CN108199337B - Transformer station secondary system and its performance improvement method are pressed in one kind - Google Patents

Transformer station secondary system and its performance improvement method are pressed in one kind Download PDF

Info

Publication number
CN108199337B
CN108199337B CN201711327501.0A CN201711327501A CN108199337B CN 108199337 B CN108199337 B CN 108199337B CN 201711327501 A CN201711327501 A CN 201711327501A CN 108199337 B CN108199337 B CN 108199337B
Authority
CN
China
Prior art keywords
bus
measure
sections
control device
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201711327501.0A
Other languages
Chinese (zh)
Other versions
CN108199337A (en
Inventor
林湘宁
金能
李正天
刘尧
邢家维
戎子睿
张培夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhong University of Science and Technology
State Grid Hubei Electric Power Co Ltd
Original Assignee
Huazhong University of Science and Technology
State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huazhong University of Science and Technology, State Grid Hubei Electric Power Co Ltd filed Critical Huazhong University of Science and Technology
Priority to CN201711327501.0A priority Critical patent/CN108199337B/en
Publication of CN108199337A publication Critical patent/CN108199337A/en
Application granted granted Critical
Publication of CN108199337B publication Critical patent/CN108199337B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H1/00Details of emergency protective circuit arrangements
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • H02H7/268Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured for dc systems

Abstract

The invention discloses transformer station secondary system and its performance improvement method are pressed in one kind, performance improvement method includes: S1, when the association feeder number in buckling power station in confirmation is less than or equal to preset quantity, multiple measure and control devices in multiple first protection supervisory equipments and multiple second protection supervisory equipments are removed respectively and are integrated into the first measure and control device and the second measure and control device, by two sections of bus to the multiple protective devices and the power supply of the first measure and control device in multiple second protection supervisory equipments, by one section of bus to the multiple protective devices and the power supply of the second measure and control device in multiple first protection supervisory equipments;Or S2, when the association feeder number in buckling power station in confirmation is greater than preset quantity, add the second remote jump device and the first remote jump device respectively to one section of bus and two sections of bus.The beneficial effects of the present invention are: effectively solving the problems, such as that line fault bring fault incidence expands in the case where DC power supply loses scene.

Description

Transformer station secondary system and its performance improvement method are pressed in one kind
Technical field
The present invention relates to relay protection fields, in particular to transformer station secondary system and its performance boost side are pressed in one kind Method.
Background technique
Transforming plant protecting and TT&C system Secondary Direct Electrical Resources loss are one of substation operation matters of aggravation, power transformation Streaming system bus-bar fault of standing erectly or for DC bus protection jump can all cause it to be powered each set protect control device Power supply is lost and out of service, so that a corresponding route or main equipment lose defencive function.In super-pressure/high-pressure system In, since the movement consequence of protection is pulled one hair and move the whole body, DC power-supply system generally takes double-bus to configure, and protects and surveys Device separation is controlled, therefore, single DC power supply loss not will lead to the devices such as protection and observing and controlling power loss to lose function, make Reliability with higher must be protected.But in 110kV and mesolow electrical power trans mission/distribution system below, consider economic cost and The configuration mode of the problems such as land occupation, double DC bus are not promoted, and DC power-supply system generally uses sectionalized single busbar connection Form, and its Substation IED generallys use protection supervisory equipment integrated design.
It is such design and configuration theory under, when certain section of DC bus exception, associated by all protection observing and controlling Device will lose DC power supply simultaneously and then lose corresponding protection observing and controlling function.Its all main protection function, including it is vertical UNPROFOR shield and I sections/current quick-breaking of distance and main nearly back-up protection, such as II sections of distance/overcurrent will lose completely Effect can only rely on the remote back-up protection of adjacent substations, such as distance/overcurrent III Duan Laijin if this line failure at this time Row excision, quick-action and selectivity are unable to get guarantee, will be enlarged by fault incidence.
Summary of the invention
The present invention provides transformer station secondary system and its performance improvement method is pressed in one kind, solves the skill of the prior art Art problem.
The technical scheme to solve the above technical problems is that
A kind of performance improvement method of middle pressure transformer station secondary system, the electrical secondary system in middle buckling power station includes that mother is opened It closes, one section and two sections of bus of bus of DC bus is divided by the bus connection switch, accesses the charging of one section of the bus Device accesses the electrical storage device of two sections of the bus, multiple first protection supervisory equipments and multiple second protection supervisory equipments, In, each first protection supervisory equipment and each second protection supervisory equipment include: a protective device and an observing and controlling dress It sets, medium pressure substation is connect with multiple substations respectively by a plurality of route, and the protective device in each substation is used for The route connecting with the substation is protected, for every route, passes through first protection supervisory equipment or one Protective device and measure and control device in two protection supervisory equipments carry out protection and observing and controlling to it respectively,
The performance improvement method includes:
S1, when the association feeder number for confirming medium pressure substation is less than or equal to preset quantity, by the multiple the Multiple measure and control devices in one protection supervisory equipment and the multiple second protection supervisory equipment are removed respectively is integrated into the first survey Device and the second measure and control device are controlled, by two sections of the bus to multiple protective devices in the multiple second protection supervisory equipment It powers with first measure and control device, is filled by one section of the bus to multiple protections in the multiple first protection supervisory equipment It sets and powers with second measure and control device;Or
S2, when confirm medium pressure substation association feeder number be greater than the preset quantity when, give one section of the bus The second remote jump device and the first remote jump device are added respectively for two sections with the bus, wherein first remote jump device is for remote Jump the breaker on a plurality of route that the multiple protective devices powered by one section of the bus are protected, second remote jump device For far jumping the breaker on a plurality of route that the multiple protective devices powered by two sections of the bus are protected.
The beneficial effects of the present invention are: being devised respectively for the few substation more with circuit is associated in association circuit The middle pressure transformer station secondary system performance boost scheme of two kinds of meters and investment O&M cost performance.Design in this way can be solved effectively The problem of certainly line fault bring fault incidence expands in the case where DC power supply loses scene.
For the few substation of association feeder number, by the associated all original guarantors of every section of DC bus in middle buckling power station The observing and controlling separating function in measure and control device is protected, protection IED is still DC bus powered by this, the observing and controlling in each circuit being stripped out Function is integrated into a set of newly-increased measure and control device, and is configured other one section of DC bus and increased measure and control device power supply newly to this, Realize that power supply is mutually redundant.
For the more substation of association feeder number, keeps original electrical secondary system design constant, increase two sets of distant places newly and jump Brake gear is exclusively used in realizing that function is far jumped in the remote jump of all route opposite side protections of our station or Remote protection.Two sets of remote jump devices are intersected It is mounted on two sections of DC bus.Since newly-increased remote tripping device is in addition to receiving transfer trip instruction and issuing to breaker Outside trip signal, without acquiring any analog quantity, be not related to other input and output amounts yet, there are no must carry out complicated numerical value and Logical operation and judgement, therefore its design will be relatively simple, relative inexpensiveness, O&M maintenance is more simple.
Based on the above technical solution, the present invention can also be improved as follows.
Preferably, in step S1, when one section of the bus because failure cause the multiple protective devices powered as it and described in Second measure and control device is out of service or described two sections of bus cause multiple protective devices as its power supply with described in because breaking down When first measure and control device is out of service, bus connection switch described in disjunction, so that one section of normal work of two sections of the bus or the bus Make.
Preferably, in step S1, one section of the bus because failure cause the multiple protective devices powered as it and described in After second measure and control device is out of service, when any line failure that multiple protective devices by its power supply are protected, by First measure and control device of two sections of bus power supplies receives the protective device that the substation that the faulty line is connected includes The straight jump order issued, and according to the straight breaker jumped on the order disjunction faulty line.
Preferably, in step S1, two sections of the bus because failure cause the multiple protective devices powered as it and described in After first measure and control device is out of service, when any line failure that multiple protective devices by its power supply are protected, by Second measure and control device of one section of bus power supply receives the protective device that the substation that the faulty line is connected includes The straight jump order issued, and according to the straight breaker jumped on the order disjunction faulty line.
Preferably, the charging unit includes: that concatenated charger, charger output fuse and charger switch, described Described one section of bus of access of charger switch.
Preferably, the electrical storage device includes: concatenated battery and battery output fuse, and the battery output is molten Described two sections of bus of silk access.
Transformer station secondary system is pressed in one kind, the electrical secondary system in middle buckling power station includes bus connection switch, passes through the mother Switch is divided into one section and two sections of bus of bus of DC bus, accesses the charging unit of one section of the bus, accesses the mother The electrical storage device that two sections of line, multiple first protection supervisory equipments, multiple second protection supervisory equipments, the first remote jump device and second Remote jump device, wherein each first protection supervisory equipment and each second protection supervisory equipment respectively include: a protective device With a measure and control device;
Medium pressure substation is connect with multiple substations respectively by a plurality of route, the protective device in each substation For protecting to the route connecting with the substation, for every route, pass through first protection supervisory equipment or one Protective device and measure and control device in a second protection supervisory equipment carry out protection and observing and controlling to it respectively, and the described first remote jump fills It sets for far jumping the breaker on a plurality of route protected of multiple protective devices powered by one section of the bus, described second Remote jump device is for far jumping the breaker on a plurality of route that the multiple protective devices powered by two sections of the bus are protected;
One section of the bus for in the multiple first protection supervisory equipment multiple protective devices and will be described more The second measure and control device power supply that multiple measure and control devices removing in a second protection supervisory equipment integrates,
Two sections of the bus for in the multiple second protection supervisory equipment multiple protective devices and will be described more The first measure and control device power supply that multiple measure and control devices removing in a first protection supervisory equipment integrates,
Alternatively,
One section of the bus is used to power to first protection supervisory equipment and second remote jump device,
Two sections of the bus to second protection supervisory equipment and first remote jump device for powering.
Preferably, the charging unit includes: that concatenated charger, charger output fuse and charger switch, described Described one section of bus of access of charger switch.
Preferably, the electrical storage device includes: concatenated battery and battery output fuse, and the battery output is molten Described two sections of bus of silk access.
Detailed description of the invention
Fig. 1 is the flow chart that the performance improvement method of transformer station secondary system is pressed in one kind provided in an embodiment of the present invention;
Fig. 2 be another embodiment of the present invention provides regional power grid structure chart;
Fig. 3 be another embodiment of the present invention provides one kind in press transformer station secondary system structure chart;
Fig. 4 be another embodiment of the present invention provides one kind in press transformer station secondary system structure chart;
Fig. 5 be another embodiment of the present invention provides one kind in press transformer station secondary system structure chart.
Specific embodiment
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the invention.
As shown in Figure 1, pressing the performance improvement method of transformer station secondary system, the electrical secondary system packet in middle buckling power station in one kind Bus connection switch is included, one section and two sections of bus of bus of DC bus, the charging of one section of bus of access are divided by bus connection switch Device, the electrical storage device of two sections of bus of access, multiple first protection supervisory equipments and multiple second protection supervisory equipments, wherein Each first protection supervisory equipment and each second protection supervisory equipment include: a protective device and a measure and control device, Middle buckling power station connect respectively by a plurality of route with multiple substations, the protective device in each substation for the change The route of power station connection is protected, and for every route, is surveyed by first protection supervisory equipment or one second protection Protective device and measure and control device in control device carry out protection and observing and controlling to it respectively,
Performance improvement method includes:
S1, when the association feeder number in buckling power station in confirmation be less than or equal to preset quantity when, will it is multiple first protection survey Multiple measure and control devices in control device and multiple second protection supervisory equipments are removed respectively is integrated into the first measure and control device and second Measure and control device, the multiple protective devices given in multiple second protection supervisory equipments by two sections of bus and the first measure and control device are powered, By one section of bus to the multiple protective devices and the power supply of the second measure and control device in multiple first protection supervisory equipments;Or
S2, when the association feeder number in buckling power station in confirmation is greater than preset quantity, to one section of bus and two sections points of bus The second remote jump device and the first remote jump device are not added, wherein the first remote jump device is powered for far jump by one section of bus more The breaker on a plurality of route that a protective device is protected, the second remote jump device are powered for far jump by two sections of bus multiple The breaker on a plurality of route that protective device is protected.
The present embodiment is directed to the association circuit seldom substation more with circuit be associated with respectively, devises two kinds of meters and invests The middle pressure transformer station secondary system performance boost scheme of O&M cost performance.Design in this way can effectively solve in DC power supply Lose the problem of line fault bring fault incidence expands under scene.
For the few substation of association feeder number, by the associated all original guarantors of every section of DC bus in middle buckling power station The observing and controlling separating function in measure and control device is protected, protection IED is still DC bus powered by this, the observing and controlling in each circuit being stripped out Function is integrated into a set of newly-increased measure and control device, and is configured other one section of DC bus and increased measure and control device power supply newly to this, Realize that power supply is mutually redundant.
For the more substation of association feeder number, keeps original electrical secondary system design constant, increase two sets of distant places newly and jump Brake gear is exclusively used in realizing that function is far jumped in the remote jump of all route opposite side protections of our station or Remote protection.Two sets of remote jump devices are intersected It is mounted on two sections of DC bus.Since newly-increased remote tripping device is in addition to receiving transfer trip instruction and issuing to breaker Outside trip signal, without acquiring any analog quantity, be not related to other input and output amounts yet, there are no must carry out complicated numerical value and Logical operation and judgement, therefore its design will be relatively simple, relative inexpensiveness, O&M maintenance is more simple.
Preferably, in step S1, when one section of bus because failure leads to the multiple protective devices and the second observing and controlling powered by it Device is out of service or two sections of bus cause to be exited by the multiple protective devices and the first measure and control device of its power supply because breaking down When operation, disjunction bus connection switch, so that two sections of bus or one section of bus normal work.
Preferably, in step S1, in one section of bus because failure leads to the multiple protective devices and the second observing and controlling powered by it After device is out of service, when any line failure that multiple protective devices by its power supply are protected, by two sections of bus First measure and control device of power supply receives the straight jump order that the protective device that the substation that the faulty line is connected includes issues, and According to the straight breaker jumped on the order disjunction faulty line.
Preferably, in step S1, in two sections of bus because failure leads to the multiple protective devices and the first observing and controlling powered by it After device is out of service, when any line failure that multiple protective devices by its power supply are protected, by one section of bus Second measure and control device of power supply receives the straight jump order that the protective device that the substation that the faulty line is connected includes issues, and According to the straight breaker jumped on the order disjunction faulty line.
As shown in Fig. 2, regional power grid structural schematic diagram, by taking substation C as an example, interior direct current system of standing is using sectionalized single busbar connection Form will be forced to move back if certain section of DC bus is abnormal and out of service via each set protection supervisory equipment of the bussed supply It runs out, the primary equipment for corresponding to interval loses corresponding protection observing and controlling function automatically.Due to transforming plant DC bus section It is limited, it cannot exclude the possibility of the equal power loss of protective device of relatively large or even all inlet wire/outlets (DC bus unsegmented).This In the case of kind, if certain line failure, it can only act, make by the remote back-up protection of substation A, B, D, E ... n and n+1 Expand at fault incidence.At this point, even if guilty culprit route direct current system perfects I sections of lateral extent, II sections of protections can recognize A certain range of failure on route, side energy reliable trip simultaneously protect (DC power supply loss institute to opposite side by far jumping function In side route protection) trip signal is assigned, but due to corresponding protection supervisory equipment power loss, so that it is simultaneously correct to take orders Disjunction line-breaker.Finally, which can only be cut off by the remote back-up protection movement of its adjacent substations.In this respect Under, a plurality of route of substation is removed simultaneously, the risk of even whole station power loss will greatly promote.
If the association feeder number of substation C is few, by the associated all originals of every section of DC bus in middle buckling power station There is the observing and controlling separating function in protection supervisory equipment, protection IED is still DC bus powered by this, each circuit being stripped out Observing and controlling function is integrated into a set of newly-increased measure and control device, and is configured other one section of DC bus and increased measure and control device confession newly to this Electricity realizes that power supply is mutually redundant.New departure is as shown in Figure 3.Originally the protection observing and controlling powered by I sections of DC bus (one section of bus) The observing and controlling function of device is stripped, and is integrated in observing and controlling IED1, and original protection is still DC bus powered by I sections, and observing and controlling IED1 is DC bus powered by II sections.If this, even if I sections of DC bus are protected due to failure and other reasons by corresponding DC power supply Shield isolation, causes I sections of DC bus powered protections out of service, since DC power supply protection will necessarily be first in isolated fault Disjunction bus connection switch B1, so that II sections of DC bus (two sections of bus) can still work normally.In certain time line fault, it is assumed that its Protection is DC bus powered by I sections, can not work normally at this time, still, the observing and controlling IED1 for working in II sections of DC bus still may be used Smoothly to receive the straight jump order that the protective device of faulty line opposite side substation issues, which is cut off with very short delay. Design in this way, even if DC power-supply system is not carried out dual, the reliability and quick-action of medium-voltage line protection are still Significantly promoted.
If the association feeder number of substation C is more, keeps original electrical secondary system design constant, increase two sets of distant places newly Tripgear is exclusively used in realizing that function is far jumped in the remote jump of all route opposite side protections of our station or Remote protection.Two sets of remote jump devices are handed over Fork is mounted on two sections of DC bus.Design scheme is as shown in figure 4, two sets of remote jump device intersections are mounted on two sections of DC bus On, i.e., remote jump device 1,2 is mounted on respectively in II sections of DC bus and I section, be respectively used to far to jump I sections and II sections of DC bus it is right Associated line-breaker should be protected.In this way, any one section of DC bus power loss, can guarantee that the in-situ protection for having opposite side is held Continuous work, copes with the line fault that may occur.
Preferably, charging unit includes: that concatenated charger, charger output fuse and charger switch, charger are opened Close one section of bus of access.
Preferably, electrical storage device includes: concatenated battery and battery output fuse, and it is female that battery exports fuse access Two sections of line.
As shown in figure 5, pressing transformer station secondary system in one kind, the electrical secondary system in middle buckling power station includes bus connection switch 1, is led to Cross the DC bus that bus connection switch 1 is divided into one section 2 of bus and two section 3 of bus, the charging unit 4 of one section 2 of bus of access, access The electrical storage device 5 that two section 3 of bus, multiple first protection supervisory equipments 6, multiple second protection supervisory equipments 7, the first remote jump device 8 and second remote jump device 9, wherein each first protection supervisory equipment 6 and each second protection supervisory equipment 7 respectively include: one A protective device and a measure and control device;
Middle buckling power station is connect with multiple substations respectively by a plurality of route, and the protective device in each substation is used for The route connecting with the substation is protected, for every route, passes through first protection supervisory equipment 6 or one Protective device and measure and control device in two protection supervisory equipments 7 carry out protection to it respectively and observing and controlling, the first remote jump device 8 are used for The remote breaker jumped on a plurality of route that the multiple protective devices powered by one section 2 of bus are protected, the second remote jump device 9 are used for The remote breaker jumped on a plurality of route that the multiple protective devices powered by two section 3 of bus are protected;
One section 2 of bus to multiple protective devices in multiple first protection supervisory equipments 6 and by multiple second for protecting The second measure and control device 10 power supply that multiple measure and control devices removing in measure and control device 7 integrates,
Two section 3 of bus to multiple protective devices in multiple second protection supervisory equipments 7 and by multiple first for protecting The first measure and control device 11 power supply that multiple measure and control devices removing in measure and control device 6 integrates,
Alternatively,
One section 2 of bus is used to power to the first protection supervisory equipment 6 and the second remote jump device 9,
Two section 3 of bus to the second protection supervisory equipment 7 and the first remote jump device 8 for powering.
Preferably, charging unit 4 includes: that concatenated charger, charger output fuse and charger switch, charger are opened Close one section 2 of bus of access.
Preferably, electrical storage device 5 includes: concatenated battery and battery output fuse, and battery exports fuse access Two section 3 of bus.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (9)

1. pressing the performance improvement method of transformer station secondary system in one kind, which is characterized in that the electrical secondary system packet in middle buckling power station Bus connection switch is included, one section and two sections of bus of bus of DC bus is divided by the bus connection switch, accesses the bus one The charging unit of section, accesses the electrical storage device of two sections of the bus, and multiple first protection supervisory equipments and multiple second protections are surveyed Control device, wherein each first protection supervisory equipment and each second protection supervisory equipment include: a protective device and one A measure and control device, medium pressure substation are connect with multiple substations respectively by a plurality of route, the protection in each substation Device, for every route, passes through first protection supervisory equipment for protecting to the route connecting with the substation Or protective device in second protection supervisory equipment and measure and control device carry out protection and observing and controlling to it respectively,
The performance improvement method includes:
S1, when confirm medium pressure substation association feeder number be less than or equal to preset quantity when, the multiple first is protected Multiple measure and control devices in shield measure and control device and the multiple second protection supervisory equipment are removed respectively is integrated into the first observing and controlling dress It sets with the second measure and control device, the multiple protective devices given in the multiple second protection supervisory equipment by two sections of the bus and institute State the power supply of the first measure and control device, by one section of the bus in the multiple first protection supervisory equipment multiple protective devices and The second measure and control device power supply;Or
S2, when confirm medium pressure substation association feeder number be greater than the preset quantity when, give one section of the bus and institute State two sections of bus and add the second remote jump device and the first remote jump device respectively, wherein first remote jump device for far jump by The breaker on a plurality of route that multiple protective devices of one section of bus power supply are protected, second remote jump device are used for The remote breaker jumped on a plurality of route that the multiple protective devices powered by two sections of the bus are protected.
2. pressing the performance improvement method of transformer station secondary system in one kind according to claim 1, which is characterized in that step In S1, when one section of the bus because failure cause it is out of service by multiple protective devices of its power supply and second measure and control device Or two sections of the bus because break down cause it is out of service by multiple protective devices of its power supply and first measure and control device When, bus connection switch described in disjunction, so that two sections of the bus or one section of bus normal work.
3. pressing the performance improvement method of transformer station secondary system in one kind according to claim 1, which is characterized in that step In S1, one section of the bus because failure cause it is out of service by multiple protective devices of its power supply and second measure and control device Afterwards, when any line failure that multiple protective devices by its power supply are protected, by the institute of two sections of bus power supplies It states the first measure and control device and receives the straight jump order that the protective device that the substation that faulty line is connected includes issues, and according to institute State the straight breaker jumped on the order disjunction faulty line.
4. pressing the performance improvement method of transformer station secondary system in one kind according to claim 1, which is characterized in that step In S1, two sections of the bus because failure cause it is out of service by multiple protective devices of its power supply and first measure and control device Afterwards, when any line failure that multiple protective devices by its power supply are protected, by the institute of one section of bus power supply It states the second measure and control device and receives the straight jump order that the protective device that the substation that faulty line is connected includes issues, and according to institute State the straight breaker jumped on the order disjunction faulty line.
5. pressing the performance improvement method of transformer station secondary system in one kind according to claim 1, which is characterized in that described Charging unit includes: concatenated charger, charger output fuse and charger switch, and the charger switch accesses the mother One section of line.
6. pressing the performance improvement method of transformer station secondary system in one kind according to claim 1, which is characterized in that described Electrical storage device includes: concatenated battery and battery output fuse, described two sections of bus of access of the battery output fuse.
7. pressing transformer station secondary system in one kind, which is characterized in that the electrical secondary system in middle buckling power station includes bus connection switch, is passed through The bus connection switch is divided into one section and two sections of bus of bus of DC bus, accesses the charging unit of one section of the bus, connects Enter the electrical storage device of two sections of the bus, multiple first protection supervisory equipments, multiple second protection supervisory equipments, the first remote jump dress It sets and the second remote jump device, wherein each first protection supervisory equipment and each second protection supervisory equipment respectively include: one Protective device and a measure and control device;
Medium pressure substation is connect with multiple substations respectively by a plurality of route, and the protective device in each substation is used for The route connecting with the substation is protected, for every route, passes through first protection supervisory equipment or one Protective device and measure and control device in two protection supervisory equipments carry out protection and observing and controlling to it respectively, and first remote jump device is used In the remote breaker jumped on a plurality of route that the multiple protective devices powered by one section of the bus are protected, the described second remote jump Device is for far jumping the breaker on a plurality of route that the multiple protective devices powered by two sections of the bus are protected;
One section of the bus for multiple protective devices in the multiple first protection supervisory equipment and by the multiple the The second measure and control device power supply that multiple measure and control devices removing in two protection supervisory equipments integrates,
Two sections of the bus for multiple protective devices in the multiple second protection supervisory equipment and by the multiple the The first measure and control device power supply that multiple measure and control devices removing in one protection supervisory equipment integrates,
Alternatively,
One section of the bus for first protection supervisory equipment and second remote jump device power supply, two sections of the bus For powering to second protection supervisory equipment and first remote jump device.
8. pressing transformer station secondary system in one kind according to claim 7, which is characterized in that the charging unit includes: Concatenated charger, charger output fuse and charger switch, described one section of bus of access of the charger switch.
9. pressing transformer station secondary system in one kind according to claim 7, which is characterized in that the electrical storage device includes: Concatenated battery and battery export fuse, described two sections of bus of access of the battery output fuse.
CN201711327501.0A 2017-12-13 2017-12-13 Transformer station secondary system and its performance improvement method are pressed in one kind Expired - Fee Related CN108199337B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711327501.0A CN108199337B (en) 2017-12-13 2017-12-13 Transformer station secondary system and its performance improvement method are pressed in one kind

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711327501.0A CN108199337B (en) 2017-12-13 2017-12-13 Transformer station secondary system and its performance improvement method are pressed in one kind

Publications (2)

Publication Number Publication Date
CN108199337A CN108199337A (en) 2018-06-22
CN108199337B true CN108199337B (en) 2019-04-05

Family

ID=62573977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711327501.0A Expired - Fee Related CN108199337B (en) 2017-12-13 2017-12-13 Transformer station secondary system and its performance improvement method are pressed in one kind

Country Status (1)

Country Link
CN (1) CN108199337B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1589348A1 (en) * 1987-10-08 1990-08-30 Ю.С.Кузник . (53) .621.316.925 (088.8) Damage selector for differential protection of double system of busbars
CN102842957A (en) * 2012-09-28 2012-12-26 重庆泊津科技有限公司 Intelligent seamless switching device for double direct-current operation power supplies of converting station
CN103701203A (en) * 2013-12-15 2014-04-02 中广核工程有限公司 Direct current system for nuclear power plant
CN204156517U (en) * 2014-11-13 2015-02-11 国家电网公司 A kind of intelligent substation low-voltage bus bar protection system
JP2015211606A (en) * 2014-04-30 2015-11-24 三菱電機株式会社 Dc power generation system and protection method thereof
CN106385021A (en) * 2016-10-22 2017-02-08 西安科技大学 Large coal mine DC power supply scheme
CN106532919A (en) * 2016-12-19 2017-03-22 广东电网有限责任公司东莞供电局 System architecture for mutual hot backup of two segments of DC power buses
CN107257160A (en) * 2017-06-30 2017-10-17 深圳奥特迅电力设备股份有限公司 A kind of DC operation power supply system and its control method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1589348A1 (en) * 1987-10-08 1990-08-30 Ю.С.Кузник . (53) .621.316.925 (088.8) Damage selector for differential protection of double system of busbars
CN102842957A (en) * 2012-09-28 2012-12-26 重庆泊津科技有限公司 Intelligent seamless switching device for double direct-current operation power supplies of converting station
CN103701203A (en) * 2013-12-15 2014-04-02 中广核工程有限公司 Direct current system for nuclear power plant
JP2015211606A (en) * 2014-04-30 2015-11-24 三菱電機株式会社 Dc power generation system and protection method thereof
CN204156517U (en) * 2014-11-13 2015-02-11 国家电网公司 A kind of intelligent substation low-voltage bus bar protection system
CN106385021A (en) * 2016-10-22 2017-02-08 西安科技大学 Large coal mine DC power supply scheme
CN106532919A (en) * 2016-12-19 2017-03-22 广东电网有限责任公司东莞供电局 System architecture for mutual hot backup of two segments of DC power buses
CN107257160A (en) * 2017-06-30 2017-10-17 深圳奥特迅电力设备股份有限公司 A kind of DC operation power supply system and its control method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
变电站直流系统的运行与维护;罗艳;《电气应用》;20170905;第36卷(第17期);第44-47页

Also Published As

Publication number Publication date
CN108199337A (en) 2018-06-22

Similar Documents

Publication Publication Date Title
CN101297448B (en) A converter station
CN104518564A (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN202486287U (en) Direct-current (DC) power supply dynamic analog simulation system
CN105655879B (en) The voltage arrangement of 110 kilovolts of system busbar combining unit duplicate system retrofits of intelligent substation double bus scheme mode
CN111146755B (en) Feeder terminal and line protection device
CN101425685B (en) Internal bridge connecting and protection implementing method for linkage standby electricity supply mode
CN102611080A (en) Main station type small current grounding control method
CN102386614A (en) Method for sharing standby protecting device by power equipment in intelligent transformer substation
CN106532683A (en) Self-healing method of 110kV transformer station hand-in-hand power supply
CN109995015A (en) Two electricity two of 220KV fills direct current system
CN203660548U (en) Transformer substation direct-current power supply system provided with emergency stand-by power supply
CN204156594U (en) A kind of region backup auto-activating device
Vidyasagar et al. Reliability improvement of a radial feeder using multiple fault passage indicators
CN107591784B (en) A kind of distribution statements based on collusion adaptive incomplete differential protection method of route
CN107910855A (en) A kind of connection applied to intelligent substation cuts small power supply device and connection blanking method
CN108199337B (en) Transformer station secondary system and its performance improvement method are pressed in one kind
CN203481822U (en) Closed loop power supply model of medium voltage 10 kilovolt power distribution network
CN105048420A (en) Secondary direct current power failure protection method for substation
CN104332969A (en) Relay protection method for cascade switching station tie lines
WO2012136241A1 (en) Fault handling during circuit breaker maintenance in a double-breaker busbar switchyard
CN205790973U (en) The electric power system of transformer lines unit connection
CN205583386U (en) Voltage hardware of double bus scheme's of transformer substation dualization of generating line merging cells configuration is connected
CN205160207U (en) Double bus scheme intelligent substation's busbar voltage connection structure
CN105449835A (en) Regional spare power automatic switch method
CN202455050U (en) Bus coupler cubicle protector for rail transit power supply system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190405

Termination date: 20191213

CF01 Termination of patent right due to non-payment of annual fee