end pin with the switching cooperation of sliding groove inner roof wall, and the first screw rod bottom is stretched
Prolong the base top surface above the cavity volume of section break-through first and switching coordinate, the first screw rod bottom stretch end pin probe into the first cavity volume and
To the third hand tap gear for the connection that coincide with second bevel gear right hand top, the second screw rod bottom section that stretches wears for end pin fixed setting
The base top surface of top and switching coordinates on logical second cavity volume, the second screw rod bottom end pin that stretches are probeed into the second cavity volume and end pin
The 4th bevel gear to the connection that coincide with first bevel gear right hand top is fixedly installed, trolley shoe is automatically controlled so as to realize
Lifting positioning work, meets the boring work on different height hillside, improves boring work efficiency and drilling quality.
2. the sliding chamber that is arranged in trolley shoe is included by drilling power device and led to inwall on the right side of sliding chamber
Set and the guide groove for the setting that stretches to the right, stretch on the right side of guide groove end pin break-through trolley shoe right flank, and sliding intracavitary is set stretches up and down
Extended the second Coupling Shaft put, end pin and sliding intracavitary the bottom wall switching that stretches of the second Coupling Shaft bottom coordinate, the second Coupling Shaft top
Portion's end pin and the second engine are connected, and the second engine outer surface is arranged in sliding intracavitary roof and secure fit connects
Connect, slip and eccentric wheel is fixedly installed on the second Coupling Shaft outer surface of intracavitary, the sliding intracavitary on the right side of eccentric wheel is slipped cooperation and pushed away
Guide block, the drilling power bar for coordinating left and right to stretch setting is slipped in guide groove, the end pin that stretched on the left of drilling power bar probes into sliding chamber
It is interior and with derive block right flank secure fit be connected, derivation block on the right side of drilling power rod outer surface set spring element, drilling power
The end pin that stretched on the right side of bar is stretched out outside trolley shoe right flank, and break-through up and down is set in the drilling power bar stretched out outside trolley shoe right flank and is set
The alleviation groove put, alleviate and the electric drill bit device of cooperation is slipped in groove, so as to realize the boring work for automatically controlling hillside, reduce worker
Workload, improve the boring work efficiency on hillside.
3. the present invention is simple in construction, easy to operate, the automatic drilling work of massif can be realized, its is time saving and energy saving, efficiency high,
Drilling quality is good, reduces the time of work, reduces financial cost, and can carry out automatic positoning, energy according to the height of massif
Meet the needs of the rapid drilling on hillside.
Brief description of the drawings
For ease of explanation, the present invention is described in detail by following specific embodiment and accompanying drawing.
Fig. 1 is overall structure diagram outside a kind of winning equipment of the present invention;
Fig. 2 is overall structure diagram inside a kind of winning equipment of the present invention;
Structural representation when Fig. 3 is a kind of winning equipment bore operation of the present invention;
Fig. 4 is a kind of right view of winning equipment of the present invention.
Embodiment
As Figure 1-Figure 4, a kind of winning equipment of the invention, including pedestal 5 and installed in the top of the pedestal 5
Debugging machine 6, left and right is correspondingly provided with the first cavity volume 51 and the second cavity volume 52 in the pedestal 5, first cavity volume 51 and described the
The first engine 53, the left and right sides power of the first engine 53 are fixedly installed in the pedestal 5 between two cavity volumes 52
It is connected with respectively that both sides stretch the first Coupling Shaft 531 of setting to the left and right, the left side of the first Coupling Shaft 531 stretches section spy
Enter in first cavity volume 51 and the end pin that stretches coordinates with the inner left wall of the first cavity volume 51 switching, first Coupling Shaft
The section that stretched on the right side of in the of 531 is probeed into second cavity volume 52 and the end pin that stretches is fixedly installed first bevel gear 520, and described first holds
The outer surface of the first Coupling Shaft 531 in chamber 51 is fixedly installed second bevel gear 510, is provided with the bottom surface of debugging machine 6
Stretch the sliding groove 61 of setting upwards, is slipped in the sliding groove 61 and is combined with trolley shoe 62, the left and right sides of trolley shoe 62
Inside is mutually correspondingly provided with the mating connection of helical line and the first screw rod 610 and the second screw rod 611 of the setting that stretches up and down, and described first
For screw rod 610 in the relative sliding groove 61 in the top of the first cavity volume 51, second screw rod 611 is located at described second
In the relative sliding groove 61 in the top of cavity volume 52, the end pin that stretched at the top of first screw rod 610 and second screw rod 611 is equal
Coordinate with the sliding inner roof wall of groove 61 switching, the bottom of the first screw rod 610 stretches described in section break-through above the first cavity volume 51
The top surface of the pedestal 5 and switching coordinate, the bottom of the first screw rod 610 end pin that stretches is probeed into first cavity volume 51 and tail
The tip is fixedly installed the third hand tap gear 511 to the connection that coincide with the right hand top of second bevel gear 510, second spiral shell
The bottom of bar 611 stretches described in section break-through on the second cavity volume 52 top surface of the pedestal 5 of top and switching coordinates, second screw rod
The 611 bottoms end pin that stretches is probeed into second cavity volume 52 and end pin is fixedly installed to right with the first bevel gear 520
4th bevel gear 521 of the identical connection of side roof part, the trolley shoe 62 is interior to be provided with drilling power device, the right side of debugging machine 6
Face is fixedly installed splashproof stone cover 4.
Valuably, the drilling power device include being arranged on sliding chamber 621 in the trolley shoe 62 and with it is described
The sliding right side inwall of chamber 621 leads to the guide groove 622 of setting and the setting that stretches to the right, and the end pin that stretched on the right side of the guide groove 622 is worn
The logical right flank of trolley shoe 62, interior the second Coupling Shaft 6210 for being provided with the setting that stretches up and down of the sliding chamber 621, described second
The bottom of Coupling Shaft 6210 end pin that stretches coordinates with the sliding inner bottom wall of chamber 621 switching, the top tail of the second Coupling Shaft 6210
The tip is connected with the second engine 6212, and the outer surface of the second engine 6212 is arranged on the inner roof wall of sliding chamber 621
Interior and secure fit is connected, and eccentric wheel is fixedly installed on the outer surface of the second Coupling Shaft 6210 in the sliding chamber 621
6211, slip to be combined with the sliding chamber 621 on the right side of the eccentric wheel 6211 and derive block 6213, it is sliding in the guide groove 622
Connect and be combined with left and right and stretch the drilling power bar 6221 of setting, the left side of drilling power bar 6221 end pin that stretches probes into the cunning
Connect in chamber 621 and be connected with the derivation right flank secure fit of block 6213, the drilling for deriving the right side of block 6213 is moved
The outer surface of power bar 6221 is provided with spring element 6222, and it is right that the end pin that stretched on the right side of the drilling power bar 6221 stretches out the trolley shoe 62
Outside side, the alleviation groove that is set in the drilling power bar 6221 that stretches out outside the right flank of trolley shoe 62 provided with upper and lower break-through
623, it is described alleviation groove 623 in slip be combined with electric drill bit device 7, so as to realize the boring work for automatically controlling hillside, reduce
Worker's workload, improve the boring work efficiency on hillside.
Valuably, the electric drill bit device 7 includes slipping the setting that is equipped with the alleviation groove 623 and stretches up and down
Pole 71, the inside of the pole 71 is provided with hole slot 710, and the guide block for being combined with or so the setting that stretches is slipped in the hole slot 710
714, the left and right sides of the guide block 714 end pin that stretches is fixedly connected with the alleviation left and right sides inwall of groove 623 respectively, described to lead
It is provided with the hole slot 710 of the downside of block 714 and alleviates spring element 711, the bottom of the pole 71 end pin switching that stretches has electric drill head
712, between first 712 right hand top of the electric drill and the outer right wall of the pole 71 switching have punching press rackwork 713, so as to real
The angle positioning of electric drill first 712 is now automatically controlled, meets the boring work on different angle hillside.
When needing boring work, electric drill first 712 is controlled to transpose to the corresponding angle in hillside by punching press rackwork 713
Degree, then, the positive and negative rotation of the first Coupling Shaft 531 is driven by the first engine 53, left and right is driven by the first Coupling Shaft 531 simultaneously
Both sides stretch second bevel gear 510 and the positive and negative rotation of first bevel gear 520 in section, and then by the second bevel gear of the left and right sides
510 and first bevel gear 520 drive the bevel gear of third hand tap gear 511 and the 4th in the first cavity volume 51 and the second cavity volume 52 respectively
521 positive and negative rotations, now, the positive and negative rotation of the first screw rod 610 is driven by third hand tap gear 511, meanwhile, by the 4th bevel gear 521
Drive the positive and negative rotation of the second screw rod 611, and then trolley shoe 62 is driven along sliding by the first screw rod 610 and the second screw rod 611 simultaneously
Above-below direction in groove 61 slides, until during positioning to the hillside corresponding height for needing to drill, now, controls the first engine 53
Stop operating, then debugging machine 6 is moved at the hillside for needing to drill by pedestal 5, while make electric drill bit device 7 and needs
The hillside of drilling is in relative status, now, drives the second Coupling Shaft 6210 to rotate by the second engine 6212, by second turn
Spindle 6210 rotates with movable eccentric wheel 6211, due to deriving block 6213 by the pressure on top surface of spring element 6222, makes derivation block 6213
Left surface and the sliding cooperation of the outer surface top pressure of eccentric wheel 6211, when eccentric wheel 6211 rotates by the outer surface of eccentric wheel 6211 with pushing away
Guide block 6213 continues the sliding cooperation of reciprocal top pressure, and then drives drilling power bar 6221 to realize that reciprocal left and right is sliding by derivation block 6213
Start building to make, finally drive electric drill bit device 7 to realize the boring work on hillside by drilling power bar 6221.
The beneficial effects of the invention are as follows:
1. stretched the first Coupling Shaft of setting by the both sides to the left and right that are connected respectively of power at left and right sides of the first engine, the
The section that stretched on the left of one Coupling Shaft probes into the first cavity volume and stretch end pin and the switching cooperation of the first cavity volume inner left wall, the first switching
The section that stretched on the right side of axle probes into the second cavity volume and the end pin fixed setting first bevel gear that stretches, the first Coupling Shaft in the first cavity volume
Second bevel gear is fixedly installed in outer surface, and the sliding groove for the setting that stretches upwards is set in debugging machine bottom surface, slips sliding in groove coordinate
Trolley shoe, internal the first screw rod and second for mutually accordingly setting the mating connection of helical line and the upper and lower setting that stretches in the trolley shoe left and right sides
Screw rod, the first screw rod are located in sliding groove relative above the first cavity volume, and the second screw rod is located at cunning relative above the second cavity volume
In access slot, the first screw rod and the second screw tip stretch end pin with the switching cooperation of sliding groove inner roof wall, and the first screw rod bottom is stretched
Prolong the base top surface above the cavity volume of section break-through first and switching coordinate, the first screw rod bottom stretch end pin probe into the first cavity volume and
To the third hand tap gear for the connection that coincide with second bevel gear right hand top, the second screw rod bottom section that stretches wears for end pin fixed setting
The base top surface of top and switching coordinates on logical second cavity volume, the second screw rod bottom end pin that stretches are probeed into the second cavity volume and end pin
The 4th bevel gear to the connection that coincide with first bevel gear right hand top is fixedly installed, trolley shoe is automatically controlled so as to realize
Lifting positioning work, meets the boring work on different height hillside, improves boring work efficiency and drilling quality.
2. the sliding chamber that is arranged in trolley shoe is included by drilling power device and led to inwall on the right side of sliding chamber
Set and the guide groove for the setting that stretches to the right, stretch on the right side of guide groove end pin break-through trolley shoe right flank, and sliding intracavitary is set stretches up and down
Extended the second Coupling Shaft put, end pin and sliding intracavitary the bottom wall switching that stretches of the second Coupling Shaft bottom coordinate, the second Coupling Shaft top
Portion's end pin and the second engine are connected, and the second engine outer surface is arranged in sliding intracavitary roof and secure fit connects
Connect, slip and eccentric wheel is fixedly installed on the second Coupling Shaft outer surface of intracavitary, the sliding intracavitary on the right side of eccentric wheel is slipped cooperation and pushed away
Guide block, the drilling power bar for coordinating left and right to stretch setting is slipped in guide groove, the end pin that stretched on the left of drilling power bar probes into sliding chamber
It is interior and with derive block right flank secure fit be connected, derivation block on the right side of drilling power rod outer surface set spring element, drilling power
The end pin that stretched on the right side of bar is stretched out outside trolley shoe right flank, and break-through up and down is set in the drilling power bar stretched out outside trolley shoe right flank and is set
The alleviation groove put, alleviate and the electric drill bit device of cooperation is slipped in groove, so as to realize the boring work for automatically controlling hillside, reduce worker
Workload, improve the boring work efficiency on hillside.
3. the present invention is simple in construction, easy to operate, the automatic drilling work of massif can be realized, its is time saving and energy saving, efficiency high,
Drilling quality is good, reduces the time of work, reduces financial cost, and can carry out automatic positoning, energy according to the height of massif
Meet the needs of the rapid drilling on hillside.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any
The change or replacement expected without creative work, it should all be included within the scope of the present invention.Therefore, it is of the invention
Protection domain should be determined by the scope of protection defined in the claims.
Claims (3)
1. a kind of winning equipment, including pedestal and the debugging machine at the top of pedestal, it is characterised in that:Left and right phase in pedestal
The first cavity volume and the second cavity volume should be provided with, the first engine is fixedly installed in the pedestal between the first cavity volume and the second cavity volume,
Power is connected with respectively both sides to the left and right and stretched the first Coupling Shaft of setting at left and right sides of first engine, the first Coupling Shaft
The left side section that stretches is probeed into the first cavity volume and the end pin that stretches coordinates with the switching of the first cavity volume inner left wall, and the first Coupling Shaft right side is stretched
Prolong that section is probeed into the second cavity volume and the end pin that stretches is fixedly installed first bevel gear, the first Coupling Shaft outer surface in the first cavity volume
Second bevel gear is fixedly installed, the sliding groove for the setting that stretches upwards is provided with debugging machine bottom surface, slips and is combined with sliding groove
Trolley shoe, the internal helical line that is mutually correspondingly provided with is connected and the first screw rod of the upper and lower setting that stretches and the at left and right sides of trolley shoe
Two screw rods, the first screw rod are located in sliding groove relative above the first cavity volume, and the second screw rod is located at relative above the second cavity volume
In sliding groove, the first screw rod and the second screw tip end pin that stretches are transferred with sliding groove inner roof wall and coordinated, the first screw rod bottom
The base top surface above the cavity volume of section break-through first that stretches and switching coordinates, the first screw rod bottom end pin that stretches are probeed into the first cavity volume
And end pin is fixedly installed the third hand tap gear to the connection that coincide with second bevel gear right hand top, the second screw rod bottom stretches
The base top surface of top and switching coordinates on the section cavity volume of break-through second, the second screw rod bottom stretch end pin probe into the second cavity volume and
End pin is fixedly installed the 4th bevel gear to the connection that coincide with first bevel gear right hand top, and it is dynamic to be provided with drilling in trolley shoe
Power apparatus, debugging machine right flank are fixedly installed splashproof stone cover.
A kind of 2. winning equipment according to claim 1, it is characterised in that:The drilling power device includes being arranged on institute
State the sliding chamber in trolley shoe and lead to the guide groove of setting and the setting that stretches to the right with inwall on the right side of the sliding chamber, it is described
Stretch trolley shoe right flank described in end pin break-through on the right side of guide groove, and the sliding intracavitary is provided with the second switching of the setting that stretches up and down
Axle, the second Coupling Shaft bottom end pin that stretches coordinate with the sliding intracavitary bottom wall switching, tail at the top of second Coupling Shaft
The tip and the second engine are connected, and the second engine outer surface is arranged in the sliding intracavitary roof and secure fit
Connection, is fixedly installed eccentric wheel on the second Coupling Shaft outer surface of the sliding intracavitary, the institute on the right side of the eccentric wheel
State that sliding intracavitary is sliding to be combined with derivation block, slipped in the guide groove and be combined with left and right and stretch the drilling power bar of setting, it is described
The end pin that stretched on the left of drilling power bar probes into the sliding intracavitary and is connected with the derivation block right flank secure fit, described to push away
The drilling power rod outer surface on the right side of guide block is provided with spring element, and the end pin that stretched on the right side of the drilling power bar stretches out the cunning
Connect outside block right flank, the alleviation set in the drilling power bar stretched out outside the trolley shoe right flank provided with upper and lower break-through
Groove, it is described alleviation groove in slip be combined with electric drill bit device.
A kind of 3. winning equipment according to claim 3, it is characterised in that:The electric drill bit device includes sliding cooperation and set
Put in the alleviation groove and the pole for the setting that stretches up and down, the pole inside are provided with hole slot, slip and coordinate in the hole slot
There is left and right to stretch the guide block of setting, the end pin that stretched at left and right sides of the guide block is fixed with inwall at left and right sides of the alleviation groove respectively
Connection, it is provided with the hole slot on the downside of the guide block and alleviates spring element, the pole bottom end pin switching that stretches has electric drill head,
Switching has punching press rackwork between the electric drill head right hand top and the pole outer right wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710951791.XA CN107816318A (en) | 2017-10-13 | 2017-10-13 | A kind of winning equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710951791.XA CN107816318A (en) | 2017-10-13 | 2017-10-13 | A kind of winning equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107816318A true CN107816318A (en) | 2018-03-20 |
Family
ID=61607941
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710951791.XA Withdrawn CN107816318A (en) | 2017-10-13 | 2017-10-13 | A kind of winning equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107816318A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108533169A (en) * | 2018-04-13 | 2018-09-14 | 梅金琪 | A kind of new road constructing device |
CN108590520A (en) * | 2018-04-13 | 2018-09-28 | 莫石维 | A kind of modified solar street light auxiliary installing device |
CN108590522A (en) * | 2018-04-13 | 2018-09-28 | 莫石维 | A kind of solar street light auxiliary installing device |
CN108625776A (en) * | 2018-04-13 | 2018-10-09 | 梅金琪 | A kind of municipal road construction device |
CN108643832A (en) * | 2018-04-13 | 2018-10-12 | 莫石维 | A kind of new type solar energy street lamp auxiliary installing device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB665920A (en) * | 1949-01-25 | 1952-02-06 | Houilleres Bassin Du Nord | Improved drill |
CN204960936U (en) * | 2015-08-15 | 2016-01-13 | 何纪江 | Mine quarrying machhine |
CN206015655U (en) * | 2016-09-05 | 2017-03-15 | 中国建筑第八工程局有限公司 | A kind of floor rammer |
CN107008935A (en) * | 2017-05-31 | 2017-08-04 | 陈柯 | A kind of punch device with two-way punching functions |
CN107100542A (en) * | 2017-05-23 | 2017-08-29 | 义乌市雄发尔机械设备有限公司 | A kind of building wall punch device |
CN107097302A (en) * | 2017-05-29 | 2017-08-29 | 何纪全 | A kind of building decorative plates perforating device |
-
2017
- 2017-10-13 CN CN201710951791.XA patent/CN107816318A/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB665920A (en) * | 1949-01-25 | 1952-02-06 | Houilleres Bassin Du Nord | Improved drill |
CN204960936U (en) * | 2015-08-15 | 2016-01-13 | 何纪江 | Mine quarrying machhine |
CN206015655U (en) * | 2016-09-05 | 2017-03-15 | 中国建筑第八工程局有限公司 | A kind of floor rammer |
CN107100542A (en) * | 2017-05-23 | 2017-08-29 | 义乌市雄发尔机械设备有限公司 | A kind of building wall punch device |
CN107097302A (en) * | 2017-05-29 | 2017-08-29 | 何纪全 | A kind of building decorative plates perforating device |
CN107008935A (en) * | 2017-05-31 | 2017-08-04 | 陈柯 | A kind of punch device with two-way punching functions |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108533169A (en) * | 2018-04-13 | 2018-09-14 | 梅金琪 | A kind of new road constructing device |
CN108590520A (en) * | 2018-04-13 | 2018-09-28 | 莫石维 | A kind of modified solar street light auxiliary installing device |
CN108590522A (en) * | 2018-04-13 | 2018-09-28 | 莫石维 | A kind of solar street light auxiliary installing device |
CN108625776A (en) * | 2018-04-13 | 2018-10-09 | 梅金琪 | A kind of municipal road construction device |
CN108643832A (en) * | 2018-04-13 | 2018-10-12 | 莫石维 | A kind of new type solar energy street lamp auxiliary installing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107816318A (en) | A kind of winning equipment | |
CN107199458A (en) | It is a kind of to open screw device for valve | |
CN108561078A (en) | A kind of drilling equipment of soil layer or rock | |
CN107838477A (en) | A kind of aluminum alloy materials installation drilling equipment for building | |
CN107838758A (en) | A kind of improved-type building decorative plates polishing punching all-in-one | |
CN107009426A (en) | A kind of decorative panel for building installs special perforating device | |
CN107199359B (en) | A kind of aluminum alloy materials drilling equipment for building | |
CN107160175A (en) | A kind of practical bridge equipment | |
CN209407472U (en) | Drilling equipment is used in a kind of processing of mold | |
CN106544968A (en) | A kind of traffic indication board being conveniently replaceable | |
CN107178036A (en) | A kind of bridge construction facility | |
CN108202161A (en) | A kind of building panel double-face drilling device | |
CN107838478A (en) | A kind of aluminium alloy drilling equipment for building | |
CN202985662U (en) | Drilling equipment of binding device and binding device | |
CN108222822A (en) | A kind of massif winning equipment | |
CN108222823A (en) | A kind of efficiently winning equipment | |
CN205200619U (en) | Camshaft terminal surface boring grab | |
CN207155225U (en) | It is a kind of to open screw device for valve | |
CN107756042A (en) | A kind of new letter box arrangement | |
CN107775038A (en) | A kind of letter box arrangement | |
CN211540607U (en) | A edging frock for high performance high strength drill bit | |
CN107685164A (en) | A kind of adjustable plate punching equipment | |
CN108838442A (en) | A kind of drilling robot | |
CN107816319B (en) | A kind of massif mining apparatus | |
CN108788232A (en) | A kind of genetic engineering device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180320 |
|
WW01 | Invention patent application withdrawn after publication |