CN108180026B - Method for protecting support is pressed in tunnel conversion under a kind of non-uniform traffic environment - Google Patents

Method for protecting support is pressed in tunnel conversion under a kind of non-uniform traffic environment Download PDF

Info

Publication number
CN108180026B
CN108180026B CN201810169909.8A CN201810169909A CN108180026B CN 108180026 B CN108180026 B CN 108180026B CN 201810169909 A CN201810169909 A CN 201810169909A CN 108180026 B CN108180026 B CN 108180026B
Authority
CN
China
Prior art keywords
tunnel
constant
hydraulic device
circular rigid
resistance hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201810169909.8A
Other languages
Chinese (zh)
Other versions
CN108180026A (en
Inventor
贾后省
王璐瑶
刘少伟
姜彦军
尹文怀
苏发强
王永峰
于涛
付孟雄
高培成
李小鹏
谢凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201810169909.8A priority Critical patent/CN108180026B/en
Publication of CN108180026A publication Critical patent/CN108180026A/en
Application granted granted Critical
Publication of CN108180026B publication Critical patent/CN108180026B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/28Longitudinal struts, i.e. longitudinal connections between adjoining arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/14Telescopic props
    • E21D15/44Hydraulic, pneumatic, or hydraulic-pneumatic props
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/48Chocks or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Road Signs Or Road Markings (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The present invention proposes a kind of tunnel according to the thought of pressure conversion and presses method for transformation, uniform, constant active pressure is converted by the unbalanced pressure of roadway surrounding rock to act in Circular Rigid supporting construction, this method is mainly used for solving the support issues of permanent openings under non-uniform traffic environment, practicability is stronger, preferable supporting effect can be obtained, the method for protecting support in tunnel under non-uniform traffic environment is enriched.

Description

Method for protecting support is pressed in tunnel conversion under a kind of non-uniform traffic environment
Technical field
The invention belongs to roadway surrounding rock control fields, and in particular to tunnel conversion is pressed under a kind of non-uniform traffic environment Method for protecting support.
Background technique
During tunnelling, unbalanced stresses field is inevitably encountered, prop is in non-and presses stress, and tunnel is easy Strong asymmetrical deformation is generated, asymmetrical deformation pressure first makes tunnel generate the deformation failure of part, and subsequent other regions are opened Begin to destroy, the support system damage inactivation in last entire tunnel, traditional support technology is difficult to meet tunnel under the geological conditions The demand of support engineering, roadway support issues under this condition are a technical problems in current roadway support field, especially Supporting for permanent openings.Technical staff starts with from the angle for increasing support density and intensity mostly at scene at present, but because The heterogeneity of roadway surrounding rock pressure cannot more efficiently solve the problem, and fall of ground accident occurs again and again, cause huge Huge economic loss and casualties.
Summary of the invention
The purpose of the present invention is the statuses poor for laneway support method under the environment of current unbalanced stresses field, provide one Method for protecting support is pressed in tunnel conversion under kind non-uniform traffic environment.
To achieve the above object, one of technical solution of the present invention, tunnel conversion is equal under a kind of non-uniform traffic environment Press method for protecting support, comprising the following steps:
(1) original tunnel is excavated, and arranges interim support system in tunnel;
(2) arrange that Circular Rigid supporting construction, the Circular Rigid supporting construction are Circular Rigid in tunnel central location Bracket, Circular Rigid bracket are assembled by arc steelframe;Arrange that constant-resistance hydraulic device, constant-resistance hydraulic device are evenly arranged in circle On the outside of shape rigid support, the both ends of constant-resistance hydraulic device are connect with Circular Rigid bracket and roadway surrounding rock respectively;The hydraulic dress of constant-resistance When setting installation, installation constant-resistance hydraulic device first is helped in roadway floor and two, constant-resistance hydraulic device is finally installed at the top of tunnel;
(3) fluid injection is boosted, and the cylinder of each group constant-resistance hydraulic device is increased, and adjust the pressure of constant-resistance hydraulic device relief valve Force value is consistent, makes it have certain setting load, is tightly supported between Circular Rigid bracket and roadway surrounding rock;
(4) several crossbeams are uniformly set up between adjacent Circular Rigid bracket, and are laid with pipeline and are formed new operation Space, pipeline are located at cross rail inner, and crossbeam is evenly distributed on the outside of pipeline;
(5) it the step of segmentation installation, repetition above-mentioned (2) ~ (4), pushes ahead.
Preferably, the constant-resistance hydraulic device is 2 ~ 5 grades of hydraulic props.
The both ends of the constant-resistance hydraulic device are equipped with matched column shoes, bolumn cap, one end of mounting post shoes and roadway surrounding rock Connection, the one end for installing bolumn cap is connect with Circular Rigid bracket.
The two of the technical solution adopted by the present invention, method for protecting support is pressed in tunnel conversion under a kind of non-uniform traffic environment, The following steps are included:
(1) original tunnel is excavated, interim support system is arranged in tunnel;
(2) the step-by-step arrangement rigid cylinder in original tunnel, and enclosing wall is established at each section of rigid cylinder both ends;
(3) liquid filling is injected into the surrounded enclosure space of enclosing wall of rigid cylinder, tunnel and rigid cylinder both ends Object, and adjust the pressure value of relief valve on rigid cylinder barrel;
(4) the step of section construction, repetition above-mentioned (2) ~ (3), extend cartridge type rigid structure forward.
The liquid charges are that coefficient of viscosity is greater than 90mm2/ s, pollution-free, pumpable, antistatic, fire-retardant liquid material Material.
The beneficial effect comprise that: tunnel conversion is equal under a kind of non-uniform traffic environment proposed by the invention Constant-resistance, which can be effectively performed, in pressure method for protecting support allows pressure, allows original tunnel to have certain deformation, to reduce roadway surrounding rock pair The pressure of Circular Rigid supporting construction increases the stability of supporting construction;A kind of non-uniform traffic ring proposed by the invention Conversion pressure method for protecting support in tunnel can convert uniform pressure for unbalanced pressure from surrounding rock and act on Circular Rigid under border In supporting construction, Circular Rigid supporting construction is made full use of most to stablize this characteristic under the conditions of pressing;Proposed by the invention Construction method is section construction, separately installed, greatly reduces construction and installation difficulty, reduces the difficulty of tunnel transport.It fills Divide using Circular Rigid supporting construction in the equal most stable of feature of press strip part, realizes that support efficiency is best.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the supporting construction used in the embodiment of the present invention 1;
Fig. 2 is the diagrammatic cross-section of the supporting construction of embodiment 1;
The constant-resistance of supporting construction, which allows, when Fig. 3 is tunnel asymmetrical deformation in embodiment 1 presses schematic diagram;
Fig. 4 is the structural schematic diagram of arc steelframe in embodiment 1;
Fig. 5 is the structural schematic diagram of the supporting construction of the use of embodiment 2;
Fig. 6 is the diagrammatic cross-section of the supporting construction of embodiment 2;
The constant-resistance of supporting construction, which allows, when Fig. 7 is tunnel asymmetrical deformation in embodiment 2 presses schematic diagram.
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Embodiment 1
As shown in Figs 1-4, method for protecting support is pressed in tunnel conversion under a kind of non-uniform traffic environment, comprising the following steps:
(1) original tunnel is excavated, and arranges interim support system in tunnel 1;
(2) arrange that Circular Rigid supporting construction, the Circular Rigid supporting construction are Circular Rigid in 1 central location of tunnel Bracket 2, Circular Rigid bracket 2 are assembled by connecting plate 9 by arc steelframe 11;Arrange constant-resistance hydraulic device 3, constant-resistance is hydraulic Device 3 is evenly arranged in the outside of Circular Rigid bracket 2, the both ends of constant-resistance hydraulic device 3 respectively with Circular Rigid bracket 2 and tunnel Country rock connection;When constant-resistance hydraulic device 3 is installed, installation constant-resistance hydraulic device first is helped in roadway floor and two, is finally pushed up in tunnel Portion is installed by constant-resistance hydraulic device;
(3) fluid injection is boosted, and the cylinder of each group constant-resistance hydraulic device 3 is increased, and adjust constant-resistance hydraulic device relief valve Pressure value is consistent, makes it have certain setting load, is tightly supported between Circular Rigid bracket 2 and roadway surrounding rock;
(4) several crossbeams 4 are uniformly set up between adjacent Circular Rigid bracket 2, and are laid with pipeline 5 and are formed new work Industry space, pipeline 5 are located at cross rail inner, and crossbeam 4 is evenly distributed on the outside of pipeline 5;
(5) it the step of segmentation installation, repetition above-mentioned (2) ~ (4), pushes ahead.
The constant-resistance hydraulic device is 2 ~ 5 grades of hydraulic props.
The both ends of the constant-resistance hydraulic device are equipped with matched column shoes, bolumn cap, one end of mounting post shoes and roadway surrounding rock Connection, the one end for installing bolumn cap is connect with Circular Rigid bracket.
Embodiment 2
As illustrated in figs. 5-7, method for protecting support is pressed in tunnel conversion under a kind of non-uniform traffic environment, comprising the following steps:
(1) original tunnel is excavated, interim support system is arranged in tunnel 1;
(2) the step-by-step arrangement rigid cylinder 6 in original tunnel, and enclosing wall 12 is established at each section of 6 both ends of rigid cylinder;
(3) liquid filling is injected into the surrounded enclosure space of enclosing wall of rigid cylinder, tunnel and rigid cylinder both ends Object 8, and adjust the pressure value of relief valve 7 on rigid cylinder barrel;
(4) the step of section construction, repetition above-mentioned (2) ~ (3), extend cartridge type rigid structure forward.
The liquid charges are that coefficient of viscosity is greater than 90mm2/ s, pollution-free, pumpable, antistatic, fire-retardant liquid material Material.
The present invention proposes a kind of tunnel according to the thought of pressure conversion and presses method for transformation, by the imbalance of roadway surrounding rock Pressure is converted into uniform, constant active pressure and acts in Circular Rigid supporting construction, and it is equal by no means that this method is mainly used for solution The support issues of permanent openings under even stress field environment, practicability is stronger, can obtain preferable supporting effect, enriches non-equal The method for protecting support in tunnel under even stress field environment.

Claims (3)

1. method for protecting support is pressed in tunnel conversion under a kind of non-uniform traffic environment, it is characterised in that the following steps are included:
(1) original tunnel is excavated, and arranges interim support system in tunnel;
(2) arrange that Circular Rigid supporting construction, the Circular Rigid supporting construction are Circular Rigid bracket in tunnel central location, Circular Rigid bracket is assembled by arc steelframe;Arrange that constant-resistance hydraulic device, constant-resistance hydraulic device are evenly arranged in round rigid Property stent outer, the both ends of constant-resistance hydraulic device are connect with Circular Rigid bracket and roadway surrounding rock respectively;Constant-resistance hydraulic device peace When dress, installation constant-resistance hydraulic device first is helped in roadway floor and two, constant-resistance hydraulic device is finally installed at the top of tunnel;
(3) fluid injection is boosted, and the cylinder of each group constant-resistance hydraulic device is increased, and adjust the pressure value of constant-resistance hydraulic device relief valve Unanimously, certain setting load is made it have, is tightly supported between Circular Rigid bracket and roadway surrounding rock;
(4) several crossbeams are uniformly set up between adjacent Circular Rigid bracket, and are laid with pipeline and are formed new working space, Pipeline is located at cross rail inner, and crossbeam is evenly distributed on the outside of pipeline;
(5) it the step of segmentation installation, repetition above-mentioned (2) ~ (4), pushes ahead.
2. method for protecting support is pressed in tunnel conversion under non-uniform traffic environment as described in claim 1, which is characterized in that the perseverance The both ends of blocking solution pressure device are equipped with matched column shoes, bolumn cap, and one end of mounting post shoes is connect with roadway surrounding rock, install bolumn cap One end is connect with Circular Rigid bracket.
3. method for protecting support is pressed in tunnel conversion under non-uniform traffic environment as described in claim 1, which is characterized in that the perseverance Blocking solution press fitting is set to 2 ~ 5 grades of hydraulic props.
CN201810169909.8A 2018-03-01 2018-03-01 Method for protecting support is pressed in tunnel conversion under a kind of non-uniform traffic environment Expired - Fee Related CN108180026B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810169909.8A CN108180026B (en) 2018-03-01 2018-03-01 Method for protecting support is pressed in tunnel conversion under a kind of non-uniform traffic environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810169909.8A CN108180026B (en) 2018-03-01 2018-03-01 Method for protecting support is pressed in tunnel conversion under a kind of non-uniform traffic environment

Publications (2)

Publication Number Publication Date
CN108180026A CN108180026A (en) 2018-06-19
CN108180026B true CN108180026B (en) 2019-03-12

Family

ID=62552981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810169909.8A Expired - Fee Related CN108180026B (en) 2018-03-01 2018-03-01 Method for protecting support is pressed in tunnel conversion under a kind of non-uniform traffic environment

Country Status (1)

Country Link
CN (1) CN108180026B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115387379B (en) * 2022-07-28 2023-07-04 中铁隧道局集团有限公司 Support structure for prefabricated arc-shaped component and application thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101280684A (en) * 2008-05-12 2008-10-08 淮南矿业(集团)有限责任公司 Goaf surrounding rock around gob-side supporting method under three soft geological condition
CN201292852Y (en) * 2008-12-03 2009-08-19 义马煤业(集团)有限责任公司 Coal mine tunnel structure
CN102182482A (en) * 2011-04-25 2011-09-14 义马煤业集团股份有限公司跃进煤矿 Impact-resistant combined anti-pressure supporting system
CN105178979A (en) * 2015-08-28 2015-12-23 中铁二十五局集团第四工程有限公司 Supporting structure of tunnel in bias salt cavity environment and construction method of supporting structure
CN205936657U (en) * 2016-08-27 2017-02-08 赤峰柴胡栏子黄金矿业有限公司 Scalable removal of whole hydraulic pressure lining car
CN106593467A (en) * 2016-11-09 2017-04-26 大唐陇东能源有限公司 Supporting method for underground soft rock roadway of coal mine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101280684A (en) * 2008-05-12 2008-10-08 淮南矿业(集团)有限责任公司 Goaf surrounding rock around gob-side supporting method under three soft geological condition
CN201292852Y (en) * 2008-12-03 2009-08-19 义马煤业(集团)有限责任公司 Coal mine tunnel structure
CN102182482A (en) * 2011-04-25 2011-09-14 义马煤业集团股份有限公司跃进煤矿 Impact-resistant combined anti-pressure supporting system
CN105178979A (en) * 2015-08-28 2015-12-23 中铁二十五局集团第四工程有限公司 Supporting structure of tunnel in bias salt cavity environment and construction method of supporting structure
CN205936657U (en) * 2016-08-27 2017-02-08 赤峰柴胡栏子黄金矿业有限公司 Scalable removal of whole hydraulic pressure lining car
CN106593467A (en) * 2016-11-09 2017-04-26 大唐陇东能源有限公司 Supporting method for underground soft rock roadway of coal mine

Also Published As

Publication number Publication date
CN108180026A (en) 2018-06-19

Similar Documents

Publication Publication Date Title
CN110397453B (en) Assembly type advanced stress release pilot tunnel supporting structure capable of being recycled and construction method
CN105756685B (en) A kind of reinforced combined retaining structure of pipe-plate lining
CN108678771B (en) Primary support and middle partition wall reinforcing support device for tunnel penetrating fault fracture zone
CN104373145A (en) Anchor device with functions of embedding, constant-resistance classifying, shear resisting and large deforming and method
CN204267064U (en) Embedded classification constant-resistance shearing resistance large deformation anchor device
CN104929148B (en) The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof
CN108180026B (en) Method for protecting support is pressed in tunnel conversion under a kind of non-uniform traffic environment
CN208966352U (en) A kind of supporting construction in weak rocks matter region tunnel
CN207905830U (en) A kind of roadway support structure
CN212359785U (en) Yielding primary support structure for controlling large deformation of high-ground-stress soft rock tunnel
CN111852505A (en) Yielding primary support system for large deformation control of high-ground-stress soft rock tunnel
CN108180027A (en) Supporting construction is pressed in tunnel conversion under a kind of non-uniform traffic environment
CN103821542A (en) Anti-collision support with corrugated face
CN106120820A (en) The anchoring process of a kind of rock side slope and structure
CN219119272U (en) Tunnel primary support structure with hydraulic pressure lets pressure function
CN103557007B (en) Cross the construction method of geological anomaly zone soft-rock tunnel smashed to pieces
CN202788126U (en) Anchor bolt type column foot herringbone framework
CN212105883U (en) Rock pillar replacement system in weak surrounding rock small-clear-distance tunnel
CN212105900U (en) Anti-collapse supporting device for road bridge tunnel construction
CN113944479A (en) Unfavorable geological tunnel three-fork construction method
CN110513123B (en) Tunnel supporting system suitable for weak broken country rock
CN209539375U (en) The temporary support system of Tunnel steelframe
CN202866828U (en) Seepage-proofing structure of hydraulic high pressure, deeply buried and leakage processing of inclined tunnel
CN111219199B (en) Arch frame yielding support structure and construction method
CN110332009A (en) A kind of stirrup Flexible formwork assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190312