CN108203979A - A kind of pile crown breaking system and restructuring bankrupt using the method for abolishing that disappears - Google Patents

A kind of pile crown breaking system and restructuring bankrupt using the method for abolishing that disappears Download PDF

Info

Publication number
CN108203979A
CN108203979A CN201810162552.0A CN201810162552A CN108203979A CN 108203979 A CN108203979 A CN 108203979A CN 201810162552 A CN201810162552 A CN 201810162552A CN 108203979 A CN108203979 A CN 108203979A
Authority
CN
China
Prior art keywords
pile
pile crown
pile foundation
main reinforcement
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810162552.0A
Other languages
Chinese (zh)
Other versions
CN108203979B (en
Inventor
刘梦捷
董树英
郭爱民
丁小平
杨榕
贾玉寒
张建伟
董楠楠
刘学玲
李倩伟
郭男
郭一男
楚建鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Road and Bridge Group Co Ltd
Original Assignee
CSCEC Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Road and Bridge Group Co Ltd filed Critical CSCEC Road and Bridge Group Co Ltd
Priority to CN201810162552.0A priority Critical patent/CN108203979B/en
Publication of CN108203979A publication Critical patent/CN108203979A/en
Application granted granted Critical
Publication of CN108203979B publication Critical patent/CN108203979B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of pile crown breaking systems and restructuring bankrupt using the method for abolishing that disappears, system includes being nested with the casing in pile foundation main reinforcement and sound detecting pipe, is arranged on the sealant tape of sleeve bottom and the supporting rack being arranged between multiple sleeve bottoms, and support frame as described above is by being in that the pipe of latticed arrangement forms;The absolute altitude line position of pile foundation is provided with steel wire rope, the steel wire rope is annular in shape, and fixing end is connect with a pile foundation main reinforcement, and free end is leading to pile crown top outer in one week around pile foundation with fixing end junction;The present invention reduces withdrawal resistance of the concrete to foundation pile main reinforcement, to achieve the purpose that pile body monoblock type detaches, improves traditional pile crown and abolish time-consuming and laborious, manpower consumption serious situation by increasing casing in the pile foundation main reinforcement more than elevation line.

Description

A kind of pile crown breaking system and restructuring bankrupt using the method for abolishing that disappears
Technical field
The present invention relates to a kind of pile crown breaking systems and restructuring bankrupt using the method for abolishing that disappears.
Background technology
At present, pile crown abolishes construction and mostly cuts method using traditional artificial, manually by pneumatic pick to pile foundation elevation line more than Invalid pile body block-by-block is cut, and during pile crown is abolished, since pile body periphery is provided with sound detecting pipe, it is improper artificially to control, may Sound detecting pipe is damaged, causes to occur during later stage pile measurement abnormal.And it is slow that manpower abolishes construction speed, expends a large amount of manpower objects Power, environmental pollution is big, noise is big.
Invention content
The technical problems to be solved by the invention be to provide it is a kind of it is easy to operate, abolish it is more convenient using disappearing Abolish the pile crown breaking system and restructuring bankrupt of method.
The technical solution adopted in the present invention is:A kind of pile crown breaking system using the method for abolishing that disappears, including being nested with Casing in pile foundation main reinforcement and sound detecting pipe is arranged on the sealant tape of sleeve bottom and is arranged between multiple sleeve bottoms Supporting rack, support frame as described above is by being in that the pipe of latticed arrangement forms;The absolute altitude line position of pile foundation is provided with steel wire rope, institute It is annular in shape to state steel wire rope, fixing end is connect with a pile foundation main reinforcement, and free end is drawn for one week around pile foundation with fixing end junction To pile crown top outer.
Support frame as described above is made of Expandable polystyrene resin bead.
The separator for pile crown to be detached with pile foundation is further included, the separator is arranged on separation including cylinder Separating head, drive shaft, the oval pushing block of setting just on the driving shaft on cylinder side wall and the liquid with drive shaft drive connection Pressure motor, the separating head are six, are symmetrically arranged on the side wall of cylinder, and the pushing block is three, each pushing block Corresponding with two separating heads, the cylinder is corresponding with the pipe of supporting rack, and cylinder is arranged on the cylinder rod of oil cylinder.
The separating head is tapered, and connecting rod is provided in the bottom of separating head, and the pushing block is corresponding with connecting rod.
The water inlet pipe of the hydraulic motor is connected with water tank, and hydraulic pump is provided on water inlet pipe, in hydraulic pump and liquid Return pipe is provided on water inlet pipe between pressure motor, the return pipe is connected with water tank, is provided on the return pipe Overflow valve.
The oil cylinder is fixed on mounting bracket, and the mounting bracket is rounded, is uniformly arranged and is useful on mounting bracket The fastening bolt that mounting bracket is connect with pile body.
Breaking system application method, includes the following steps:
Step 1:Steel reinforcement cage is made, casing is inserted on pile foundation main reinforcement and the sound detecting pipe of steel reinforcement cage, with sealant tape by casing Sealed bottom;
Step 2:Steel wire rope is installed in a pile foundation main reinforcement, around steel reinforcement cage one week, free end was led at the top of pile crown steel wire rope Outside, while ensure steel wire rope should be located in elevation line for one week around pile foundation main reinforcement;
Step 3:Supporting rack is mounted in pile foundation main reinforcement, the position of supporting rack should be higher than that elevation line;
Step 4:Carry out pile foundation concreting;
Step 5:It after pile foundation concrete reaches some strength, carries out pile crown and abolishes, manually haulage cable in certain direction Free end, the outside and the concrete more than elevation line for making pile foundation main reinforcement come off;
Step 6:Supporting rack is heated, under fuel factor, supporting rack melts volatilization, and through-hole is left on pile crown;
Step 7:Separator is fixed on pile crown, cylinder is inserted into the through-hole that supporting rack leaves, and starts hydraulic motor The side wall of through-hole is abolished with oil cylinder, while is carved using steel and constantly agitates pile crown upwards, realizes pile crown separation;
Step 8:Pile crown is transferred from using devices such as tower cranes.
The positive effect of the present invention is:The present invention is dropped by increasing casing in the pile foundation main reinforcement more than elevation line Low concrete, to achieve the purpose that pile body monoblock type detaches, improves traditional pile crown and abolishes time-consuming expense to the withdrawal resistance of foundation pile main reinforcement Power, manpower consumption serious situation.Supporting rack is installed simultaneously in the bottom of pile foundation main reinforcement, which can completely be gone by heating It removes, duct is left on pile crown again after removal, effectively reduce pile crown and remove difficulty, improve and remove efficiency.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is separator structure diagram of the present invention;
Fig. 3 is partial enlarged view at Fig. 2 A of the present invention;
Fig. 4 is pushing block structure diagram of the present invention.
Specific embodiment
As shown in attached drawing 1-4, the present invention includes the casing 3 being nested in pile foundation main reinforcement 1 and sound detecting pipe 2, is arranged on casing 3 The sealant tape of bottom and the supporting rack 4 being arranged between multiple 3 bottoms of casing, support frame as described above 4 is by being in latticed arrangement Pipe composition;The absolute altitude line position of pile foundation is provided with steel wire rope 5, the steel wire rope 5 is annular in shape, fixing end and a stake Base main reinforcement 1 connects, and free end is leading to pile crown top outer in one week around pile foundation with fixing end junction.
4 height of support frame as described above should be slightly above elevation line, be made of Expandable polystyrene resin bead, which exists Volatilizable anger body after heating so that channel is formed inside pile crown, reduces pile crown removal difficulty.In pile crown molding removal Before, supporting rack 4 can play a supporting role, and reduce the intensity effect to pile crown.
Further include the separator for pile crown to be detached with pile foundation, the separator is arranged on point including cylinder 8 From on 8 side wall of cylinder separating head 11, drive shaft 9, oval pushing block 10 of the setting just in drive shaft 9 and pass with drive shaft 9 The hydraulic motor 13 of dynamic connection, the separating head are six, are symmetrically arranged on the side wall of cylinder 8, the pushing block 10 It is three, separating head 11 answers horizontal homogeneous to be distributed in the both sides of drive shaft 9, and each pushing block 10 is corresponding with two separating heads 11, The cylinder 8 is corresponding with the pipe of supporting rack 4, and cylinder 8 is arranged on the cylinder rod of oil cylinder 14.The separating head 11 is in Taper, connecting rod 12 is provided in the bottom of separating head 11, and the pushing block 10 is corresponding with connecting rod 12.Cylinder 8 is in oil cylinder 14 Lower realize of effect moves back and forth, and carries out friction to the through-hole left by supporting rack 4 as separating head 11 and abolishes, only need to be to horizontal direction On concrete surface abolished.Drive shaft 9 is driven to rotate by hydraulic motor 13, make pushing block 10 always by separating head 11 to Outside squeezes, and guarantee separating head 11 comes into full contact with concrete, and efficiency is abolished in raising.
The water inlet pipe 15 of the hydraulic motor 13 is connected with water tank 16, and hydraulic pump 17 is provided on water inlet pipe 15, Return pipe 18 is provided on water inlet pipe 15 between hydraulic pump 17 and hydraulic motor 13, the return pipe 18 is connected with water tank 16 It is logical, it is provided with overflow valve 19 on the return pipe 18.Hydraulic motor 13 is connected by carrying the hydraulic pump 17 of overflow passage, when When can not be forced further out separating head 11 i.e. drive shaft 9 can not rotate, water flows through overflow passage reflow tank, can not only begin Separating head 11 is kept to be come into full contact with concrete eventually, hydraulic motor 13 can also be effectively prevent to damage.
The oil cylinder 14 is fixed on mounting bracket 6, and the mounting bracket 6 is rounded, is evenly arranged on mounting bracket 6 For the fastening bolt 7 for connecting mounting bracket 6 with pile body.
A kind of breaking system application method:It includes the following steps:
Step 1:Steel reinforcement cage is made, casing 3 is inserted in the pile foundation main reinforcement 1 of steel reinforcement cage and sound detecting pipe 2, will be covered with sealant tape The sealed bottom of pipe 3;
Step 2:Steel wire rope 5 is installed in a pile foundation main reinforcement 1, for steel wire rope 5 around steel reinforcement cage one week, free end led to pile crown Top outer, while ensure should be located in elevation line for one week around pile foundation main reinforcement 1 of steel wire rope 5;
Step 3:Supporting rack 4 is mounted in pile foundation main reinforcement 1, the position of supporting rack 4 should be higher than that elevation line;
Step 4:Carry out pile foundation concreting;
Step 5:After treating that pile foundation concrete reaches some strength, such as 70% or 80%, carry out pile crown and abolish, it is artificial by certain side To the free end of haulage cable 5, the outside and the concrete more than elevation line for making pile foundation main reinforcement 1 come off;
Step 6:Supporting rack 4 is heated, under fuel factor, supporting rack 4 melts volatilization, and through-hole is left on pile crown;
Step 7:Separator is fixed on pile crown, cylinder 8 is inserted into the through-hole that supporting rack 4 leaves, and starts hydraulic pressure horse The side wall of through-hole is abolished up to 13 and oil cylinder 14, while is carved using steel and constantly agitates pile crown upwards, realizes pile crown separation;
Step 8:Pile crown is transferred from using devices such as tower cranes, so as to complete the removal of entire pile crown.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments The present invention is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to previous embodiment Recorded technical solution modifies or carries out equivalent replacement to which part technical characteristic;And these are changed or replace It changes, the spirit and scope for technical solution of the embodiment of the present invention that it does not separate the essence of the corresponding technical solution.

Claims (7)

1. a kind of pile crown breaking system using the method for abolishing that disappears, it is characterised in that it includes being nested in pile foundation main reinforcement(1)And sound Test tube(2)On casing(3), be arranged on casing(3)The sealant tape of bottom and it is arranged on multiple casings(3)Between bottom Supporting rack(4), support frame as described above(4)It is made of the pipe for being in latticed arrangement;The absolute altitude line position of pile foundation is provided with steel wire Rope(5), the steel wire rope(5)Annularly, fixing end and a pile foundation main reinforcement(1)Connection, free end is around one Zhou Yu of pile foundation Fixing end junction leads to pile crown top outer.
A kind of 2. pile crown breaking system using the method for abolishing that disappears according to claim 1, it is characterised in that the support Frame(4)It is made of Expandable polystyrene resin bead.
3. a kind of pile crown breaking system using the method for abolishing that disappears according to claim 1 or 2, it is characterised in that further include For the separator for detaching pile crown with pile foundation, the separator includes cylinder(8), be arranged on cylinder(8)Side wall On separating head(11), drive shaft(9), be arranged on drive shaft(9)On oval pushing block(10)And and drive shaft(9)Transmission The hydraulic motor of connection(13), the separating head is six, is symmetrically arranged on cylinder(8)Side wall on, the pushing block (10)It is three, each pushing block(10)With two separating heads(11)It is corresponding, the cylinder(8)With supporting rack(4)Pipe It is corresponding, cylinder(8)It is arranged on oil cylinder(14)Cylinder rod on.
A kind of 4. pile crown breaking system using the method for abolishing that disappears according to claim 3, it is characterised in that the separation Head(11)It is tapered, in separating head(11)Bottom be provided with connecting rod(12), the pushing block(10)With connecting rod(12)It is corresponding.
A kind of 5. pile crown breaking system using the method for abolishing that disappears according to claim 3 or 4, it is characterised in that the liquid Pressure motor(13)Water inlet pipe(15)With water tank(16)It is connected, in water inlet pipe(15)On be provided with hydraulic pump(17), in hydraulic pressure Pump(17)With hydraulic motor(13)Between water inlet pipe(15)On be provided with return pipe(18), the return pipe(18)With water tank (16)It is connected, in the return pipe(18)On be provided with overflow valve(19).
A kind of 6. pile crown breaking system using the method for abolishing that disappears according to claim 3, it is characterised in that the oil cylinder (14)It is fixed at mounting bracket(6)On, the mounting bracket(6)It is rounded, in mounting bracket(6)On be uniformly arranged and be useful for pacify It shelves(6)The fastening bolt being connect with pile body(7).
7. according to claim 1-6 any one of them breaking system application methods:It is characterized in that it includes the following steps:
Step 1:Steel reinforcement cage is made, in the pile foundation main reinforcement of steel reinforcement cage(1)With sound detecting pipe(2)On be inserted in casing(3), use fluid sealant Band is by casing(3)Sealed bottom;
Step 2:In a pile foundation main reinforcement(1)Upper installation steel wire rope(5), steel wire rope(5)Around steel reinforcement cage one week, free end was drawn To pile crown top outer, while ensure steel wire rope(5)Around pile foundation main reinforcement(1)One week should be located at elevation line on;
Step 3:By supporting rack(4)Mounted on pile foundation main reinforcement(1)On, supporting rack(4)Position should be higher than that elevation line;
Step 4:Carry out pile foundation concreting;
Step 5:After pile foundation concrete reaches some strength, carry out pile crown and abolish, artificial traction steel wire rope(5)Free end, Make pile foundation main reinforcement(1)Outside and the concrete more than the elevation line come off;
Step 6:To supporting rack(4)It is heated, under fuel factor, supporting rack(4)Melt volatilization, through-hole is left on pile crown;
Step 7:Separator is fixed on pile crown, cylinder(8)It is inserted into supporting rack(4)In the through-hole left, start liquid Pressure motor(13)And oil cylinder(14)The side wall of through-hole is abolished, while is carved using steel and constantly agitates pile crown upwards, realizes stake Head separation;
Step 8:Pile crown is transferred from using devices such as tower cranes.
CN201810162552.0A 2018-02-27 2018-02-27 Pile head breaking system and pile head breaking method adopting vanishing breaking method Active CN108203979B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810162552.0A CN108203979B (en) 2018-02-27 2018-02-27 Pile head breaking system and pile head breaking method adopting vanishing breaking method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810162552.0A CN108203979B (en) 2018-02-27 2018-02-27 Pile head breaking system and pile head breaking method adopting vanishing breaking method

Publications (2)

Publication Number Publication Date
CN108203979A true CN108203979A (en) 2018-06-26
CN108203979B CN108203979B (en) 2023-06-06

Family

ID=62605392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810162552.0A Active CN108203979B (en) 2018-02-27 2018-02-27 Pile head breaking system and pile head breaking method adopting vanishing breaking method

Country Status (1)

Country Link
CN (1) CN108203979B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2025754A (en) * 2020-04-08 2021-10-27 Heerema Marine Contractors Nl Devices and methods for installing piles into the ground or seabed
CN115094892A (en) * 2022-05-18 2022-09-23 安徽省交通规划设计研究总院股份有限公司 Multi-station auxiliary device and method for bridge construction

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11247186A (en) * 1998-03-02 1999-09-14 Nkk Corp Pile-head concrete removing method and device for steel pipe pile filled with concrete
JP2000212972A (en) * 1999-01-27 2000-08-02 Nippon Steel Corp Joint construction and method between steel pipe pile and foundation concrete construction
JP2005325607A (en) * 2004-05-14 2005-11-24 Takenaka Komuten Co Ltd Pile head treating method of cast-in-place concrete pile
JP2006037492A (en) * 2004-07-27 2006-02-09 Takenaka Komuten Co Ltd Pile head processing construction method of cast-in-place concrete pile
FR2885928A1 (en) * 2005-05-20 2006-11-24 Explosifs Et De Prod Chim Soc Concrete block e.g. pile, cutting device for e.g. bridge, has reservoir comprising rigid duct units extending in horizontal plane, and demolishing agent filled in part via any of free ends of another duct unit connected to former units
CN102312429A (en) * 2011-07-12 2012-01-11 中铁西北科学研究院有限公司 Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile
CN102518124A (en) * 2011-11-30 2012-06-27 中交隧道工程局有限公司 Method for chiseling away cast-in-place pile head concrete rapidly
CN105297729A (en) * 2015-11-23 2016-02-03 中国葛洲坝集团第六工程有限公司 Bridge pile foundation pile head breaking device and method
CN206052712U (en) * 2016-08-24 2017-03-29 中交一公局厦门工程有限公司 A kind of Novel drilling pile head is pre-buried to exempt from the overall quick lift of ring cutting that drills
CN106759336A (en) * 2016-12-19 2017-05-31 中交路桥建设有限公司 A kind of cast-in-situ bored pile quickly abolishes pile crown construction method
WO2017141039A1 (en) * 2016-02-19 2017-08-24 Novaslice Ltd Improvements in or relating to pile head removal
CN208009431U (en) * 2018-02-27 2018-10-26 中建路桥集团有限公司 A kind of pile crown breaking system using the method for abolishing that disappears

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11247186A (en) * 1998-03-02 1999-09-14 Nkk Corp Pile-head concrete removing method and device for steel pipe pile filled with concrete
JP2000212972A (en) * 1999-01-27 2000-08-02 Nippon Steel Corp Joint construction and method between steel pipe pile and foundation concrete construction
JP2005325607A (en) * 2004-05-14 2005-11-24 Takenaka Komuten Co Ltd Pile head treating method of cast-in-place concrete pile
JP2006037492A (en) * 2004-07-27 2006-02-09 Takenaka Komuten Co Ltd Pile head processing construction method of cast-in-place concrete pile
FR2885928A1 (en) * 2005-05-20 2006-11-24 Explosifs Et De Prod Chim Soc Concrete block e.g. pile, cutting device for e.g. bridge, has reservoir comprising rigid duct units extending in horizontal plane, and demolishing agent filled in part via any of free ends of another duct unit connected to former units
CN102312429A (en) * 2011-07-12 2012-01-11 中铁西北科学研究院有限公司 Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile
CN102518124A (en) * 2011-11-30 2012-06-27 中交隧道工程局有限公司 Method for chiseling away cast-in-place pile head concrete rapidly
CN105297729A (en) * 2015-11-23 2016-02-03 中国葛洲坝集团第六工程有限公司 Bridge pile foundation pile head breaking device and method
WO2017141039A1 (en) * 2016-02-19 2017-08-24 Novaslice Ltd Improvements in or relating to pile head removal
CN206052712U (en) * 2016-08-24 2017-03-29 中交一公局厦门工程有限公司 A kind of Novel drilling pile head is pre-buried to exempt from the overall quick lift of ring cutting that drills
CN106759336A (en) * 2016-12-19 2017-05-31 中交路桥建设有限公司 A kind of cast-in-situ bored pile quickly abolishes pile crown construction method
CN208009431U (en) * 2018-02-27 2018-10-26 中建路桥集团有限公司 A kind of pile crown breaking system using the method for abolishing that disappears

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
牛新利: "钻孔灌注桩桩头破除施工新工艺", 《工程建设与设计》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2025754A (en) * 2020-04-08 2021-10-27 Heerema Marine Contractors Nl Devices and methods for installing piles into the ground or seabed
CN115094892A (en) * 2022-05-18 2022-09-23 安徽省交通规划设计研究总院股份有限公司 Multi-station auxiliary device and method for bridge construction
CN115094892B (en) * 2022-05-18 2023-08-22 安徽省交通规划设计研究总院股份有限公司 Multi-station auxiliary device and auxiliary method for bridge construction

Also Published As

Publication number Publication date
CN108203979B (en) 2023-06-06

Similar Documents

Publication Publication Date Title
CN108203979A (en) A kind of pile crown breaking system and restructuring bankrupt using the method for abolishing that disappears
CN208009431U (en) A kind of pile crown breaking system using the method for abolishing that disappears
CN206976923U (en) A kind of transformer station's cover for indoor cable groove hook special
CN206971076U (en) A kind of bridge drainage system
CN202542770U (en) Tube joint turning over device of pressure steel tube in hole chamber
CN109681268B (en) Indoor experiment method for simulating filling process of metal underground mine stope
CN208585948U (en) A kind of auxiliary mould for the lifting of offshore engineering structure pipe
CN107187369A (en) A kind of flood control and drainage car of speedily carrying out rescue work with automatic control function
CN206501765U (en) It is a kind of to be used for the hydraulic power drainage system of emergent water drainage car
CN203895865U (en) Cable laying device
CN207633847U (en) A kind of chimney steel beam hydraulic promotion high-altitude integral slipping hanging apparatus
CN103115000B (en) Water suction pump driven by excavator and used in emergency
CN111456052B (en) River channel slope supporting corridor type rapid dismounting combined cofferdam
CN211008750U (en) Large-gradient reverse-slope drainage tunnel water pump quick-moving installation device
CN106799985A (en) A kind of hydraulic power drainage system for water drainage car of meeting an urgent need
CN203393830U (en) Municipal sewer wellhead protection device
CN203404486U (en) Hydraulic pipeline installation machine
CN202265830U (en) Sleeve secant pile water fetching bucket
CN206680153U (en) A kind of inspection well cover provision for disengagement
CN105421457A (en) Spiral type pipe pile soil getting machine
CN220865618U (en) Novel float type submersible pump
CN206306915U (en) A kind of flood control and drainage car of speedily carrying out rescue work with automatic control function
CN219491151U (en) Water storage structure for water conservancy design
CN205100905U (en) Weight controlled hydraulic drive workover rig
CN205100904U (en) Controllable type hydraulic drive workover rig of speed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant