CN104332969A - Relay protection method for cascade switching station tie lines - Google Patents
Relay protection method for cascade switching station tie lines Download PDFInfo
- Publication number
- CN104332969A CN104332969A CN201410588391.3A CN201410588391A CN104332969A CN 104332969 A CN104332969 A CN 104332969A CN 201410588391 A CN201410588391 A CN 201410588391A CN 104332969 A CN104332969 A CN 104332969A
- Authority
- CN
- China
- Prior art keywords
- protection
- time
- switching station
- overcurrent
- fault
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Emergency Protection Circuit Devices (AREA)
Abstract
本发明公开了一种级联开闭所联络线继电保护方法,在相邻开闭所的联络线间隔配置纵联过流保护作为联络线故障的主保护,当出现故障时,故障点对应的电源侧纵联过流启动且没有收到负荷侧的纵联过流启动闭锁信号时,延时一段设定时间进行确认后动作并跳本侧开关,同时发联跳信号到负荷侧开闭所保护装置;故障点对应的负荷侧收到电源侧联跳信号且本侧纵联过流未启动时,延时一段设定时间进行确认后跳开本侧开关,完成故障隔离。本发明的级联开闭所联络线继电保护方法针对城区10kV开闭所级联接线方式,有效解决了城区10kV配网该接线方式下经常出现的越级跳闸现象,避免了事故情况下的故障范围扩大,提高了城区10kV供电系统的可靠性和安全性。
The invention discloses a relay protection method for the connection line of cascaded switching stations. The longitudinal overcurrent protection is arranged at the interval between the connection lines of adjacent switching stations as the main protection for the connection line fault. When a fault occurs, the fault point corresponds to the When the longitudinal over-current start on the power supply side does not receive the locking signal of the longitudinal over-current start on the load side, it will delay for a set time to confirm and then operate and jump the switch on this side, and send a jump signal to the load side switch at the same time The protected device; when the load side corresponding to the fault point receives the power supply side tripping signal and the longitudinal overcurrent on this side is not activated, it will delay for a set time to confirm and then trip the switch on this side to complete the fault isolation. The relay protection method for the connection line of the cascaded switching station of the present invention is aimed at the cascaded connection mode of the 10kV switching station in the urban area, effectively solving the phenomenon of leapfrog tripping that often occurs in the connection mode of the 10kV distribution network in the urban area, and avoiding failures in case of accidents The scope is expanded, and the reliability and safety of the urban 10kV power supply system are improved.
Description
技术领域technical field
本发明,属于电力工程领域的继电保护自动化领域,适用于各种级联开关站、开闭所及环网柜单元,具体涉及一种级联开闭所联络线继电保护方法。The invention belongs to the field of relay protection automation in the field of electric power engineering, is applicable to various cascaded switching stations, switching stations and ring network cabinet units, and specifically relates to a relay protection method for cascading switching stations and connecting lines.
背景技术Background technique
随着电力负荷的增加,为了解决高压变电站中压配电出线开关柜数量不足、出线走廊受限、联络转供方式不灵活等问题,在城区供电系统中建设了大量的开闭所,出现了级联方式的开闭所,典型接线方式如图1所示,开闭所的两条进线来自同一变电站的不同10kV母线或者不同的变电站。开闭所为单母分段接线,正常运行时两段母线分裂运行。开闭所之间“手拉手”形成级联接线,如图开关2、5之间,4、7之间,6、9之间,8、11之间,10、13之间,12、15之间均为“手拉手”联络线。With the increase of power load, in order to solve the problems of insufficient number of switch cabinets for medium-voltage distribution outlets in high-voltage substations, limited outlet corridors, and inflexible contact transfer methods, a large number of switchgears have been built in the urban power supply system. The typical wiring mode of the switching station in cascade mode is shown in Figure 1. The two incoming lines of the switching station come from different 10kV buses of the same substation or different substations. The switching station is single-bus section wiring, and the two-section busbars are split to run during normal operation. "Hand in hand" between the opening and closing stations to form a cascade connection, as shown in the figure between switches 2 and 5, between 4 and 7, between 6 and 9, between 8 and 11, between 10 and 13, and between 12 and 15 Both are "hand in hand" contact lines.
由于现代城市配电网的容量大,在负荷密度较大的区域,变电站到开闭所的10kV供电线路,及开闭所出线大量采用电缆,线路长度较短,按照常规三段式电流保护的保护配置及整定方法,级联开闭所联络线电流保护无法实现上下级保护配合,故障时电流保护就会失去选择性,出现越级跳闸的现象,造成事故停电范围的扩大。如图1所示,当K1点发生故障时,联络线开关4、7、8、11、12均流过故障电流且满足过流动作条件,由于无法实现级差配合,开关4、7、8、11处保护装置均可能出现越级跳闸,扩大事故停电范围。即使在过流保护中增加方向判别,开关4、8处保护装置仍可能出现越级跳闸。Due to the large capacity of the distribution network in modern cities, in areas with high load density, the 10kV power supply line from the substation to the switching station, and the outgoing line of the switching station use a large number of cables, and the line length is relatively short. According to the conventional three-stage current protection Protection configuration and setting method, the current protection of the connecting line of the cascaded switch cannot realize the coordination of the upper and lower protections, and the current protection will lose its selectivity in the event of a fault, and the phenomenon of leapfrog tripping will occur, resulting in the expansion of the scope of accidental power outages. As shown in Figure 1, when a fault occurs at point K1, the tie line switches 4, 7, 8, 11, and 12 all flow through the fault current and meet the overcurrent action conditions. All 11 protective devices may have leapfrog trips, expanding the scope of accidental power outages. Even if the direction discrimination is added in the overcurrent protection, the protection devices at switches 4 and 8 may still trip over the level.
发明内容Contents of the invention
本发明的目的是提供一种级联开闭所联络线继电保护方法,以解决现有级联开闭所联络线电流保护无法实现上下级保护配合,故障时出现越级跳闸现象的问题。The purpose of the present invention is to provide a relay protection method for cascaded switching station tie line to solve the problem that the current protection of the existing cascaded switching station tie line cannot realize the coordination of upper and lower level protection, and the phenomenon of leapfrog tripping occurs when a fault occurs.
为了实现以上目的,本发明所采用的技术方案是:一种级联开闭所联络线继电保护方法,在相邻开闭所的联络线间隔配置纵联过流保护作为联络线故障的主保护,当出现故障时,故障点对应的电源侧纵联过流启动且没有收到负荷侧的纵联过流启动闭锁信号时,延时一段设定时间进行确认后动作并跳本侧开关,同时发联跳信号到负荷侧开闭所保护装置;故障点对应的负荷侧收到电源侧联跳信号且本侧纵联过流未启动时,延时一段设定时间进行确认后跳开本侧开关,完成故障隔离。In order to achieve the above objectives, the technical solution adopted in the present invention is: a relay protection method for the tie line of the cascaded switching station, and the longitudinal overcurrent protection is arranged at the interval of the tie line of the adjacent switch station as the main fault of the tie line. Protection, when a fault occurs, when the longitudinal overcurrent start of the power supply side corresponding to the fault point does not receive the blocking signal of the longitudinal overcurrent start of the load side, it will delay for a set time to confirm and then act and jump the switch on this side. At the same time, send a tripping signal to the load side to switch on and off the protection device; when the load side corresponding to the fault point receives the tripping signal from the power supply side and the longitudinal overcurrent on this side is not activated, delay for a set period of time to confirm and then trip the side switch to complete fault isolation.
在相邻开闭所的联络线间隔还配置有限时过流保护与低电压保护配合作为联络线故障的后备保护,通讯异常情况下纵联过流保护退出,当出现故障时,限时过流保护与低电压保护投入,故障点对应的电源侧限时过流动作跳开本侧开关,同时故障点对应的负荷侧低电压保护动作跳开本侧开关,完成选择性故障隔离。Time-limited over-current protection and low-voltage protection are also configured in the interval between the connecting lines of adjacent switching stations as a backup protection for connecting line failures. In case of abnormal communication, the longitudinal over-current protection exits. When a fault occurs, time-limited over-current protection With the low voltage protection input, the time-limited overcurrent action on the power supply side corresponding to the fault point trips the switch on this side, and at the same time the low voltage protection action on the load side corresponding to the fault point trips off the switch on this side to complete selective fault isolation.
限时过流保护与低电压保护延时设置设定保护时间,该设定保护时间大于开闭所内母线故障及馈出线故障时的级差配合时间。Time-limited overcurrent protection and low-voltage protection delay settings set the protection time, which is greater than the step-by-step coordination time when the busbar fault in the switching station and the feeder line fault.
在相邻开闭所的联络线间隔还配置有失灵保护,当出现故障时,纵联过流或限时过流与低电压保护动作后启动失灵保护,等待设定时间后如果对应电源侧或负荷侧开关有电流或者处于合位,则失灵保护动作出口,跳开对应段母线上的其它联络开关。There is also a failure protection at the interval between the connecting lines of the adjacent switching stations. When a failure occurs, the failure protection will be activated after the longitudinal overcurrent or time-limited overcurrent and low voltage protection action. After waiting for the set time, if the corresponding power supply side or load If the side switch has current or is in the closed position, the failure protection action exits and jumps off other contact switches on the corresponding busbar.
开闭所内母线故障及馈出线故障时的级差配合时间为0.3s,限时过流保护与低电压保护延时设置的延时设定保护时间为0.35s。The step-by-step coordination time for the busbar failure and feeder line failure in the switching station is 0.3s, and the delay setting protection time for time-limited overcurrent protection and low voltage protection delay setting is 0.35s.
纵联过流保护时延时的设定确认时间为50ms。The confirmation time for the delay setting of the longitudinal overcurrent protection is 50ms.
纵联过流保护中传递的闭锁信号及联跳信号均为GOOSE信号。The blocking signal and joint jump signal transmitted in the longitudinal overcurrent protection are both GOOSE signals.
开闭所保护装置内置ONU模块,通过EPON网络进行GOOSE信号的传输。The switch protection device has a built-in ONU module, which transmits the GOOSE signal through the EPON network.
本发明的级联开闭所联络线继电保护方法针对城区10kV开闭所级联接线方式,在相邻开闭所联络线间隔配置纵联过流保护作为联络线故障的主保护,并配置限时过流保护与低电压保护配合作为联络线故障的后备保护,有效解决了城区10kV配网该接线方式下经常出现的越级跳闸现象,避免了事故情况下的故障范围扩大,提高了城区10kV供电系统的可靠性和安全性。The relay protection method for the tie line of cascaded switching stations of the present invention is aimed at the cascaded connection mode of 10kV switching stations in urban areas, and the longitudinal overcurrent protection is arranged at the interval between the connecting lines of adjacent switching stations as the main protection for tie line faults, and the Time-limited over-current protection and low-voltage protection are used as backup protection for tie-line faults, effectively solving the phenomenon of leapfrog tripping that often occurs in urban 10kV distribution networks, avoiding the expansion of fault ranges in case of accidents, and improving urban 10kV power supply System reliability and security.
附图说明Description of drawings
图1是级联开闭所接线示意图;Figure 1 is a schematic diagram of the wiring of cascaded switching stations;
图2是纵联过流保护逻辑图;Figure 2 is a logic diagram of the longitudinal overcurrent protection;
图3 GOOSE通讯示意图。Figure 3 GOOSE communication schematic diagram.
具体实施方式Detailed ways
下面结合附图及具体的实施例对本发明进行进一步介绍。The present invention will be further introduced below in conjunction with the accompanying drawings and specific embodiments.
本发明级联开闭所联络线继电保护方法在相邻开闭所的联络线间隔配置纵联过流保护作为联络线故障的主保护,如图2所示为纵联过流保护的逻辑图,由图可知,当出现故障时,故障点对应的电源侧纵联过流启动且没有收到负荷侧的纵联过流启动闭锁信号时,延时一段设定时间进行确认后动作并跳本侧开关,同时发联跳信号到负荷侧开闭所保护装置;故障点对应的负荷侧收到电源侧联跳信号且本侧纵联过流未启动时,延时一段设定时间进行确认后跳开本侧开关,完成故障隔离。The relay protection method for the tie line of the cascaded switching station of the present invention configures the longitudinal overcurrent protection at the interval between the tie lines of the adjacent switching stations as the main protection for the tie line fault, as shown in Figure 2 is the logic of the longitudinal overcurrent protection It can be seen from the figure that when a fault occurs, when the longitudinal overcurrent start of the power supply side corresponding to the fault point does not receive the blocking signal of the longitudinal overcurrent start of the load side, it will delay for a set period of time to confirm the action and jump The switch on this side sends a trip signal to the load side to switch on and off the protection device at the same time; when the load side corresponding to the fault point receives the trip signal from the power supply side and the longitudinal overcurrent on this side does not start, delay for a set time to confirm Then jump off the switch on the local side to complete fault isolation.
本实施例中上述纵联过流的延时确认时间为50ms。In this embodiment, the delayed confirmation time of the above-mentioned longitudinal overcurrent is 50 ms.
另外,本发明在相邻开闭所的联络线间隔还配置有限时过流保护与低电压保护配合作为联络线故障的后备保护,考虑与开闭所内母线故障及馈出线故障时的级差配合(0.3),限时过流保护与低电压保护延时设置0.35s。In addition, the present invention also configures limited-time overcurrent protection and low-voltage protection in the tie-line interval between adjacent switching stations as a backup protection for tie-line faults, considering the step-difference coordination with busbar failures and feeder line failures in switching stations ( 0.3), the time-limited overcurrent protection and low voltage protection delay setting is 0.35s.
在通讯异常情况下纵联过流保护退出,当出现故障时,限时过流保护与低电压保护投入,故障点对应的电源侧限时过流动作跳开本侧开关,同时故障点对应的负荷侧低电压保护动作跳开本侧开关,完成选择性故障隔离。In the case of abnormal communication, the longitudinal over-current protection exits. When a fault occurs, the time-limited over-current protection and low-voltage protection are activated. The voltage protection action trips the switch on the local side to complete selective fault isolation.
为进一步保障继电保护的安全性,在相邻开闭所的联络线间隔还配置有失灵保护,当出现故障时,纵联过流或限时过流与低电压保护动作后启动失灵保护,等待设定时间后如果对应电源侧或负荷侧开关有电流或者处于合位,则失灵保护动作出口,跳开对应段母线上的其它联络开关。In order to further ensure the safety of relay protection, a failure protection is provided at the interval between the connecting lines of adjacent switching stations. When a failure occurs, the failure protection is activated after the longitudinal overcurrent or time-limited overcurrent and low voltage protection action, and wait After the set time, if the switch on the corresponding power supply side or load side has current or is in the closed position, the failure protection will act on the exit and jump off other contact switches on the corresponding busbar.
纵联过流保护中传递的闭锁信号及联跳信号均为GOOSE信号,如图3所示,开闭所保护装置的保护CPU完成逻辑判别后将GOOSE信号发送给集成在装置内部的电力专线数据通信模块ONU(如图中开闭所保护装置3所示),再由ONU模块经光线路终端设备OLT发送到电力专线数据传输网络EPON。同样,保护CPU可以从网络上接收所需的GOOSE信号。The blocking signal and the jumping signal transmitted in the longitudinal overcurrent protection are both GOOSE signals. As shown in Figure 3, the protection CPU that opens and closes the protected device completes the logic judgment and sends the GOOSE signal to the power dedicated line data integrated in the device. The communication module ONU (shown as the switching station protection device 3 in the figure), and then the ONU module transmits to the electric power dedicated line data transmission network EPON through the optical line terminal equipment OLT. Likewise, the guard CPU can receive the required GOOSE signal from the network.
下面以图1所示的级联开闭所进行说明,在图1中的开关2、4、5~12所在间隔均配置上述各种保护。The cascaded switches shown in Fig. 1 will be used for illustration below, and the above-mentioned various protections are arranged in the intervals where the switches 2, 4, 5-12 are located in Fig. 1 .
纵联过流保护:当K1点故障时,开关4、7,8、11,12处纵联过流均启动,如果通讯正常,则根据纵联过流动作原理,开关4、7,8、11处纵联过流由于收到相应的闭锁信号不动作;开关12处纵联过流由于未收到开关15处纵联过流启动闭锁信号,满足动作条件经50ms确认后跳开关12,同时发联跳信号给开关15;开关15处收到开关12发过来的联跳信号,同时纵联过流未启动,经50ms确认后跳开开关15,完成故障隔离。Longitudinal overcurrent protection: When K1 fails, the longitudinal overcurrent at switches 4, 7, 8, 11, and 12 will all start. If the communication is normal, according to the principle of longitudinal overcurrent operation, switches 4, 7, 8, The longitudinal overcurrent at 11 does not act due to receiving the corresponding blocking signal; the longitudinal overcurrent at switch 12 does not receive the blocking signal for the longitudinal overcurrent starting at switch 15, and the action condition is met. After 50ms confirmation, switch 12 is jumped, and at the same time Send the trip signal to the switch 15; the switch 15 receives the trip signal from the switch 12, and the longitudinal overcurrent is not activated at the same time, after 50ms confirmation, the switch 15 is tripped to complete the fault isolation.
如果供电方向改变,则根据纵联过流保护原理,开关15处纵联过流由过流启动动作,开关12处纵联过流由联跳信号动作。If the direction of power supply is changed, according to the principle of longitudinal overcurrent protection, the longitudinal overcurrent at switch 15 is activated by the overcurrent, and the longitudinal overcurrent at switch 12 is activated by the jump signal.
纵联过流保护在通讯异常情况下退出,限时过流保护与低电压保护配合作为联络线故障的后备保护,仅在通讯异常情况下投入。The longitudinal overcurrent protection exits under abnormal communication conditions, and the time-limited overcurrent protection and low voltage protection cooperate as backup protection for tie line failures, and are only activated under abnormal communication conditions.
限时过流与低电压保护:当K1点故障时,如果开关12与15之间的通讯异常,则限时过流保护与低电压保护投入,经0.35s延时后开关12处限时过流动作,跳开开关12;开关15处低电压保护动作跳开开关15,完成选择性故障隔离。如果供电方向改变,则开关15处限时过流保护动作,开关12处低电压保护动作,选择性切除故障。Time-limited over-current and low-voltage protection: When K1 fails, if the communication between switches 12 and 15 is abnormal, time-limited over-current protection and low-voltage protection will be enabled, and after a delay of 0.35s, time-limited over-current action at switch 12, The switch 12 is tripped; the low voltage protection action at the switch 15 trips the switch 15 to complete selective fault isolation. If the power supply direction changes, the time-limited overcurrent protection at switch 15 will act, and the low voltage protection at switch 12 will act to selectively remove the fault.
由于考虑了延时级差配合(0.35s),当开闭所4内的馈线或者母线故障时,保护不会误动。Due to the consideration of the time-delay differential coordination (0.35s), when the feeder or bus in the switching station 4 fails, the protection will not malfunction.
当K1点故障时,如果其它联络线通讯异常,如开关4与7之间的通讯异常,则开关4、7的限时过流保护与低电压保护投入。由于故障联络线(开关12、15之间)的纵联过流保护动作快速切除故障,开关4、7的限时过流保护与低电压保护由于延时未到不会误动。When the K1 point fails, if the communication of other connecting lines is abnormal, such as the communication between the switches 4 and 7, the time-limited overcurrent protection and low voltage protection of the switches 4 and 7 are switched on. Because the longitudinal overcurrent protection action of the fault tie line (between switches 12 and 15) quickly removes the fault, the time-limited overcurrent protection and low voltage protection of switches 4 and 7 will not malfunction due to the delay.
失灵保护:当K1点故障时,开关12处纵联过流动作跳开关12。如果0.2s后开关12处有电流或者开关处于合位,则失灵保护动作出口跳开开闭所3开关11及27(如果27处于合闸状态)。同理,如果开关15失灵,则失灵保护动作跳开开闭所4开关16及28(如果28处于合闸状态)。Failure protection: when the K1 point fails, the longitudinal overcurrent at the switch 12 will trip the switch 12. If there is current at the switch 12 place after 0.2s or the switch is in the closed position, then the failure protection action outlet jumps off the switch 11 and 27 of the switch 3 (if 27 is in the closed state). In the same way, if the switch 15 is out of order, then the failure protection action jumps the switches 16 and 28 of the switch 4 (if 28 is in the closing state).
以上实施例仅用于帮助理解本发明的核心思想,不能以此限制本发明,对于本领域的技术人员,凡是依据本发明的思想,对本发明进行修改或者等同替换,在具体实施方式及应用范围上所做的任何改动,均应包含在本发明的保护范围之内。The above embodiments are only used to help understand the core idea of the present invention, and cannot limit the present invention with this. For those skilled in the art, any modification or equivalent replacement of the present invention based on the idea of the present invention, in the specific implementation mode and application scope Any changes made above should be included within the protection scope of the present invention.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410588391.3A CN104332969A (en) | 2014-10-28 | 2014-10-28 | Relay protection method for cascade switching station tie lines |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410588391.3A CN104332969A (en) | 2014-10-28 | 2014-10-28 | Relay protection method for cascade switching station tie lines |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN104332969A true CN104332969A (en) | 2015-02-04 |
Family
ID=52407646
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410588391.3A Pending CN104332969A (en) | 2014-10-28 | 2014-10-28 | Relay protection method for cascade switching station tie lines |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104332969A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105375635A (en) * | 2015-12-02 | 2016-03-02 | 国家电网公司 | Method and system of intelligent management of power distribution network cascading switching stations |
| CN106154106A (en) * | 2015-04-14 | 2016-11-23 | 济南置真电气有限公司 | Layering cascade system failure line selection logic decision method based on route selection result |
| CN108123424A (en) * | 2017-12-29 | 2018-06-05 | 国电南瑞科技股份有限公司 | A kind of ring network power supply relay protecting method for taking into account quick-action and selectivity |
| CN111244902A (en) * | 2020-03-12 | 2020-06-05 | 北京合锐赛尔电力科技股份有限公司 | Ring main unit protection system and protection method with mutual standby function |
| CN112421582A (en) * | 2020-09-28 | 2021-02-26 | 国网宁夏电力有限公司检修公司 | Switch protection device for power source system for transformer substation |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102386615A (en) * | 2011-11-23 | 2012-03-21 | 北京天能继保电力科技有限公司 | Protection system and method for preventing override trip during short-circuit fault in coal mine power supply and distribution system |
| CN103560585A (en) * | 2013-11-07 | 2014-02-05 | 南京国电南自轨道交通工程有限公司 | Digitized line protection measurement and control system suitable for metro industry |
-
2014
- 2014-10-28 CN CN201410588391.3A patent/CN104332969A/en active Pending
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102386615A (en) * | 2011-11-23 | 2012-03-21 | 北京天能继保电力科技有限公司 | Protection system and method for preventing override trip during short-circuit fault in coal mine power supply and distribution system |
| CN103560585A (en) * | 2013-11-07 | 2014-02-05 | 南京国电南自轨道交通工程有限公司 | Digitized line protection measurement and control system suitable for metro industry |
Non-Patent Citations (6)
| Title |
|---|
| 庄博,黄梅: "失灵保护的实现方案", 《继电器》 * |
| 揭林玲: "配电线路自适应保护研究", 《万方硕士学位论文库》 * |
| 董张卓,段新: "开闭所超短进出线电流保护的改进", 《电力系统保护与控制》 * |
| 贾建平: "基于相互闭锁的地铁继电保护方案", 《广西轻工业》 * |
| 贾建平: "基于输电线路低电压闭锁过流保护系统设计及模拟仿真研究", 《广西轻工业》 * |
| 陈淑芝: "基于光纤通信的区域保护在馈线自动化中的应用", 《万方硕士学位论文库》 * |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106154106A (en) * | 2015-04-14 | 2016-11-23 | 济南置真电气有限公司 | Layering cascade system failure line selection logic decision method based on route selection result |
| CN105375635A (en) * | 2015-12-02 | 2016-03-02 | 国家电网公司 | Method and system of intelligent management of power distribution network cascading switching stations |
| CN105375635B (en) * | 2015-12-02 | 2017-11-07 | 国家电网公司 | Power distribution network cascades switching station's intelligent management and system |
| CN108123424A (en) * | 2017-12-29 | 2018-06-05 | 国电南瑞科技股份有限公司 | A kind of ring network power supply relay protecting method for taking into account quick-action and selectivity |
| CN108123424B (en) * | 2017-12-29 | 2019-09-24 | 国电南瑞科技股份有限公司 | A kind of ring network power supply relay protecting method for taking into account quick-action and selectivity |
| CN111244902A (en) * | 2020-03-12 | 2020-06-05 | 北京合锐赛尔电力科技股份有限公司 | Ring main unit protection system and protection method with mutual standby function |
| CN112421582A (en) * | 2020-09-28 | 2021-02-26 | 国网宁夏电力有限公司检修公司 | Switch protection device for power source system for transformer substation |
| CN112421582B (en) * | 2020-09-28 | 2024-05-24 | 国网宁夏电力有限公司检修公司 | A switch protection device for a power source system used in a substation |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107800121A (en) | A kind of Distributed power line protection method | |
| CN102386614B (en) | Method for sharing standby protecting device by power equipment in intelligent transformer substation | |
| CN104078946B (en) | A kind of wide area distance protecting method towards transformer station | |
| CN101425685B (en) | Internal bridge connecting and protection implementing method for linkage standby electricity supply mode | |
| CN104539043A (en) | Automatic-switching device system and method of standby power source | |
| CN103412239B (en) | Detecting and positioning method of bus coupler flashover fault in subway alternating current power system | |
| CN104701825B (en) | A kind of fast protection method suitable for intelligent distribution network | |
| CN103078304B (en) | Protection method of power distribution network for coal mine | |
| CN103746356A (en) | Digital communication current protection technology based on IEC 61850 protocol | |
| CN106329492B (en) | A kind of simple bus bar protecting method based on system topological | |
| CN106300282B (en) | Single-trunk segmental wiring 110kV bus differential protection is latched prepared auto restart guard method | |
| CN203151085U (en) | Coal mine power distribution network intelligent protection system | |
| CN203278385U (en) | Control locking loop used for automatic switch protection apparatus of high voltage power distribution system | |
| CN103066560B (en) | The method of current protection performance is improved under the short string articulating multi-stage cascade mode of connection | |
| KR101105302B1 (en) | Machining loop distribution system | |
| CN103746354B (en) | One kind is based on transformer station's overcurrent protection method for isolating power distribution network fault without constant time lag in | |
| CN105024360A (en) | Distribution network switching station relay protection operation optimization method | |
| CN110932244A (en) | Relay protection method for all substation protection outlet pressure plates that are not turned on | |
| CN107026433B (en) | Rapid protection system and method for current collection circuit of new energy power station | |
| CN101051581B (en) | Digital Transformer Differential Protection to Prevent Misoperation of TA Secondary Circuit Fault Discrimination Method | |
| CN106159917B (en) | Power distribution network indulges the relay protection system of sequence accelerated motion | |
| CN109861224A (en) | Combined standby power input method for hot standby line based on Fibre Channel | |
| CN109617030A (en) | A kind of subway AC ring network power supply dynamic adaptive overcurrent protection method and system | |
| CN204696667U (en) | Be applicable to the railway substation protection for feed line measure and control device of Line for Passenger Transportation | |
| CN103840553A (en) | Failure starting circuit and method for starting failure circuit |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150204 |
|