CN106284321A CN201610677687.1A CN201610677687A CN106284321A CN 106284321 A CN106284321 A CN 106284321A CN 201610677687 A CN201610677687 A CN 201610677687A CN 106284321 A CN106284321 A CN 106284321A
Authority
CN
China
Prior art keywords
pile
cement
construction method
mixing method
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610677687.1A
Other languages
Chinese (zh)
Other versions
CN106284321B (en
Inventor
刘从波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ronghua Construction Group Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610677687.1A priority Critical patent/CN106284321B/en
Publication of CN106284321A publication Critical patent/CN106284321A/en
Application granted granted Critical
Publication of CN106284321B publication Critical patent/CN106284321B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The present application relates to the construction method of a kind of composite pile foundation, comprises the steps: that (1) utilizes jet drill rig construction cement mixing method, selects jet cement powder or cement mortar according to soil property situation;(2) steel pile casting formation squeezed to cement mixing method center pile tube stake holes is utilized;(3) the pile tube utilization with annular steel pile tip is arranged at its internal pile sinking sleeve pipe static pressure or hammering sinks in stake holes and reaches design attitude;(4) pile after pile sinking sleeve pipe is extracted.The pile foundation reliability of the method construction is high, little to surrounding environment influence.Being simultaneous under littoral environment, cement mixing method easily loses durability under seawater eroding, adds detection equipment and reinforcement equipment, effectively improve the durability of pile foundation in Pile Foundations Design.

Description

A kind of construction method of composite pile foundation
Technical field
The present invention relates to the construction method of a kind of composite pile foundation, a kind of in mud environment, carry out composite pile foundation Construction method.
Background technology
At present, when carrying out pile foundation construction in coastal riverine muck soil environment along the lake, utilize Soil-cement more Pile-making method is constructed.Cement mixing method be utilize cement as firming agent, by Mixing Machine, in ground depths by weak soil and solid Agent action of forced stirring, utilizes produced series of physical chemical reaction between firming agent and weak soil, makes weak soil harden into and have The high-quality ground of globality, water stability and some strength.
The ultimate principle of soil-cement is physical-chemical reaction process based on soil-cement, it and concrete hardening Mechanism is different, and owing to cement mixing content is few, cement is to have certain active medium--soil around under react, setting rate Relatively slow, and effect complexity, after cement hydrolysis and aquation generate various hydrates, the ion of the generation again exchange having and granule are turned into With and pozzolanic reaction, make soil-cement body intensity be greatly improved.
At present, the construction method that cement mixing method is usual includes powder spray and deep mixing method.Powder spray refers to utilize The sclerosing agent (such as cement, Calx, flyash etc.) of powdered is stirred in the soil body in the range of pile by piling facility uniformly, makes Soil body hardening forms pile body;Deep mixing method is usually used in reinforcing saturated soft clay foundation, and it is to utilize the material such as cement, Calx to make For the host of firming agent, by Mixing Machine on the spot by weak soil and firming agent action of forced stirring, utilize institute between firming agent and weak soil Series of physical one chemical reaction produced, makes weak soil harden into the high-quality ground with globality, water stability and some strength.
But, due to soil cement material itself, its bearing capacity is subject to certain restrictions, and its durability is also Not as good as other pile-type, during construction, intensity meets requirement, but elapses over time, be particularly subject in a surrounding seawater sulfate radical from The impact of son, magnesium ion and calcium ion etc., its intensity can be had a greatly reduced quality over time, brings hidden danger to the engineering in pile foundation.
And utilize traditional pile tube as the pile foundation of mud soil property architectural engineering, due to pile peripheral earth limited strength, it is impossible to Good bonding and protecting is brought to pile tube;And due to coastal, along the river, top layer along the lake have some miscellaneous fills, intensity is relatively Height, damages when easily giving pile tube pile sinking so that the construction quality of pile tube is not easy to ensure.
For overcoming drawbacks described above, the present invention designs the construction method of a kind of composite pile foundation, and its periphery construction soil cement, at it Pipe pile core is made in inside.The stake that this construction method becomes can not only the anti-pressure ability of comprehensive two kinds of pile-type, but also ensure that The durability of cement earth pile and the construction quality of pile tube.
Summary of the invention
The construction method of a kind of composite pile foundation, comprises the steps: that (1) utilizes jet drill rig construction cement mixing method, Jet cement powder or cement mortar is selected according to soil property situation;(2) steel pile casting shape squeezed to cement mixing method center is utilized Become pile tube stake holes;(3) the pile tube utilization with annular steel pile tip is arranged at its internal pile sinking sleeve pipe static pressure or hammering is sunk to In stake holes and reach design attitude;(4) pile after pile sinking sleeve pipe is extracted.
After pile, hard plastics heavy wall Grouting Pipe is set in the cement mixing method of pile tube side, and is caused Outside foundation ditch.The lateral surface 2-5cm of Grouting Pipe distance cement mixing method.The Grouting Pipe of the stake of foundation ditch periphery is provided with With the nuditing wire of insulating paper parcel, wire is connected with monitoring instrument, when insulating paper is because subsoil water immersion after coming off, exposed leads Two terminations of line are turned on by water, are appreciated that cement mixing method there occurs destruction by the change of monitoring instrument.
Pile sinking sleeve pipe in step (3) is steel, and its end withstands on the interior along upper of steel pile tip, its top be provided with static pressure face or Impact surface.Pile tube carries out thickening process at phreatic line position.The weight of steel pile tip is not less than 1/8th of tubular pile body. This kind of setting is possible to prevent pile tube to be exploded, it is ensured that the service life of pile tube, ensures the perpendicularity during tube pile construction simultaneously.
The pile foundation reliability constructed according to the method for the present invention is high, little to surrounding environment influence.It is simultaneous in strand Under environment, cement mixing method easily loses durability under seawater eroding, adds detection equipment and benefit in Pile Foundations Design Strong equipment, effectively improves the durability of pile foundation.
Accompanying drawing explanation
Fig. 1 is the side view after the application construction method pile;
Fig. 2 is the side view during tube pile construction.
1-pile sinking sleeve pipe, 2-pile tube, 3-steel pile tip, 4-Grouting Pipe, 5-insulating paper, 6-wire, 7-monitoring instrument.
Detailed description of the invention
Certain engineering place ground elevation is 125~2170mm, and surface feature was Intertidal zone before the beginning of the nineties in last century, Filling out sea by artificial fill to form, geomorphic type is littoral plain now.This stratum, place in the range of depth of exploration from and Under be divided into 4 big layers.
1st layer: plain fill, thickness 1100~7180mm.Variegated, loose, mainly it is cut by pools such as rubble, block stone, sand and builds Building refuse forms, and ballast grain sizes mostly is 5~40cm, and minority is more than 100cm, and disproportionately graded, the most uneven, it is poor, between granule to sort By sand filling.Character is uneven, loosely organized, and soil layer discreteness is relatively big, has anisotropy, and thickness changes greatly.
2nd layer: silty clay interlayer, thickness 170mm.Lark, wet, soft mould, containing sand.Dry strength is medium, medium toughness, Shake reaction nothing, slightly gloss.
3rd layer: very soft sill clay, mud, thickness 9110~23150mm.Lycoperdon polymorphum Vitt, saturated, stream is moulded, and dry strength is high, Toughness is hard, the smooth slightly gloss in soil face, and shake reaction is slow, and containing organic and humus, taste is smelly, has Extra-fine sand thin layer to divide in layer Cloth.Mechanical property is poor, has high-moisture, high-compressibility, high sensitivity, low intensive feature.
4th layer: silty clay, thickness 5160~9100m.Lark, plastic, the wettest, dry strength is medium, medium toughness, Slightly gloss, local segment contains gravel.For middle compression soil, whole audience major part is distributed.
According to field survey situation, measure static level in drill hole.Phreatic water predominantly tax be stored in plain fill or Diving in very soft sill clay, mud, vertically infiltrated by Atmospheric precipitation and under surface water body impregnation slow to, runoff, with Evaporation mode is drained and is drained to the lateral runoff of adjacent domain.This prospecting during record fixed level 160~1160mm it Between, subsoil water year amplitude of variation be 15~115mm.
According to above geological condition, designing pile tube a length of 15-30 rice, stake footpath 600mm, cement earth pile is 12-25 rice, Stake footpath 1000mm.Construct cement mixing method first with jet drill rig, jet cement powder take the circumstances into consideration to add fine coal in the soil body Ash;Then steel pile casting formation squeezed to cement mixing method center pile tube stake holes is utilized;By the pipe with annular steel pile tip Stake utilization is arranged at its internal pile sinking sleeve pipe static pressure or hammering sinks in stake holes and reaches design attitude;Extract pile sinking sleeve pipe Rear pile.The last hard plastics heavy wall Grouting Pipe that arranges in the cement mixing method of the pile tube side of foundation ditch periphery, and will It causes outside foundation ditch.The lateral surface 3cm of Grouting Pipe distance cement mixing method.Grouting Pipe is provided with and wraps up with insulating paper Nuditing wire, wire is connected with monitoring instrument, when insulating paper is because subsoil water soaks after coming off, two terminations of nuditing wire Turned on by water, be appreciated that cement mixing method there occurs destruction by the change of monitoring instrument.

Claims (6)

1. the construction method of a composite pile foundation, it is characterised in that comprise the steps: that (1) utilizes jet drill rig construction cement Soil mixing pile, selects jet cement powder or cement mortar according to soil property situation;(2) utilize steel pile casting to cement mixing method centre bit Put squeezed formation pile tube stake holes;(3) pile tube with annular steel pile tip is utilized be arranged at its internal pile sinking sleeve pipe static pressure or Hammering sinks in stake holes and reaches design attitude;(4) pile after pile sinking sleeve pipe is extracted.
2. construction method as claimed in claim 1, it is characterised in that after pile, set in the cement mixing method of pile tube side Put hard plastics heavy wall Grouting Pipe, and caused outside foundation ditch.
3. construction method as claimed in claim 2, it is characterised in that the lateral surface 2-of Grouting Pipe distance cement mixing method 5cm。
4. construction method as claimed in claim 2 or claim 3, it is characterised in that be provided with in the Grouting Pipe of the stake of foundation ditch periphery With the nuditing wire of insulating paper parcel, wire is connected with monitoring instrument, when insulating paper is because subsoil water immersion after coming off, exposed leads Two terminations of line are turned on by water, are appreciated that cement mixing method there occurs destruction by the change of monitoring instrument.
5. construction method as claimed in claim 1, it is characterised in that the pile sinking sleeve pipe in step (3) is steel, and its end is pushed up On the interior edge of steel pile tip, its top is provided with static pressure face or impact surface.
6. the construction method as described in claim 1 or 5, it is characterised in that pile tube is carried out at thickening at phreatic line position Reason, the weight of steel pile tip is not less than 1/8th of tubular pile body.
CN201610677687.1A 2016-08-17 2016-08-17 A kind of construction method of composite pile foundation Active CN106284321B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610677687.1A CN106284321B (en) 2016-08-17 2016-08-17 A kind of construction method of composite pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610677687.1A CN106284321B (en) 2016-08-17 2016-08-17 A kind of construction method of composite pile foundation

Publications (2)

Publication Number Publication Date
CN106284321A true CN106284321A (en) 2017-01-04
CN106284321B CN106284321B (en) 2018-05-08

Family

ID=57678859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610677687.1A Active CN106284321B (en) 2016-08-17 2016-08-17 A kind of construction method of composite pile foundation

Country Status (1)

Country Link
CN (1) CN106284321B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108179753A (en) * 2017-12-28 2018-06-19 安徽新瑞重工股份有限公司 A kind of construction method of bottom bridge pile foundation
CN110453682A (en) * 2019-08-07 2019-11-15 启东市建筑设计院有限公司 A kind of tubular pole reinforcement system construction method
CN110847205A (en) * 2019-11-08 2020-02-28 中煤江南建设发展有限公司 Composite pile foundation structure and construction method thereof
CN112726582A (en) * 2021-01-08 2021-04-30 中国建筑第二工程局有限公司 PHC cement soil mixing composite pile construction process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008175039A (en) * 2007-01-22 2008-07-31 Yasuyuki Yamamoto Method of driving both steel pipe pile and soil cement pile
CN201411687Y (en) * 2009-02-25 2010-02-24 河海大学 Corrugated plastic sleeve pipe granule grouting pile with hole
CN202730791U (en) * 2012-08-10 2013-02-13 福建省华荣建设集团有限公司 Composite pile foundation of building
CN204326070U (en) * 2014-09-15 2015-05-13 上海宝冶集团有限公司 A kind of PHC pile tube open-type steel pile tip
CN105220700A (en) * 2015-09-11 2016-01-06 中铁第四勘察设计院集团有限公司 Foundation pit waterproof curtain reinforcement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008175039A (en) * 2007-01-22 2008-07-31 Yasuyuki Yamamoto Method of driving both steel pipe pile and soil cement pile
CN201411687Y (en) * 2009-02-25 2010-02-24 河海大学 Corrugated plastic sleeve pipe granule grouting pile with hole
CN202730791U (en) * 2012-08-10 2013-02-13 福建省华荣建设集团有限公司 Composite pile foundation of building
CN204326070U (en) * 2014-09-15 2015-05-13 上海宝冶集团有限公司 A kind of PHC pile tube open-type steel pile tip
CN105220700A (en) * 2015-09-11 2016-01-06 中铁第四勘察设计院集团有限公司 Foundation pit waterproof curtain reinforcement

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108179753A (en) * 2017-12-28 2018-06-19 安徽新瑞重工股份有限公司 A kind of construction method of bottom bridge pile foundation
CN110453682A (en) * 2019-08-07 2019-11-15 启东市建筑设计院有限公司 A kind of tubular pole reinforcement system construction method
CN110453682B (en) * 2019-08-07 2021-03-02 启东市建筑设计院有限公司 Construction method of tubular pile reinforcement system
CN110847205A (en) * 2019-11-08 2020-02-28 中煤江南建设发展有限公司 Composite pile foundation structure and construction method thereof
CN112726582A (en) * 2021-01-08 2021-04-30 中国建筑第二工程局有限公司 PHC cement soil mixing composite pile construction process

Also Published As

Publication number Publication date
CN106284321B (en) 2018-05-08

Similar Documents

Publication Publication Date Title
CN106284321B (en) A kind of construction method of composite pile foundation
CN110984213A (en) Offshore wind power single pile-friction cone composite foundation and construction method thereof
CN102888834B (en) A kind of construction method of major diameter broken stone pile
CN108589688B (en) Construction method for coral sand foundation deep vibration-impact combined with shallow water spraying impact rolling reinforcement
CN100532733C (en) Diving casting cast-in-place pile construction method for constructing in scree layer and sand layer
CN108252291A (en) The construction method of the coastal backfill super thick foundation of gravelly soil of 25000KN.m heavy tamping treatments
CN105735245B (en) The soil stabilization method of trenching construction in the hydraulic reclamation mud layer stratum of seashore
CN106381869A (en) Double-protective barrel impact pile-forming method at silt rock soil layer
CN103015396A (en) Construction method of soft foundation
CN104264653B (en) Ultra high energy level strong rammer construction technology compatible with displacement
CN105735232A (en) Collapsible loess wellpoint presoaking dynamic compaction replacement method
CN101260664A (en) Soft soil foundation large scale steel float lock head construction method
CN109056716A (en) Rubber bag tank (chamber) Post Grouting Technique is installed at manually digging hole and full-sleeve engineering method bored concrete pile bottom
Prasad et al. Improvement of soft soil performance using stone columns improved with circular geogrid discs
CN103374900A (en) Gravity wharf built on silt foundation and method for constructing gravity wharf
CN108797578A (en) Crushed stone grouting pile and its construction method with classification enlarged footing
CN101481913A (en) Construction method of rock-socketed underground continuous wall punching slot section
CN102296591A (en) Rapid drainage solidifying treatment method of soft soil foundation
CN211898504U (en) Offshore wind power single pile-friction cone composite foundation
CN110656642B (en) Method for treating collapsible loess foundation by controllable pre-soaking
CN202626934U (en) Gravity wharf built on silty foundation
Hamidi et al. Offshore ground improvement records
RU2663420C1 (en) Pile in the punched well arrangement method (embodiments)
CN110438973A (en) A kind of reinforcement means of soft foundation
CN106087957A (en) Power distribution room cable duct anti-settling method is built on a kind of coastal sludge matter soil

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhao Zhijun

Inventor after: Geng Zhaozu

Inventor after: Liu Congbo

Inventor after: Yu Yonggang

Inventor after: Yu Yizhuo

Inventor after: Pan Youchun

Inventor after: Wang Shenping

Inventor after: Nie Jianwei

Inventor after: Dong Xiuyuan

Inventor after: Liu Shunhua

Inventor after: Li Chunlin

Inventor before: Liu Congbo

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180408

Address after: 266600 Weihai Road, Laixi City, Qingdao, Shandong Province, No. 3

Applicant after: Ronghua Construction Group Co Ltd

Address before: Baoding City, Hebei province 073000 families of Hospital of Dingzhou city Xicheng District drilling team

Applicant before: Liu Congbo