CN108179753A - A kind of construction method of bottom bridge pile foundation - Google Patents
A kind of construction method of bottom bridge pile foundation Download PDFInfo
- Publication number
- CN108179753A CN108179753A CN201711458098.5A CN201711458098A CN108179753A CN 108179753 A CN108179753 A CN 108179753A CN 201711458098 A CN201711458098 A CN 201711458098A CN 108179753 A CN108179753 A CN 108179753A
- Authority
- CN
- China
- Prior art keywords
- pile
- steel
- water
- cement
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/10—Placing gravel or light material under water inasmuch as not provided for elsewhere
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/40—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds in open water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0061—Production methods for working underwater
Abstract
The invention discloses a kind of construction methods of water-bed bridge pile foundation, include the following steps:(1) water-bed Bridge Pile basal plane leveling, cleaning and water-bed bridge pile foundation planar survey operation;(2) it using jet drill rig construction cement mixing method, and is carried out using cement mortar spray regime, the density domination of cement mortar is 1.1 1.2kg/cm3;(3) pile pile stake holes is formed using steel pile casting is squeezed to cement mixing method center, the inner wall of pile pile stake holes is tamped later, the steel pile casting uses thickness to be made for the steel plate of 0.8 1mm;(4) it will be sunk in stake holes using the pile sinking casing static pressure or hammering for being set to its inside with the pile pile of annular steel pile tip and reach design position, pile pile is obtained after extracting pile sinking casing, the verticality of pile pile is within 0.5% and its position deviation is not greater than 15cm, and the pile sinking casing is made of stainless steel.The present invention effectively improves the durability of water-bed bridge pile foundation.
Description
Technical field
The present invention relates to technical field of bridge construction, and in particular to a kind of construction method of bottom bridge pile foundation.
Background technology
At present, it when pile foundation construction is carried out in muck soil environment coastal, riverine, along the lake, is mostly stirred using soil cement
Mix pile-making method construction.Cement mixing method be by the use of cement as curing agent, by Mixing Machine, ground depths by weak soil and
Curing agent action of forced stirring is chemically reacted using a series of physical generated between curing agent and weak soil, makes weak soil scleroma into tool
There is the high-quality ground of globality, water stability and some strength.
The basic principle of soil-cement is the physical-chemical reaction process based on soil-cement, it and concrete hardening
Mechanism is different, and since cement mixing content is few, cement is with certain active medium -- and native is reacted under, setting rate
It is relatively slow, and complexity is acted on, after cement hydrolysis generates various hydrates with aquation, ion exchange occurs again for some and granule is turned into
With and pozzolanic reaction, greatly improve soil-cement body intensity.But due to cement soil material itself, energy is carried
Power is subject to certain restrictions, and its durability is also not as good as other pile-type, and intensity is met the requirements during construction, but as the time pushes away
It moves, is particularly subject to the influence of sulfate ion, magnesium ion and calcium ion etc. in surrounding seawater, intensity can greatly be beaten with the time
Discount brings hidden danger to the engineering in pile foundation.
Invention content
The purpose of the present invention is to provide a kind of construction methods of water-bed bridge pile foundation, can effectively solve background technology
In the technical issues of being previously mentioned.
To achieve the above object, the present invention provides following technical solution:
A kind of construction method of bottom bridge pile foundation, which is characterized in that include the following steps:
(1) water-bed Bridge Pile basal plane leveling, cleaning and water-bed bridge pile foundation planar survey operation:It is clear using underwater diver
Reason and the method for underwater demolition form work surface after excavation cleaning, as water-bed Bridge Pile basal plane, and complete water-bed bridge pile foundation
Planar survey operation;
(2) it using jet drill rig construction cement mixing method, and is carried out using cement mortar spray regime, the density of cement mortar
It controls as 1.1-1.2kg/cm3;
(3) pile pile stake holes is formed using steel pile casting is squeezed to cement mixing method center, later to pile pile stake holes
Inner wall is tamped, and the steel pile casting uses thickness to be made for the steel plate of 0.8-1mm;
(4) stake will be sunk to using the pile sinking casing static pressure or hammering for being set to its inside with the pile pile of annular steel pile tip
In hole and reach design position, extract and pile pile is obtained after pile sinking casing, the verticality of pile pile is within 0.5% and its position deviation
15cm is not greater than, the pile sinking casing is made of stainless steel;
(5) hard engineering plastic heavy wall Grouting Pipe in the cement mixing method of pile pile side is set, and is led to foundation pit
Except, lateral surface 3-4cm of the Grouting Pipe apart from cement mixing method.
Preferably, lateral surface 4cm of the Grouting Pipe apart from cement mixing method.
Preferably, the steel pile casting uses thickness to be made for the steel plate of 1mm.
Compared with prior art, the beneficial effects of the invention are as follows:
The water-bed bridge pile foundation made using the construction method of bridge pile foundation water-bed in the present invention is with safety and reliably
Property it is high, and greatly improve its durability under seawater eroding, compared to traditional cement mixing method, the water in the present invention
Bottom bridge pile foundation service life can be longer.
Specific embodiment
With reference to the embodiment technical solution that the present invention will be described in detail, but protection domain is not limited thereto.
Embodiment one:
A kind of construction method of bottom bridge pile foundation, includes the following steps:
(1) water-bed Bridge Pile basal plane leveling, cleaning and water-bed bridge pile foundation planar survey operation:It is clear using underwater diver
Reason and the method for underwater demolition form work surface after excavation cleaning, as water-bed Bridge Pile basal plane, and complete water-bed bridge pile foundation
Planar survey operation;
(2) it using jet drill rig construction cement mixing method, and is carried out using cement mortar spray regime, the density of cement mortar
It controls as 1.1-1.2kg/cm3;
(3) pile pile stake holes is formed using steel pile casting is squeezed to cement mixing method center, later to pile pile stake holes
Inner wall is tamped, and the steel pile casting uses thickness to be made for the steel plate of 0.8-1mm;
(4) stake will be sunk to using the pile sinking casing static pressure or hammering for being set to its inside with the pile pile of annular steel pile tip
In hole and reach design position, extract and pile pile is obtained after pile sinking casing, the verticality of pile pile is within 0.5% and its position deviation
15cm is not greater than, the pile sinking casing is made of stainless steel;
(5) hard engineering plastic heavy wall Grouting Pipe in the cement mixing method of pile pile side is set, and is led to foundation pit
Except, lateral surface 3-4cm of the Grouting Pipe apart from cement mixing method, between Grouting Pipe and the lateral surface of cement mixing method
Distance preferably 4cm.
The steel pile casting preferentially uses thickness to be made for the steel plate of 1mm.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with
The present invention is described in detail in good embodiment, it will be understood by those of ordinary skill in the art that, it can be to the skill of the present invention
Art scheme is modified or replaced equivalently, and without departing from the objective and range of the technical program, should all be covered in the present invention
Right in.
Claims (3)
1. a kind of construction method of bottom bridge pile foundation, which is characterized in that include the following steps:
(1) water-bed Bridge Pile basal plane leveling, cleaning and water-bed bridge pile foundation planar survey operation:Using underwater diver cleaning and
The method of underwater demolition forms work surface after excavation cleaning, as water-bed Bridge Pile basal plane, and completes water-bed Bridge Pile basal plane and surveys
Measure operation;
(2) it using jet drill rig construction cement mixing method, and is carried out using cement mortar spray regime, the density domination of cement mortar
For 1.1-1.2kg/cm3;
(3) pile pile stake holes is formed using steel pile casting is squeezed to cement mixing method center, later to the inner wall of pile pile stake holes
It is tamped, the steel pile casting uses thickness to be made for the steel plate of 0.8-1mm;
(4) it will be sunk in stake holes using the pile sinking casing static pressure or hammering for being set to its inside with the pile pile of annular steel pile tip
And reach design position, obtain pile pile after extracting pile sinking casing, pile pile verticality is within 0.5% and its position deviation must not
More than 15cm, the pile sinking casing is made of stainless steel;
(5) hard engineering plastic heavy wall Grouting Pipe in the cement mixing method of pile pile side is set, and is led to except foundation pit,
Lateral surface 3-4cm of the Grouting Pipe apart from cement mixing method.
2. the construction method of bottom bridge pile foundation according to claim 1, it is characterised in that:Grouting Pipe is stirred apart from soil cement
Mix the lateral surface 4cm of stake.
3. the construction method of bottom bridge pile foundation according to claim 1, it is characterised in that:The steel pile casting uses thickness
Steel plate for 1mm is made.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711458098.5A CN108179753A (en) | 2017-12-28 | 2017-12-28 | A kind of construction method of bottom bridge pile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711458098.5A CN108179753A (en) | 2017-12-28 | 2017-12-28 | A kind of construction method of bottom bridge pile foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108179753A true CN108179753A (en) | 2018-06-19 |
Family
ID=62548093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711458098.5A Pending CN108179753A (en) | 2017-12-28 | 2017-12-28 | A kind of construction method of bottom bridge pile foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108179753A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113338272A (en) * | 2021-06-15 | 2021-09-03 | 广州市公路工程公司 | Annular reinforcing method for thick sand layer pile foundation |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2353795Y (en) * | 1999-01-13 | 1999-12-15 | 中国建筑科学研究院地基基础研究所 | Prefabricated-tube composite pile of cement and soil |
CN2509232Y (en) * | 2001-08-31 | 2002-09-04 | 凌光荣 | Long-corn cement soil combined piles |
CN106284321A (en) * | 2016-08-17 | 2017-01-04 | 刘从波 | A kind of construction method of composite pile foundation |
-
2017
- 2017-12-28 CN CN201711458098.5A patent/CN108179753A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2353795Y (en) * | 1999-01-13 | 1999-12-15 | 中国建筑科学研究院地基基础研究所 | Prefabricated-tube composite pile of cement and soil |
CN2509232Y (en) * | 2001-08-31 | 2002-09-04 | 凌光荣 | Long-corn cement soil combined piles |
CN106284321A (en) * | 2016-08-17 | 2017-01-04 | 刘从波 | A kind of construction method of composite pile foundation |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113338272A (en) * | 2021-06-15 | 2021-09-03 | 广州市公路工程公司 | Annular reinforcing method for thick sand layer pile foundation |
CN113338272B (en) * | 2021-06-15 | 2022-07-22 | 广州市公路工程公司 | Annular reinforcing method for thick sand layer pile foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104929135A (en) | Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof | |
CN108060894A (en) | A kind of boring method under complex geological condition | |
CN106244108A (en) | A kind of water-proof repairing agent and preparation method thereof | |
CN102409666B (en) | Construction process of pile foundation in air-raid shelter trend | |
CN101985836B (en) | Processing method of pile-wall type deep base pit supporting structure in case of encountering large boulder stone | |
CN108179753A (en) | A kind of construction method of bottom bridge pile foundation | |
CN105386444B (en) | A kind of basis pile pore-forming device and forming hole method | |
CN207862925U (en) | A kind of slip casting casing device | |
CN103979880B (en) | A kind of pipeline engineering trench backfill material cement many conjunctions compound and preparation method | |
CN101769157B (en) | Construction method for tunnel working face counterpressure treatment during tunnel excavation | |
CN103343534A (en) | Closed precipitation method for foundation pit construction | |
EP3581714A1 (en) | Foundation treatment method for laying foundation structure by penetrating hardpan layer | |
CN108086897A (en) | A kind of impact drill drilling construction method | |
CN102677630A (en) | Construction method of concrete cut-off wall in sludge soil with high water content | |
CN205444192U (en) | Bridge stake is towards pile driving construction system | |
CN205205811U (en) | Drilling bit of deep submerged agitation pile | |
CN208563316U (en) | A kind of large-section in-situ concrete pile pile-end sediment sediment processing unit | |
CN202031081U (en) | Pipe sinking cast-in-place pile with soil discharge pipes | |
CN101793024B (en) | Construction method for multi-head small-diameter deep mixing and high-pressure jet combined anti-seepage wall of foundation pit | |
Shen et al. | Current state of the art in jet grouting for stabilizing soft soil | |
CN108842800A (en) | A kind of drilling backfill The End-bearing Piles Foundation and its construction method | |
CN102444137A (en) | Construction method of vacuum pre-pressed mortar enclosing wall | |
CN1429952A (en) | Application of water injection method for making plastic concrete leakage proof wall in garbage sanitary embedding field | |
CN203755326U (en) | Water stopping building envelope of soft soil foundation building foundation pit | |
CN102605775A (en) | Combination pile of flexible pile and rigid pile concentrically arranged at upper end and lower end and pile forming method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180619 |
|
RJ01 | Rejection of invention patent application after publication |