CN205583386U - Voltage hardware of double bus scheme's of transformer substation dualization of generating line merging cells configuration is connected - Google Patents

Voltage hardware of double bus scheme's of transformer substation dualization of generating line merging cells configuration is connected Download PDF

Info

Publication number
CN205583386U
CN205583386U CN201620048873.4U CN201620048873U CN205583386U CN 205583386 U CN205583386 U CN 205583386U CN 201620048873 U CN201620048873 U CN 201620048873U CN 205583386 U CN205583386 U CN 205583386U
Authority
CN
China
Prior art keywords
bus
voltage
merging unit
intelligent
remote
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620048873.4U
Other languages
Chinese (zh)
Inventor
陈雅云
庄小河
陈瑞章
吴玉婷
吴秋月
叶勃红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Fujian Electric Power Co Ltd
Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Fujian Electric Power Co Ltd
Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Fujian Electric Power Co Ltd, Quanzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Fujian Electric Power Co Ltd
Priority to CN201620048873.4U priority Critical patent/CN205583386U/en
Application granted granted Critical
Publication of CN205583386U publication Critical patent/CN205583386U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本实用新型公开了一种变电站双母线接线的母线合并单元双重化配置的电压硬件连接,在每段母线智能控制柜上加装一套与之前配置相同的母线PT合并单元,两个合并单元配置相同,每段母线智能控制柜还增加一套完整的OLP光纤自动切换装置,还包括有远程专家智能判断系统,远程专家智能判断系统用以实现异常信息自动捕抓并远程切换控制,所述的远程专家智能判断系统包括有母线电压监测继电器接线回路及远程智能切换控制逻辑回路。本实用新型通过增加相关设备投入及逻辑控制回路,可以实现故障设备自愈无缝切换控制,极大提高电网设备运行的可靠性,且可任意时间安排设备检修,提高检修维护的方便性。

The utility model discloses a double-configured voltage hardware connection of a bus merging unit for double-bus connection in a substation. A bus PT merging unit with the same configuration as before is installed on each section of the bus intelligent control cabinet, and the two merging units have the same configuration. A complete set of OLP optical fiber automatic switching device is added to each busbar intelligent control cabinet, and a remote expert intelligent judgment system is also included. The remote expert intelligent judgment system is used to realize automatic capture of abnormal information and remote switching control. The remote The expert intelligent judgment system includes a bus voltage monitoring relay wiring circuit and a remote intelligent switching control logic circuit. The utility model can realize self-healing and seamless switching control of faulty equipment by increasing related equipment input and logic control loops, greatly improving the reliability of power grid equipment operation, and can arrange equipment maintenance at any time, improving the convenience of maintenance.

Description

变电站双母线接线的母线合并单元双重化配置的电压硬件 连接Voltage hardware with dual configuration of bus merging unit for double bus connection in substation connect

技术领域technical field

本实用新型涉及一种110千伏系统电压配置方案,特别是一种变电站双母线接线的母线合并单元双重化配置的电压硬件连接。The utility model relates to a voltage configuration scheme for a 110 kV system, in particular to a voltage hardware connection for dual configuration of a bus merging unit of a double bus connection in a substation.

背景技术Background technique

众所周知,双母线接线方式母线PT同时向多个间隔多个设备供电,一旦出现故障影响面极大,恶化区域保护整定配合,甚至可能造成电网大量设备拒动作或越级跳闸。近几年,随着智能变电站加快建设和不断投入运行,合并单元和智能终端广泛应用改变传统变电站输出、输出方式研发和设计理念,而对于智能化变电站双母线接线方式110千伏系统单配置设备,目前220kV智能站所有110kV单配置的保护和安全自动装置均由110kV I段母线合并单元级联引取母线电压,如图1,2所示。直流电源设计:110kV I、II段母线合并单元直流电源分别引取直流电源系统I、II段电源,110kV线路间隔保护、测控、控制及智能组件电源按照奇偶间隔编号进行电源分配。一般奇数编号间隔取直流电源I段,偶数编号间隔取II段电源。如图3、4所示。现有技术的母线配置方案存在主要的问题有:1)110kVI段母线合并单元设备故障,造成级联其母线电压的所有110kV线路间隔电压失去,距离保护及带方向元件的快速段零序保护均被闭锁,仅保留长延时PT断线过流保护及零序保护(一般整定动作时间为3~4秒),这种电网运行方式下任一线路或元件故障,势必因保护整定配合困难造成越级动作,扩大故障范围,甚至可能造成多条线路同时发生跳闸。2)偶数编号间隔的保护、控制及智能组件与级联的母线合并单元挂接不在同段直流电源上,直流电源I段故障失去情况下,所有110kV线路保护电压均失去,产生的影响同1)分析。As we all know, the bus PT of the double-bus connection mode supplies power to multiple devices at multiple intervals at the same time. Once a fault occurs, the impact will be huge, the coordination of regional protection settings will be deteriorated, and it may even cause a large number of devices in the power grid to refuse to operate or trip over the level. In recent years, with the accelerated construction and continuous operation of smart substations, merging units and smart terminals have been widely used to change the traditional substation output and output mode research and development and design concepts. At present, all 110kV single-configuration protection and safety automatic devices in the 220kV intelligent station are cascaded to draw the bus voltage from the 110kV section I bus merging unit, as shown in Figures 1 and 2. DC power supply design: 110kV Section I and Section II bus merge unit DC power supply respectively leads to Section I and Section II power supply of DC power supply system, 110kV line interval protection, measurement and control, control and intelligent component power supply are distributed according to odd and even interval numbers. Generally, segment I of the DC power supply is used for odd-numbered intervals, and segment II is used for even-numbered intervals. As shown in Figure 3 and 4. The main problems in the existing bus configuration scheme are as follows: 1) 110kVI section bus merging unit equipment failure, resulting in the loss of all 110kV line interval voltages cascaded with its bus voltage, distance protection and fast section zero-sequence protection with directional elements. If it is blocked, only long-time PT disconnection overcurrent protection and zero-sequence protection (generally setting action time is 3~4 seconds) are retained. Any line or component failure in this power grid operation mode is bound to be caused by the difficulty of protection setting coordination. Leapfrog actions expand the scope of faults, and may even cause multiple lines to trip at the same time. 2) The protection, control and intelligent components of even-numbered intervals and the cascaded bus merging unit are not connected to the same segment of DC power supply. In the case of failure of DC power supply section I, all 110kV line protection voltages are lost, and the impact is the same as that of 1 )analyze.

实用新型内容Utility model content

本实用新型的目的在于克服现有技术的不足之处,而提供一种通过主备设备自动切换控制,有效隔离故障设备,极大提高电网设备运行的可靠性,且可任意时间安排设备检修,提高检修维护的方便性的智能变电站双母线接线方式110千伏系统电压配置方案的硬件连接。The purpose of this utility model is to overcome the deficiencies of the prior art, and to provide an automatic switching control of main and backup equipment, which can effectively isolate faulty equipment, greatly improve the reliability of power grid equipment operation, and can arrange equipment maintenance at any time. The hardware connection of the 110 kV system voltage configuration scheme of the smart substation double busbar wiring method that improves the convenience of maintenance.

一种变电站双母线接线的母线合并单元双重化配置的电压硬件连接,包括有Ⅰ、Ⅱ母线,Ⅰ、Ⅱ母线智能控制柜,Ⅰ、Ⅱ母线PT合并单元,在每段母线智能控制柜上加装一套与之前配置相同的母线PT合并单元,即在每段母线智能控制柜装设有母线PT合并单元A与母线PT合并单元B,两个合并单元配置相同,都具有母线电压并列功能,均可对外输出Ⅰ母和Ⅱ母电压,为实现母线电压的主、备装置的无缝切换,每段母线智能控制柜还增加一套完整的OLP光纤自动切换装置,当两套合并单元均正常情况下,A套合并单元作为主设备工作,B套合并单元作为热备用设备,还包括有远程专家智能判断系统,远程专家智能判断系统用以实现异常信息自动捕抓并远程切换控制,所述的远程专家智能判断系统包括有母线电压监测继电器接线回路及远程智能切换控制逻辑回路。A kind of voltage hardware connection with double configuration of the bus merging unit of the double bus connection in the substation, including I and II buses, I and II bus intelligent control cabinets, and I and II bus PT merging units, which are installed on each section of the bus intelligent control cabinet A set of bus PT merging units with the same configuration as before, that is, bus PT merging unit A and bus PT merging unit B are installed in each bus intelligent control cabinet. It can output bus voltage I and bus II externally. In order to realize the seamless switching of main and backup devices of bus voltage, a complete set of OLP optical fiber automatic switching device is added to each bus intelligent control cabinet. When the two sets of combined units are normal Next, the A set of merging units works as the main equipment, and the B set of merging units works as hot standby equipment, and also includes a remote expert intelligent judgment system, which is used to realize automatic capture of abnormal information and remote switching control. The remote expert intelligent judgment system includes a bus voltage monitoring relay wiring circuit and a remote intelligent switching control logic circuit.

本实用新型通过在现有母线电压设计的基础上,在每段母线智能控制柜上加装一套与之前配置相同的母线PT合并单元,即Ⅰ母母线智能控制柜装设有Ⅰ母母线PT合并单元A与Ⅰ母母线PT合并单元B,两个合并单元配置相同,都具有母线电压并列功能,均可对外输出Ⅰ母和Ⅱ母电压。为实现母线电压的主、备装置的无缝切换,每段母线智能控制柜需增加一套完整的OLP光纤自动切换装置,当两套设备均正常情况下,A套装置作为主设备工作,B套作为热备用设备,当A套合并装置故障导致级联或引取该段母线设备的相关间隔出现SV级联异常或PT断线信号,或者伴随有A套母线合并单元直流消失或装置闭锁等异常信息,且对该母线智能控制柜保护测量、计量交流电压输入、B套合并单元以及OLP装置的硬接点信号进行实时监测和综合判断,远程专家智能判断(以上述工作状态及异常信息进行综合逻辑判别),实现异常信息自动捕抓并远程切换控制。Based on the existing busbar voltage design, the utility model installs a set of busbar PT merging unit with the same configuration as before on each section of busbar intelligent control cabinet, that is, I busbar intelligent control cabinet is equipped with I busbar PT merging unit. Unit A and I busbar PT merging unit B have the same configuration, both have the bus voltage parallel function, and both can output I bus and II bus voltage to the outside. In order to realize the seamless switching of the main and backup devices of the bus voltage, a complete set of OLP optical fiber automatic switching devices needs to be added to each bus intelligent control cabinet. When the two sets of equipment are normal, the A set works as the main equipment, and the B set The set is used as hot standby equipment. When the failure of the merging device of set A causes cascading or leads to the relevant interval of the bus equipment, the SV cascading abnormality or PT disconnection signal occurs, or it is accompanied by abnormalities such as DC disappearance of the bus merging unit of set A or device lockout. Information, and real-time monitoring and comprehensive judgment of the busbar intelligent control cabinet protection measurement, metering AC voltage input, B-set merging unit, and hard contact signal of the OLP device, remote expert intelligent judgment (comprehensive logic based on the above-mentioned working status and abnormal information Discrimination), to realize automatic capture of abnormal information and remote switching control.

所述的智能变电站双母线接线方式110千伏系统电压配置方案还可通过人工远程或就地手动控制驱动OLP装置进行切换。The 110 kV system voltage configuration scheme of the intelligent substation dual-bus connection mode can also be switched by manual remote or local manual control to drive the OLP device.

所述的母线电压监测继电器接线回路,具体为在:在每段母线智能控制柜的每段母线保护和计量二次绕组加装AB、BC相低电压监测继电器,母线电压互感器输出电压正常及接线正常时,继电器输入线圈均有100V二次电压,因而低电压继电器不动作;当母线电压互感器输出电压异常及接线异常时,AB、BC相低电压监测继电器检测到输入电压低于70V,此时继电器动作,I段母线两只低电压监测继电器告警信号接点并接后接入该段母线智能控制柜的母线智能终端设备,II段母线两只低电压监测继电器告警信号接点同样并接入该柜的母线智能终端设备。增加的母线PT合并单元装置B其I、II段母线保护、计量、开口电压输入与母线PT合并单元装置A输入并接,均并接于低电压监测继电器后端,合并单元装置B工作电源由独立直流空开供给,电源取自该段母线智能控制柜直流电源输入;装置闭锁、直流失电信号接入该段母线智能控制柜的母线智能终端设备,合并单元装置A、合并单元装置B均配置尾纤跳线至OLP装置输入端,同时将各级联支路光缆接线接于OLP装置输出端,增加的OLP装置电源由独立直流空开供给,电源取自该段母线智能控制柜直流电源输入;OLP装置故障信号也接入该段母线智能控制柜的母线智能终端设备,利用该段母线智能控制柜的母线智能终端设备的双位置备用开出点,同时串接可供投退的出口控制压板,实现远控自动或手动切换控制,该输出点同柜上新增的就地人工投切控制按钮并接后接入OLP装置的切换电路,形成远程及就地光纤切换控制回路,控制电源采用该段母线智能控制柜的母线智能终端设备工作电源。The wiring circuit of the bus voltage monitoring relay is specifically: installing AB and BC phase low-voltage monitoring relays on each bus protection and metering secondary winding of each bus intelligent control cabinet, and the output voltage of the bus voltage transformer is normal and When the wiring is normal, the relay input coil has a secondary voltage of 100V, so the low-voltage relay does not operate; when the output voltage of the bus voltage transformer and the wiring are abnormal, the AB and BC phase low-voltage monitoring relays detect that the input voltage is lower than 70V, At this time, the relay operates, and the two low-voltage monitoring relay alarm signal contacts of the bus section I are connected in parallel to the bus intelligent terminal equipment in the bus intelligent control cabinet of the bus section, and the two low-voltage monitoring relay alarm signal contacts of the bus section II are also connected in parallel The cabinet's bus intelligent terminal equipment. The added busbar PT merging unit device B has the busbar protection, metering and opening voltage input of sections I and II connected in parallel with the input of the busbar PT merging unit device A, and is connected in parallel to the back end of the low-voltage monitoring relay. The working power of the merging unit device B is provided by Independent DC circuit breaker supply, the power is taken from the DC power input of the bus intelligent control cabinet of this section; the device lockout and DC power failure signal are connected to the bus intelligent terminal equipment of the bus intelligent control cabinet of this section, and the combined unit device A and the combined unit device B are both Configure the pigtail jumper to the input end of the OLP device, and at the same time connect the cascade branch optical cable to the output end of the OLP device. The power supply of the added OLP device is supplied by an independent DC circuit breaker, and the power is taken from the DC power supply of the intelligent control cabinet of the busbar. Input; the fault signal of the OLP device is also connected to the bus intelligent terminal equipment of the bus intelligent control cabinet of this section, and the two-position standby opening point of the bus intelligent terminal equipment of the bus intelligent control cabinet of this section is used, and the outlets available for switching on and off are connected in series at the same time Control the pressure plate to realize remote control automatic or manual switching control. The output point is connected with the newly added local manual switching control button on the cabinet and then connected to the switching circuit of the OLP device to form a remote and local optical fiber switching control circuit to control the power supply. The working power supply of the intelligent terminal equipment of the bus that adopts the intelligent control cabinet of the bus.

综上所述的,本实用新型相比现有技术如下优点:In summary, the utility model has the following advantages compared with the prior art:

本实用新型通过增加相关设备投入及逻辑控制回路以及结合相应的控制,可以实现故障设备自愈无缝切换控制,极大提高电网设备运行的可靠性,且可任意时间安排设备检修,提高检修维护的方便性。The utility model can realize self-healing and seamless switching control of faulty equipment by increasing investment in related equipment and logic control loops and combining corresponding controls, greatly improving the reliability of power grid equipment operation, and can arrange equipment maintenance at any time to improve maintenance. convenience.

附图说明Description of drawings

图1是现有技术的110kV I段母线合并单元接线示意图。Fig. 1 is a schematic diagram of wiring of a 110kV section I bus merging unit in the prior art.

图2是现有技术的110kV II段母线合并单元接线示意图。Fig. 2 is a schematic diagram of the wiring of the merging unit of the 110kV II section bus in the prior art.

图3是110kV系统间隔直流电源I段接线示意图。Fig. 3 is a schematic diagram of section I wiring of the 110kV system interval DC power supply.

图4是110kV系统间隔直流电源II段接线示意图。Figure 4 is a schematic diagram of section II wiring of the 110kV system interval DC power supply.

图5是本实用新型的110kVI段母线加装电压监测继电器接线回路图。Fig. 5 is a wiring circuit diagram of the 110kVI section bus of the utility model with a voltage monitoring relay installed.

图6是本实用新型的110kVI段母线合并单元切换控制示意回路图。Fig. 6 is a schematic circuit diagram of switching control of 110kVI section bus merging unit of the utility model.

图7是本实用新型的110kVII段母线加装电压监测继电器接线回路图。Fig. 7 is the wiring circuit diagram of the 110kVII section bus of the utility model equipped with a voltage monitoring relay.

图8是本实用新型的110kVII段母线合并单元切换控制示意回路图。Fig. 8 is a schematic circuit diagram of switching control of 110kVII section bus merging unit of the present invention.

具体实施方式detailed description

下面结合实施例对本实用新型进行更详细的描述。Below in conjunction with embodiment the utility model is described in more detail.

实施例1Example 1

一种变电站双母线接线的母线合并单元双重化配置的电压硬件连接,具体在每段母线智能控制柜上加装一套与之前配置相同的母线PT合并单元。即Ⅰ母母线智能控制柜装设有Ⅰ母母线PT合并单元A与Ⅰ母母线PT合并单元B,两个合并单元配置相同,都具有母线电压并列功能,均可对外输出Ⅰ母和Ⅱ母电压。即Ⅱ母母线智能控制柜装设有Ⅱ母母线PT合并单元A与Ⅱ母母线PT合并单元B,两个合并单元配置相同,都具有母线电压并列功能,均可对外输出Ⅰ母和Ⅱ母电压。为实现母线电压的主备装置的无缝切换,每段母线智能控制柜需增加一套完整的OLP光纤自动切换装置,当两套设备均正常情况下,A套装置作为主设备工作,B套作为热备用设备,当A套合并装置故障导致级联或引取该段母线设备的相关间隔出现SV级联异常或PT断线信号,或者伴随有A套母线合并单元直流消失或装置闭锁等异常信息,且对该母线智能控制柜保护测量、计量交流电压输入、B套合并单元以及OLP装置的硬接点信号进行实时监测和综合判断,远程专家智能判断(以上述工作状态及异常信息进行综合逻辑判别),实现异常信息自动捕抓并远程切换控制,或者在远方智能判别失效情况下,运维值班人员可通过人工远程或就地手动控制驱动OLP装置进行切换,母线电压监测继电器接线回路图,切换控制回路示意图,远程智能切换控制逻辑图。A dual-configuration voltage hardware connection of a bus merging unit for double-bus wiring in a substation, specifically installing a set of bus PT merging units with the same configuration as before on each bus intelligent control cabinet. That is to say, the intelligent control cabinet of the busbar I is equipped with the PT merging unit A of the busbar I and the PT merging unit B of the busbar I. The configuration of the two merging units is the same, and both have the parallel function of the busbar voltage, and both can output busbar I and II bus voltages externally. . That is to say, the intelligent control cabinet of bus II is equipped with PT combining unit A of bus II and PT combining unit B of bus II. . In order to realize the seamless switching of the main and standby devices of the bus voltage, a complete set of OLP optical fiber automatic switching device needs to be added to each bus intelligent control cabinet. When the two sets of equipment are normal, the A set works as the main equipment, and the B set As a hot standby device, when the failure of the merging device of A set causes cascading or leads to the relevant interval of the bus equipment, SV cascading abnormality or PT disconnection signal appears, or accompanied by abnormal information such as DC disappearance of the bus merging unit of A set or device blocking , and the real-time monitoring and comprehensive judgment of the busbar intelligent control cabinet protection measurement, metering AC voltage input, B-set merging unit and OLP device hard contact signal, remote expert intelligent judgment (comprehensive logic judgment based on the above working status and abnormal information ), to realize automatic capture of abnormal information and remote switching control, or in the case of failure of remote intelligent judgment, the operation and maintenance personnel on duty can drive the OLP device to switch through manual remote or local manual control, the wiring circuit diagram of the bus voltage monitoring relay, switching Schematic diagram of the control circuit, remote intelligent switching control logic diagram.

本实用新型具体为:在原有设计方案需增加以下主要设备:1)每段母线智能控制柜加装1套母线合并装置,双母线接线为2套;2)每段母线智能控制柜加装1套OLP光纤自动切换装置,双母线接线为2套; 3)每段母线需加装4只母线智能控制柜交流输入电压监测继电器,双母线接线为8只。The utility model is specifically as follows: the following main equipment needs to be added to the original design scheme: 1) Each section of the bus intelligent control cabinet is equipped with a bus merging device, and the double bus connection is 2 sets; 2) Each section of the bus intelligent control cabinet is equipped with 1 One set of OLP optical fiber automatic switching device, 2 sets for double-bus wiring; 3) Each bus section needs to be equipped with 4 AC input voltage monitoring relays for bus intelligent control cabinet, 8 for double-bus wiring.

2、回路接线情况(文中以I段母线PT智能控制柜为例,II段母线相同):1)在每段母线保护和计量二次绕组加装AB、BC相低电压监测继电器(一般整定在70V),母线电压互感器输出电压正常及接线正常时,继电器输入线圈均有100V二次电压,因而低电压继电器不动作;当母线电压互感器输出电压异常及接线异常时,AB、BC相低电压监测继电器检测到输入电压低于70V,此时继电器动作,I段母线两只低电压监测继电器告警信号接点并接后接入I段母线智能终端设备,II段母线两只低电压监测继电器告警信号接点同样并接接入I段母线智能终端设备。2)增加的母线PT合并单元装置B其I、II段母线保护、计量、开口电压输入与母线PT合并单元装置A输入并接,均并接于低电压监测继电器后端;PT合并单元装置B工作电源由独立直流空开供给,电源取自该柜直流电源输入;装置闭锁、直流失电信号接入I段母线智能终端。3)合并单元装置A、合并单元装置B均配置尾纤跳线至OLP装置输入端,同时将各级联支路光缆接线接于OLP装置输出端。4)增加的OLP装置电源由独立直流空开供给,电源取自该柜直流电源输入;装置故障信号接入I段母线智能终端设备。5)利用I母PT智能智能控制柜内智能终端设备的双位置备用开出点,同时串接可供投退的出口控制压板,实现远控自动或手动切换控制,该输出点同柜上新增的就地人工投切控制按钮并接后接入OLP装置的切换电路,形成远程及就地光纤切换控制回路,控制电源采用该柜智能终端设备的工作电源。2. Loop wiring situation (in this article, the PT intelligent control cabinet of section I busbar is taken as an example, and the section II busbar is the same): 1) Install AB and BC phase low-voltage monitoring relays in each section of busbar protection and metering secondary windings (generally set at 70V), when the output voltage of the bus voltage transformer is normal and the wiring is normal, the relay input coil has a secondary voltage of 100V, so the low voltage relay does not operate; when the output voltage of the bus voltage transformer and the wiring are abnormal, the AB and BC phases are low The voltage monitoring relay detects that the input voltage is lower than 70V. At this time, the relay operates, and the two low-voltage monitoring relay alarm signal contacts of the I-section bus are connected together and then connected to the I-section bus intelligent terminal equipment, and the II-section bus two low-voltage monitoring relays alarm The signal contacts are also connected in parallel to the intelligent terminal equipment of the I-section busbar. 2) The added busbar PT merging unit device B, its I and II section busbar protection, metering, opening voltage input and busbar PT merging unit device A input are connected in parallel, and are connected in parallel to the back end of the low voltage monitoring relay; PT merging unit device B The working power is supplied by an independent DC circuit breaker, and the power is taken from the DC power input of the cabinet; the device is locked and the DC power-off signal is connected to the I-section bus intelligent terminal. 3) The merging unit device A and the merging unit device B are equipped with pigtail jumpers to the input end of the OLP device, and at the same time connect the optical cables of the cascading branches to the output end of the OLP device. 4) The power supply of the added OLP device is supplied by an independent DC circuit breaker, and the power is taken from the DC power input of the cabinet; the device fault signal is connected to the intelligent terminal equipment of the I-section bus. 5) Utilize the dual-position backup output point of the intelligent terminal equipment in the I-female PT intelligent control cabinet, and at the same time connect in series the output control platen that can be switched on and off to realize remote control automatic or manual switching control. This output point is newly added on the same cabinet The on-site manual switching control button is connected to the switching circuit of the OLP device to form a remote and on-site optical fiber switching control circuit, and the control power supply uses the working power supply of the intelligent terminal equipment of the cabinet.

本实施例未述部分与现有技术相同。The parts not described in this embodiment are the same as the prior art.

Claims (3)

1.一种变电站双母线接线的母线合并单元双重化配置的电压硬件连接,包括有Ⅰ、Ⅱ母线,Ⅰ、Ⅱ母线智能控制柜,Ⅰ、Ⅱ母线PT合并单元,其特征在于:在每段母线智能控制柜上加装一套与之前配置相同的母线PT合并单元,即在每段母线智能控制柜装设有母线PT合并单元A与母线PT合并单元B,两个合并单元配置相同,都具有母线电压并列功能,均可对外输出Ⅰ母和Ⅱ母电压,为实现母线电压的主、备装置的无缝切换,每段母线智能控制柜还增加一套完整的OLP光纤自动切换装置,当两套合并单元均正常情况下,A套合并单元作为主设备工作,B套合并单元作为热备用设备,还包括有远程专家智能判断系统,远程专家智能判断系统用以实现异常信息自动捕抓并远程切换控制,所述的远程专家智能判断系统包括有母线电压监测继电器接线回路及远程智能切换控制逻辑回路。1. A voltage hardware connection with double configuration of bus merging unit for double bus connection in substation, including I and II bus, I and II bus intelligent control cabinet, I and II bus PT merging unit, characterized in that: in each section A bus PT merging unit with the same configuration as before is installed on the bus intelligent control cabinet, that is, a bus PT merging unit A and a bus PT merging unit B are installed in each bus intelligent control cabinet. The two merging units have the same configuration and have The parallel function of the bus voltage can output bus voltage I and bus II externally. In order to realize the seamless switching of the main and backup devices of the bus voltage, a complete set of OLP optical fiber automatic switching device is added to each bus intelligent control cabinet. When the two Under normal circumstances, the merging unit of the set A works as the main equipment, and the merging unit of the B set works as the hot standby equipment. It also includes a remote expert intelligent judgment system. The remote expert intelligent judgment system is used to automatically capture abnormal information and remotely For switching control, the remote expert intelligent judgment system includes a bus voltage monitoring relay wiring circuit and a remote intelligent switching control logic circuit. 2.根据权利要求1所述的变电站双母线接线的母线合并单元双重化配置的电压硬件连接,其特征在于:所述的变电站双母线接线母线合并单元双重化配置的电压连接还可通过人工远程或就地手动控制驱动OLP装置进行切换。2. The voltage hardware connection of the double configuration of the bus merging unit of the substation double bus connection according to claim 1, characterized in that: the voltage connection of the double configuration of the double bus connection bus merging unit of the substation can also be manually remote Or manually control and drive the OLP device to switch on the spot. 3.根据权利要求1或2所述的变电站双母线接线的母线合并单元双重化配置的电压硬件连接,其特征在于:所述的母线电压监测继电器接线回路具体为在每段母线智能控制柜的每段母线保护和计量二次绕组加装AB、BC相低电压监测继电器,母线电压互感器输出电压正常及接线正常时,继电器输入线圈均有100V二次电压,因而低电压继电器不动作;当母线电压互感器输出电压异常及接线异常时,AB、BC相低电压监测继电器检测到输入电压低于70V,此时继电器动作,I段母线两只低电压监测继电器告警信号接点并接后接入该段母线智能控制柜的母线智能终端设备,II段母线两只低电压监测继电器告警信号接点同样并接入该柜的母线智能终端设备,增加的母线PT合并单元装置B其I、II段母线保护、计量、开口电压输入与母线PT合并单元装置A输入并接,均并接于低电压监测继电器后端,合并单元装置B工作电源由独立直流空开供给,电源取自该段母线智能控制柜直流电源输入;装置闭锁、直流失电信号接入该段母线智能控制柜的母线智能终端设备,合并单元装置A、合并单元装置B均配置尾纤跳线至OLP装置输入端,同时将各级联支路光缆接线接于OLP装置输出端,增加的OLP装置电源由独立直流空开供给,电源取自该段母线智能控制柜直流电源输入;OLP装置故障信号也接入该段母线智能控制柜的母线智能终端设备,利用该段母线智能控制柜的母线智能终端设备的双位置备用开出点,同时串接可供投退的出口控制压板,实现远控自动或手动切换控制,输出点同柜上新增的就地人工投切控制按钮并接后接入OLP装置的切换电路,形成远程及就地光纤切换控制回路,控制电源采用该段母线智能控制柜的母线智能终端设备工作电源。3. According to claim 1 or 2, the voltage hardware connection of the dual configuration of the bus merging unit of the double bus connection of the substation is characterized in that: the wiring circuit of the bus voltage monitoring relay is specifically in each section of the bus intelligent control cabinet Each busbar protection and metering secondary winding is equipped with AB and BC phase low voltage monitoring relays. When the output voltage of the busbar voltage transformer is normal and the wiring is normal, the relay input coil has a secondary voltage of 100V, so the low voltage relay does not operate; When the output voltage of the bus voltage transformer is abnormal and the wiring is abnormal, the AB and BC phase low-voltage monitoring relays detect that the input voltage is lower than 70V. At this time, the relay operates, and the two low-voltage monitoring relay alarm signal contacts of the I-section bus are connected together and then connected. The bus intelligent terminal equipment of the bus intelligent control cabinet in this section, the two low-voltage monitoring relay alarm signal contacts of the bus section II are also connected to the bus intelligent terminal equipment of this cabinet, and the added bus PT merging unit device B has its I and II bus sections Protection, metering, opening voltage input are connected in parallel with the input of busbar PT merging unit device A, and are connected in parallel to the back end of the low voltage monitoring relay. The working power of merging unit device B is supplied by an independent DC circuit breaker, and the power is taken from the intelligent control of the busbar The DC power input of the cabinet; the device lockout and DC power-off signal are connected to the bus intelligent terminal equipment of the bus intelligent control cabinet in this section. The merging unit device A and the merging unit device B are equipped with pigtail jumpers to the input end of the OLP device. The cascade branch optical cable connection is connected to the output end of the OLP device, and the power supply of the added OLP device is supplied by an independent DC circuit breaker, and the power is taken from the DC power input of the intelligent control cabinet of the bus; the fault signal of the OLP device is also connected to the intelligent control of the bus The bus intelligent terminal equipment of the cabinet uses the dual-position standby opening point of the bus intelligent terminal equipment of the bus intelligent control cabinet in this section, and at the same time connects in series the exit control pressure plate that can be switched on and off to realize remote control automatic or manual switching control, the output point The newly added local manual switching control button on the same cabinet is connected to the switching circuit of the OLP device to form a remote and local optical fiber switching control circuit. The control power supply uses the working power supply of the bus intelligent terminal equipment of the bus intelligent control cabinet.
CN201620048873.4U 2016-01-19 2016-01-19 Voltage hardware of double bus scheme's of transformer substation dualization of generating line merging cells configuration is connected Expired - Fee Related CN205583386U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620048873.4U CN205583386U (en) 2016-01-19 2016-01-19 Voltage hardware of double bus scheme's of transformer substation dualization of generating line merging cells configuration is connected

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620048873.4U CN205583386U (en) 2016-01-19 2016-01-19 Voltage hardware of double bus scheme's of transformer substation dualization of generating line merging cells configuration is connected

Publications (1)

Publication Number Publication Date
CN205583386U true CN205583386U (en) 2016-09-14

Family

ID=56883077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620048873.4U Expired - Fee Related CN205583386U (en) 2016-01-19 2016-01-19 Voltage hardware of double bus scheme's of transformer substation dualization of generating line merging cells configuration is connected

Country Status (1)

Country Link
CN (1) CN205583386U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106712017A (en) * 2017-03-30 2017-05-24 山东钢铁股份有限公司 Double-bus secondary voltage switching circuit and self-holding circuit thereof
CN111641260A (en) * 2020-04-17 2020-09-08 许继集团有限公司 A substation process layer local module device and control method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106712017A (en) * 2017-03-30 2017-05-24 山东钢铁股份有限公司 Double-bus secondary voltage switching circuit and self-holding circuit thereof
CN106712017B (en) * 2017-03-30 2023-06-30 山东钢铁股份有限公司 Double-bus Secondary Voltage Switching Circuit and Its Self-Holding Circuit
CN111641260A (en) * 2020-04-17 2020-09-08 许继集团有限公司 A substation process layer local module device and control method thereof

Similar Documents

Publication Publication Date Title
CN105655879B (en) The voltage arrangement of 110 kilovolts of system busbar combining unit duplicate system retrofits of intelligent substation double bus scheme mode
CN103595120B (en) Many inlet wires standby electric power automatic throwing method
CN103887879B (en) Petal-shaped distribution protection control system
CN102694369B (en) Method for preventing low-voltage protection misoperation of motor caused by PT disconnection
CN108565974B (en) A remote failure protection method and system based on self-powered protection device
CN204538802U (en) Middle pressure power transmission and distribution automatic switching control system
CN102790426A (en) Improved spare power source automatic switch method for single bus sectionalized operation of power substation
CN106532683A (en) Self-healing method of 110kV transformer station hand-in-hand power supply
CN104407265A (en) Method and device for monitoring line defect in bus differential protection current analog quantity of transformer substation
CN108270283A (en) Automatic switch control system
CN102801207A (en) Backup auto-switching voltage loss start interlocking method for multi-power double-bus substation
CN112332521B (en) Segmented back-up self-injection circuit and its control method for low-voltage double-branch configuration of bus main transformer
CN104821655B (en) A kind of Fault Locating Method of region prepared auto restart
CN105529685B (en) A kind of interim IT grounded system switching method of frequency conversion load with TT grounded systems low-pressure system under leak current fault
CN201130821Y (en) Intelligent control device for the electrical system used
CN105071249A (en) Intelligent low voltage power distribution box
CN105281419A (en) Standby power supply automatic input system and validation method thereof
CN216929577U (en) Intelligent substation protection clamp plate order system of puting into with signal identification
CN105429286B (en) A kind of 0.4kV station service electrical system prepared auto restart logic
CN112491014B (en) Double-bus double-section and bus differential protection transformation method capable of reducing power failure time
CN204334126U (en) Measurement and control device for 10kV switching station
CN103532111A (en) Incoming line and outgoing line protector of switching station
CN209608335U (en) A kind of protection supervisory equipment for distribution network automated switch
CN105939006B (en) The integrated distribution website institute relay protection system of dual power supply
CN207010233U (en) A kind of transformer station direct current system based on DC/DC isolation modules

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160914

CF01 Termination of patent right due to non-payment of annual fee