CN108193764B - A pull throughs for sewer grid plate of municipal works - Google Patents

A pull throughs for sewer grid plate of municipal works Download PDF

Info

Publication number
CN108193764B
CN108193764B CN201810173887.2A CN201810173887A CN108193764B CN 108193764 B CN108193764 B CN 108193764B CN 201810173887 A CN201810173887 A CN 201810173887A CN 108193764 B CN108193764 B CN 108193764B
Authority
CN
China
Prior art keywords
plate
small
long connecting
belt pulley
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810173887.2A
Other languages
Chinese (zh)
Other versions
CN108193764A (en
Inventor
农克俭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG TIANMU INSULATING COMPOSITE MATERIALS Co.,Ltd.
Original Assignee
Wenzhou Motailun Industrial Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Motailun Industrial Design Co ltd filed Critical Wenzhou Motailun Industrial Design Co ltd
Priority to CN201810173887.2A priority Critical patent/CN108193764B/en
Publication of CN108193764A publication Critical patent/CN108193764A/en
Application granted granted Critical
Publication of CN108193764B publication Critical patent/CN108193764B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/06Gully gratings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/30Cleaning by methods involving the use of tools by movement of cleaning members over a surface
    • B08B1/32Cleaning by methods involving the use of tools by movement of cleaning members over a surface using rotary cleaning members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/02Cleaning by the force of jets or sprays
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F7/00Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
    • E03F7/10Wheeled apparatus for emptying sewers or cesspools

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Invalid Beds And Related Equipment (AREA)
  • Devices For Conveying Motion By Means Of Endless Flexible Members (AREA)

Abstract

The invention relates to a dredging device for municipal engineering, in particular to a dredging device for a sewer grid plate of the municipal engineering. The invention aims to solve the technical problem of providing a dredging device for a sewer grid plate of municipal engineering, which is simple to clean, low in labor intensity, time-saving, labor-saving, clean and sanitary. The invention provides a dredging device for a sewer grid plate of municipal engineering, which comprises a base, rollers, universal wheels, a large fixing plate, a lifting plate, a first tension spring and the like, wherein the rollers are arranged on the base; the bottom of the base is connected with a roller and a universal wheel. The dredging device for the sewer grid plate of the municipal engineering, provided by the invention, can be used for conveniently cleaning garbage sundries accumulated on the sewer grid plate of the municipal engineering and dredging the blocked sewer grid plate, and is small in labor intensity, time-saving, labor-saving, clean, sanitary, simple in structure, convenient to operate, easy to maintain and repair and low in maintenance cost.

Description

A pull throughs for sewer grid plate of municipal works
Technical Field
The invention relates to a dredging device for municipal engineering, in particular to a dredging device for a sewer grid plate of the municipal engineering.
Background
Before the 80 th century in the 20 th century, urban public facilities are often called municipal engineering facilities in China, which mainly refer to urban roads, water supply and drainage constructed by government investment, and experts about urban problem research after reform and development propose a method for replacing municipal engineering facilities with urban infrastructure and obtain general acceptance of various social circles. Municipal works are generally national infrastructures, which refer to infrastructures such as various public transportation facilities, water supply, drainage, gas, urban flood control, environmental sanitation and lighting in urban construction, are material foundations essential for urban survival and development, and are basic conditions for improving the living standard of people and opening the people to the outside. The municipal facilities in China refer to various buildings, structures, equipment and the like which are arranged in planning and construction ranges of urban areas and towns and provide paid or unpaid public products and services for residents based on government responsibilities and obligations, the construction of various public infrastructures matched with urban life belongs to the category of municipal engineering, the municipal administration refers to urban public service projects such as urban roads, bridges, water supply and drainage, sewage treatment, urban flood control, gardens, road greening, street lamps, environmental sanitation and the like, the development and urbanization of national economy and society face a severe challenge, on one hand, the urban and rural and regional gap is further expanded, a large city, particularly the central area of the large city, extreme flourishing of the edge cities and towns of the large city, and stagnation and fading of villages; on the other hand, the process of urbanization under the bright and fresh conditions also causes various urban diseases such as traffic jam, environmental pollution, poverty and unemployment, housing shortage, health hazard, urban disasters, safety weakening and the like.
Present all is artifical manual rubbish debris to piling up on municipal works's sewer grid plate to dredge the sewer grid plate that blocks up, not only the clearance is troublesome, intensity of labour is big, wastes time and energy, and staff and rubbish debris contact moreover, and is unclean insanitary, consequently needs the research and development a clearance simply, intensity of labour is little, labour saving and time saving, clean sanitary is used for the pull throughs of municipal works's sewer grid plate urgent.
Disclosure of Invention
(1) Technical problem to be solved
The invention aims to overcome the defects that the existing sewer grating plate is dredged by manually cleaning garbage sundries accumulated on the sewer grating plate of municipal engineering, the cleaning is troublesome, the labor intensity is high, time and labor are wasted, hands are in contact with the garbage sundries, and the sewer grating plate is not clean and unsanitary.
(2) Technical scheme
In order to solve the technical problem, the invention provides a dredging device for a sewer grid plate of municipal engineering, which comprises a base, a roller, a universal wheel, a large fixing plate, a lifting plate, a first tension spring, a top plate, a second tension spring, a first long connecting plate, a first fixing plate, a first bearing, a long connecting shaft, a second bearing, a second fixing plate, a second long connecting plate, a first small rotating disk, a large rotating disk, a first fixing rod, a first hook, a second fixing rod and a second hook, wherein the bottom of the base is connected with the roller and the universal wheel, the universal wheel is positioned on the right side of the roller, the middle position of the top of the base is connected with the large fixing plate, the large fixing plate is provided with a first large sliding chute penetrating in the front and back direction, the large fixing plate is provided with a second large sliding chute penetrating in the left and right direction, the second large sliding chute is communicated with the first large sliding chute, the top of the lifting plate is connected with a first tension spring and a second tension spring, the first tension spring is positioned on the right side of the large fixing plate, the second tension spring is positioned on the left side of the large fixing plate, the top of the large fixing plate is connected with a top plate, the upper end of the first tension spring and the upper end of the second tension spring are both connected with the bottom of the top plate, the middle of the lifting plate is provided with a large groove, the large groove is positioned in a first large chute, a first long connecting plate is positioned in the large groove, the left side wall of the first long connecting plate is connected with the lifting plate, the rear side wall of the first long connecting plate is connected with the first fixing plate, the middle of the first fixing plate is embedded with a first bearing, a long connecting shaft is in interference connection with the first bearing, the second bearing is positioned right in front of the first bearing, the second bearing is connected with a long interference connecting shaft, the front side wall of the first long connecting plate is connected with a, the long connecting plate of second is located the right side of long connecting axle, the long connecting plate of second is located big recess, the right side wall and the lifter plate of the long connecting plate of second are connected, the long connecting plate of second is located between first fixed plate and the second fixed plate, first fixed plate and second fixed plate all are connected with the long connecting plate of second, first long connecting plate, long connecting axle and the equal slidingtype of the long connecting plate of second are located first big spout, the rear end of long connecting axle is connected with first little rotary disk, the front end of long connecting axle is connected with big rotary disk, the top of big rotary disk is connected with first dead lever, the top of first dead lever is connected with the first hook of a plurality of, the bottom of big rotary disk is connected with the second dead lever, the bottom of second dead lever is connected with a plurality of second hook, first dead lever and second dead lever all are located the.
Preferably, the device also comprises a third bearing, a large screw rod, a large nut, a fourth bearing, a first belt pulley, a second belt pulley, a first circulating belt, a holding rod, a first rotating shaft and a fifth bearing, wherein the third bearing is embedded at the right part of the top plate, the upper end of the large screw rod is in interference fit connection with the third bearing, the large nut is arranged on the large screw rod, the large nut is matched with the large screw rod, the left side of the large nut is connected with a lifting plate, the lower end of the large screw rod is in interference fit connection with the fourth bearing, the fourth bearing is embedded at the top of the base, the first belt pulley is fixedly sleeved on the large screw rod, the first belt pulley is positioned below the large nut, the second belt pulley is positioned at the right side of the first belt pulley, the second belt pulley is connected with the first belt pulley through the first circulating belt, the eccentric position at the top of the second belt pulley is connected with the holding rod, the bottom of the second belt pulley is connected with the first rotating, the fifth bearing is embedded at the top of the base.
Preferably, still including the little rotary disk of second, little connecting axle, the rotating electrical machines, little connecting plate, little support and first little fixed block, the little rotary disk of second is located the top of second belt pulley, the eccentric position of the little rotary disk of second opens there is the jack, the holding rod is located the jack, the top of the little rotary disk of second is connected with little connecting axle, the upper end of little connecting axle is connected with the lower extreme of rotating electrical machines output shaft, the right side of rotating electrical machines is connected with little connecting plate, the right side of little connecting plate is connected with little support, the bottom of little support is connected with first little fixed block, the left side of first little fixed block is connected with the base.
Preferably, the lifting device further comprises a small fixing plate, a second rotating shaft, a rotating roller, a brush, a third belt pulley, a fourth belt pulley and a second circulating belt, wherein the small fixing plate is connected to the left side of the lifting plate, the second rotating shaft and the small fixing plate are rotatably connected, the rotating roller is connected to the front end of the second rotating shaft, the brush is connected to the outer circumferential wall of the rotating roller, the first hook and the second hook correspond to the brush, the third belt pulley is connected to the rear end of the second rotating shaft, the fourth belt pulley is fixedly sleeved on the long connecting shaft, the fourth belt pulley is located between the first fixing plate and the first small rotating plate, and the fourth belt pulley and the third belt pulley are connected through the second circulating belt.
Preferably, still including the little fixed block of second, clamp plate and little screw rod, the bottom of base is connected with the little fixed block of second, and threaded connection has little screw rod on the little fixed block of second, and the left end of little screw rod is connected with the clamp plate, and the clamp plate is located the right side of gyro wheel.
The working principle is as follows: because the invention comprises a base, a roller, a universal wheel, a large fixed plate, a lifting plate, a first tension spring, a top plate, a second tension spring, a first long connecting plate, a first fixed plate, a first bearing, a long connecting shaft, a second bearing, a second fixed plate, a second long connecting plate, a first small rotating disc, a large rotating disc, a first fixed rod, a first hook, a second fixed rod and a second hook, a worker can move the invention to one side of a sewer grid plate for municipal engineering blocked by sundries through the roller and the universal wheel, place the large rotating disc right above the sewer grid plate, pull the lifting plate downwards, slide up and down in the large fixed plate, drive the large rotating disc to move downwards, drive the first fixed rod, the first hook, the second fixed rod and the second hook to move downwards together by the large rotating disc, the second hook is contacted with the sundries blocked on the sewer grating plate, then a worker rotates the first small rotating disk, the first small rotating disk drives the large rotating disk to rotate through the long connecting shaft, the large rotating disk drives the first fixing rod, the first hook, the second fixing rod and the second hook to rotate together, the second hook can hook up the blocked sundries and is taken away from the sewer grating plate by the rotating second hook, then the worker treats the sundries on the second hook through other equipment and then continues to rotate the large rotating disk, the large rotating disk drives the first hook to be contacted with the sundries on the sewer grating plate, the sundries on the sewer grating plate are hooked up through the first hook and then continue to rotate, and the operation is repeated, so that the sundries blocked on the sewer grating plate can be conveniently cleaned, labour saving and time saving, clean health, after finishing to sewer grid plate clearance mediation, loosen the pulling to the lifter plate, under the pulling of first extension spring and second extension spring, lifter plate and big rotary disk upward movement reset.
Because the device also comprises a third bearing, a large screw rod, a large nut, a fourth bearing, a first belt pulley, a second belt pulley, a first circulating belt, a holding rod, a first rotating shaft and a fifth bearing, the third bearing is embedded at the right part of the top plate, the upper end of the large screw rod is in interference connection with the third bearing, the large nut is arranged on the large screw rod, the large nut is matched with the large screw rod, the left side of the large nut is connected with a lifting plate, the lower end of the large screw rod is in interference connection with the fourth bearing, the fourth bearing is embedded at the top of the base, the first belt pulley is fixedly sleeved on the large screw rod, the first belt pulley is positioned below the large nut, the second belt pulley is positioned at the right side of the first belt pulley, the second belt pulley is connected with the first belt pulley through the first circulating belt, the eccentric position at the top of the second belt pulley is connected with the holding rod, the bottom of the second belt pulley is connected with the first rotating shaft, the fifth bearing is embedded at the top of the base, so the worker can rotate the second belt pulley through the holding rod, the second belt pulley drives the first belt pulley through the first circulating belt to rotate, thereby the first belt pulley drives the big lead screw to rotate, thereby big lead screw drives big nut and lifter plate and moves downwards, thereby the high position of the big rotary disk of adjustment that not only can be convenient, and the high position to big rotary disk that can be convenient fixes a position, the operation is more convenient, more time and labor are saved.
Because the device also comprises a second small rotating disk, a small connecting shaft, a rotating motor, a small connecting plate, a small bracket and a first small fixing block, the second small rotating disk is positioned above the second belt pulley, the eccentric position of the second small rotating disk is provided with a jack, a holding rod is positioned in the jack, the top of the second small rotating disk is connected with the small connecting shaft, the upper end of the small connecting shaft is connected with the lower end of an output shaft of the rotating motor, the right side of the rotating motor is connected with the small connecting plate, the right side of the small connecting plate is connected with the small bracket, the bottom of the small bracket is connected with the first small fixing block, the left side of the first small fixing block is connected with a base, a worker can start the rotating motor to operate, the rotating motor drives the second small rotating disk to rotate through the small connecting shaft, the second small rotating disk drives the second belt pulley, more convenient and faster.
Because the lifting plate also comprises a small fixing plate, a second rotating shaft, a rotating roller, a brush, a third belt pulley, a fourth belt pulley and a second circulating belt, the left side of the lifting plate is connected with the small fixing plate, the second rotating shaft and the small fixing plate are arranged to be in rotating connection, the front end of the second rotating shaft is connected with the rotating roller, the outer circumferential wall of the rotating roller is connected with the brush, a first hook and a second hook both correspond to the brush, the rear end of the second rotating shaft is connected with the third belt pulley, the fourth belt pulley is fixedly sleeved on the long connecting shaft, the fourth belt pulley is positioned between the first fixing plate and the first small rotating disk, and the fourth belt pulley is connected with the third belt pulley through the second circulating belt, when a worker rotates the first small rotating disk, the first small rotating disk can drive the large rotating disk and the fourth belt pulley to rotate together through the long connecting shaft, and the fourth belt pulley drives the third belt pulley to, the third belt pulley drives the rotating roller and the brush to rotate together through the second rotating shaft, when the first hook or the second hook rotates to contact with the brush, the brush can brush sundries on the first hook or the second hook, workers can clean the first hook and the second hook conveniently, and meanwhile the workers can collect the sundries conveniently.
The novel roller fixing device comprises a base, a first small fixing block, a pressing plate and a small screw rod, wherein the bottom of the base is connected with the first small fixing block, the small screw rod is in threaded connection with the second small fixing block, the pressing plate is connected with the left end of the small screw rod and is located on the right side of the roller, so that when the novel roller fixing device needs to be fixed, the small screw rod can be screwed, the pressing plate is driven by the small screw rod to move towards the position where the roller is located, the pressing plate is pressed on the roller, and the novel roller fixing device can be fixed safely and stably.
(3) Advantageous effects
The dredging device for the sewer grid plate of the municipal engineering, provided by the invention, can be used for conveniently cleaning garbage sundries accumulated on the sewer grid plate of the municipal engineering and dredging the blocked sewer grid plate, and is small in labor intensity, time-saving, labor-saving, clean, sanitary, simple in structure, convenient to operate, easy to maintain and repair and low in maintenance cost.
Drawings
Fig. 1 is a schematic front view structure of the present invention.
Fig. 2 is a schematic perspective view of a large fixing plate according to the present invention.
Fig. 3 is a schematic perspective view of a large rotating disk according to the present invention.
Fig. 4 is a front view structure diagram of the large screw rod of the present invention.
Fig. 5 is a front view structural schematic diagram of the rotating electric machine of the present invention.
Fig. 6 is a rear view structural schematic diagram of a second endless belt of the present invention.
Fig. 7 is a rear view structural diagram of a second small fixing block according to the present invention.
The labels in the figures are: 1-base, 2-roller, 3-universal wheel, 4-large fixed plate, 5-lifting plate, 6-first tension spring, 7-top plate, 8-second tension spring, 9-first long connecting plate, 10-first fixed plate, 11-first bearing, 12-long connecting shaft, 13-second bearing, 14-second fixed plate, 15-second long connecting plate, 16-first small rotating disk, 17-large rotating disk, 18-first fixed rod, 19-first hook, 20-second fixed rod, 21-second hook, 31-third bearing, 32-large screw rod, 33-large nut, 34-fourth bearing, 35-first belt pulley, 36-second belt pulley, 37-first endless belt, 38-holding rod, 39-a first rotating shaft, 40-a fifth bearing, 51-a second small rotating disc, 52-a small connecting shaft, 53-a rotating motor, 54-a small connecting plate, 55-a small bracket, 56-a first small fixed block, 61-a small fixed plate, 62-a second rotating shaft, 63-a rotating roller, 64-a brush, 65-a third belt pulley, 66-a fourth belt pulley, 67-a second circulating belt, 71-a second small fixed block, 72-a pressing plate, 73-a small screw, 401-a first large sliding groove, 402-a second large sliding groove, 501-a large groove and 511-a jack.
Detailed Description
The invention is further described below with reference to the figures and examples.
Example 1
A dredging device for a sewer grid plate of municipal engineering is disclosed, as shown in figures 1-7, and comprises a base 1, a roller 2, a universal wheel 3, a large fixing plate 4, a lifting plate 5, a first tension spring 6, a top plate 7, a second tension spring 8, a first long connecting plate 9, a first fixing plate 10, a first bearing 11, a long connecting shaft 12, a second bearing 13, a second fixing plate 14, a second long connecting plate 15, a first small rotating disk 16, a large rotating disk 17, a first fixing rod 18, a first hook 19, a second fixing rod 20 and a second hook 21, wherein the bottom of the base 1 is connected with the roller 2 and the universal wheel 3, the universal wheel 3 is positioned at the right side of the roller 2, the middle position of the top of the base 1 is connected with the large fixing plate 4, the large fixing plate 4 is provided with a first large sliding chute 401 penetrating through the front and back, the large fixing plate 4 is provided with a second large sliding chute 402 penetrating through the left and right, the second large sliding chute, the lifting plate 5 is slidably positioned in the second large sliding groove 402, the top of the lifting plate 5 is connected with a first tension spring 6 and a second tension spring 8, the first tension spring 6 is positioned on the right side of the large fixing plate 4, the second tension spring 8 is positioned on the left side of the large fixing plate 4, the top of the large fixing plate 4 is connected with a top plate 7, the upper end of the first tension spring 6 and the upper end of the second tension spring 8 are both connected with the bottom of the top plate 7, the middle of the lifting plate 5 is provided with a large groove 501, the large groove 501 is positioned in the first large sliding groove 401, the first long connecting plate 9 is positioned in the large groove 501, the left side wall of the first long connecting plate 9 is connected with the lifting plate 5, the rear side wall of the first long connecting plate 9 is connected with a first fixing plate 10, the middle of the first fixing plate 10 is embedded with a first bearing 11, the long connecting shaft 12 is in interference connection with the first bearing 11, the second bearing 13 is positioned right, the front side wall of the first long connecting plate 9 is connected with a second fixing plate 14, a second bearing 13 is embedded in the middle of the second fixing plate 14, the long connecting shaft 12 is positioned at the right side of the first long connecting plate 9, the second long connecting plate 15 is positioned at the right side of the long connecting shaft 12, the second long connecting plate 15 is positioned in the large groove 501, the right side wall of the second long connecting plate 15 is connected with the lifting plate 5, the second long connecting plate 15 is positioned between the first fixing plate 10 and the second fixing plate 14, the first fixing plate 10 and the second fixing plate 14 are both connected with the second long connecting plate 15, the first long connecting plate 9, the long connecting shaft 12 and the second long connecting plate 15 are all slidably positioned in the first large sliding groove 401, the rear end of the long connecting shaft 12 is connected with a first small rotating disc 16, the front end of the long connecting shaft 12 is connected with a large rotating disc 17, the top of the large rotating disc 17 is connected with a first fixing rod 18, the, the bottom of the large rotating disk 17 is connected with a second fixing rod 20, the bottom of the second fixing rod 20 is connected with a plurality of second hooks 21, and the first fixing rod 18 and the second fixing rod 20 are both positioned in front of the base 1.
Example 2
A dredging device for a sewer grid plate of municipal engineering is disclosed, as shown in figures 1-7, and comprises a base 1, a roller 2, a universal wheel 3, a large fixing plate 4, a lifting plate 5, a first tension spring 6, a top plate 7, a second tension spring 8, a first long connecting plate 9, a first fixing plate 10, a first bearing 11, a long connecting shaft 12, a second bearing 13, a second fixing plate 14, a second long connecting plate 15, a first small rotating disk 16, a large rotating disk 17, a first fixing rod 18, a first hook 19, a second fixing rod 20 and a second hook 21, wherein the bottom of the base 1 is connected with the roller 2 and the universal wheel 3, the universal wheel 3 is positioned at the right side of the roller 2, the middle position of the top of the base 1 is connected with the large fixing plate 4, the large fixing plate 4 is provided with a first large sliding chute 401 penetrating through the front and back, the large fixing plate 4 is provided with a second large sliding chute 402 penetrating through the left and right, the second large sliding chute, the lifting plate 5 is slidably positioned in the second large sliding groove 402, the top of the lifting plate 5 is connected with a first tension spring 6 and a second tension spring 8, the first tension spring 6 is positioned on the right side of the large fixing plate 4, the second tension spring 8 is positioned on the left side of the large fixing plate 4, the top of the large fixing plate 4 is connected with a top plate 7, the upper end of the first tension spring 6 and the upper end of the second tension spring 8 are both connected with the bottom of the top plate 7, the middle of the lifting plate 5 is provided with a large groove 501, the large groove 501 is positioned in the first large sliding groove 401, the first long connecting plate 9 is positioned in the large groove 501, the left side wall of the first long connecting plate 9 is connected with the lifting plate 5, the rear side wall of the first long connecting plate 9 is connected with a first fixing plate 10, the middle of the first fixing plate 10 is embedded with a first bearing 11, the long connecting shaft 12 is in interference connection with the first bearing 11, the second bearing 13 is positioned right, the front side wall of the first long connecting plate 9 is connected with a second fixing plate 14, a second bearing 13 is embedded in the middle of the second fixing plate 14, the long connecting shaft 12 is positioned at the right side of the first long connecting plate 9, the second long connecting plate 15 is positioned at the right side of the long connecting shaft 12, the second long connecting plate 15 is positioned in the large groove 501, the right side wall of the second long connecting plate 15 is connected with the lifting plate 5, the second long connecting plate 15 is positioned between the first fixing plate 10 and the second fixing plate 14, the first fixing plate 10 and the second fixing plate 14 are both connected with the second long connecting plate 15, the first long connecting plate 9, the long connecting shaft 12 and the second long connecting plate 15 are all slidably positioned in the first large sliding groove 401, the rear end of the long connecting shaft 12 is connected with a first small rotating disc 16, the front end of the long connecting shaft 12 is connected with a large rotating disc 17, the top of the large rotating disc 17 is connected with a first fixing rod 18, the, the bottom of the large rotating disk 17 is connected with a second fixing rod 20, the bottom of the second fixing rod 20 is connected with a plurality of second hooks 21, and the first fixing rod 18 and the second fixing rod 20 are both positioned in front of the base 1.
The lifting device further comprises a third bearing 31, a large screw rod 32, a large nut 33, a fourth bearing 34, a first belt pulley 35, a second belt pulley 36, a first circulating belt 37, a holding rod 38, a first rotating shaft 39 and a fifth bearing 40, the third bearing 31 is embedded in the right part of the top plate 7, the upper end of the large screw rod 32 is in interference connection with the third bearing 31, the large nut 33 is arranged on the large screw rod 32, the large nut 33 is matched with the large screw rod 32, the left side of the large nut 33 is connected with the lifting plate 5, the lower end of the large screw rod 32 is in interference connection with the fourth bearing 34, the fourth bearing 34 is embedded in the top of the base 1, the first belt pulley 35 is fixedly sleeved on the large screw rod 32, the first belt pulley 35 is positioned below the large nut 33, the second belt pulley 36 is positioned on the right side of the first belt pulley 35, the second belt pulley 36 is connected with the first belt pulley 35 through the first circulating belt 37, the holding rod 38 is connected in an eccentric position of the top of, the bottom of the second belt pulley 36 is connected with a first rotating shaft 39, the lower end of the first rotating shaft 39 is connected with a fifth bearing 40 in an interference manner, and the fifth bearing 40 is embedded in the top of the base 1.
Example 3
A dredging device for a sewer grid plate of municipal engineering is disclosed, as shown in figures 1-7, and comprises a base 1, a roller 2, a universal wheel 3, a large fixing plate 4, a lifting plate 5, a first tension spring 6, a top plate 7, a second tension spring 8, a first long connecting plate 9, a first fixing plate 10, a first bearing 11, a long connecting shaft 12, a second bearing 13, a second fixing plate 14, a second long connecting plate 15, a first small rotating disk 16, a large rotating disk 17, a first fixing rod 18, a first hook 19, a second fixing rod 20 and a second hook 21, wherein the bottom of the base 1 is connected with the roller 2 and the universal wheel 3, the universal wheel 3 is positioned at the right side of the roller 2, the middle position of the top of the base 1 is connected with the large fixing plate 4, the large fixing plate 4 is provided with a first large sliding chute 401 penetrating through the front and back, the large fixing plate 4 is provided with a second large sliding chute 402 penetrating through the left and right, the second large sliding chute, the lifting plate 5 is slidably positioned in the second large sliding groove 402, the top of the lifting plate 5 is connected with a first tension spring 6 and a second tension spring 8, the first tension spring 6 is positioned on the right side of the large fixing plate 4, the second tension spring 8 is positioned on the left side of the large fixing plate 4, the top of the large fixing plate 4 is connected with a top plate 7, the upper end of the first tension spring 6 and the upper end of the second tension spring 8 are both connected with the bottom of the top plate 7, the middle of the lifting plate 5 is provided with a large groove 501, the large groove 501 is positioned in the first large sliding groove 401, the first long connecting plate 9 is positioned in the large groove 501, the left side wall of the first long connecting plate 9 is connected with the lifting plate 5, the rear side wall of the first long connecting plate 9 is connected with a first fixing plate 10, the middle of the first fixing plate 10 is embedded with a first bearing 11, the long connecting shaft 12 is in interference connection with the first bearing 11, the second bearing 13 is positioned right, the front side wall of the first long connecting plate 9 is connected with a second fixing plate 14, a second bearing 13 is embedded in the middle of the second fixing plate 14, the long connecting shaft 12 is positioned at the right side of the first long connecting plate 9, the second long connecting plate 15 is positioned at the right side of the long connecting shaft 12, the second long connecting plate 15 is positioned in the large groove 501, the right side wall of the second long connecting plate 15 is connected with the lifting plate 5, the second long connecting plate 15 is positioned between the first fixing plate 10 and the second fixing plate 14, the first fixing plate 10 and the second fixing plate 14 are both connected with the second long connecting plate 15, the first long connecting plate 9, the long connecting shaft 12 and the second long connecting plate 15 are all slidably positioned in the first large sliding groove 401, the rear end of the long connecting shaft 12 is connected with a first small rotating disc 16, the front end of the long connecting shaft 12 is connected with a large rotating disc 17, the top of the large rotating disc 17 is connected with a first fixing rod 18, the, the bottom of the large rotating disk 17 is connected with a second fixing rod 20, the bottom of the second fixing rod 20 is connected with a plurality of second hooks 21, and the first fixing rod 18 and the second fixing rod 20 are both positioned in front of the base 1.
The lifting device further comprises a third bearing 31, a large screw rod 32, a large nut 33, a fourth bearing 34, a first belt pulley 35, a second belt pulley 36, a first circulating belt 37, a holding rod 38, a first rotating shaft 39 and a fifth bearing 40, the third bearing 31 is embedded in the right part of the top plate 7, the upper end of the large screw rod 32 is in interference connection with the third bearing 31, the large nut 33 is arranged on the large screw rod 32, the large nut 33 is matched with the large screw rod 32, the left side of the large nut 33 is connected with the lifting plate 5, the lower end of the large screw rod 32 is in interference connection with the fourth bearing 34, the fourth bearing 34 is embedded in the top of the base 1, the first belt pulley 35 is fixedly sleeved on the large screw rod 32, the first belt pulley 35 is positioned below the large nut 33, the second belt pulley 36 is positioned on the right side of the first belt pulley 35, the second belt pulley 36 is connected with the first belt pulley 35 through the first circulating belt 37, the holding rod 38 is connected in an eccentric position of the top of, the bottom of the second belt pulley 36 is connected with a first rotating shaft 39, the lower end of the first rotating shaft 39 is connected with a fifth bearing 40 in an interference manner, and the fifth bearing 40 is embedded in the top of the base 1.
The novel belt conveyor is characterized by further comprising a second small rotating disk 51, a small connecting shaft 52, a rotating motor 53, a small connecting plate 54, a small support 55 and a first small fixing block 56, wherein the second small rotating disk 51 is located above the second belt pulley 36, an insertion hole 511 is formed in the eccentric position of the second small rotating disk 51, the holding rod 38 is located in the insertion hole 511, the top of the second small rotating disk 51 is connected with the small connecting shaft 52, the upper end of the small connecting shaft 52 is connected with the lower end of an output shaft of the rotating motor 53, the right side of the rotating motor 53 is connected with the small connecting plate 54, the right side of the small connecting plate 54 is connected with the small support 55, the bottom of the small support 55 is connected with the first small fixing block 56, and the left side.
Example 4
A dredging device for a sewer grid plate of municipal engineering is disclosed, as shown in figures 1-7, and comprises a base 1, a roller 2, a universal wheel 3, a large fixing plate 4, a lifting plate 5, a first tension spring 6, a top plate 7, a second tension spring 8, a first long connecting plate 9, a first fixing plate 10, a first bearing 11, a long connecting shaft 12, a second bearing 13, a second fixing plate 14, a second long connecting plate 15, a first small rotating disk 16, a large rotating disk 17, a first fixing rod 18, a first hook 19, a second fixing rod 20 and a second hook 21, wherein the bottom of the base 1 is connected with the roller 2 and the universal wheel 3, the universal wheel 3 is positioned at the right side of the roller 2, the middle position of the top of the base 1 is connected with the large fixing plate 4, the large fixing plate 4 is provided with a first large sliding chute 401 penetrating through the front and back, the large fixing plate 4 is provided with a second large sliding chute 402 penetrating through the left and right, the second large sliding chute, the lifting plate 5 is slidably positioned in the second large sliding groove 402, the top of the lifting plate 5 is connected with a first tension spring 6 and a second tension spring 8, the first tension spring 6 is positioned on the right side of the large fixing plate 4, the second tension spring 8 is positioned on the left side of the large fixing plate 4, the top of the large fixing plate 4 is connected with a top plate 7, the upper end of the first tension spring 6 and the upper end of the second tension spring 8 are both connected with the bottom of the top plate 7, the middle of the lifting plate 5 is provided with a large groove 501, the large groove 501 is positioned in the first large sliding groove 401, the first long connecting plate 9 is positioned in the large groove 501, the left side wall of the first long connecting plate 9 is connected with the lifting plate 5, the rear side wall of the first long connecting plate 9 is connected with a first fixing plate 10, the middle of the first fixing plate 10 is embedded with a first bearing 11, the long connecting shaft 12 is in interference connection with the first bearing 11, the second bearing 13 is positioned right, the front side wall of the first long connecting plate 9 is connected with a second fixing plate 14, a second bearing 13 is embedded in the middle of the second fixing plate 14, the long connecting shaft 12 is positioned at the right side of the first long connecting plate 9, the second long connecting plate 15 is positioned at the right side of the long connecting shaft 12, the second long connecting plate 15 is positioned in the large groove 501, the right side wall of the second long connecting plate 15 is connected with the lifting plate 5, the second long connecting plate 15 is positioned between the first fixing plate 10 and the second fixing plate 14, the first fixing plate 10 and the second fixing plate 14 are both connected with the second long connecting plate 15, the first long connecting plate 9, the long connecting shaft 12 and the second long connecting plate 15 are all slidably positioned in the first large sliding groove 401, the rear end of the long connecting shaft 12 is connected with a first small rotating disc 16, the front end of the long connecting shaft 12 is connected with a large rotating disc 17, the top of the large rotating disc 17 is connected with a first fixing rod 18, the, the bottom of the large rotating disk 17 is connected with a second fixing rod 20, the bottom of the second fixing rod 20 is connected with a plurality of second hooks 21, and the first fixing rod 18 and the second fixing rod 20 are both positioned in front of the base 1.
The lifting device further comprises a third bearing 31, a large screw rod 32, a large nut 33, a fourth bearing 34, a first belt pulley 35, a second belt pulley 36, a first circulating belt 37, a holding rod 38, a first rotating shaft 39 and a fifth bearing 40, the third bearing 31 is embedded in the right part of the top plate 7, the upper end of the large screw rod 32 is in interference connection with the third bearing 31, the large nut 33 is arranged on the large screw rod 32, the large nut 33 is matched with the large screw rod 32, the left side of the large nut 33 is connected with the lifting plate 5, the lower end of the large screw rod 32 is in interference connection with the fourth bearing 34, the fourth bearing 34 is embedded in the top of the base 1, the first belt pulley 35 is fixedly sleeved on the large screw rod 32, the first belt pulley 35 is positioned below the large nut 33, the second belt pulley 36 is positioned on the right side of the first belt pulley 35, the second belt pulley 36 is connected with the first belt pulley 35 through the first circulating belt 37, the holding rod 38 is connected in an eccentric position of the top of, the bottom of the second belt pulley 36 is connected with a first rotating shaft 39, the lower end of the first rotating shaft 39 is connected with a fifth bearing 40 in an interference manner, and the fifth bearing 40 is embedded in the top of the base 1.
The novel belt conveyor is characterized by further comprising a second small rotating disk 51, a small connecting shaft 52, a rotating motor 53, a small connecting plate 54, a small support 55 and a first small fixing block 56, wherein the second small rotating disk 51 is located above the second belt pulley 36, an insertion hole 511 is formed in the eccentric position of the second small rotating disk 51, the holding rod 38 is located in the insertion hole 511, the top of the second small rotating disk 51 is connected with the small connecting shaft 52, the upper end of the small connecting shaft 52 is connected with the lower end of an output shaft of the rotating motor 53, the right side of the rotating motor 53 is connected with the small connecting plate 54, the right side of the small connecting plate 54 is connected with the small support 55, the bottom of the small support 55 is connected with the first small fixing block 56, and the left side.
The lifting plate comprises a lifting plate 5, and is characterized by further comprising a small fixing plate 61, a second rotating shaft 62, a rotating roller 63, a brush 64, a third belt pulley 65, a fourth belt pulley 66 and a second circulating belt 67, wherein the small fixing plate 61 is connected to the left side of the lifting plate 5, the second rotating shaft 62 is rotatably connected with the small fixing plate 61, the rotating roller 63 is connected to the front end of the second rotating shaft 62, the brush 64 is connected to the outer circumferential wall of the rotating roller 63, the first hook 19 and the second hook 21 both correspond to the brush 64, the third belt pulley 65 is connected to the rear end of the second rotating shaft 62, the fourth belt pulley 66 is fixedly sleeved on the long connecting shaft 12, the fourth belt pulley 66 is located between the first fixing plate 10 and the first small rotating disc 16, and the fourth belt pulley 66 is connected with the third belt pulley 65.
The roller device is characterized by further comprising a second small fixing block 71, a pressing plate 72 and a small screw rod 73, the bottom of the base 1 is connected with the second small fixing block 71, the second small fixing block 71 is in threaded connection with the small screw rod 73, the left end of the small screw rod 73 is connected with the pressing plate 72, and the pressing plate 72 is located on the right side of the roller 2.
The working principle is as follows: because the invention comprises a base 1, a roller 2, a universal wheel 3, a large fixing plate 4, a lifting plate 5, a first tension spring 6, a top plate 7, a second tension spring 8, a first long connecting plate 9, a first fixing plate 10, a first bearing 11, a long connecting shaft 12, a second bearing 13, a second fixing plate 14, a second long connecting plate 15, a first small rotating disk 16, a large rotating disk 17, a first fixing rod 18, a first hook 19, a second fixing rod 20 and a second hook 21, a worker can move the invention to one side of a sewage grating plate for municipal engineering blocked by sundries through the roller 2 and the universal wheel 3, place the large rotating disk 17 right above the sewage grating plate, and then pull the lifting plate 5 downwards, the lifting plate 5 can slide up and down in the large fixing plate 4, and the lifting plate 5 drives the large rotating disk 17 to move downwards, the large rotating disc 17 drives the first fixing rod 18, the first hook 19, the second fixing rod 20 and the second hook 21 to move downwards together, the second hook 21 is made to contact with sundries blocked on the sewer grille plate, then a worker rotates the first small rotating disc 16, the first small rotating disc 16 drives the large rotating disc 17 to rotate through the long connecting shaft 12, the large rotating disc 17 drives the first fixing rod 18, the first hook 19, the second fixing rod 20 and the second hook 21 to rotate together, the second hook 21 can hook up the blocked sundries and is taken away from the sewer grille plate by the rotating second hook 21, then the worker processes the sundries on the second hook 21 through other equipment, then the large rotating disc 17 continues to rotate, and the large rotating disc 17 drives the first hook 19 to contact with the sundries on the sewer grille plate, and collude the debris on the sewer grid plate through first hook 19, then continue to rotate again, repeat above-mentioned operation can to can carry out convenient clearance to the debris that blocks up on the sewer grid plate, labour saving and time saving, clean health, after finishing to the clearance mediation of sewer grid plate, loosen the pulling to lifter plate 5, under the pulling of first extension spring 6 and second extension spring 8, lifter plate 5 and big rotary disk 17 move upward and reset.
Because the device also comprises a third bearing 31, a large screw rod 32, a large nut 33, a fourth bearing 34, a first belt pulley 35, a second belt pulley 36, a first circulating belt 37, a holding rod 38, a first rotating shaft 39 and a fifth bearing 40, the third bearing 31 is embedded at the right part of the top plate 7, the upper end of the large screw rod 32 is in interference connection with the third bearing 31, the large nut 33 is arranged on the large screw rod 32, the large nut 33 is matched with the large screw rod 32, the left side of the large nut 33 is connected with the lifting plate 5, the lower end of the large screw rod 32 is in interference connection with the fourth bearing 34, the fourth bearing 34 is embedded at the top part of the base 1, the first belt pulley 35 is fixedly sleeved on the large screw rod 32, the first belt pulley 35 is positioned below the large nut 33, the second belt pulley 36 is positioned at the right side of the first belt pulley 35, the second belt pulley 36 is connected with the first belt pulley 35 through the first circulating belt 37, the eccentric position at the top part of the second belt pulley 36 is, the bottom of second belt pulley 36 is connected with first rotation axis 39, the lower extreme interference of first rotation axis 39 is connected with fifth bearing 40, fifth bearing 40 inlays and establishes the top at base 1, so the staff can rotate second belt pulley 36 through holding rod 38, second belt pulley 36 drives first belt pulley 35 through first endless belt 37 and rotates, thereby first belt pulley 35 drives big lead screw 32 and rotates, big lead screw 32 thereby drives big nut 33 and lifter plate 5 and moves downwards, thereby the high position of the big rotary disk 17 of adjustment that not only can be convenient, and the high position to big rotary disk 17 that can be convenient fixes a position, it is more convenient to operate, and is more time saving and labor saving.
Because the device also comprises a second small rotating disk 51, a small connecting shaft 52, a rotating motor 53, a small connecting plate 54, a small bracket 55 and a first small fixing block 56, the second small rotating disk 51 is positioned above the second belt pulley 36, the eccentric position of the second small rotating disk 51 is provided with an insertion hole 511, the holding rod 38 is positioned in the insertion hole 511, the top of the second small rotating disk 51 is connected with the small connecting shaft 52, the upper end of the small connecting shaft 52 is connected with the lower end of the output shaft of the rotating motor 53, the right side of the rotating motor 53 is connected with the small connecting plate 54, the right side of the small connecting plate 54 is connected with the small bracket 55, the bottom of the small bracket 55 is connected with the first small fixing block 56, the left side of the first small fixing block 56 is connected with the base 1, so that a worker can start the rotating motor 53 to operate, the rotating motor 53 drives the second small rotating disk 51 to rotate through the small connecting shaft 52, the second small rotating disk, utilize rotating electrical machines 53 to replace manual operation, more convenient and fast.
Because the lifting plate further comprises a small fixing plate 61, a second rotating shaft 62, a rotating roller 63, a brush 64, a third belt pulley 65, a fourth belt pulley 66 and a second circulating belt 67, the left side of the lifting plate 5 is connected with the small fixing plate 61, the second rotating shaft 62 is rotatably connected with the small fixing plate 61, the front end of the second rotating shaft 62 is connected with the rotating roller 63, the outer circumferential wall of the rotating roller 63 is connected with the brush 64, the first hook 19 and the second hook 21 both correspond to the brush 64, the rear end of the second rotating shaft 62 is connected with the third belt pulley 65, the fourth belt pulley 66 is fixedly sleeved on the long connecting shaft 12, the fourth belt pulley 66 is positioned between the first fixing plate 10 and the first small rotating disc 16, the fourth belt pulley 66 is connected with the third belt pulley 65 through the second circulating belt 67, when a worker rotates the first small rotating disc 16, the first small rotating disc 16 can drive the large rotating disc 17 and the fourth belt pulley 66 to rotate together through the long connecting shaft 12, the fourth belt pulley 66 drives the third belt pulley 65 to rotate through the second endless belt 67, the third belt pulley 65 drives the rotating roller 63 and the brush 64 to rotate together through the second rotating shaft 62, when the first hook 19 or the second hook 21 rotates to be in contact with the brush 64, the brush 64 can brush the sundries on the first hook 19 or the second hook 21, the first hook 19 and the second hook 21 can be cleaned conveniently by a worker, and meanwhile the sundries can be collected conveniently by the worker.
Because the roller fixing device further comprises a second small fixing block 71, a pressing plate 72 and a small screw rod 73, the bottom of the base 1 is connected with the second small fixing block 71, the second small fixing block 71 is in threaded connection with the small screw rod 73, the left end of the small screw rod 73 is connected with the pressing plate 72, and the pressing plate 72 is located on the right side of the roller 2, when the roller fixing device needs to be fixed, the small screw rod 73 can be screwed, the small screw rod 73 drives the pressing plate 72 to move towards the position where the roller 2 is located, and the pressing plate 72 is pressed on the roller 2 to be fixed, so that the roller fixing device is safe and stable.
The above examples are merely representative of preferred embodiments of the present invention, and the description thereof is more specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, various changes, modifications and substitutions can be made without departing from the spirit of the present invention, and these are all within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (2)

1. A dredging device for a sewer grid plate of municipal engineering is characterized by comprising a base (1), rollers (2), universal wheels (3), a large fixing plate (4), a lifting plate (5), a first tension spring (6), a top plate (7), a second tension spring (8), a first long connecting plate (9), a first fixing plate (10), a first bearing (11), a long connecting shaft (12), a second bearing (13), a second fixing plate (14), a second long connecting plate (15), a first small rotating disk (16), a large rotating disk (17), a first fixing rod (18), a first hook (19), a second fixing rod (20) and a second hook (21), wherein the rollers (2) and the universal wheels (3) are connected to the bottom of the base (1), the universal wheels (3) are positioned on the right sides of the rollers (2), the large fixing plate (4) is connected to the middle of the top of the base (1), the large fixing plate (4) is provided with a first large sliding chute (401) which penetrates through the large fixing plate in the front-back direction, the large fixing plate (4) is provided with a second large sliding chute (402) which penetrates through the large fixing plate in the left-right direction, the second large sliding chute (402) is communicated with the first large sliding chute (401), the lifting plate (5) is slidably positioned in the second large sliding chute (402), the top of the lifting plate (5) is connected with a first tension spring (6) and a second tension spring (8), the first tension spring (6) is positioned on the right side of the large fixing plate (4), the second tension spring (8) is positioned on the left side of the large fixing plate (4), the top of the large fixing plate (4) is connected with a top plate (7), the upper end of the first tension spring (6) and the upper end of the second tension spring (8) are both connected with the bottom of the top plate (7), the middle part of the lifting plate (5) is provided with a large groove (501), the large groove (501) is positioned in, the left side wall of a first long connecting plate (9) is connected with a lifting plate (5), the rear side wall of the first long connecting plate (9) is connected with a first fixing plate (10), a first bearing (11) is embedded in the middle of the first fixing plate (10), a long connecting shaft (12) is in interference connection with the first bearing (11), a second bearing (13) is positioned right in front of the first bearing (11), the second bearing (13) is in interference connection with a long connecting shaft (12), the front side wall of the first long connecting plate (9) is connected with a second fixing plate (14), the second bearing (13) is embedded in the middle of the second fixing plate (14), the long connecting shaft (12) is positioned on the right side of the first long connecting plate (9), the second long connecting plate (15) is positioned on the right side of the long connecting shaft (12), the second long connecting plate (15) is positioned in a large groove (501), the right side wall of the second long connecting plate (15) is connected with the lifting plate (5), a second long connecting plate (15) is positioned between the first fixing plate (10) and the second fixing plate (14), the first fixing plate (10) and the second fixing plate (14) are both connected with the second long connecting plate (15), a first long connecting plate (9), the long connecting shaft (12) and the second long connecting plate (15) are both slidably located in a first large sliding groove (401), the rear end of the long connecting shaft (12) is connected with a first small rotating disc (16), the front end of the long connecting shaft (12) is connected with a large rotating disc (17), the top of the large rotating disc (17) is connected with a first fixing rod (18), the top of the first fixing rod (18) is connected with a plurality of first hooks (19), the bottom of the large rotating disc (17) is connected with a second fixing rod (20), the bottom of the second fixing rod (20) is connected with a plurality of second hooks (21), and the first fixing rod (18) and the second fixing rod (20) are both located in front of the base (1); the novel screw rod lifting mechanism further comprises a third bearing (31), a large screw rod (32), a large nut (33), a fourth bearing (34), a first belt pulley (35), a second belt pulley (36), a first circulating belt (37), a holding rod (38), a first rotating shaft (39) and a fifth bearing (40), the third bearing (31) is embedded in the right part of the top plate (7), the upper end of the large screw rod (32) is in interference connection with the third bearing (31), the large nut (33) is arranged on the large screw rod (32), the large nut (33) is matched with the large screw rod (32), the left side of the large nut (33) is connected with a lifting plate (5), the lower end of the large screw rod (32) is in interference connection with the fourth bearing (34), the fourth bearing (34) is embedded in the top of the base (1), the first belt pulley (35) is fixedly sleeved on the large screw rod (32), and the first belt pulley (35) is located below the large nut (33), the second belt pulley (36) is positioned on the right side of the first belt pulley (35), the second belt pulley (36) is connected with the first belt pulley (35) through a first circulating belt (37), a holding rod (38) is connected to the eccentric position of the top of the second belt pulley (36), a first rotating shaft (39) is connected to the bottom of the second belt pulley (36), a fifth bearing (40) is connected to the lower end of the first rotating shaft (39) in an interference mode, and the fifth bearing (40) is embedded in the top of the base (1); the novel belt conveyor is characterized by further comprising a second small rotating disk (51), a small connecting shaft (52), a rotating motor (53), a small connecting plate (54), a small support (55) and a first small fixing block (56), wherein the second small rotating disk (51) is positioned above the second belt pulley (36), a jack (511) is formed in the eccentric position of the second small rotating disk (51), a holding rod (38) is positioned in the jack (511), the top of the second small rotating disk (51) is connected with the small connecting shaft (52), the upper end of the small connecting shaft (52) is connected with the lower end of an output shaft of the rotating motor (53), the right side of the rotating motor (53) is connected with the small connecting plate (54), the right side of the small connecting plate (54) is connected with the small support (55), the bottom of the small support (55) is connected with the first small fixing block (56), and the left side of the first small fixing block (56; also comprises a small fixed plate (61), a second rotating shaft (62), a rotating roller (63), a brush (64), a third belt pulley (65), a fourth belt pulley (66) and a second circulating belt (67), the left side of lifter plate (5) is connected with little fixed plate (61), second rotation axis (62) and little fixed plate (61) set up to rotate to be connected, the front end of second rotation axis (62) is connected with rotatory roller (63), be connected with brush (64) on the outer circumferential wall of rotatory roller (63), first hook (19) and second hook (21) all correspond with brush (64), the rear end of second rotation axis (62) is connected with third belt pulley (65), fourth belt pulley (66) fixed cover is on long connecting axle (12), fourth belt pulley (66) are located between first fixed plate (10) and first little rotary disk (16), fourth belt pulley (66) are connected through second endless belt (67) with third belt pulley (65).
2. The dredging device for the sewer grid plate of the municipal engineering according to claim 1, further comprising a second small fixing block (71), a pressing plate (72) and a small screw (73), wherein the bottom of the base (1) is connected with the second small fixing block (71), the second small fixing block (71) is in threaded connection with the small screw (73), the left end of the small screw (73) is connected with the pressing plate (72), and the pressing plate (72) is located on the right side of the roller (2).
CN201810173887.2A 2018-03-02 2018-03-02 A pull throughs for sewer grid plate of municipal works Active CN108193764B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810173887.2A CN108193764B (en) 2018-03-02 2018-03-02 A pull throughs for sewer grid plate of municipal works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810173887.2A CN108193764B (en) 2018-03-02 2018-03-02 A pull throughs for sewer grid plate of municipal works

Publications (2)

Publication Number Publication Date
CN108193764A CN108193764A (en) 2018-06-22
CN108193764B true CN108193764B (en) 2020-06-19

Family

ID=62594751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810173887.2A Active CN108193764B (en) 2018-03-02 2018-03-02 A pull throughs for sewer grid plate of municipal works

Country Status (1)

Country Link
CN (1) CN108193764B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110052432B (en) * 2019-05-29 2021-06-11 南京拓耘达智慧科技有限公司 Water grate dredging device for garbage pool
CN110374188B (en) * 2019-07-22 2020-10-02 浙江奔腾市政园林建设工程有限公司 Temporary sewage pipe dredging device for sewage well and using method thereof
CN111877504B (en) * 2020-08-03 2021-07-13 绍兴市魏达机械有限公司 Sewage inlet pipe with blocking function for domestic wastewater pollution discharge

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2742132A1 (en) * 1995-12-11 1997-06-13 Parize Albert Building gutter grate reduction gear lift frame
CN2575198Y (en) * 2002-10-31 2003-09-24 陈军 Light composite construction materials
CN204081058U (en) * 2014-07-09 2015-01-07 李�杰 Municipal sewage system dredging descaling machine
CN205636600U (en) * 2016-03-24 2016-10-12 刘翔 Manhole cover pull throughs
CN106423370A (en) * 2016-12-18 2017-02-22 赣州科源甬致科技有限公司 Efficient crushing and cleaning device for building cement blocks
CN106522356A (en) * 2016-12-11 2017-03-22 南昌安润科技有限公司 Special dredging vehicle for sewer man-hole
CN106541518A (en) * 2016-11-03 2017-03-29 胡凤英 A kind of plastic garbage quick crashing device
CN107724513A (en) * 2017-11-29 2018-02-23 常熟市谷雷特机械产品设计有限公司 A kind of anti-blocking anti-sticking drainage mechanism based on roller

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2742132A1 (en) * 1995-12-11 1997-06-13 Parize Albert Building gutter grate reduction gear lift frame
CN2575198Y (en) * 2002-10-31 2003-09-24 陈军 Light composite construction materials
CN204081058U (en) * 2014-07-09 2015-01-07 李�杰 Municipal sewage system dredging descaling machine
CN205636600U (en) * 2016-03-24 2016-10-12 刘翔 Manhole cover pull throughs
CN106541518A (en) * 2016-11-03 2017-03-29 胡凤英 A kind of plastic garbage quick crashing device
CN106522356A (en) * 2016-12-11 2017-03-22 南昌安润科技有限公司 Special dredging vehicle for sewer man-hole
CN106423370A (en) * 2016-12-18 2017-02-22 赣州科源甬致科技有限公司 Efficient crushing and cleaning device for building cement blocks
CN107724513A (en) * 2017-11-29 2018-02-23 常熟市谷雷特机械产品设计有限公司 A kind of anti-blocking anti-sticking drainage mechanism based on roller

Also Published As

Publication number Publication date
CN108193764A (en) 2018-06-22

Similar Documents

Publication Publication Date Title
CN108193764B (en) A pull throughs for sewer grid plate of municipal works
CN205711913U (en) A kind of excess surface water cleaning plant for building
CN108607851B (en) Municipal administration garbage bin belt cleaning device
CN109898633A (en) A kind of sewage network maintenance system
CN212026569U (en) Dredging device for municipal underground pipeline
CN216948023U (en) Step cleaning device for municipal works with climb building function
CN108114551A (en) Construction site dust controlling method
CN211922447U (en) Road sweeping device for municipal engineering
CN215052355U (en) Municipal works are with construction suggestion device
CN215656942U (en) Building site holds bucket mortar clearing device with cement mortar
CN212200214U (en) Municipal works construction dust collector
CN211872947U (en) Municipal administration highway construction sampling device
CN215387840U (en) Municipal administration public works's sewer grid board pull throughs
CN215105951U (en) Grid plate dredging device for sewer
CN214338476U (en) A gardens meadow planting equipment for municipal works
CN220469074U (en) Road and bridge is with sluicing device convenient to maintain
CN2295794Y (en) Apparatus for cleaning waste barrier
CN221589696U (en) Municipal works wellhead assembly
CN214459994U (en) Highway road surface cleaning device
CN217949303U (en) Hydraulic push rod sewer cleaning robot
CN219992142U (en) Road construction joint cutting device
CN217232211U (en) Prevent accumulational municipal works pipeline drainage pull throughs
CN219621571U (en) Road pavement slotting and seam cleaning equipment
CN221054938U (en) Solar street lamp convenient to overhaul
CN218409045U (en) Drainage pipe detection robot convenient to clearance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200528

Address after: 325000 room 233, floor 2, Huachang building, Chezhan Avenue, Nanhui street, Lucheng District, Wenzhou City, Zhejiang Province

Applicant after: Wenzhou motailun Industrial Design Co., Ltd

Address before: 510062 Guangzhou Road Machinery Design Institute, 17 Zhongshan Road, Guangzhou 5, Guangdong

Applicant before: Nong Kejian

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201111

Address after: 226500 Group 15 of Dengyuan Community of Rucheng Town, Rugao City, Nantong City, Jiangsu Province (in No. 4 Standard Workshop of Rugao Economic and Trade Development Corporation)

Patentee after: NANTONG TIANMU INSULATING COMPOSITE MATERIALS Co.,Ltd.

Address before: 325000 room 233, floor 2, Huachang building, Chezhan Avenue, Nanhui street, Lucheng District, Wenzhou City, Zhejiang Province

Patentee before: Wenzhou motailun Industrial Design Co.,Ltd.

TR01 Transfer of patent right