CN206680153U - A kind of inspection well cover provision for disengagement - Google Patents

A kind of inspection well cover provision for disengagement Download PDF

Info

Publication number
CN206680153U
CN206680153U CN201720382120.1U CN201720382120U CN206680153U CN 206680153 U CN206680153 U CN 206680153U CN 201720382120 U CN201720382120 U CN 201720382120U CN 206680153 U CN206680153 U CN 206680153U
Authority
CN
China
Prior art keywords
well cover
inspection well
supporting plate
disengagement
balancing pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720382120.1U
Other languages
Chinese (zh)
Inventor
李金雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Dragon Property Management Development Co Ltd
Original Assignee
Guangzhou Dragon Property Management Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Dragon Property Management Development Co Ltd filed Critical Guangzhou Dragon Property Management Development Co Ltd
Priority to CN201720382120.1U priority Critical patent/CN206680153U/en
Application granted granted Critical
Publication of CN206680153U publication Critical patent/CN206680153U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of inspection well cover provision for disengagement, including base, supporting plate is provided with the base, the length of the base and supporting plate is all higher than inspection well cover diameter length, the supporting plate is provided with lifting apparatus, the lifting apparatus includes balancing pole and two rope yarns, the balancing pole direction is horizontal, and it is mutually perpendicular to supporting plate, hook is designed with the end of each rope yarn, the hook includes connecting rod and motion bar, the connecting rod upper end is connected with rope yarn end, and lower end is provided with through slot, the motion bar is hinged in through slot.The utility model replaces manpower using plant equipment, greatly reducing the amount of labour, improves maintenance efficiency, while hook is symmetrical arranged, and adds stability, reduces the destruction to inspection well cover, more securely and reliably.

Description

A kind of inspection well cover provision for disengagement
Technical field
It the utility model is related to underground piping service technique field, more particularly to a kind of inspection well cover provision for disengagement.
Background technology
With expanding economy, the quickening of social Development of China's Urbanization, the various pipelines of provided underground are also more and more, road surface The quantity of upper various inspection shafts also increases therewith., it is necessary to often clear up when inspection shaft is used for water-supply-pipe, especially in rainy season, more Ensure the usual of sewer pipe, therefore, opening inspection well cover maintenance turns into an important process of municipal administration maintenance.Existing inspection well cover Opening means are mainly:Injected in inspection well cover passage with instrument, firmly prized, tilt inspection well cover one end, then again by sticking up Play one end to move whole inspection well cover, not only labor takes manpower to this method, and prizes passage and be easy to cause brokenly inspection well cover It is bad, it might even be possible to directly to destroy inspection well cover.Therefore, how to realize that safe and efficient dismounting inspection well cover is urgently to be resolved hurrily as one The problem of.
Utility model content
For above-mentioned the deficiencies in the prior art, the utility model provides a kind of inspection well cover provision for disengagement, with prior art To compare, the utility model replaces manpower using plant equipment, greatly reducing the amount of labour, while to the hook mode of inspection well cover It is more safe and reliable, reduce the destruction to inspection well cover.
Technical scheme is used by the utility model solves its technical problem:
A kind of inspection well cover provision for disengagement, including base, are provided with supporting plate on the base, the base and supporting plate Length is all higher than inspection well cover diameter length, and the supporting plate is provided with lifting apparatus, and the lifting apparatus includes balancing pole and two Root rope yarn, the balancing pole direction is horizontal, and is mutually perpendicular to supporting plate, is designed with hooking in the end of each rope yarn Device, the hook include connecting rod and motion bar, and the connecting rod upper end is connected with rope yarn end, and lower end is provided with and passed through Groove, the motion bar are hinged in through slot.
Further, the lifting apparatus also includes hydraulic jack, and the piston rod upper end of the hydraulic jack is with putting down The bar that weighs is connected, and the head end of each rope yarn is all connected with one end of balancing pole.
Further, the lifting apparatus also includes fixed block, motor and drum, and the fixed block is fixed on the supporting plate And close to centre position, connecting hole is provided with fixed block upper end, rotating shaft, one end of the rotating shaft and line are provided with the connecting hole Disk is engaged, and the other end is engaged with the output shaft of motor, and the motor is fixed on the supporting plate by fixed seat, the balance Bar be fixed on it is on fixed block and adjacent with drum, wherein the head end of a rope yarn is fixed on the upper end of drum periphery, separately The head end of a piece rope yarn is fixed on the lower end of drum periphery.
Further, pulley is provided with the both sides of the balancing pole, each rope yarn all fills around pulley with hooking Put connection.
Further, the motion bar both ends are taper.
Further, it is provided with roller in the Its lower side.
The beneficial effects of the utility model are:
1. being dismantled by motor driving or hydraulic jack to inspection well cover, installment work, people is greatly saved Power;Two inspection shaft cap bore are hooked simultaneously, lifting, add balance, avoid one direction hook in traditional method for dismounting The infringement problem brought to inspection well cover is hung, decreases the destruction to ground around.
2. drive balancing pole, hook to move up and down by hydraulic jack, so as to realize installation to inspection well cover, Dismounting, avoids the hypodynamic situation of maintenance place electricity, and adaptive faculty is stronger.
3. because motion bar both ends are taper, soil, the rubbish blocked in inspection well cover passage can be cleared up, from And conveniently enter, and motion bar is hinged with connecting rod, after being inserted perpendicularly into passage, under gravity can horizontal development, so as to Inspection shaft cap bore both sides can be hooked, add hook area, further increase stability, reduce to inspection well cover Damage, improves practicality.
4. Its lower side sets roller, after lifting apparatus lifts inspection well cover, base is promoted, inspection well cover can be moved away from The expansion of the follow-up work such as inspection shaft position, convenient inspection, maintenance.
The utility model replaces manpower using plant equipment, greatly reducing the amount of labour, improves maintenance efficiency, simultaneously Hook is symmetrical arranged, and adds stability, reduces the destruction to inspection well cover, more securely and reliably.
Brief description of the drawings
Accompanying drawing 1 is structural representation when the utility model uses hydraulic jack;
Accompanying drawing 2 is structural representation when the utility model is driven using motor;
Accompanying drawing 3 is hooking device structural representation;
In figure, 1, base, 2, supporting plate, 31, hydraulic jack, 32, fixed block, 33, motor, 34, drum, 35, rotating shaft, 36th, fixed seat, 4, balancing pole, 5, rope yarn, 61, connecting rod, 611, through slot, 62, motion bar, 7, pulley, 8, roller.
Embodiment
In order to more fully understand the utility model, embodiment of the present utility model is explained in detail below in conjunction with the accompanying drawings.
As shown in accompanying drawing 1 and accompanying drawing 3, including base 1, the length of supporting plate 2, base 1 and supporting plate 2 is provided with base 1 Degree is all higher than inspection well cover diameter length, and supporting plate 2 is provided with lifting apparatus, and lifting apparatus includes 4, two and of rope yarn 5 of balancing pole Hydraulic jack 31, inspection well cover is dismantled by hydraulic jack 31, installment work, be greatly saved manpower, hydraulic pressure The piston rod upper end of jack 31 is connected with balancing pole 4, and the direction of balancing pole 4 is horizontal, and is mutually perpendicular to supporting plate 2, after convenient The lifting of continuous rope yarn 5, the both ends of balancing pole 4 are respectively provided with a rope yarn 5, are designed with hook in the end of each rope yarn 5, simultaneously Two inspection shaft cap bore are hooked, lifting, add balance, avoided one direction in traditional method for dismounting and hook to inspection shaft The infringement problem that cover strip is come, decreases the destruction to ground around.
Hook includes connecting rod 61 and motion bar 62, and the upper end of connecting rod 61 is connected with the end of rope yarn 5, and lower end is provided with Through slot 611, through hole being provided with the lower end both sides of connecting rod 61, the shape of motion bar 62 is engaged with through slot 611, and in centre Position is provided with pin-and-hole, and pin sequentially passes through through hole and pin-and-hole, realizes being articulated and connected for motion bar 62 and connecting rod 61, due to The both ends of motion bar 62 are taper, and soil, the rubbish that blocked in inspection well cover passage can be cleared up, and are entered so as to convenient, And motion bar 62 and connecting rod 61 are be hinged, after being inserted perpendicularly into passage, under gravity can horizontal development, so as to basement Well lid hole both sides are hooked, and are added hook area, are further increased stability, are reduced the damage to inspection well cover, are carried High practicality.
Roller 8 is provided with the downside of base 1, after lifting apparatus lifts inspection well cover, promotes base 1, can be by inspection well cover Move away from the expansion of the follow-up work such as inspection shaft position, convenient inspection, maintenance.
As shown in accompanying drawing 2 and accompanying drawing 3, including base 1, supporting plate 2, the supporting plate 2 of base 1 and first are provided with base 1 Length be all higher than inspection well cover diameter length, supporting plate 2 is provided with lifting apparatus, and lifting apparatus includes 4, two rope yarns of balancing pole 5th, fixed block 32, motor 33 and drum 34, fixed block 32 are fixed in supporting plate 2 and close to centre positions, and in fixed block 32 Upper end is provided with connecting hole, and rotating shaft 35 is provided with connecting hole, and one end of rotating shaft 35 is engaged with drum 34, the other end and motor 33 Output shaft is engaged, and motor 33 is fixed in supporting plate 2 by fixed seat 36, is driven by motor 33 and inspection well cover is torn open Unload, installment work, be greatly saved manpower, balancing pole 4 is fixed on fixed block 32 and adjacent with drum 34, the side of balancing pole 4 It is mutually perpendicular to level, and with supporting plate 2, facilitates the lifting of follow-up rope yarn 5, a rope yarn 5 is respectively provided with the both ends of balancing pole 4, its In the head end of a rope yarn 5 be fixed on the upper end of the periphery of drum 34, the head end of another rope yarn 5 is fixed on the periphery of drum 34 Lower end, hook is designed with the end of each rope yarn 5, while two inspection shaft cap bore are hooked, lifting, increased Balance, avoid one direction in traditional method for dismounting and hook the infringement problem brought to inspection well cover, decrease to surrounding The destruction on ground.
In order to reduce the friction of balancing pole 4 and rope yarn 5, be provided with pulley 7 in the both sides of balancing pole 4, each rope yarn 5 around Pulley 7 is crossed to be connected with hook.
Hook includes connecting rod 61 and motion bar 62, and the upper end of connecting rod 61 is connected with the end of rope yarn 5, and lower end is provided with Through slot 611, through hole being provided with the lower end both sides of connecting rod 61, the shape of motion bar 62 is engaged with through slot 611, and in centre Position is provided with pin-and-hole, and pin sequentially passes through through hole and pin-and-hole, realizes being articulated and connected for motion bar 62 and connecting rod 61, due to The both ends of motion bar 62 are taper, and soil, the rubbish that blocked in inspection well cover passage can be cleared up, and are entered so as to convenient, And motion bar 62 and connecting rod 61 are be hinged, after being inserted perpendicularly into passage, under gravity can horizontal development, so as to basement Well lid hole both sides are hooked, and are added hook area, are further increased stability, are reduced the damage to inspection well cover, are carried High practicality.
Roller 8 is provided with the downside of base 1, after lifting apparatus lifts inspection well cover, promotes base 1, can be by inspection well cover Move away from the expansion of the follow-up work such as inspection shaft position, convenient inspection, maintenance.
Although above-mentioned the embodiment of utility model is described with reference to accompanying drawing, not to the utility model The limitation of protection domain, on the basis of the technical solution of the utility model, those skilled in the art need not pay creativeness The various modifications or deformation that work can be made are still within the scope of protection of the utility model.

Claims (6)

1. a kind of inspection well cover provision for disengagement, including base, it is characterised in that:Supporting plate, the base are provided with the base Inspection well cover diameter length is all higher than with the length of supporting plate, the supporting plate is provided with lifting apparatus, and the lifting apparatus includes Balancing pole and two rope yarns, the balancing pole direction is horizontal, and is mutually perpendicular to supporting plate, in the end of each rope yarn Hook is designed with, the hook includes connecting rod and motion bar, and the connecting rod upper end is connected with rope yarn end, and Lower end is provided with through slot, and the motion bar is hinged in through slot.
2. a kind of inspection well cover provision for disengagement as claimed in claim 1, it is characterised in that the lifting apparatus also includes hydraulic pressure thousand Jin top, the piston rod upper end of the hydraulic jack is connected with balancing pole, the head end of each rope yarn all with balancing pole One end connects.
3. a kind of inspection well cover provision for disengagement as claimed in claim 1, it is characterised in that the lifting apparatus also includes fixing Block, motor and drum, the fixed block are fixed on the supporting plate and close to centre position, and connecting hole is provided with fixed block upper end, Rotating shaft is provided with the connecting hole, one end of the rotating shaft is engaged with drum, and the other end is engaged with the output shaft of motor, institute State motor by fixed seat fix on the supporting plate, the balancing pole be fixed on it is on fixed block and adjacent with drum, wherein one The head end of the rope yarn is fixed on the upper end of drum periphery, and the head end of another rope yarn is fixed on the lower end of drum periphery.
4. a kind of inspection well cover provision for disengagement as claimed in claim 3, it is characterised in that be provided with and slide in the both sides of the balancing pole Wheel, each rope yarn are all connected around pulley with hook.
5. a kind of inspection well cover provision for disengagement as described in claim 2 or 4, it is characterised in that the motion bar both ends are taper.
6. a kind of inspection well cover provision for disengagement as claimed in claim 5, it is characterised in that be provided with roller in the Its lower side.
CN201720382120.1U 2017-04-13 2017-04-13 A kind of inspection well cover provision for disengagement Expired - Fee Related CN206680153U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720382120.1U CN206680153U (en) 2017-04-13 2017-04-13 A kind of inspection well cover provision for disengagement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720382120.1U CN206680153U (en) 2017-04-13 2017-04-13 A kind of inspection well cover provision for disengagement

Publications (1)

Publication Number Publication Date
CN206680153U true CN206680153U (en) 2017-11-28

Family

ID=60400033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720382120.1U Expired - Fee Related CN206680153U (en) 2017-04-13 2017-04-13 A kind of inspection well cover provision for disengagement

Country Status (1)

Country Link
CN (1) CN206680153U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110282583A (en) * 2019-06-27 2019-09-27 南宁学院 A kind of manhole cover lifting machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110282583A (en) * 2019-06-27 2019-09-27 南宁学院 A kind of manhole cover lifting machine

Similar Documents

Publication Publication Date Title
CN105442934B (en) Bi-directional torque cement pole pole centralizing device
CN205421253U (en) Novel piling machine
CN202751711U (en) Deep well rescue device
CN104179365B (en) Overall steel tower displacement constructional method
CN111620282A (en) Municipal works construction is mentioned device with well lid
CN207129863U (en) Servicing unit is safeguarded in a kind of pole-mounted circuit breaker installation
CN206680153U (en) A kind of inspection well cover provision for disengagement
CN202299574U (en) Plug-in type communication base station lifting tower
CN209618661U (en) The hoisting mechanism of pipe robot
CN205557520U (en) Novel pile -drawing machine
CN117167681A (en) LED integrated solar street lamp system with ice and snow removing and spraying dust reducing functions
CN206336964U (en) A kind of support top formula lifting pipeline apparatus and system
CN206233673U (en) A kind of herringbone holding pole standing device
CN215287782U (en) Traction device is restoreed to non-excavation pipeline inside lining
CN204434174U (en) Self-control electric hoisting device
CN207046668U (en) A kind of instrument for opening drainage pipeline well lid
CN206737106U (en) Prefabricated pumping plant Lift-on/Lift-off System
CN207348829U (en) Hydraulic double-arm balance oil extractor
CN205100906U (en) Environmental protection and energy saving type hydraulic drive workover rig
CN205100905U (en) Weight controlled hydraulic drive workover rig
CN204162334U (en) The large pump peace of dark dewatering well tears jacking system open
CN202117077U (en) Manhole cover opening device
CN205100904U (en) Controllable type hydraulic drive workover rig of speed
CN207092513U (en) A kind of rotary type lowering or hoisting gear for tank inside construction
CN205100903U (en) Novel hydraulic drive workover rig

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171128

Termination date: 20190413

CF01 Termination of patent right due to non-payment of annual fee