CN104332969A - Relay protection method for cascade switching station tie lines - Google Patents

Relay protection method for cascade switching station tie lines Download PDF

Info

Publication number
CN104332969A
CN104332969A CN201410588391.3A CN201410588391A CN104332969A CN 104332969 A CN104332969 A CN 104332969A CN 201410588391 A CN201410588391 A CN 201410588391A CN 104332969 A CN104332969 A CN 104332969A
Authority
CN
China
Prior art keywords
switching station
overcurrent
protection
time
fault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410588391.3A
Other languages
Chinese (zh)
Inventor
李国斌
刘星
魏勇
姜睿智
李俊刚
张义
郭晓宁
史宏光
尹剑仑
胡源奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Original Assignee
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XJ Electric Co Ltd, Xuchang XJ Software Technology Co Ltd filed Critical XJ Electric Co Ltd
Priority to CN201410588391.3A priority Critical patent/CN104332969A/en
Publication of CN104332969A publication Critical patent/CN104332969A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a relay protection method for cascade switching station tie lines. Longitudinal overcurrent protection is configured for the tie line interval of adjacent switching stations as main protection to tie line faults; in case of a fault, after the longitudinal overcurrent of a power supply side corresponding to the fault point is activated and when no longitudinal overcurrent start blocking signal of a load side is received, a period of set time is delayed and confirmed, and then action is performed and a switch on the local side is tripped; meanwhile, a shunt tripping signal is transmitted to a switching station protector on the load side; when the load side corresponding to the fault point receives the shunt tripping signal of the power supply side and the longitudinal overcurrent on the local side is not activated, a period of set time is delayed and confirmed, and a switch on the local side is tripped, and consequently, fault isolation is completed. For the cascade connection mode of 10kV switching stations in urban areas, the relay protection method for the cascade switching station tie lines is used for effectively solving the frequent override tripping phenomenon of 10kV distribution networks in the urban areas in the connection mode, and therefore, the fault range is prevented from expanding in case of accidents and the reliability and safety of 10kV power supply systems in the urban areas are improved.

Description

A kind of cascade switching station interconnection relay protecting method
Technical field
The present invention, belongs to the relaying protection automatic field in power engineering field, is applicable to various cascaded switch station, opening and closing ring main unit unit in one's power, is specifically related to a kind of cascade switching station interconnection relay protecting method.
Background technology
Along with the increase of electric load, in order to solve the problems such as high voltage substation medium-voltage distribution outlet switch cabinet lazy weight, electric outgoing line corridor is limited, contact turn supplies mode dumb, a large amount of switching stations has been built in the electric power system of city, there is the switching station of cascade system, as shown in Figure 1, two inlet wires of switching station are from the different 10kV bus of same transformer station or different transformer stations for typical wiring mode.Opening and closing is done single mother partition wiring, normal two sections of bus splittings when running." hand in hand " between switching station and form level tie, between figure switch 2,5, between 4,7, between 6,9, between 8,11, between 10,13, between 12,15, be " handing in hand " interconnection.
Because the capacity of modern city power distribution network is large; in the region that load density is larger; transformer station is to the 10kV supply line of switching station; and switching station outlet adopts cable in a large number, line length is shorter, conveniently the relaying configuration of three-step charging and setting method; cascade switching station interconnection current protection cannot realize the superior and the subordinate's protection cooperation; during fault, current protection will lose selectivity, occurs the phenomenon of overstep tripping, the expansion of the power failure range that causes the accident.As shown in Figure 1; when K1 point breaks down, interconnection switch 4,7,8,11,12 all flows through fault current and meets overcurrent operation condition, owing to realizing Graded coordination; all may there is overstep tripping in switch 4,7,8,11 place's protective device, expand accident interruption scope.Even if increase discriminating direction in overcurrent protection, still may there is overstep tripping in switch 4,8 place's protective device.
Summary of the invention
The object of this invention is to provide a kind of cascade switching station interconnection relay protecting method, the superior and the subordinate's protection cooperation cannot be realized to solve existing cascade switching station interconnection current protection, during fault, occur the problem of overstep tripping phenomenon.
In order to realize above object, the technical solution adopted in the present invention is: a kind of cascade switching station interconnection relay protecting method, in the main protection of the interconnection interval of adjacent switching station configuration vertical connection overcurrent protection as fault of interconnected transmission line, when a failure occurs, mains side corresponding to fault point indulge connection overcurrent start and the vertical overcurrent not receiving load side starts block signal time, time delay one section of setting-up time carries out confirming rear action and jumps this side switch, sends out connection simultaneously and jumps signal to load side switching station protective device; Load side corresponding to fault point receive mains side connection jump signal and this side vertical connection overcurrent does not start time, time delay one section of setting-up time carries out confirming this side switch of rear tripping, completes Fault Isolation.
Also be configured with overcurrent protection in limited time at the interconnection interval of adjacent switching station and coordinate backup protection as fault of interconnected transmission line with under-voltage protection; in communication abnormality situation, the overcurrent protection of vertical connection is exited; when a failure occurs; overcurrent protection in limited time and under-voltage protection drop into; mains side corresponding to fault point is prescribed a time limit this side switch of overcurrent action tripping; this side switch of load side under-voltage protection action tripping that simultaneous faults point is corresponding, completes selectivity Fault Isolation.
Overcurrent protection in limited time and under-voltage protection time delay arrange setting guard time, and this setting guard time is greater than Graded coordination time when busbar fault and outgoing fault in switching station.
Also failure protection is configured with at the interconnection interval of adjacent switching station; when a failure occurs; indulge connection overcurrent or actuating breaker failure protection after prescribe a time limit overcurrent and under-voltage protection action; if corresponding power side or load side switch have electric current or are in co-bit after waiting for setting-up time; then failure protection action outlet, other interconnection switch on the corresponding section bus of tripping.
The Graded coordination time in switching station when busbar fault and outgoing fault is 0.3s, and the delay adjustments guard time that overcurrent protection in limited time and under-voltage protection time delay are arranged is 0.35s.
During vertical connection overcurrent protection, the setting check time of time delay is 50ms.
The block signal transmitted in the overcurrent protection of vertical connection and connection are jumped signal and are GOOSE signal.
The built-in ONU module of switching station protective device, carries out the transmission of GOOSE signal by EPON network.
Cascade switching station interconnection relay protecting method of the present invention is for the city 10kV switching station cascade mode of connection; in the main protection of adjacent switching station interconnection interval configuration vertical connection overcurrent protection as fault of interconnected transmission line; and configuration overcurrent protection in limited time coordinates the backup protection as fault of interconnected transmission line with under-voltage protection; the overstep tripping phenomenon often occurred under efficiently solving this mode of connection of city 10kV distribution; the fault coverage avoided under accident conditions expands, and improves reliability and the fail safe of city 10kV electric power system.
Accompanying drawing explanation
Fig. 1 is cascade switching station wiring schematic diagram;
Fig. 2 is vertical connection overcurrent protection logic diagram;
Fig. 3 GOOSE communication schematic diagram.
Embodiment
Below in conjunction with accompanying drawing and specific embodiment, the present invention is described further.
Cascade switching station interconnection relay protecting method of the present invention is in the main protection of the interconnection interval of adjacent switching station configuration vertical connection overcurrent protection as fault of interconnected transmission line, be illustrated in figure 2 the logic diagram of vertical connection overcurrent protection, as seen from the figure, when a failure occurs, mains side corresponding to fault point indulge connection overcurrent start and the vertical overcurrent not receiving load side starts block signal time, time delay one section of setting-up time carries out confirming rear action and jumps this side switch, sends out connection simultaneously and jumps signal to load side switching station protective device; Load side corresponding to fault point receive mains side connection jump signal and this side vertical connection overcurrent does not start time, time delay one section of setting-up time carries out confirming this side switch of rear tripping, completes Fault Isolation.
In the present embodiment, the delay confirmation time of above-mentioned vertical overcurrent is 50ms.
In addition; the present invention is also configured with overcurrent protection in limited time and coordinates backup protection as fault of interconnected transmission line with under-voltage protection at the interconnection interval of adjacent switching station; consider and the Graded coordination (0.3) when busbar fault in switching station and outgoing fault, overcurrent protection in limited time and under-voltage protection time delay arrange 0.35s.
In communication abnormality situation, the overcurrent protection of vertical connection is exited; when a failure occurs; overcurrent protection in limited time and under-voltage protection drop into; mains side corresponding to fault point is prescribed a time limit this side switch of overcurrent action tripping; this side switch of load side under-voltage protection action tripping that simultaneous faults point is corresponding, completes selectivity Fault Isolation.
For ensureing the fail safe of relaying protection further; also failure protection is configured with at the interconnection interval of adjacent switching station; when a failure occurs; indulge connection overcurrent or actuating breaker failure protection after prescribe a time limit overcurrent and under-voltage protection action; if corresponding power side or load side switch have electric current or are in co-bit after waiting for setting-up time; then failure protection action outlet, other interconnection switch on the corresponding section bus of tripping.
The block signal transmitted in the overcurrent protection of vertical connection and connection are jumped signal and are GOOSE signal; as shown in Figure 3; after the protection CPU completion logic differentiation of switching station protective device, GOOSE signal is sent to the electric power special line data communication module ONU (as shown in switching station protective device in figure 3) being integrated in device inside, then be sent to electric power special line data transmission network EPON by ONU module through optical line terminal equipment OLT.Equally, CPU is protected can to receive required GOOSE signal from network.
Be described with the cascade switching station shown in Fig. 1 below, switch 2,4,5 ~ 12 interval, place in FIG all configures above-mentioned various protection.
Vertical connection overcurrent protection: when K1 point failure, switch 4,7,8,11,12 places vertical connection overcurrent all starts, if communication is normal, then according to vertical connection overcurrent operating principle, switch 4,7,8,11 places vertical connection overcurrent is failure to actuate owing to receiving corresponding block signal; Switch 12 place vertical connection overcurrent starts block signal owing to not receiving switch 15 place vertical connection overcurrent, meets operation condition TRIP 12 after 50ms confirms, sends out connection simultaneously and jump signal to switch 15; Switch 15 place receives the connection jumping signal that switch 12 sends, and vertical connection overcurrent does not start simultaneously, and tripping switch 15 after 50ms confirms, completes Fault Isolation.
If supplier of electricity is to change, then according to vertical connection overcurrent protection principle, switch 15 place vertical connection overcurrent is by overcurrent starting operation, and switch 12 place vertical connection overcurrent is by joining jumping signalizing activity.
The overcurrent protection of vertical connection is exited in communication abnormality situation, and overcurrent protection in limited time coordinates the backup protection as fault of interconnected transmission line with under-voltage protection, only drop in communication abnormality situation.
Overcurrent and under-voltage protection in limited time: when K1 point failure, if the communication abnormality between switch 12 and 15, then overcurrent protection in limited time and under-voltage protection drop into, and after 0.35s time delay, switch 12 place prescribes a time limit overcurrent action, tripping switch 12; Switch 15 place under-voltage protection action tripping switch 15, completes selectivity Fault Isolation.If supplier of electricity is to change, then switch 15 place prescribes a time limit overcurrent protection action, the under-voltage protection action of switch 12 place, selective ablation fault.
Owing to considering time delay Graded coordination (0.35s), when the feeder line in switching station 4 or busbar fault, protection can not malfunction.
When K1 point failure, if other interconnection communication abnormality, as the communication abnormality between switch 4 and 7, then the overcurrent protection in limited time of switch 4,7 and under-voltage protection drop into.Because the vertical overcurrent protection action of fault interconnection (between switch 12,15) excises fault fast, the overcurrent protection in limited time of switch 4,7 and under-voltage protection are not arrived due to time delay can not malfunction.
Failure protection: when K1 point failure, switch 12 place vertical connection overcurrent action TRIP 12.If switch 12 place has electric current or switch to be in co-bit after 0.2s, then failure protection action outlet tripping switching station 3 switch 11 and 27 (if 27 are in "on" position).In like manner, if switch 15 is malfunctioning, then failure protection action tripping switching station 4 switch 16 and 28 (if 28 are in "on" position).
Above embodiment only understands core concept of the present invention for helping; the present invention can not be limited with this; for those skilled in the art; every according to thought of the present invention; the present invention is modified or equivalent replacement; any change done in specific embodiments and applications, all should be included within protection scope of the present invention.

Claims (8)

1. a cascade switching station interconnection relay protecting method, it is characterized in that: in the main protection of the interconnection interval of adjacent switching station configuration vertical connection overcurrent protection as fault of interconnected transmission line, when a failure occurs, mains side corresponding to fault point indulge connection overcurrent start and the vertical overcurrent not receiving load side starts block signal time, time delay one section of setting-up time carries out confirming rear action and jumps this side switch, sends out connection simultaneously and jumps signal to load side switching station protective device; Load side corresponding to fault point receive mains side connection jump signal and this side vertical connection overcurrent does not start time, time delay one section of setting-up time carries out confirming this side switch of rear tripping, completes Fault Isolation.
2. cascade switching station interconnection relay protecting method according to claim 1; it is characterized in that: be also configured with overcurrent protection in limited time at the interconnection interval of adjacent switching station and coordinate backup protection as fault of interconnected transmission line with under-voltage protection; in communication abnormality situation, the overcurrent protection of vertical connection is exited; when a failure occurs; overcurrent protection in limited time and under-voltage protection drop into; mains side corresponding to fault point is prescribed a time limit this side switch of overcurrent action tripping; this side switch of load side under-voltage protection action tripping that simultaneous faults point is corresponding, completes selectivity Fault Isolation.
3. cascade switching station interconnection relay protecting method according to claim 2; it is characterized in that: overcurrent protection in limited time and under-voltage protection time delay arrange setting guard time, and this setting guard time is greater than Graded coordination time when busbar fault and outgoing fault in switching station.
4. cascade switching station interconnection relay protecting method according to claim 3; it is characterized in that: be also configured with failure protection at the interconnection interval of adjacent switching station; when a failure occurs; indulge connection overcurrent or actuating breaker failure protection after prescribe a time limit overcurrent and under-voltage protection action; if corresponding power side or load side switch have electric current or are in co-bit after waiting for setting-up time; then failure protection action outlet, other interconnection switch on the corresponding section bus of tripping.
5. cascade switching station interconnection relay protecting method according to claim 3; it is characterized in that: the Graded coordination time in switching station when busbar fault and outgoing fault is 0.3s, the delay adjustments guard time that overcurrent protection in limited time and under-voltage protection time delay are arranged is 0.35s.
6. cascade switching station interconnection relay protecting method according to claim 1, is characterized in that: during vertical connection overcurrent protection, the setting check time of time delay is 50ms.
7. cascade switching station interconnection relay protecting method according to claim 1, is characterized in that: the block signal transmitted in the overcurrent protection of vertical connection and connection are jumped signal and be GOOSE signal.
8. cascade switching station interconnection relay protecting method according to claim 7, be is characterized in that: the built-in ONU module of switching station protective device, is carried out the transmission of GOOSE signal by EPON network.
CN201410588391.3A 2014-10-28 2014-10-28 Relay protection method for cascade switching station tie lines Pending CN104332969A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410588391.3A CN104332969A (en) 2014-10-28 2014-10-28 Relay protection method for cascade switching station tie lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410588391.3A CN104332969A (en) 2014-10-28 2014-10-28 Relay protection method for cascade switching station tie lines

Publications (1)

Publication Number Publication Date
CN104332969A true CN104332969A (en) 2015-02-04

Family

ID=52407646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410588391.3A Pending CN104332969A (en) 2014-10-28 2014-10-28 Relay protection method for cascade switching station tie lines

Country Status (1)

Country Link
CN (1) CN104332969A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105375635A (en) * 2015-12-02 2016-03-02 国家电网公司 Method and system of intelligent management of power distribution network cascading switching stations
CN106154106A (en) * 2015-04-14 2016-11-23 济南置真电气有限公司 Layering cascade system failure line selection logic decision method based on route selection result
CN108123424A (en) * 2017-12-29 2018-06-05 国电南瑞科技股份有限公司 A kind of ring network power supply relay protecting method for taking into account quick-action and selectivity

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102386615A (en) * 2011-11-23 2012-03-21 北京天能继保电力科技有限公司 Protection system and method for preventing override trip during short-circuit fault in coal mine power supply and distribution system
CN103560585A (en) * 2013-11-07 2014-02-05 南京国电南自轨道交通工程有限公司 Digitized line protection measurement and control system suitable for metro industry

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102386615A (en) * 2011-11-23 2012-03-21 北京天能继保电力科技有限公司 Protection system and method for preventing override trip during short-circuit fault in coal mine power supply and distribution system
CN103560585A (en) * 2013-11-07 2014-02-05 南京国电南自轨道交通工程有限公司 Digitized line protection measurement and control system suitable for metro industry

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
庄博,黄梅: "失灵保护的实现方案", 《继电器》 *
揭林玲: "配电线路自适应保护研究", 《万方硕士学位论文库》 *
董张卓,段新: "开闭所超短进出线电流保护的改进", 《电力系统保护与控制》 *
贾建平: "基于相互闭锁的地铁继电保护方案", 《广西轻工业》 *
贾建平: "基于输电线路低电压闭锁过流保护系统设计及模拟仿真研究", 《广西轻工业》 *
陈淑芝: "基于光纤通信的区域保护在馈线自动化中的应用", 《万方硕士学位论文库》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106154106A (en) * 2015-04-14 2016-11-23 济南置真电气有限公司 Layering cascade system failure line selection logic decision method based on route selection result
CN105375635A (en) * 2015-12-02 2016-03-02 国家电网公司 Method and system of intelligent management of power distribution network cascading switching stations
CN105375635B (en) * 2015-12-02 2017-11-07 国家电网公司 Power distribution network cascades switching station's intelligent management and system
CN108123424A (en) * 2017-12-29 2018-06-05 国电南瑞科技股份有限公司 A kind of ring network power supply relay protecting method for taking into account quick-action and selectivity
CN108123424B (en) * 2017-12-29 2019-09-24 国电南瑞科技股份有限公司 A kind of ring network power supply relay protecting method for taking into account quick-action and selectivity

Similar Documents

Publication Publication Date Title
CN102270836B (en) Wide-area over-current protection method and system for power distribution network
CN102386614B (en) Method for sharing standby protecting device by power equipment in intelligent transformer substation
CN103354352B (en) A kind of power distribution network safety protection method based on distributed intelligence
CN103166203A (en) Distribution network topology guard method with direction
EP2909908B1 (en) Method of operate is-limiters in ring systems
CN103746349A (en) Circuit breaker failure protection mechanism of transformer substation and optimal configuration method for circuit breaker protection
CN104701825A (en) Quick protection method applicable to intelligent distribution network
CN106505529A (en) A kind of intelligent substation low-voltage bus bar guard method
CN204481568U (en) A kind of power plant is standby throws protective device
CN109599847A (en) The guard method of power distribution network and power distribution network
CN103986128A (en) Low-voltage side accelerated trip protection technology based on intelligent substation
CN109217270A (en) A kind of DC line segmented specified time over-current protection method and device
CN104332969A (en) Relay protection method for cascade switching station tie lines
CN205753377U (en) Looped network cyclization rack system based on distribution power automation terminal
CN103746356A (en) Digital communication current protection technology based on IEC 61850 protocol
CN107732881A (en) A kind of direct current network dc circuit breaker failure protection method and apparatus
CN102496916B (en) Switch failure protection method using electric network wide area information
CN107591784B (en) A kind of distribution statements based on collusion adaptive incomplete differential protection method of route
CN105162088B (en) A kind of power distribution station automatic fault detection system of 10kV cable system feeder line
CN103746354B (en) One kind is based on transformer station's overcurrent protection method for isolating power distribution network fault without constant time lag in
CN203151085U (en) Coal mine power distribution network intelligent protection system
CN106532659B (en) A kind of parallel-connection structure extra-high voltage direct-current engineering direct current change-over switch controls guard method
Monadi et al. A communication-assisted protection for MVDC distribution systems with distributed generation
CN108493911B (en) Pressure ring network protection method in a kind of magnetic floating traffic
CN101051581B (en) Error identification method of digital transformer differential protection for preventing TA secondary loop fault

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150204