CN108222822A - A kind of massif winning equipment - Google Patents
A kind of massif winning equipment Download PDFInfo
- Publication number
- CN108222822A CN108222822A CN201710951755.3A CN201710951755A CN108222822A CN 108222822 A CN108222822 A CN 108222822A CN 201710951755 A CN201710951755 A CN 201710951755A CN 108222822 A CN108222822 A CN 108222822A
- Authority
- CN
- China
- Prior art keywords
- stretches
- cavity volume
- end pin
- setting
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005553 drilling Methods 0.000 claims abstract description 46
- 230000008878 coupling Effects 0.000 claims abstract description 42
- 238000010168 coupling process Methods 0.000 claims abstract description 42
- 238000005859 coupling reaction Methods 0.000 claims abstract description 42
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 19
- 239000000523 sample Substances 0.000 claims abstract description 18
- 238000009795 derivation Methods 0.000 claims description 9
- 230000013011 mating Effects 0.000 claims description 4
- 238000004080 punching Methods 0.000 claims description 4
- 230000005611 electricity Effects 0.000 claims description 3
- 239000004575 stone Substances 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/025—Rock drills, i.e. jumbo drills
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/022—Control of the drilling operation; Hydraulic or pneumatic means for activation or operation
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
The invention discloses a kind of massif winning equipments, debugging machine including pedestal and at the top of pedestal, left and right is correspondingly provided with the first cavity volume and the second cavity volume in pedestal, the first engine is fixedly installed in pedestal between first cavity volume and the second cavity volume, power is connected with respectively both sides to the left and right and stretches the first Coupling Shaft of setting at left and right sides of first engine, the section that stretches on the left of first Coupling Shaft probes into the first cavity volume and stretch end pin and the switching cooperation of the first cavity volume inner left wall, the section that stretches on the right side of first Coupling Shaft probes into the second cavity volume and the end pin that stretches is fixedly installed first bevel gear, the first Coupling Shaft outer surface in first cavity volume is fixedly installed second bevel gear, the sliding slot for the setting that stretches upwards is equipped in debugging machine bottom surface, it is slipped in sliding slot and is combined with trolley shoe;The configuration of the present invention is simple, it is easy to operate, it can realize the automatic drilling work of massif, and can automatic positoning be carried out according to the height of massif.
Description
Technical field
The present invention relates to mining technique field, specifically a kind of massif winning equipment.
Background technology
It usually needs to drill to massif during mining, traditional bore mode is artificial hand-held drilling machine
It drills, this mode is time-consuming and laborious, and because massif has certain gradient, therefore artificial drilling is very easy to bore
Askew, precision is low.
Invention content
The technical problems to be solved by the invention are to provide a kind of massif winning equipment, can solve above-mentioned present technology
The problems in.
The present invention is achieved through the following technical solutions:The present invention a kind of massif winning equipment, including pedestal with
And the debugging machine at the top of the pedestal, left and right is correspondingly provided with the first cavity volume and the second cavity volume in the pedestal, and described the
The first engine, first engine or so two is fixedly installed in the pedestal between one cavity volume and second cavity volume
Side power is connected with respectively both sides to the left and right and stretches the first Coupling Shaft of setting, the section that stretches on the left of first Coupling Shaft spy
Enter in first cavity volume and the end pin that stretches coordinates with the first cavity volume inner left wall switching, stretched on the right side of first Coupling Shaft
Prolong that section is probeed into second cavity volume and the end pin that stretches is fixedly installed first bevel gear, described first in first cavity volume
Coupling Shaft outer surface is fixedly installed second bevel gear, and the sliding slot for the setting that stretches upwards, institute are equipped in the debugging machine bottom surface
State to slip in sliding slot and be combined with trolley shoe, at left and right sides of the trolley shoe it is internal be mutually correspondingly provided with the mating connection of helical line and on
Under stretch the first screw rod and the second screw rod of setting, first screw rod is located at opposite described sliding above first cavity volume
In slot, second screw rod is located in the opposite sliding slot above second cavity volume, first screw rod and described the
Two screw tips stretch end pin with the sliding slot inner roof wall switching cooperation, and the first screw rod bottom stretches described in section break-through
The base top surface above first cavity volume and switching cooperation, the first screw rod bottom end pin that stretches probe into first cavity volume
Interior and end pin is fixedly installed to the third hand tap gear that connect of coincideing with the second bevel gear right hand top, second spiral shell
Bar bottom stretches described in section break-through the base top surface of top and switching cooperation on the second cavity volume, and the second screw rod bottom is stretched
Prolong that end pin is probeed into second cavity volume and end pin is fixedly installed and is connect to coincide with the first bevel gear right hand top
The 4th bevel gear, drilling power device is equipped in the trolley shoe, the debugging machine right side is fixedly installed splashproof stone cover,
Control device is provided on first engine.
Preferably technical solution, the drilling power device include being arranged on sliding chamber in the trolley shoe and
Lead to the guide groove of setting and the setting that stretches to the right with inner wall on the right side of the sliding chamber, stretch end pin break-through institute on the right side of the guide groove
Trolley shoe right side is stated, the sliding intracavitary is equipped with the second Coupling Shaft of the setting that stretches up and down, and the second Coupling Shaft bottom is stretched
To prolong end pin with the sliding intracavitary bottom wall switching to coordinate, end pin and the second engine are connected at the top of second Coupling Shaft,
The second engine outer surface is arranged in the sliding intracavitary roof and secure fit connects, the sliding intracavitary it is described
It is fixedly installed eccentric wheel on second Coupling Shaft outer surface, the sliding intracavitary on the right side of the eccentric wheel, which is slipped, is combined with derivation
Block slips in the guide groove and is combined with left and right and stretches the drilling power bar of setting, and stretch end pin spy on the left of the drilling power bar
Enter the sliding intracavitary and connect with derivation block right side secure fit, the drilling power bar derived on the right side of block
Outer surface is equipped with spring element, and the end pin that stretches on the right side of the drilling power bar is stretched out outside the trolley shoe right side, stretches out the cunning
The alleviation slot equipped with upper and lower break-through setting in the drilling power bar outside block right side is connect, slips and is combined in the alleviation slot
Electric drill bit device.
Preferably technical solution, the electricity drill bit device include sliding be equipped in the alleviation slot and up and down
Stretch the strut of setting, and the strut is internally provided with hole slot, is slipped in the hole slot and is combined with left and right and stretches the guide block of setting, institute
The end pin that stretches at left and right sides of guide block is stated to be fixedly connected with inner wall at left and right sides of the alleviation slot respectively, it is described on the downside of the guide block
It is equipped in hole slot and alleviates spring element, the strut bottom end pin switching that stretches has electric drill head, the electric drill head right hand top and institute
Switching has punching press rackwork between stating strut outer right wall.
Preferably technical solution, the control device include being fixed at first on the upside of first engine
Control device and the second control device being fixed on the downside of first engine.
The beneficial effects of the invention are as follows:
1. it is stretched the first Coupling Shaft of setting by the both sides to the left and right that are connected respectively of power at left and right sides of the first engine, the
The section that stretches on the left of one Coupling Shaft probes into the first cavity volume and stretch end pin and the switching cooperation of the first cavity volume inner left wall, the first switching
The section that stretches on the right side of axis probes into the second cavity volume and the end pin fixed setting first bevel gear that stretches, the first Coupling Shaft in the first cavity volume
Second bevel gear is fixedly installed in outer surface, and the sliding slot for the setting that stretches upwards is set in debugging machine bottom surface, slips and cooperation is slipped in slot
Trolley shoe, internal the first screw rod and second for mutually accordingly setting the mating connection of helical line and the upper and lower setting that stretches in the trolley shoe left and right sides
Screw rod, the first screw rod are located in sliding slot opposite above the first cavity volume, and the second screw rod is located at cunning opposite above the second cavity volume
In access slot, the first screw rod and the second screw tip stretch end pin with the switching cooperation of sliding slot inner roof wall, and the first screw rod bottom is stretched
Prolong the base top surface above the first cavity volume of section break-through and switching cooperation, the first screw rod bottom stretch end pin probe into the first cavity volume and
To the third hand tap gear that connect of coincideing with second bevel gear right hand top, the second screw rod bottom section that stretches is worn for end pin fixed setting
The base top surface of top and switching cooperation on logical second cavity volume, the second screw rod bottom end pin that stretches are probeed into the second cavity volume and end pin
It is fixedly installed to the 4th bevel gear that connect of coincideing with first bevel gear right hand top, so as to fulfill automatic manipulation trolley shoe
Lifting positioning work, meets the boring work on different height hillside, improves boring work efficiency and drilling quality.
2. the sliding chamber being arranged in trolley shoe is included by drilling power device and is led to inner wall on the right side of sliding chamber
Setting and the guide groove for the setting that stretches to the right, stretch on the right side of guide groove end pin break-through trolley shoe right side, and sliding intracavitary is set stretches up and down
Extended the second Coupling Shaft put, end pin and sliding intracavitary the bottom wall switching that stretches of the second Coupling Shaft bottom coordinate, the second Coupling Shaft top
Portion's end pin and the second engine are connected, and the second engine outer surface is arranged in sliding intracavitary roof and secure fit connects
It connects, slips and eccentric wheel is fixedly installed on the second Coupling Shaft outer surface of intracavitary, the sliding intracavitary on the right side of eccentric wheel is slipped cooperation and pushed away
Guide block, cooperation left and right is slipped in guide groove and is stretched the drilling power bar of setting, and the end pin that stretches on the left of drilling power bar probes into sliding chamber
Interior and connect with deriving block right side secure fit, the drilling power rod outer surface on the right side of derivation block sets spring element, drilling power
The end pin that stretches on the right side of bar is stretched out outside trolley shoe right side, and break-through up and down is set in the drilling power bar stretched out outside trolley shoe right side and is set
The alleviation slot put is alleviated and the electric drill bit device of cooperation is slipped in slot, so as to fulfill the boring work on automatic manipulation hillside, reduces worker
Workload improves the boring work efficiency on hillside.
3. the configuration of the present invention is simple, easy to operate, the automatic drilling work of massif can be realized, it is time saving and energy saving, it is efficient,
Drilling quality is good, reduces the time of work, reduces financial cost, and can carry out automatic positoning, energy according to the height of massif
Meet the needs of the rapid drilling on hillside.
Description of the drawings
For ease of explanation, the present invention is described in detail by following specific embodiment and attached drawing.
Fig. 1 is overall structure diagram outside a kind of massif winning equipment of the present invention;
Fig. 2 is overall structure diagram inside a kind of massif winning equipment of the present invention;
Structure diagram when Fig. 3 is a kind of massif winning equipment bore operation of the present invention;
Fig. 4 is a kind of right view of massif winning equipment of the present invention.
Specific embodiment
As Figure 1-Figure 4, a kind of massif winning equipment of the invention is pushed up including pedestal 5 and mounted on the pedestal 5
The debugging machine 6 in portion, the interior left and right of the pedestal 5 are correspondingly provided with the first cavity volume 51 and the second cavity volume 52, first cavity volume 51 and institute
It states and the first engine 53 is fixedly installed in the pedestal 5 between the second cavity volume 52,53 left and right sides of the first engine
Power is connected with respectively both sides to the left and right and stretches the first Coupling Shaft 531 of setting, and 531 left side of the first Coupling Shaft stretches
Section is probeed into first cavity volume 51 and the end pin that stretches coordinates with 51 inner left wall of the first cavity volume switching, first switching
The right side of axis 531 section that stretches is probeed into second cavity volume 52 and the end pin that stretches is fixedly installed first bevel gear 520, and described first
531 outer surface of the first Coupling Shaft in cavity volume 51 is fixedly installed second bevel gear 510, is set in 6 bottom surface of debugging machine
There is the sliding slot 61 for the setting that stretches upwards, slipped in the sliding slot 61 and be combined with trolley shoe 62, the trolley shoe 62 or so two
It is mutually correspondingly provided with helical line inside side to be connected and the first screw rod 610 and the second screw rod 611 of the setting that stretches up and down, described the
One screw rod 610 is located in the opposite sliding slot 61 in first cavity volume, 51 top, and second screw rod 611 is located at described the
In the opposite sliding slot 61 in two cavity volumes, 52 top, stretch end pin at the top of first screw rod 610 and second screw rod 611
Coordinate with sliding 61 inner roof wall of the slot switching, 610 bottom of the first screw rod stretches described in section break-through on the first cavity volume 51
5 top surface of the pedestal of side and switching cooperation, 610 bottom of the first screw rod stretch end pin probe into first cavity volume 51 and
End pin is fixedly installed to the third hand tap gear 511 that connect of coincideing with 510 right hand top of second bevel gear, and described second
611 bottom of screw rod stretches described in section break-through 5 top surface of the pedestal of top and switching cooperation, second spiral shell on the second cavity volume 52
611 bottom of bar stretch end pin probe into second cavity volume 52 and end pin be fixedly installed to the first bevel gear 520
Right hand top coincide the 4th bevel gear 521 of connection, drilling power device is equipped in the trolley shoe 62, the debugging machine 6 is right
Side is fixedly installed splashproof stone cover 4, and control device is provided on first engine 53.
Valuably, the drilling power device include being arranged on sliding chamber 621 in the trolley shoe 62 and with it is described
Sliding 621 right side inner wall of chamber leads to the guide groove 622 of setting and the setting that stretches to the right, and the end pin that stretches on the right side of the guide groove 622 is worn
Logical 62 right side of trolley shoe, interior the second Coupling Shaft 6210 for being equipped with the setting that stretches up and down of the sliding chamber 621, described second
6210 bottom of the Coupling Shaft end pin that stretches coordinates with sliding 621 inner bottom wall of the chamber switching, the 6210 top tail of the second Coupling Shaft
The tip is connected with the second engine 6212, and 6212 outer surface of the second engine is arranged on 621 inner roof wall of sliding chamber
Interior and secure fit connects, and eccentric wheel is fixedly installed on 6210 outer surface of the second Coupling Shaft in the sliding chamber 621
6211, it slips to be combined in the sliding chamber 621 on 6211 right side of the eccentric wheel and derives block 6213, it is sliding in the guide groove 622
The drilling power bar 6221 for being combined with and controlling the setting that stretches is connect, the end pin that stretches on the left of the drilling power bar 6221 probes into the cunning
It connects in chamber 621 and is connect with the derivation 6213 right side secure fit of block, the drilling for deriving 6213 right side of block is moved
6221 outer surface of power bar is equipped with spring element 6222, and it is right that the end pin that stretches on the right side of the drilling power bar 6221 stretches out the trolley shoe 62
Outside side, the alleviation slot equipped with upper and lower break-through setting in the drilling power bar 6221 outside 62 right side of trolley shoe is stretched out
623, it slips in the alleviation slot 623 and is combined with electric drill bit device 7, so as to fulfill the boring work on automatic manipulation hillside, reduce
Worker's workload improves the boring work efficiency on hillside.
Valuably, the electric drill bit device 7 includes slipping the setting that is equipped in the alleviation slot 623 and stretches up and down
Strut 71, the strut 71 is internally provided with hole slot 710, is slipped in the hole slot 710 and is combined with left and right and stretches the guide block of setting
714,714 left and right sides of the guide block end pin that stretches is fixedly connected respectively with alleviation 623 left and right sides inner wall of slot, described to lead
It is equipped in the hole slot 710 of the downside of block 714 and alleviates spring element 711,71 bottom of the strut end pin switching that stretches has electric drill head
712, between 71 outer right wall of 712 right hand top of electric drill head and the strut switching have punching press rackwork 713, so as to real
The now angle positioning of manipulation electric drill head 712 automatically meets the boring work on different angle hillside.
Valuably, the control device includes the first control device 5301 for being fixed at 53 upside of the first engine
With the second control device 5302 for being fixed at 53 downside of the first engine, first control device 5301 is used to manipulate institute
The steering of the first engine 53 is stated, the second control device 5302 is used to manipulate the rotating speed of first engine 53.
When needing boring work, electric drill head 712 is manipulated by punching press rackwork 713 and is transposed to the corresponding angle in hillside
Then degree, 531 positive and negative rotation of the first Coupling Shaft is driven by the first engine 53, left and right is driven simultaneously by the first Coupling Shaft 531
Both sides stretch 520 positive and negative rotation of second bevel gear 510 and first bevel gear in section, and then by the second bevel gear of the left and right sides
510 and first bevel gear 520 drive 511 and the 4th bevel gear of third hand tap gear in the first cavity volume 51 and the second cavity volume 52 respectively
521 positive and negative rotations, at this point, 610 positive and negative rotation of the first screw rod is driven by third hand tap gear 511, meanwhile, by the 4th bevel gear 521
It drives 611 positive and negative rotation of the second screw rod, and then trolley shoe 62 is driven along sliding by the first screw rod 610 and the second screw rod 611 simultaneously
Upper and lower directions in slot 61 is slided, until during positioning to the hillside corresponding height for needing to drill, at this point, the first engine 53 of manipulation
It stops operating, is then moved to debugging machine 6 at the hillside for needing to drill, while make electric drill bit device 7 and needs by pedestal 5
The hillside of drilling is in relative status, at this point, the second Coupling Shaft 6210 is driven to rotate by the second engine 6212, by second turn
Spindle 6210 is rotated with movable eccentric wheel 6211, due to deriving block 6213 by the pressure on top surface of spring element 6222, makes derivation block 6213
Left side and 6211 outer surface top pressure of eccentric wheel slip cooperation, when eccentric wheel 6211 is rotated by 6211 outer surface of eccentric wheel with pushing away
Guide block 6213 continues reciprocal top pressure and slips cooperation, and then drilling power bar 6221 is driven to realize that reciprocal left and right is slided by derivation block 6213
It starts building to make, finally electric drill bit device 7 is driven to realize the boring work on hillside by drilling power bar 6221.
The beneficial effects of the invention are as follows:
1. it is stretched the first Coupling Shaft of setting by the both sides to the left and right that are connected respectively of power at left and right sides of the first engine, the
The section that stretches on the left of one Coupling Shaft probes into the first cavity volume and stretch end pin and the switching cooperation of the first cavity volume inner left wall, the first switching
The section that stretches on the right side of axis probes into the second cavity volume and the end pin fixed setting first bevel gear that stretches, the first Coupling Shaft in the first cavity volume
Second bevel gear is fixedly installed in outer surface, and the sliding slot for the setting that stretches upwards is set in debugging machine bottom surface, slips and cooperation is slipped in slot
Trolley shoe, internal the first screw rod and second for mutually accordingly setting the mating connection of helical line and the upper and lower setting that stretches in the trolley shoe left and right sides
Screw rod, the first screw rod are located in sliding slot opposite above the first cavity volume, and the second screw rod is located at cunning opposite above the second cavity volume
In access slot, the first screw rod and the second screw tip stretch end pin with the switching cooperation of sliding slot inner roof wall, and the first screw rod bottom is stretched
Prolong the base top surface above the first cavity volume of section break-through and switching cooperation, the first screw rod bottom stretch end pin probe into the first cavity volume and
To the third hand tap gear that connect of coincideing with second bevel gear right hand top, the second screw rod bottom section that stretches is worn for end pin fixed setting
The base top surface of top and switching cooperation on logical second cavity volume, the second screw rod bottom end pin that stretches are probeed into the second cavity volume and end pin
It is fixedly installed to the 4th bevel gear that connect of coincideing with first bevel gear right hand top, so as to fulfill automatic manipulation trolley shoe
Lifting positioning work, meets the boring work on different height hillside, improves boring work efficiency and drilling quality.
2. the sliding chamber being arranged in trolley shoe is included by drilling power device and is led to inner wall on the right side of sliding chamber
Setting and the guide groove for the setting that stretches to the right, stretch on the right side of guide groove end pin break-through trolley shoe right side, and sliding intracavitary is set stretches up and down
Extended the second Coupling Shaft put, end pin and sliding intracavitary the bottom wall switching that stretches of the second Coupling Shaft bottom coordinate, the second Coupling Shaft top
Portion's end pin and the second engine are connected, and the second engine outer surface is arranged in sliding intracavitary roof and secure fit connects
It connects, slips and eccentric wheel is fixedly installed on the second Coupling Shaft outer surface of intracavitary, the sliding intracavitary on the right side of eccentric wheel is slipped cooperation and pushed away
Guide block, cooperation left and right is slipped in guide groove and is stretched the drilling power bar of setting, and the end pin that stretches on the left of drilling power bar probes into sliding chamber
Interior and connect with deriving block right side secure fit, the drilling power rod outer surface on the right side of derivation block sets spring element, drilling power
The end pin that stretches on the right side of bar is stretched out outside trolley shoe right side, and break-through up and down is set in the drilling power bar stretched out outside trolley shoe right side and is set
The alleviation slot put is alleviated and the electric drill bit device of cooperation is slipped in slot, so as to fulfill the boring work on automatic manipulation hillside, reduces worker
Workload improves the boring work efficiency on hillside.
3. the configuration of the present invention is simple, easy to operate, the automatic drilling work of massif can be realized, it is time saving and energy saving, it is efficient,
Drilling quality is good, reduces the time of work, reduces financial cost, and can carry out automatic positoning, energy according to the height of massif
Meet the needs of the rapid drilling on hillside.
The above description is merely a specific embodiment, but protection scope of the present invention is not limited thereto, any
The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, it is of the invention
Protection domain should be determined by the scope of protection defined in the claims.
Claims (4)
1. a kind of massif winning equipment, the debugging machine including pedestal and at the top of pedestal, it is characterised in that:It is left in pedestal
The right side is correspondingly provided with the first cavity volume and the second cavity volume, and the first power is fixedly installed in the pedestal between the first cavity volume and the second cavity volume
Machine, power is connected with respectively both sides to the left and right and stretches the first Coupling Shaft of setting at left and right sides of the first engine, first turn
The section that stretches on the left of spindle probes into the first cavity volume and stretch end pin and the switching cooperation of the first cavity volume inner left wall, the first Coupling Shaft right side
The side section that stretches is probeed into the second cavity volume and the end pin that stretches is fixedly installed first bevel gear, outside the first Coupling Shaft in the first cavity volume
Surface is fixedly installed second bevel gear, and the sliding slot for the setting that stretches upwards is equipped in debugging machine bottom surface, slips and matches in sliding slot
Conjunction has trolley shoe, internal the first screw rod for being mutually correspondingly provided with the mating connection of helical line and the upper and lower setting that stretches in the trolley shoe left and right sides
With the second screw rod, the first screw rod is located in sliding slot opposite above the first cavity volume, and the second screw rod is located at phase above the second cavity volume
To sliding slot in, the first screw rod and the second screw tip end pin that stretches are transferred with sliding slot inner roof wall and are coordinated, the first screw rod
Base top surface and the switching cooperation that bottom stretches above the first cavity volume of section break-through, the first screw rod bottom end pin that stretches probe into the first appearance
Intracavitary and end pin are fixedly installed to the third hand tap gear that connect of coincideing with second bevel gear right hand top, the second screw rod bottom
Stretch the base top surface of top and switching cooperation on the second cavity volume of section break-through, and the second screw rod bottom end pin that stretches probes into the second cavity volume
Interior and end pin is fixedly installed to the 4th bevel gear that connect of coincideing with first bevel gear right hand top, is equipped with and is bored in trolley shoe
Hole power plant, debugging machine right side are fixedly installed splashproof stone cover, control device are provided on the first engine.
2. a kind of massif winning equipment according to claim 1, it is characterised in that:The drilling power device includes setting
Sliding chamber in the trolley shoe and the guide groove for leading to setting and the setting that stretches to the right with inner wall on the right side of the sliding chamber,
Stretch trolley shoe right side described in end pin break-through on the right side of the guide groove, and the sliding intracavitary is equipped with second turn of the setting that stretches up and down
Spindle, the second Coupling Shaft bottom end pin that stretches coordinates with the sliding intracavitary bottom wall switching, at the top of second Coupling Shaft
End pin and the second engine are connected, and the second engine outer surface is arranged in the sliding intracavitary roof and fixation is matched
Connection is closed, is fixedly installed eccentric wheel on the second Coupling Shaft outer surface of the sliding intracavitary, on the right side of the eccentric wheel
The sliding intracavitary, which is slipped, is combined with derivation block, and the drilling power bar for being combined with and controlling the setting that stretches, institute are slipped in the guide groove
The end pin that stretches on the left of drilling power bar is stated to probe into the sliding intracavitary and connect with derivation block right side secure fit, it is described
It derives the drilling power rod outer surface on the right side of block and is equipped with spring element, stretch on the right side of the drilling power bar described in end pin stretching
Outside trolley shoe right side, the alleviation equipped with upper and lower break-through setting in the drilling power bar outside the trolley shoe right side is stretched out
Slot, it is described alleviation slot in slip be combined with electric drill bit device.
3. a kind of massif winning equipment according to claim 3, it is characterised in that:The electricity drill bit device includes sliding match
The strut for the setting that is arranged in the alleviation slot and stretches up and down is closed, the strut is internally provided with hole slot, is slipped in the hole slot
The guide block for controlling the setting that stretches is combined with, the end pin that stretches at left and right sides of the guide block alleviates inner wall at left and right sides of slot with described respectively
It is fixedly connected, is equipped in the hole slot on the downside of the guide block and alleviates spring element, the strut bottom end pin switching that stretches has electricity
Drill bit, transferring between the electric drill head right hand top and the strut outer right wall has punching press rackwork.
4. a kind of massif winning equipment according to claim 1, it is characterised in that:The control device includes fixed setting
The first control device on the upside of first engine and the second control device being fixed on the downside of first engine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710951755.3A CN108222822A (en) | 2017-10-13 | 2017-10-13 | A kind of massif winning equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710951755.3A CN108222822A (en) | 2017-10-13 | 2017-10-13 | A kind of massif winning equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108222822A true CN108222822A (en) | 2018-06-29 |
Family
ID=62654549
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710951755.3A Pending CN108222822A (en) | 2017-10-13 | 2017-10-13 | A kind of massif winning equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108222822A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB665920A (en) * | 1949-01-25 | 1952-02-06 | Houilleres Bassin Du Nord | Improved drill |
CN204960936U (en) * | 2015-08-15 | 2016-01-13 | 何纪江 | Mine quarrying machhine |
CN206015655U (en) * | 2016-09-05 | 2017-03-15 | 中国建筑第八工程局有限公司 | A kind of floor rammer |
CN107008935A (en) * | 2017-05-31 | 2017-08-04 | 陈柯 | A kind of punch device with two-way punching functions |
CN107100542A (en) * | 2017-05-23 | 2017-08-29 | 义乌市雄发尔机械设备有限公司 | A kind of building wall punch device |
CN107097302A (en) * | 2017-05-29 | 2017-08-29 | 何纪全 | A kind of building decorative plates perforating device |
-
2017
- 2017-10-13 CN CN201710951755.3A patent/CN108222822A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB665920A (en) * | 1949-01-25 | 1952-02-06 | Houilleres Bassin Du Nord | Improved drill |
CN204960936U (en) * | 2015-08-15 | 2016-01-13 | 何纪江 | Mine quarrying machhine |
CN206015655U (en) * | 2016-09-05 | 2017-03-15 | 中国建筑第八工程局有限公司 | A kind of floor rammer |
CN107100542A (en) * | 2017-05-23 | 2017-08-29 | 义乌市雄发尔机械设备有限公司 | A kind of building wall punch device |
CN107097302A (en) * | 2017-05-29 | 2017-08-29 | 何纪全 | A kind of building decorative plates perforating device |
CN107008935A (en) * | 2017-05-31 | 2017-08-04 | 陈柯 | A kind of punch device with two-way punching functions |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107816318A (en) | A kind of winning equipment | |
CN108561078A (en) | A kind of drilling equipment of soil layer or rock | |
CN107662003A (en) | A kind of decorative panel for building Special punching device | |
CN107199359B (en) | A kind of aluminum alloy materials drilling equipment for building | |
CN107803528A (en) | A kind of new letter box arrangement | |
CN107199458A (en) | It is a kind of to open screw device for valve | |
CN107838477A (en) | A kind of aluminum alloy materials installation drilling equipment for building | |
CN107160175A (en) | A kind of practical bridge equipment | |
CN108839265A (en) | A kind of convenient and fast Cast-in-place Bent Cap construction method | |
CN108222822A (en) | A kind of massif winning equipment | |
CN107116943A (en) | A kind of cup device | |
CN107465046A (en) | A kind of new electric supply installation | |
CN108222823A (en) | A kind of efficiently winning equipment | |
CN208895563U (en) | High speed drill carves machine | |
CN107552521B (en) | A kind of sewage cylinder inner-wall cleaning device | |
CN107838478A (en) | A kind of aluminium alloy drilling equipment for building | |
CN107756042A (en) | A kind of new letter box arrangement | |
CN107775038A (en) | A kind of letter box arrangement | |
CN108589545A (en) | A kind of automation bridge Architectural Equipment | |
CN207155225U (en) | It is a kind of to open screw device for valve | |
CN107685164A (en) | A kind of adjustable plate punching equipment | |
CN107816319B (en) | A kind of massif mining apparatus | |
CN108838442A (en) | A kind of drilling robot | |
CN107780939B (en) | A kind of mining apparatus | |
CN107020415A (en) | A kind of cutting machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180629 |